04 500
10 000
12 714,29
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
River Crossing
Bird Nests
L449
Mobilization and Rig Setup
K31
Haul and String
B38
Weld
Pilot hole
A656
Coating
Reaming path 1
Rail crossing
Trench
A61
Lower-In
L556
Reaming path 2
Backfill
B35
Clear and Grub
Reaming path 3
Final Cleanup
Grade
Pull Back
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
12 714,29
19 500
04 500
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
River Crossing
Bird Nests
L449
Mobilization and Rig Setup
K31
Haul and String
B38
Weld
Pilot hole
A656
Coating
Reaming path 1
Rail crossing
Trench
A61
Lower-In
L556
Reaming path 2
Backfill
B35
Clear and Grub
Reaming path 3
Final Cleanup
Grade
Pull Back
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
06 700
05 800
4 500 10 000
10 000
14 500
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
River Crossing
Bird Nests
L449
Mobilization and Rig Setup
K31
Haul and String
B38
Weld
Pilot hole
A656
Coating
Reaming path 1
Rail crossing
Trench
A61
Lower-In
L556
Reaming path 2
Backfill
B35
Clear and Grub
Reaming path 3
Final Cleanup
Grade
Pull Back
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
6 700
13 4005 800
11 600
19 50026 700
14 500
22 000
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
Mobilization and Rig Setup
L449
Bird Nests
River Crossing
K31
Haul and String
B38
Weld
A656
Pilot hole
Coating
Rail crossing
Reaming path 1
Trench
A61
Lower-In
Reaming path 2
L556
Backfill
Reaming path 3
Clear and Grub
B35
Final Cleanup
Pull Back
Grade
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
22 000
28 288,64
26 700
35 408,33
4 500 10 000
13 400
16 879,88
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
Mobilization and Rig Setup
L449
Bird Nests
River Crossing
K31
Haul and String
B38
Weld
A656
Pilot hole
Coating
Rail crossing
Reaming path 1
Trench
A61
Lower-In
Reaming path 2
L556
Backfill
Reaming path 3
Clear and Grub
B35
Final Cleanup
Pull Back
Grade
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
28 288,64
34 577,28
35 408,33
44 116,67
16 879,88
25 333,02
11 60020 600
07 852,15
03 039,13
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
Mobilization and Rig Setup
L449
Bird Nests
River Crossing
K31
Haul and String
B38
Weld
A656
Pilot hole
Coating
Rail crossing
Reaming path 1
Trench
A61
Lower-In
Reaming path 2
L556
Backfill
Reaming path 3
Clear and Grub
B35
Final Cleanup
Pull Back
Grade
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
34 577,2840 865,92
44 116,67
47 600
25 333,0233 786,16
20 600
29 600
7 852,15
19 542,69
3 039,13
14 765,67
011 900
07 461,09
95 125,1799 670
02 607,95
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
Mobilization and Rig Setup
L449
Bird Nests
River Crossing
K31
Haul and String
B38
Weld
A656
Pilot hole
Coating
Rail crossing
Reaming path 1
Trench
A61
Lower-In
Reaming path 2
L556
Backfill
Reaming path 3
Clear and Grub
B35
Final Cleanup
Pull Back
Grade
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
40 865,92 47 154,55
33 786,16 42 239,3
29 600
38 600
19 542,69
31 233,24
14 765,67
26 492,2211 900
23 8007 461,0919 226,28
87 550,46
95 125,17
2 607,95
14 373,14
92 746,9599 670
99 145,35
99 670
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
Mobilization and Rig Setup
L449
Bird Nests
River Crossing
K31
Haul and String
B38
Weld
A656
Pilot hole
Coating
Rail crossing
Reaming path 1
Trench
A61
Lower-In
Reaming path 2
L556
Backfill
Reaming path 3
Clear and Grub
B35
Final Cleanup
Pull Back
Grade
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
47 154,55
47 600
42 239,3
47 600
38 600
47 600
31 233,24
42 923,78
26 492,22
38 218,76
23 800
35 700
19 226,28
30 991,47
79 975,75
87 550,46
14 373,14
26 138,33
85 823,992 746,95
91 824,58
99 145,35
95 355,8399 670
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
Mobilization and Rig Setup
L449
Bird Nests
River Crossing
K31
Haul and String
B38
Weld
A656
Pilot hole
Coating
Rail crossing
Reaming path 1
Trench
A61
Lower-In
Reaming path 2
L556
Backfill
Reaming path 3
Clear and Grub
B35
Final Cleanup
Pull Back
Grade
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
42 923,78 47 600
38 218,76
47 600
35 700
47 600
30 991,47
42 756,66
72 401,04 79 975,75
26 138,3337 903,52
78 900,85
85 823,9
84 503,82
91 824,58
88 165,5695 355,83
92 358,2899 670
96 295,1999 670
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
Mobilization and Rig Setup
L449
Bird Nests
River Crossing
K31
Haul and String
B38
Weld
A656
Pilot hole
Coating
Rail crossing
Reaming path 1
Trench
A61
Lower-In
Reaming path 2
L556
Backfill
Reaming path 3
Clear and Grub
B35
Final Cleanup
Pull Back
Grade
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
42 756,6647 600
64 826,3372 401,04
37 903,52
47 600
71 977,878 900,85
77 183,05
84 503,82
80 975,2888 165,56
85 046,5792 358,28
89 140,196 295,19
92 479,7299 670
97 129,9599 670
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
Mobilization and Rig Setup
L449
Bird Nests
River Crossing
K31
Haul and String
B38
Weld
A656
Pilot hole
Coating
Rail crossing
Reaming path 1
Trench
A61
Lower-In
Reaming path 2
L556
Backfill
Reaming path 3
Clear and Grub
B35
Final Cleanup
Pull Back
Grade
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
57 251,61
64 826,33
65 054,7471 977,8
69 862,2977 183,05
73 78580 975,28
77 734,85
85 046,57
81 985,02
89 140,1
85 289,44 92 479,72
89 974,86 97 129,95
93 541,8599 670
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
Mobilization and Rig Setup
L449
Bird Nests
River Crossing
K31
Haul and String
B38
Weld
A656
Pilot hole
Coating
Rail crossing
Reaming path 1
Trench
A61
Lower-In
Reaming path 2
L556
Backfill
Reaming path 3
Clear and Grub
B35
Final Cleanup
Pull Back
Grade
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
49 676,9
57 251,61
58 131,69
65 054,74
62 541,5369 862,29
66 594,72 73 785
70 423,1377 734,85
74 829,94
81 985,02
78 099,17
85 289,44
82 819,78
89 974,86
86 511,4693 541,85
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
Mobilization and Rig Setup
L449
Bird Nests
River Crossing
K31
Haul and String
B38
Weld
A656
Pilot hole
Coating
Rail crossing
Reaming path 1
Trench
A61
Lower-In
Reaming path 2
L556
Backfill
Reaming path 3
Clear and Grub
B35
Final Cleanup
Pull Back
Grade
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
47 900
49 676,9
51 208,64 58 131,69
55 220,76
62 541,53
59 404,44
66 594,72
63 111,42 70 423,13
67 674,8674 829,94
70 908,8978 099,17
75 664,7
82 819,78
78 578,84
85 609,23
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
Mobilization and Rig Setup
L449
Bird Nests
River Crossing
K31
Haul and String
B38
Weld
A656
Pilot hole
Coating
Rail crossing
Reaming path 1
Trench
A61
Lower-In
Reaming path 2
L556
Backfill
Reaming path 3
Clear and Grub
B35
Final Cleanup
Pull Back
Grade
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
47 900 51 208,6447 900
55 220,76
52 214,1759 404,44
55 799,7
63 111,42
60 519,78
67 674,86
63 718,61 70 908,89
68 509,6275 664,7
71 548,4678 578,84
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
Mobilization and Rig Setup
L449
Bird Nests
River Crossing
K31
Haul and String
B38
Weld
A656
Pilot hole
Coating
Rail crossing
Reaming path 1
Trench
A61
Lower-In
Reaming path 2
L556
Backfill
Reaming path 3
Clear and Grub
B35
Final Cleanup
Pull Back
Grade
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
47 900 52 214,1748 487,98
55 799,7
53 364,69 60 519,78
56 528,33
63 718,61
61 354,5468 509,62
64 518,0771 548,46
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
Mobilization and Rig Setup
L449
Bird Nests
River Crossing
K31
Haul and String
B38
Weld
A656
Pilot hole
Coating
Rail crossing
Reaming path 1
Trench
A61
Lower-In
Reaming path 2
L556
Backfill
Reaming path 3
Clear and Grub
B35
Final Cleanup
Pull Back
Grade
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
47 900
48 487,98
47 900 53 364,6949 338,06
56 528,33
54 199,45
61 354,54
57 487,69
64 518,07
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
Mobilization and Rig Setup
L449
Bird Nests
River Crossing
K31
Haul and String
B38
Weld
A656
Pilot hole
Coating
Rail crossing
Reaming path 1
Trench
A61
Lower-In
Reaming path 2
L556
Backfill
Reaming path 3
Clear and Grub
B35
Final Cleanup
Pull Back
Grade
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
47 900
49 338,06
47 900 54 199,45
50 457,3
57 487,69
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
Mobilization and Rig Setup
L449
Bird Nests
River Crossing
K31
Haul and String
B38
Weld
A656
Pilot hole
Coating
Rail crossing
Reaming path 1
Trench
A61
Lower-In
Reaming path 2
L556
Backfill
Reaming path 3
Clear and Grub
B35
Final Cleanup
Pull Back
Grade
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
47 900 50 457,3
0
15 000
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
Mobilization and Rig Setup
L449
Bird Nests
River Crossing
K31
Haul and String
B38
Weld
A656
Pilot hole
Coating
Rail crossing
Reaming path 1
Trench
A61
Lower-In
Reaming path 2
L556
Backfill
Reaming path 3
Clear and Grub
B35
Final Cleanup
Pull Back
Grade
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
15 000
23 000
0
15 000
98 00099 670
23 000
37 500
37 500
38 109,79
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
Mobilization and Rig Setup
L449
Bird Nests
River Crossing
K31
Haul and String
B38
Weld
A656
Pilot hole
Coating
Rail crossing
Reaming path 1
Trench
A61
Lower-In
Reaming path 2
L556
Backfill
Reaming path 3
Clear and Grub
B35
Final Cleanup
Pull Back
Grade
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
38 109,79
47 593
0
38 109,79
98 00099 670
47 59353 268,07
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
Mobilization and Rig Setup
L449
Bird Nests
River Crossing
K31
Haul and String
B38
Weld
A656
Pilot hole
Coating
Rail crossing
Reaming path 1
Trench
A61
Lower-In
Reaming path 2
L556
Backfill
Reaming path 3
Clear and Grub
B35
Final Cleanup
Pull Back
Grade
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
53 268,07 58 000
0
53 268,07
98 00099 670
58 000
79 000
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
Mobilization and Rig Setup
L449
Bird Nests
River Crossing
K31
Haul and String
B38
Weld
A656
Pilot hole
Coating
Rail crossing
Reaming path 1
Trench
A61
Lower-In
Reaming path 2
L556
Backfill
Reaming path 3
Clear and Grub
B35
Final Cleanup
Pull Back
Grade
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07
79 000
98 000
0
79 000
98 00099 670
Décapage
Epreuves hydrauliques
Finitions
Forage
Nivellement
Peinture
Pose de canalisation
Remblai
Soudure
Terrassement
Zone interdite
2013
Mars Avril Mai Juin Juillet Août
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Zone (PM) Nom (PM) Début (PM) Fin (PM) PK de début (PM) PK de fin (PM)
Pipeline Clear and Grub 11/03/2013 08:00 13/03/2013 16:00 0.0 4500.0
Pipeline Clear and Grub 14/03/2013 08:00 22/03/2013 16:00 10000.0 19500.0
Protected area 1 Bird Area 15/03/2013 08:00 14/05/2013 16:00 60000.0 55000.0
Pipeline Grade 18/03/2013 08:00 22/03/2013 16:00 0.0 4500.0
Pipeline Weld 25/03/2013 08:00 05/04/2013 16:00 0.0 11600.0
Pipeline Haul and String 25/03/2013 08:00 05/04/2013 16:00 0.0 13400.0
Pipeline Grade 25/03/2013 08:00 27/03/2013 16:00 10000.0 14500.0
Pipeline Clear and Grub 25/03/2013 08:00 29/03/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 01/04/2013 08:00 05/04/2013 16:00 19500.0 26700.0
Pipeline Grade 02/04/2013 08:00 05/04/2013 16:00 14500.0 22000.0
Pipeline Grade 08/04/2013 08:00 06/05/2013 10:50 22000.0 47600.0
Pipeline Grade 08/04/2013 08:00 11/04/2013 16:00 4500.0 10000.0
Pipeline Clear and Grub 08/04/2013 08:00 23/04/2013 16:00 26700.0 47600.0
NECKAR Mobilization and Rig Setup 08/04/2013 08:00 12/04/2013 16:00 48400.0 46800.0
L449 L449 08/04/2013 08:00 09/04/2013 16:00 2700.0 2700.0
Protected area 2 Bird Nests 08/04/2013 08:00 23/04/2013 16:00 47600.0 26700.0
Aucune River Crossing 08/04/2013 08:00 03/05/2013 16:00 48400.0 46800.0
K31 K31 10/04/2013 08:00 11/04/2013 16:00 26914.0 26914.0
Pipeline Haul and String 10/04/2013 15:32 09/05/2013 09:22 13400.0 47600.0
B38 B38 12/04/2013 08:00 12/04/2013 16:00 42302.0 42302.0
Pipeline Weld 15/04/2013 08:00 10/05/2013 16:00 11600.0 47600.0
A656 A656 15/04/2013 08:00 16/04/2013 16:00 50385.0 50385.0
NECKAR Pilot hole 15/04/2013 08:00 16/04/2013 16:00 48400.0 46800.0
Pipeline Coating 16/04/2013 13:08 14/05/2013 16:00 0.0 47600.0
MA HD Rail crossing 17/04/2013 08:00 18/04/2013 16:00 51015.0 51015.0
NECKAR Reaming path 1 17/04/2013 08:00 19/04/2013 16:00 48400.0 46800.0
Pipeline Trench 18/04/2013 13:38 16/05/2013 16:00 0.0 47600.0
A61 A61 19/04/2013 08:00 19/04/2013 16:00 64163.0 64163.0
Pipeline Lower-In 22/04/2013 08:00 17/05/2013 16:00 0.0 47600.0
NECKAR Reaming path 2 22/04/2013 08:00 23/04/2013 16:00 48400.0 46800.0
L556 L556 22/04/2013 08:00 23/04/2013 16:00 68772.0 68772.0
Pipeline Backfill 23/04/2013 14:38 22/05/2013 08:28 0.0 47600.0
NECKAR Reaming path 3 24/04/2013 08:00 26/04/2013 16:00 48400.0 46800.0
Pipeline Clear and Grub 24/04/2013 08:00 11/06/2013 09:23 99670.0 47900.0
B35 B35 24/04/2013 08:00 25/04/2013 16:00 81968.0 81968.0
Pipeline Final Cleanup 25/04/2013 15:08 24/05/2013 08:58 0.0 47600.0
NECKAR Pull Back 29/04/2013 08:00 30/04/2013 16:00 48400.0 46800.0
Pipeline Grade 29/04/2013 08:00 19/06/2013 11:07 99670.0 47900.0
NECKAR Demobilization 01/05/2013 08:00 03/05/2013 16:00 48400.0 46800.0
Pipeline Haul and String 03/05/2013 13:08 21/06/2013 16:00 99670.0 47900.0
Pipeline Weld 08/05/2013 08:00 26/06/2013 16:00 99670.0 47900.0
Pipeline Coating 13/05/2013 08:00 01/07/2013 11:13 99670.0 47900.0
Pipeline Trench 15/05/2013 13:08 04/07/2013 14:33 99670.0 47900.0
Pipeline Lower-In 20/05/2013 08:00 08/07/2013 16:00 99670.0 47900.0
Pipeline Backfill 23/05/2013 09:48 12/07/2013 11:13 99670.0 47900.0
Pipeline Final Cleanup 27/05/2013 13:08 16/07/2013 14:33 99670.0 47900.0
Pipeline Hydro - 01 16/07/2013 14:33 19/07/2013 16:00 0.0 15000.0
Pipeline Hydro - 02 22/07/2013 08:00 23/07/2013 14:33 15000.0 23000.0
Pipeline Hydro - 03 23/07/2013 14:33 26/07/2013 14:33 23000.0 37500.0
Pipeline Hydro - 04 26/07/2013 14:33 31/07/2013 14:33 37500.0 47593.0
Pipeline Hydro - 05 31/07/2013 14:33 06/08/2013 14:33 47593.0 58000.0
Pipeline Hydro - 06 06/08/2013 14:33 09/08/2013 16:00 58000.0 79000.0
Pipeline Hydro - 07 12/08/2013 08:00 16/08/2013 14:33 79000.0 98000.0
2013
Mars Avril Mai Juin Juillet Août
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 ...
Clear and Grub
Clear and Grub
Bird Area
Grade
Weld
Haul and String
Grade
Clear and Grub
Clear and Grub
Grade
Grade
Grade
Clear and Grub
Mobilization and Rig Setup
L449
Bird Nests
River Crossing
K31
Haul and String
B38
Weld
A656
Pilot hole
Coating
Rail crossing
Reaming path 1
Trench
A61
Lower-In
Reaming path 2
L556
Backfill
Reaming path 3
Clear and Grub
B35
Final Cleanup
Pull Back
Grade
Demobilization
Haul and String
Weld
Coating
Trench
Lower-In
Backfill
Final Cleanup
Hydro - 01
Hydro - 02
Hydro - 03
Hydro - 04
Hydro - 05
Hydro - 06
Hydro - 07