CASE STUDIES
HIGH VELOCITY COOLING
UNIT TECHNOLOGY
HIGH VELOCITY COOLING UNIT TECHNOLOGY
Case Transmission
Meter Body
Cap Cam Shaft
Part Name
Tonnage
No. of Cavity
Material
Problem Area
Result
Case Transmission
1250 Ton
1 no.
Aluminium
Pressure Leakage
Greatly reduced after using our HVCU System
Part Name
Tonnage
No. of Cavity
Material
Problem Area
Result
Case Transmission
530 Ton
2 no.
Aluminium
Shrinkage Porosity
Porosity reduced to a great extent [12% to 7%]
Part Name
Tonnage
No. of Cavity
Material
Problem Area
Result
Meter Body
670 Ton
1 no.
Aluminium
Shrinkage
Greatly reduced after using our HVCU System from 30%
to only 9% rejection
HIGH VELOCITY COOLING UNIT TECHNOLOGY
Engine Case Cover
Timing Case Cover
Part Name
Tonnage
No. of Cavity
Material
Problem Area
Result
Engine Case Cover
350 Ton
1 no.
Aluminium
Soldering Effect & Shrinkage Porosity
Defects reduced to a great extent [11% to 5.5%]
Part Name
Tonnage
No. of Cavity
Material
Problem Area
Result
Timing Case Cover
530 Ton
1 no.
Aluminium
Shrinkage Porosities
Porosity reduced to a great extent from 35% to only 6%