British Energy Public Meeting, Nether Stowey, Monday 20th October 2008
Richard Mayson, Nuclear Counsel© Copyright EDF Energy plc. All rights reserved. 2006. 1
Hinkley Point Nuclear New Build
Hugh Hutton
Severn Estuary Forum
Gloucester, Friday 11 September 2009
British Energy Public Meeting, Nether Stowey, Monday 20th October 2008
Richard Mayson, Nuclear Counsel© Copyright EDF Energy plc. All rights reserved. 2006. 2
About EDF Energy
•UK’s biggest electricity generator
– Nuclear
– Coal
– Gas
– Wind
– Combined heat and power
•Largest UK electricity network operator
•Gas and electricity supplier to 5.5 million customers
British Energy Public Meeting, Nether Stowey, Monday 20th October 2008
Richard Mayson, Nuclear Counsel© Copyright EDF Energy plc. All rights reserved. 2006. 3
333
Helps combat climate change
Reduces reliance on imported gas
Benefits customers and UK competitiveness
The policy case for nuclear
Low CarbonEmissions
Security of Supply
Stability of Costs
British Energy Public Meeting, Nether Stowey, Monday 20th October 2008
Richard Mayson, Nuclear Counsel© Copyright EDF Energy plc. All rights reserved. 2006. 4
EDF is committed to new nuclear in the UK
• EDF Energy intends to build four nuclear units in the UK by 2025 – subject to a robust investment framework
• EDF Energy’s target for completion of first new nuclear power station in the UK is end of 2017
• Technology choice is EPR – 1650 MWe PWR
• Preferred sites are in the south of England
• Hinkley Point in Somerset – 2x EPR
• Sizewell in Suffolk – 2x EPR
• Other sites may also be needed
British Energy Public Meeting, Nether Stowey, Monday 20th October 2008
Richard Mayson, Nuclear Counsel© Copyright EDF Energy plc. All rights reserved. 2006. 5
UK nuclear power station sites
EDF/BE nuclear power stations
Site nominated for new build*
Sizewell
Torness
Hartlepool
Dungeness
Hunterston
Heysham
Hinkley Point
Wylfa
Oldbury Bradwell
SellafieldKirksanton
Braystones
*The nomination process for potential new build sites does
not apply in Scotland
British Energy Public Meeting, Nether Stowey, Monday 20th October 2008
Richard Mayson, Nuclear Counsel© Copyright EDF Energy plc. All rights reserved. 2006. 6
Hinkley Point – new build nomination area
A B
C
A,Boutfall
A,B intake
British Energy Public Meeting, Nether Stowey, Monday 20th October 2008
Richard Mayson, Nuclear Counsel© Copyright EDF Energy plc. All rights reserved. 2006. 7
Baseline studies• Flora and fauna
• Breeding birds• Inter-tidal and inshore birds• Wintering birds• Bats• Botanical interest• Badgers, dormice, great crested newts,
water voles, otters, reptiles, invertebrates
• Marine• Fish entrainment• Plankton• Water quality• Subtidal and intertidal habitat mapping • Sediment particle size and distribution• Bathymetry (single beam, sidescan, swathe)• Intertidal topography• Waves – direction, amplitude (Waverider plus shorter term shallow water
installations)• Hydrographic surveys (fixed plus towed doppler current measurement)
British Energy Public Meeting, Nether Stowey, Monday 20th October 2008
Richard Mayson, Nuclear Counsel© Copyright EDF Energy plc. All rights reserved. 2006. 8
Cooling water discharge modelling
British Energy Public Meeting, Nether Stowey, Monday 20th October 2008
Richard Mayson, Nuclear Counsel© Copyright EDF Energy plc. All rights reserved. 2006. 9
Socio-economic impacts
• Hinkley Point B•Over 550 EDF Energy staff plus 220 from contract partners
•Apprenticeship programme – currently 21 apprentices
•Around £30million into local economy per year
• Hinkley Point C (current assumptions)•Construction 2012 to 2018 (first unit on line by end 2017)
•Construction workforce of several thousand
•60 year operational life
•600-900 operating staff
•20 year decommissioning period
British Energy Public Meeting, Nether Stowey, Monday 20th October 2008