…Real Solutions Since 1988
Boca Chica Power Project Dominican Republic
Platt’s 13th Annual Caribbean Energy Conference
Charles Parsons, Director Business Development January, 2013
Company Profile
LS Energia is a global Engineering, Procurement, and Construction (EPC), and Operation & Maintenance (O&M) company specializing in industrial and municipal-size thermal power plants. We are also developers in the D.R.
Our core business: • Turnkey Power Solutions from 50 to 500 MW • Full O&M Services and Guaranteed Availability
EPC TURN KEY PROJECT - AFRICA 5xGE TM2500+ 150MW BASE LOAD
• Headquarters: Panama • Engineering Center in Venezuela • Purchasing Center in Miami • Africa HQ: Johannesburg • Project Execution Teams in
Angola, Dominican Republic, and Venezuela
Organization
• LS Energia has built more than 60 Simple Cycle (SC) & Combined Cycle (CC) power projects since 1988
References
EPC TURN KEY PROJECT - AFRICA 5xGE TM2500+ 150MW BASE LOAD
• EPC Services: • Angola = (6 x 25 MW, 2x40MW, 2x20MW)
• O&M Services: • Angola = Extended service contracts for 4 sites • Venezuela = 1 site, (80 MW)
• IPP Project Dominican Republic = Boca Chica (100 MW)
Current Activities
Boca Chica Project
100 MW Gas-fired Electrical Power Plant
Site Location
Boca Chica is strategically located close to both the high load centers as well as the AES Andres regas facility. Sub-station and transmission capacities are adequate for over 100MW. The Site will accomodate up to three 100MW modules.
Site Location
Site Layout
Future Expansion
Source = GE Energy
Air inlet Filter
Auxiliary skid
VBV Silencer Stack
Turbine & Enclosure
Generator & Enclosure
Intercooler
Intercooler water pump skid
Intercooler air piping
Enclosure Ventilation Exhaust
Chosen Technology
• Cold start to full load in <10 mins
• Half load to full load in 1 minute
• 45% SC efficiency • Low emissions
• High hot weather output >100MW • Excellent load-
following characteristics
Flexible Dispatch GE LMS100
LMS100 fleet reliability & availability*
LMS100 reliability Current 98.9 % Mature target 99.2 %
LMS100 availability Current 95.0 % Mature target 97.1 %
LMS100 starting reliability Current 98.0 %
* Based upon latest customer data submitted as of August 29th, 2012
Source = GE Energy
Chosen Technology
Estimated Dispatch Order
In the Top 10 !
LS ENERGIA DOMINICANA and AES DOMINICANA have an agreement for the construction of an 8 Km gas pipeline from the AES LNG regasification plant to the LS Energia Boca Chica site. The accord provides for an uninterrupted supply of high quality, competitively priced natural gas to enable LS Energia to serve multiple both private and pubic off-takers.
Gas Supply Agreement
LS ENERGIA DOMINICANA has obtained committments from multiple private and public consumers of electricity sufficient to assure construction of the project. All major PPAs are close to execution.
Power Purchase Agreements
PERMISOS y NO OBJECIONES: CONCESION DEFINITIVA MEDIO AMBIENTE ETED(Empresa Transmisión Eléctrica Dominicana) MINISTERIO DE INDUSTRIA Y COMERCIO AYUNTAMIENTO BOCA CHICA MINISTERIO DE OBRA PUBLICAS MINISTERIO DE TURISMO
Permitting
The Inter-American Investment Corporation (IIC) will provide the financing for the project.
Project Financing
Summarizing…
• Project design & engineering is nearing completion
• Permitting is well advanced • Fuel supply is secured • PPAs are negotiated and ready to sign • Project Financing by IIC • Major equipment on order from OEMs • Construction begins in 2nd quarter, 2013 • COD by mid- 2014
Commercial Operation by Mid-2014
… real solutions since 1988