YOU ARE DOWNLOADING DOCUMENT

Please tick the box to continue:

Transcript
Page 1: Blackspot 1   demak 12.5

BLACKSPOT CASE STUDIES –

CENTRAL JAVA

Investigations of 8 blackspots near Semarang – April 2012

Page 2: Blackspot 1   demak 12.5

BLACKSPOT 1 – DEMAK 12.5KM

Page 3: Blackspot 1   demak 12.5
Page 4: Blackspot 1   demak 12.5

4 5 6 7 8 9 10 11 12 13 14

12.5 12.5 12.5 12.5 12.5 12.5 12.5 12.6 12.6 12.6 12.6

14/05/2011 25/09/2011 03/08/2011 31/10/2011 11/05/2011 28/11/2011 18/01/2012 18/03/2011 10/09/2011 18/08/2011 30/09/2011

21:30:00 05:00:00 06:00:00 11:30:00 17:15:00 08:00:00 19:00:00 21:30:00 05:00:00 16:30:00 20:00:00

0 0 0 0 1 1 0 0 1 1 0

0 0 0 0 0 0 0 0 0 0 0

2 1 1 2 2 1 1 3 0 0 2

3 2 2 1 2 2 3 3 2 2 3

fine fine fine fine fine fine fine fine fine fine fine

good good good good good good good good good good good

m/c m/c m/c m/c mini bus m/c m/c m/c mini bus heavy truck m/c

m/c m/c m/c m/c m/c m/c m/c

m/c

41 63 3 93 41 4 41 4 3 41 91

1 1 1 1 1 1 1 1 1 1 1

7 7 7 7 7 7 1 1 7 7 7

1 1 1 1 1 1 1 1 1 1 1

Page 5: Blackspot 1   demak 12.5

Demak 12.5km

Page 6: Blackspot 1   demak 12.5

Demak 12.5km

Page 7: Blackspot 1   demak 12.5

Demak 12.5km

Page 8: Blackspot 1   demak 12.5

Demak 12.5km

Page 9: Blackspot 1   demak 12.5

Demak 12.5km

Page 10: Blackspot 1   demak 12.5

Demak 12.5km

Page 11: Blackspot 1   demak 12.5

Demak 12.5km

Page 12: Blackspot 1   demak 12.5

Demak 12.5km

Page 13: Blackspot 1   demak 12.5

Demak 12.5km

Page 14: Blackspot 1   demak 12.5

Demak 12.5km

Page 15: Blackspot 1   demak 12.5

Demak 12.5km

Page 16: Blackspot 1   demak 12.5

Demak 12.5km

Page 17: Blackspot 1   demak 12.5

Demak 12.5km

Page 18: Blackspot 1   demak 12.5

Demak 12.5km

Page 19: Blackspot 1   demak 12.5

RECOMMENDATIONS FOR U TURN:

Speed restriction signs at 1km spacing's along

Pantura through Demak

Relocate U turn west by 15m (approx) to make a T

junction with side road

Make the U turn more conspicuous

Regulatory signs both sides

Warning signs 200m and 100m in advance

Pavement arrows – 3 pairs – both approaches

Edge line both sides of each carriageway

Paint kerbing for last 100m each approach

Page 20: Blackspot 1   demak 12.5

RECOMMENDATIONS FOR BRIDGE:

Seal the shoulder on the last 100m approaching the

bridge from the west.

Make the bridge more conspicuous

Width markers both sides

Edge line both sides of each carriageway


Related Documents