BIRDLAND PARK AND MARINA MASTER PLAN
PUBLIC INPUT MEETING 3
VIRTUAL PUBLIC MEETING
2
Meeting informationRecording and transcription will be available on City website
Visithttps://www.dsm.city/business_detail_T6_R250.php
Contact
Colby FangmanDes Moines Parks and [email protected](515) 248-6357
VIRTUAL PUBLIC MEETING
3
Participation
Mute or unmute your device
Open Participant Window
Chat feature to ask a question
1
2
3
2
3
1
AGENDA
4
1. Schedule2. Summary of Work3. Concept Refinement4. The Big Ideas
PRESENTERS
5
TOM ROGERSSmithGroup
J BLUESmithGroup
BRENT SCHIPPERAsk Studio
SUPPORT TEAM
6
CONNOR NETTSmithGroup
LEON YOUNGERPROS Consulting
GREG ROTHV&K
SCHEDULE
7
Public Information Meeting 1Kick-off
September
Community Survey 1
Public Information Meeting 3
Draft Final Master Plan
5 – ADVISORY COMMITTEE MEETINGS
SITE DATA COLLECTION AND ASSEMBLY
October November December January February MarchAugust
Public Information Meeting 2
Community Survey 2
PREFERRED CONCEPT REFINEMENT
DEVELOPMENT OF CONCEPT ALTERNATIVES
ADVISORY COMMITTEE INPUT
Final Master Plan
SITE ANALYSIS
8
N
COMMUNITY INPUT – WHAT WE HEARD
9
REGIONAL CONNECTIONS
10
[CONNECT TO BIRDLAND PARK SPORTS COMPLEX
[CONNECTIONS THROUGH UNION PARK
[CENTRAL IOWA WATER TRAIL
[NEAL SMITH TRAIL
Watertown Town Square11 smithgroup.com11 smithgroup.com
CONFLUENCEDESIGN DRIVERS – WHAT DES MOINES TOLD US
1. Trails and Connections are key to the how you use and how you want to use Birdland
2. All forms of boating – power, quiet (canoe/kayak and rowing) are equally desired at the park
3. Socializing and community activity spaces are part of what has made this park special and needs to remain as part of the fabric of this park.
4. View, experiencing and enjoying the natural characteristics of this park set it apart from other parks in the river, so close to downtown.
5. Explore opportunities for Birdland Dr. and the Birdland Dr. Bridge
12
CONCEPT A – URBAN ESCAPE
N
Concept AParking Stalls - 210Marina Slips - 90
ExistingParking Stalls - 160Marina Slips - 63
CONCEPT B – LAGOON LOOP
13
N
Concept BParking Stalls -250Marina Slips - 140
ExistingParking Stalls - 160Marina Slips - 63
14
CONCEPT C – RIVER HUB
N
Concept CParking Stalls -200Marina Slips - 160
ExistingParking Stalls - 160Marina Slips - 63
CONCEPT A – URBAN ESCAPE WITH REFINEMENTS
15
N
RELOCATE BEACH TO ISLAND
ROWING CLUB ON THE RIVER
CENTRAL BOATHOUSE
RIVER OVERLOOK
BOAT LAUNCH
DRAFT PREFERRED CONCEPT
16
N
THE BIG IDEAS
17
N
1. BIRDLAND BOATHOUSE
2. RIVER GATEWAY
3. DESTINATION PLAY
BIRDLAND BOATHOUSE
18
N
Lagoon
TOWER PRECEDENTS
19
BOATHOUSE PRECEDENTS
20
BOATHOUSE PRECEDENTS
TAMPA RIVER CENTER BOSTON COMMUNITY ROWING BOATHOUSE
AUSTIN ROWING CLUB
UNIVERSITY COLLEGE BOATHOUSE, OXFORD
UW CONIBEAR SHELLHOUSE
21
BOATHOUSE1ST FLOOR PLAN
22
BOATHOUSE2ND FLOOR PLAN
23
RIVER GATEWAY
24
N
Lagoon
Marina
RIVER GATEWAY (THE BRIDGE)
25
N
RIVER GATEWAY (THE BRIDGE)
26
N
DESTINATION PLAY
27
N
Lagoon
Wetland
Wetland
SPLASHRESTROOM / PAVILION
PLAY STRUCTURE
FOREST PLAYLAGOON STEPS
SKATE RIBBON
DESTINATION PLAY (PLAY TOWER)
28
DESTINATION PLAY (SPLASH)
29
DESTINATION (PLAY POD)
30
DESTINATION PLAY (SKATE RIBBON)
31
MARINA
32
N
Lagoon
Marina
MARINA
33
BY THE NUMBERS: TRAILS
34
Trails (Miles)
EXISTING
1.2PROPOSED
3.1
BY THE NUMBERS: PARKING
35
Parking Stalls
EXISTING
200PROPOSED
VEHICLE
361PROPOSED
TRAILER
34
72
8270
20
50
42
25
9
25
BY THE NUMBERS: PLAY
36
Play Space (Square Feet)
EXISTING
12,800PROPOSED
40,300
BY THE NUMBERS: MARINA
37
MARINA SLIPS
EXISTING
63PROPOSED
150
BY THE NUMBERS: RESTORATION
38
RESTORATION (ACRES)
23.4 Fish Pier / Overlooks
3
DRAFT PREFERRED CONCEPT
39
N
SCHEDULE
40
Public Information Meeting 1Kick-off
September
Community Survey 1
Public Information Meeting 3
Draft Final Master Plan
5 – ADVISORY COMMITTEE MEETINGS
SITE DATA COLLECTION AND ASSEMBLY
October November December January February MarchAugust
Public Information Meeting 2
Community Survey 2
PREFERRED CONCEPT REFINEMENT
DEVELOPMENT OF CONCEPT ALTERNATIVES
ADVISORY COMMITTEE INPUT
Final Master Plan
QUESTIONS