MoUDMoUD Workshop on the preparation of:Workshop on the preparation of:City Sanitation PlansCity Sanitation Plans
GTZ thrust areaGTZ thrust areaSustainable Urban Habitat Sustainable Urban Habitat
KochinKochinVaranasiVaranasi
TirupatiTirupati CityCity
Sustainable Urban Habitat Sustainable Urban Habitat
NashikNashikRaipurRaipurShimlaShimlaCityCity
CSPCSP CDMCDM
WS&SWMWS&SWMMSWMSW
InterventionIntervention
Dirk Walther (Dipl.Geol./MSc. WRM)
ReformsReforms CMPCMP
New Delhi 2New Delhi 2ndnd of August 2010of August 2010
Support on the development ofSupport on the development ofCity Sanitation PlansCity Sanitation Plans
“The Vision”“The Vision”
NUSP vision on healthy & NUSP vision on healthy & liveableliveable citiescities
Restored Water bodiesRestored Water bodies(Lakes & Rivers are ecological restored)
NUSP vision on healthy & NUSP vision on healthy & liveableliveable citiescities(Living quality in cities is enhanced and inclusive)
Open defecation free cities Open defecation free cities (100% awareness generation)
(Lakes & Rivers are ecological restored)
100% grey water treatment100% grey water treatment(no open discharge into stormwater drains))
100% black water treatment 100% black water treatment (adequacy of treatment capacity including unserved areas & floating population)
100% 100% seweredsewered citiescities(max. coverage of sewage network services)
Dirk Walther (Dipl.Geol./MSc. WRM) New Delhi 2New Delhi 2ndnd of August 2010of August 2010
Key Objectives for GTZKey Objectives for GTZ
A•• Strengthen database of ULBs pertaining to sanitation including thematic mapsStrengthen database of ULBs pertaining to sanitation including thematic maps•• Strengthen database of ULBs pertaining to sanitation including thematic mapsStrengthen database of ULBs pertaining to sanitation including thematic maps
B•• Facilitate formulation of a CTFFacilitate formulation of a CTF•• Facilitate formulation of a CTFFacilitate formulation of a CTF
C•• Strategy for awareness generation and launch of 100% sanitation campaignStrategy for awareness generation and launch of 100% sanitation campaign•• Strategy for awareness generation and launch of 100% sanitation campaignStrategy for awareness generation and launch of 100% sanitation campaign
D•• Provide technological options for various boundary conditionsProvide technological options for various boundary conditions•• Provide technological options for various boundary conditionsProvide technological options for various boundary conditions
E•• Pilot intervention in two model wardsPilot intervention in two model wards•• Pilot intervention in two model wardsPilot intervention in two model wards
•• Household surveyHousehold survey•• Household surveyHousehold surveyFF
•• Household surveyHousehold survey•• Household surveyHousehold survey
Dirk Walther (Dipl.Geol./MSc. WRM) New Delhi 2New Delhi 2ndnd of August 2010of August 2010
Steering and support structureSteering and support structure
Solid WasteSolid WasteSupport structureSupport structure
GTZ GTZ (Interventions)(Interventions)
RAYRAY
C itC itCapacity Capacity BuildingBuilding
CorporationCorporation
City Task ForceCity Task Force
GTZGTZ
(CSP on behalf (CSP on behalf ff M UDM UD))
Co po at oCo po at oPIUPIU‐‐GTZ GTZ EnvEnv. .
CellCellState Nodal State Nodal AgencyAgency
of of MoUDMoUD))
ConsultantConsultant
GISGIS‐‐CellCell
Local NGOLocal NGOSteering structureSteering structure
Local NGOLocal NGO
Dirk Walther (Dipl.Geol./MSc. WRM) New Delhi 2New Delhi 2ndnd of August 2010of August 2010
Current StatusCurrent Status
Formation of CTFs in 5 out Formation of CTFs in 5 out of 6 citiesof 6 citiesof 6 citiesof 6 cities
Preparation of StatusPreparation of Status
Dirk Walther (Dipl.Geol./MSc. WRM) New Delhi 2New Delhi 2ndnd of August 2010of August 2010
Preparation of Status Preparation of Status Report till 12Report till 12thth of Augustof August
Major ObstaclesMajor Obstacles
Availability of appropriate base maps and GIS supported informationsupported information
Information about misuse of storm sewers
Quality of financial information related to CSP
CSP endorsement through Corporation
Definition of boundary conditions for homogenous clusters
Level of detail to provide recommendations for DPRs
Dirk Walther (Dipl.Geol./MSc. WRM) New Delhi 2New Delhi 2ndnd of August 2010of August 2010
CSPCSP--Revised Time ScheduleRevised Time Schedule--
Submission of first draft Status Report
2nd week of August GTZ-SUE, Municipal Corporationp p
Status report review and presentation
Till 4th week of August GTZ–SUE, Municipal Corporations, CTF
Submission of first draft CSP 2nd week of September GTZ-SUE, Municipal CorporationCo po at o
CSP report review and presentation
Till 4th week of September GTZ-SUE, Municipal Corporation, CTF
Submission of final draft CSP
2nd week of October GTZ-SUE, Municipal Corporation MoUDCSP Corporation, MoUD
Dirk Walther (Dipl.Geol./MSc. WRM) New Delhi 2New Delhi 2ndnd of August 2010of August 2010
Green CitiesGreen Cities--Water for LifeWater for Life--
ThankThank You!You!
gs,
Thank Thank You!You!
ort
rag
eil
ig
es V
oig w
eiz
e
tel d
en
zeil
ie
r zw
Tit
ein
od
e
Dirk Walther (Dipl.Geol./MSc. WRM) New Delhi 2New Delhi 2ndnd of August 2010of August 2010