Mature fields - use of technology
John VemmestadBP
BPN03094.ppt
Mature Overall considerations - use of technology
Health, safety and environment Underlying results Framework conditions Regional coordination/cooperation Infrastructure and flexibility in commercial
agreements.
Cost versus margin
BPN03094.ppt
Modne feltUtfordinger neste 5 – 10 år?
BPN03094.ppt
Mature fields -Valhall Redevelopment
1 97 New well platform2 98 New export solutions3 99/00 Fibre optics, automation &
upgrading4 02 Water injection platform5 03 Flank development6 03 Power cable7 06/12 Upgrading/jacking or new
construction/PQ
BPN03094.ppt
Mature fields - use of technologyNew infrastructure
Gyda
Ekofisk
UlaCod
Valhall
Hod Emden
Teeside
BPN03094.ppt
Mature fields - use of technologyNew infrastructure
Gyda
Ekofisk
UlaCod
Tambar
Valhall
Hod Emden
Teeside
BPN03094.ppt
Mature fields - use of technologyFibre optic cable offers enormous opportunitiesSchiehallion &
Foinaven
Magnus
Bruce
HardingCruden Bay
Aberdeen
Ula
EkofiskValhall
Stavanger
ShetlandIslands
BPN03094.ppt
eOperations –StrategyAchieve full use of the fibre cable
SeamlessSeamlessCommsCommsO
n-lin
e
On-
line
CB
MC
BM
Operator
Operator
of of
FutureFuture VideoVideo
MonitoringMonitoring
3D
3D
Vis
ualiz
atio
n
Vis
ualiz
atio
n
Optim
ization
Optim
ization
& A
utoma
& A
utoma
-tion-tion
eOPERATIONSeOPERATIONS
BPN03094.ppt
Mature fields - use of technologyFibre optics - offers enormous opportunities
SeamlessSeamlessCommsCommsO
n-lin
e
On-
line
CB
MC
BM
Operator
Operator
of of
Future26
Future26 VideoVideoMonitoringMonitoring
3D
3D
Vis
ualiz
atio
n
Vis
ualiz
atio
n
Optim
ization
Optim
ization
& A
utoma
& A
utoma
-tion-tion
eOPERATIONSeOPERATIONSFULLY INTEGRATED OPERATIONS FULLY INTEGRATED OPERATIONS
THROUGH SEAMLESS WEB BASED THROUGH SEAMLESS WEB BASED INTERNAL AND EXTERNAL INTERNAL AND EXTERNAL
COMMUNICATIONSCOMMUNICATIONS
TV QUALITY VIDEO CONFERENCING TV QUALITY VIDEO CONFERENCING ONSHORE-OFFSHOREONSHORE-OFFSHORE
BPN03094.ppt
Mature fields - use of technologyFibre optics - offers enormous opportunities
SeamlessSeamlessCommsCommsO
n-lin
e
On-
line
CB
MC
BM
Operator
Operator
of of
FutureFuture VideoVideo
MonitoringMonitoring
3D
3D
Vis
ualiz
atio
n
Vis
ualiz
atio
n
Optim
ization
Optim
ization
& A
utoma
& A
utoma
-tion-tion
eOPERATIONSeOPERATIONS““THE SELF-DIAGNOSTIC PLATFORM” THE SELF-DIAGNOSTIC PLATFORM”
REAL TIME WEB BASED INFORMATION ON REAL TIME WEB BASED INFORMATION ON POTENTIAL PRODUCTION EFFICIENCY, POTENTIAL PRODUCTION EFFICIENCY,
MACHINERY or ENVIRONMENTAL ISSUESMACHINERY or ENVIRONMENTAL ISSUES
BPN03094.ppt
Mature fields - use of technologyFibre optics - offers enormous opportunities
SeamlessSeamlessCommsCommsO
n-lin
e
On-
line
CB
MC
BM
Operator
Operator
of of
FutureFuture VideoVideo
MonitoringMonitoring
3D
3D
Vis
ualiz
atio
n
Vis
ualiz
atio
n
Optim
ization
Optim
ization
& A
utoma
& A
utoma
-tion-tion
eOPERATIONSeOPERATIONS
THE PRODUCTION OPERATOR OF THE THE PRODUCTION OPERATOR OF THE FUTURE FUTURE
(THE WALKING CCR)(THE WALKING CCR)
WITH WIRELESS LAN COMMUNICATIONS WITH WIRELESS LAN COMMUNICATIONS LINKS TO ACCESS ALL CONTROL & PLANT LINKS TO ACCESS ALL CONTROL & PLANT OPERATIONAL DATA AND PARAMETERS, OPERATIONAL DATA AND PARAMETERS,
AS WELL AS ACCESS TO TECHNICAL AS WELL AS ACCESS TO TECHNICAL DATA FROM SHOREDATA FROM SHORE
BPN03094.ppt
Mature fields - use of technologyFibre optics - offers enormous opportunities
SeamlessSeamlessCommsCommsO
n-lin
e
On-
line
CB
MC
BM
Operator
Operator
of of
FutureFuture
VideoVideoMonitoringMonitoring
3D
3D
Vis
ualiz
atio
n
Vis
ualiz
atio
n
Optim
ization
Optim
ization
& A
utoma
& A
utoma
-tion-tion
eOPERATIONSeOPERATIONS
EXTENSIVE VIDEO MONITORING OF ALL EXTENSIVE VIDEO MONITORING OF ALL AREASAREAS
PORTABLE CAMERAS CARRIED BY PORTABLE CAMERAS CARRIED BY
OPERATORS AND MAINTENANCE STAFF.OPERATORS AND MAINTENANCE STAFF.
INTELLIGENT VIDEO MONITORING FOR: INTELLIGENT VIDEO MONITORING FOR: FIRE & GAS DETECTION FIRE & GAS DETECTION ABNORMAL OPERATIONABNORMAL OPERATION
BPN03094.ppt
Mature fields - use of technologyFibre optics - offers enormous opportunities
SeamlessSeamlessCommsCommsO
n-lin
e
On-
line
CB
MC
BM
Operator
Operator
of of
Future26
Future26
VideoVideoMonitoringMonitoring
3D
3D
Vis
ualiz
atio
n
Vis
ualiz
atio
n
Optim
ization
Optim
ization
& A
utoma
& A
utoma
-tion-tion
eOPERATIONSeOPERATIONS
OPERATIONS HIVE OPERATIONS HIVE
3D VISUALIZATION TECHNIQUES FOR 3D VISUALIZATION TECHNIQUES FOR OPERATIONS, MODIFICATIONS AND RISK OPERATIONS, MODIFICATIONS AND RISK
ANALYSISANALYSIS
BPN03094.ppt
Mature fields - use of technologyFibre optics - offers enormous opportunities
SeamlessSeamlessCommsCommsO
n-lin
e
On-
line
CB
MC
BM
Operator
Operator
of of
Future26
Future26
VideoVideoMonitoringMonitoring
3D
3D
Vis
ualiz
atio
n
Vis
ualiz
atio
n
Optim
ization
Optim
ization
& A
utoma
& A
utoma
-tion-tion
eOPERATIONSeOPERATIONS
HIGHLY AUTOMATED & FULLY HIGHLY AUTOMATED & FULLY OPTIMIZED OPERATIONS OPTIMIZED OPERATIONS
THROUGH USE OF ADVANCED CONTROL & THROUGH USE OF ADVANCED CONTROL & OPTIMIZATION TECHNIQUESOPTIMIZATION TECHNIQUES
==INCREASED PRODUCTION, REDUCED INCREASED PRODUCTION, REDUCED
SHUTDOWNS AND EMISSIONSSHUTDOWNS AND EMISSIONS
BPN03094.ppt
BPA Norge ePurchase /& ePaySolution
BPN03094.ppt
Mature fields - use of technology What are the longer term possibilities?
Forties(270MW) Ekofisk
(210MW)
”Grand Scheme” HVDC transmission scheme
Several technical options
EconomicSocial
Environmental
BPN03094.ppt
Mature fields - use of technology What are the longer term possibilities?
Forties(270MW) Ekofisk
(210MW)
Piper(165MW)
Miller(200MW)
Bruce(150MW)
”Grand Scheme” HVDC transmission scheme
Several technical options
EconomicSocial
Environmental
7 Hubs
68 platforms included
-15 excluded (short life)
Average life 15 years (base)
2 GWs offshore load
> 99.8% availability
7 million te pa CO2 saving
0.6bcf gas sales increase
> $2bn capex
BPN03094.ppt
Mature fields - use of technology What are the longer term possibilities?
Forties(270MW) Ekofisk
(210MW)
Piper(165MW)
Miller(200MW)
Bruce(150MW)
NW Hutton(650MW)
Oseberg(200MW)
Valhall alene 50MW Dedikert kabel
EconomicSocial
Environmental
”Grand Scheme” HVDC transmission scheme
Several technical options
7 Hubs
68 platforms included
-15 excluded (short life)
Average life 15 years (base)
2 GWs offshore load
> 99.8% availability
7 million te pa CO2 saving
0.6bcf gas sales increase
> $2bn capex
BPN03094.ppt
Valhall Continues Improvement Project,-in co-operation with RLG international
FocusWhere arewe going?
AccountabilityWhat is the
Score?
InvolvementWho is
Involved?
ResponseAre we
respondingappropriately?
ORGANIZATION
PEOPLE
Improved Business Decisions
Improved Bottom Line Results
More EffectiveLeadership Style
O U T C O M E S
The RLG Change Implementation Framework – The F.A.I.R. Model
How, • Working with Valhall offshore team•Identity key results areas & KPI`s•Plan, Execute, Measure & Learn•Cross function problem solving•Feedback/re-inforcement•Team leader coaching
What,• Gas process focus team – initiated to follow-up all compressor aspects•Workmate focus team –intiated to improve communication with onshore and to enhance system competencies
BPN03094.ppt
Valhall Continues Improvement Project in co-operation with RLG international
•The Score card is updated on a continues basis• Process for updating scorecard will be automated
• Currently testing a wed based balanced score card system• Starting point is Asset Performance Contracts• Drill down function to lower level KPIs• Actively used in Monthly Performance Reviews between on/offshore
BPN03094.ppt
Manned OperationsOrganisational changes
Gyda MMO
TEAM LEADER (1)
CATERING (2)
MULTISKILLED OPS. TECH (4/3)ELECTRO/INSTR./TELECOM (2)
STORE/CRANE/DECK (1)
Total 14
Today
OIM (1)
OSO (1)
NURSE (1)
FIELD OAK (0.5)
CATERING (4)
OTL-D (1)
WORKING FIREMAN (1)
PROD.TECK. (4/4)MECH.TECH. (2)
ELECTRO (3)TELECOM (1)
STOREMAN/DECK (3)SCAFFOLDING/PAINTER (2)
Total 29
NURSE(1)
BPN03094.ppt
Mature fields - use of technology What are the longer term possibilities?
Degree of change
Different is not necessarily better,
but better is different
BPN03094.ppt
Mature fields - use of technology What are the longer term possibilities?
Degree of change
Different is not necessarily better,
but better is differentHC leaks
Lifting cost
Efficiency
DAFWC
Backlog
BPN03094.ppt
Mature fieldsThe way we worked yesterday
BPN03094.ppt
The way we wish to work tomorrowThrough eOperations
BPN03094.ppt
BP Norge eProcurement
Credit card
Internet-based ordering and payment system for offshore material.
Internet system for ordering and payment of services
Internet system for small purchaces made by all users
Trade-Ranger – global oil market place
Quaris, sale of surplus material via the internet
BPAInnovation.com
BPN03094.ppt
Mature fields - use of technology What are the longer term possibilities?
Ageing
Ability/competence/willingness to change
Safety
New regulations
Human challenges
bigger than technological challenges
BPN03094.ppt
Mature fields
This presentation is available at:
www.bp.noKlick on External
Presentations
Please view: www.BPAInnovation.com