ICON ENGINEERING SERVICESP R O F I L E
2 IES
C O N T E N T SVision 4
Philosophy and Mission 5
History 6
About CEO 8
Activities at a glance 10
Equipment 12
Bored Pile 22
Driven Concrete Pile 30
Pile Load Test 34
High Strain Dynamic Testing of Pile 38
Pile Integrity Testing Work 44
Geotechnical Investigation Work 45
List of few major clients 46
4 IES
Our vision is to be a vanguard of comprehensive
geotechnical engineering service provider in
the country by power of knowledge, technology,
machinery and human resources. Our prime vision is
to develop present geotechnical engineering practice
by incorporating modern technology practiced
in developed world and to improve skills of local
engineers and entrepreneurs.
We believe in commitment to the profession,
advancement of technology and provide the best
services to the client.
Vision
Bridge 01, Hatirjheel Intregrated Development Project1200φ Depth-32m, Nos-86 bored RC pile constructed by IES
5 IES
Long back, in mid fifties of the last century, geotechnical
engineering services i.e. soil investigation and bored pile
construction has been introduced in the then East Pakistan
under the entrepreneurship of Swiss Boring, later, the
company switched over to Soiltech International Ltd in
the year of 1971, just after independence of the country.
Other than Soiltech International Ltd, few other company
grew under the leadership of local engineer, and started
practicing geotechnical engineering in real life project. But
work volume failed to attract others to this profession.
Over time, economy of the country gained momentum and
development work volume amplified but this specialized
geotechnical engineering did not move forward, rather, we
want to say, quality and services declined. Non-professionals
dominated the industry and in most cases people took it
simply as business. Now it's time to set a new benchmark
and set on our missions are to:
• Incorporate updated technology.
• Procure modern equipment and instrument.
• Improve skills of local engineers and entrepreneur.
• Develop human resources.
Philosophy & Mission
6 IES
Setting Up: 1991- 1997IES launched late in 1991 by Engr. Abu Mohammed Masud, without any financial investment and without any employee on payroll. Onset a very small geotechnical laboratory setup in a rented garage. In early 1992, Beximco Engineering Ltd awarded a small contract of bored pile work for Rangunia – Hathazaree electrical transmission line at Chittagong. That was the beginning and later in following years IES did many small diameter bored pile construction project and completed successfully. Few of them are can mentioned here- UGC building, laundry building of Hotel Sonergaon, Parishankhyan Bhaban at Agargaon, Twin tower, Concord Grand at Shantinagar, Concord Regency at Panthapath, Golf Heights at Banani, ShundarbanTechnopark at Darussalam etc and many other small building projects.
Decade for Stabilization: 1998- 2007 Onset IES faced a lot of troubles due to faulty workmanship of out sourced mechanical work that resulted in huge backlog and idle time. To overcome the crisis, IES set-up one mechanical workshop and started repair and maintenance of their own equipment and machines and IES got new momentum in site works.
During this period we have constructed bored pile by conventional method for many prestigious projects having national importance. Off them we may mentioned bored pile for Hatubhanga bridge
on Bangshi river at Mirzapore, Crown Cement Ltd at Mukterpur, Dhaka-Sylhet highway under Ircon International Ltd, Hz Shah Paran Bridge on Sylhet bi-pass road, Lafarge Surma Cement plant at Chattak under Lerson &Toubru Ltd, Kin Bridge Sylhet etc and many other projects.
During this period IES also started non-destructive pile testing work – PIT, Pile integrity test and PDA, High Strain Dynamic Testing for quality assurance test of pile foundation. Also, procured equipment for high tonnage pile load test work and conducted many pile load test having test load more than 500 ton.
Stage of Development: 2007-2012In 2007, we had under taken a large diameter bored pile work for Arch bridge on Gulshan Lake between Banani and Gulshan. Technical specification restricted the rotary boring method to follow. IES have rented one table drive rotary drilling rig for the work but failed to accomplish drilling. As a result, engineers and workers had been humiliated and insulted by the client and consultant. IES took that as challenge and started brain storming to develop a machine to accomplish the job. Finally, collected old components from Dholaykhal and assembled in their own workshop to make a drilling machine and finally succeeded and finished the piling work by newly developed rotary boring machine. This is a mile stone development of IES which boosted engineers and workers to go ahead. Presently, IES have big fleet of
History
7 IES
mechanical rotary boring machine for bored pile
construction and successfully used in many prestigious projects of the country like- Hatirjheel integrated development project, Mirpur-airport road flyover, box girder bridge on river Brhammaputra at Gaffargaon, Y-bridge on river Titas at Bancharampur, bridges on Mahananda at Chapai, Gangachara bridge on river Teesta in Rangpur etc.
Another new division started on by procuring new diesel hammers and pile drivers to undertake many projects. Such as the 22,000 Flat construction project of RAJUK. IES procured new diesel hammers from Delmag, and now, have a fleet of diesel hammers ranging from D22 to D46 with pile drivers and are on the top of the list of contractors having highest number and heaviest diesel hammers and pile drivers.
During this time IES have widened and introduced High Strain Dynamic Pile Test by procuring two sets of Pile Driving Analyzers and Pile Integrity Testers from Pile Dynamics Inc, USA and engineers and technicians obtained certification from overseas training and proficiency test from PDCA & PDI.
IES, procured 2500 ton and 1500 ton test setups and expanded their ability to conduct static pile load test up to 2500 ton. IES also procured half dozen vibrating wire load cells, displacement transducers, 16 channel data loger, readout unit fot instrumentation of static pile load test. This is anew horizon and IES become only service provider for instrumented pile load test.
Advancement with New Technology: 2013 onwardSince inception IES always looked forward with a vision to utilize modern machineries and practices essential for geotechnical engineering; and develop human resources on par with the international geotechnical sector. All their focuses are being collectively directed to become a leader of this nation’s geotechnical service providers. This has already been achieved and become the only piling and testing contractor in the country, who have introduced: Hydraulic drilling rig for bored cast-in-situ pile; fleet of new diesel hammers; CFA piling; performing static axial load tests using the most sophisticated and precise instruments—displacement transducers and load cell; and introducing dynamic testing of piles.
IES have also taken initiatives to modernize the nation’s geotechnical investigation sector. At present, IES is the only geotechnical firm to implement the usage of auto-trip hammer to carryout standard penetration test (SPT) and developed double tube thin walled vacuum sampler for collection of undisturbed soil samples. In addition, the entire operation is digitally recorded and submitted to our clients. In the process, the quality assurance is also guaranteed. Furthermore, it is also in our intention to introduce internationally accepted CPT; and seismic survey to clearly map out geotechnical features of a particular location.
8 IES
Obtained graduation degree in civil engineering from Rajshahi
Engineering College, Rajshahi, Bangladesh and started career
as junior engineer for construction of slipway for Chittagong
Port Authority and then joined specialized geotechnical
engineering German company, Soiltech International Ltd,
pioneer of geotechnical engineering in Bangladesh. During
four and half years service in Soiltech International Ltd he
himself experienced boring and installation of water wells,
construction of bored pile, driven cast-in place pile, geotechnical
investigation, pile load testing work done for different project
and started career as geotechnical engineer.
Then, went abroad worked in a geotechnical investigation and
material testing laboratory in Jeddah, KSA. He was responsible
there for doing geotechnical investigation work, asphalt mix
design, compaction test, CBR test, Marshall stability and flow
test on asphalt concrete, non-destructive concrete testing by
using ultra-sonic pulse machine and Schmidt hammer and
other routine concrete testing in laboratory.
After returning home he joined DRILLTECH and did ground
improvement work such as dynamic consolidation, ground
improvement by sand injection, construction of stone column,
determination of lateral deformation of soil by using pressure
meter, boring and installation of water well for drinking
purposes etc. During the period he became experienced in
developing equipment for different purposes.
Started his own business in 1991 under the banner of ICON
ENGINEERING SERVICES based only on past experience and
personal contact. Construction of bored RC pile, geotechnical
investigation, pile load test and driving pre-cast concrete pile
works were the main stream of the business at the beginning.
About CEOAbu Mohammed MasudB Sc Engg (Civil), FIEB
9 IES
10 IES
Activities at a glance
Summary Activities• Large Diameter Bored Casi-in-situ Pile, Especially Deep Piles. Capable to install any diameter bored pile at any depth.• Driving & Construction of Concrete Driven Piles. Capable to undertake project of any size.• Static Compression, Uplift and Lateral Pile Load Test. Capable to conduct pile load test up to 2500 ton.• Dynamic Pile Load Test & Pile Itegrity Test. Capable to test any size of pile.• Geotechnical Investigation/ Survey. For reliable, authentic and precise services.
Mile Stone Projects Acomplished• Padma Bridge, Janjeera Aproach. Bored Pile- 1200φ 40m Static Compression Pile Load test- 1350t Geotechnical Investigation• 22000 flat project of RAJUK Driving and constrction of concrete 28 to 33 m long 400mm square pre-cast pile. Static Compression Pile Load test. Dynamic load test, PDA Geotechnical Investigation• Maghbazer-Mouchack Flyover Static Compression Pile Load Test-650t Dynamic Load Test, PDA- 1500t Geotechnical Investigation• Ashugonj 450 CC Pwer Plant Static Pile Load Test, Anchor Method-1265t max• Saidabad Water Treatment Plant Phase-II Static Compression Pile Load test-800t max Pile Uplift Test- 250t Pile Dynamic Load Test, PDA Cross-hole Sonic Logging• Mirpur-Airport Road Flyover Bored Pile-1000φ 43m• Hatirjheel Integrated Development Project Bored Pile-1000φ & 750φ Pile Dynamic Load Test, PDA Static Compression Pile Load test 550t max• Mayor Hanif Flyover Pile Dynamic Load Test, PDA Pile Integrity Test, PIT• Laferge Shurma Cemement Plant Bored Pile Pile Dynamic Load Test, PDA- 1200t
Exceptional Activities
Bored Pile WorkIntroduced few activities to improve bored pile qualities.• Driving long (15m max) temporary steel casing by vibro-hammer.• Drilling by hydraulic rig. • Borehole cleaning just before pouring concrete under suction by air lift pumping.• Impact flashing of borehole by using a seperator.
Driven Pile Work• Drivavility analysis for driven concrete and steel pile.• Hammer performance analysis.• Introduced brand new single acting diesel hammer.• Automatic blow count by ESAXIMETER.
Pile Load Test Work• Load measurement by vibrating wire load cell.• Settlement meassured by dispalcement transducer.• Digital data collection by 16-channel data logger.• Concrete strain monitoring by embeded strain gauges.• Capable to conduct 2,500t static compression pile load test.• Capable to conduct 1,200t uplift pile load test.• Having 1,500t concrete block
Quality Assurance of Pile• Dynamic pile load test and dynamic analysis by PAX-8 PDA analyser.• Test done by certified engineers having profficiency certification by PDCA & PDI, USA.
Geotechnical Investigation• Use hydraulic cat head to carryout SPT – the most perfect technique.• Introduced auto-trip gear for conducting Standard Penetration Test, SPT.• Authentic SPT blow count- each & every operation captured by video footage.• Capable to drill upto 250m by using rotary boring machine.• Static sounding by electronic CPT.
Exceptional Activities
Bored Pile WorkIntroduced few activities to improve bored pile qualities.• Driving long (15m max) temporary steel casing by vibro-hammer.• Drilling by hydraulic rig. • Borehole cleaning just before pouring concrete under suction by air lift pumping.• Impact flashing of borehole by using a seperator.
Driven Pile Work• Drivavility analysis for driven concrete and steel pile.• Hammer performance analysis.• Introduced brand new single acting diesel hammer.• Automatic blow count by ESAXIMETER.
Pile Load Test Work• Load measurement by vibrating wire load cell.• Settlement meassured by dispalcement transducer.• Digital data collection by 16-channel data logger.• Concrete strain monitoring by embeded strain gauges.• Capable to conduct 2,500t static compression pile load test.• Capable to conduct 1,200t uplift pile load test.• Having 1,500t concrete block
Quality Assurance of Pile• Dynamic pile load test and dynamic analysis by PAX-8 PDA analyser.• Test done by certified engineers having profficiency certification by PDCA & PDI, USA.
Geotechnical Investigation• Use hydraulic cat head to carryout SPT – the most perfect technique.• Introduced auto-trip gear for conducting Standard Penetration Test, SPT.• Authentic SPT blow count- each & every operation captured by video footage.• Capable to drill upto 250m by using rotary boring machine.• Static sounding by electronic CPT.
11 IES
12 IES
Equi
pmen
t
Sl Item Qty
Bore
d pi
le d
ivis
ion
1 Hydraulic rotary boring rig for construction of large diameter boredRC pile - Soilmec SR-30
One
2 Hydraulic rotary boring rig for construction of large diameter bored RC pile - MAIT HR-180 One
3 Hydraulic powered double clamped vibrotary Hammer (300 HP) - ICE model 1423C One
4 Mechanical table drive rotary boring machine for construction of large diameterbored RC pile, diameter upto 1500 mm
Nine set
5 Tripod and winch based percussion boring machine for bored RC pile Nine set
6 Drum type motorised bentonyte mixing cyclone complete Four set
7 Screw type air compressor AIRMAN PDS125S, Japan Two set
8 Vacuum priming centrifugal pump for RCD drilling One set
Driv
en p
ile d
ivis
ion
1 Open ended single acting diesel hammer
1.1 Delmag D 46, Germany Two set
1.2 WICE D 46, ICE Netherland One set
1.3 WICE D 36, ICE Netherland Two set
1.4 Delmag D 30, Germany One set
1.5 Delmag D 36, Germany One set
1.6 K35, Kobe Japan Two set
1.7 K25, Kobe Japan One set
1.8 IDH22, IHI Netherland One set
2 Pile driver
2.1 Skid mounted Pile driver Six set
2.2 Footstep hydraulic pile driver TDJB62B, NHM China One set
3 E-SAXIMETER: for hammer blow count during pile driving, PDI USA One
Own plant and machinery
13 IES
Stat
ic Pi
le lo
ad te
st
1 2500 ton capacity 1700x12000 Plate Girder One set
2 1500 ton capacity 1320x8000 Plate Girder One set
3 Hot rolled standard I-Beam 150 ton
4 Hydraullic jack 800 ton capacity, India One
5 Hydraullic jack 800 ton capacity, CSLS-80012, Singapore Two
6 Hydraullic jack 100-600 ton capacity Eight
7 Vibrating-wire Load Cells 100-2000 ton capacity, 4900 Geokon USA Five
8 Automatic datalogger CR 800 model 8025-3X, Geokon USA One
9 Readout unit GK-405, Geokon USA One
10 Displacement transducer 4450-1, Geokon USA Ten
11 Concrete embedment Strain Gauge 4200 A-2, Geokon USA
12 Concrete blocks for counterweight 1600 ton
13 Concrete cribbing block 200 ton
Non-
dest
ruct
ive
test
ing 1 High strain dynamic pile test, PDA
1.1 Pile driving analyser, PDA including radio device etc plus software: CAPWAP, ICAP , GRL WEAP & PDI plot, model PAX-8 & PAX-4, pile dynamics inc, USA
Two set
1.2 Hammer, guide, trip gear etc. Four set
2 Pile integrity tester, PIT, model PIT-V, pile dynamics inc, USA One unit
3 SPT-Analyzer One set
14 IES
Conc
rete
eqp
t 1 Greaves 65XL concrete transit mixture truck, TATA 2516, 7 m3 capacityTwo set
2 SIMEM JUMPER 750 batching plant, 30 m3/hr One
3 Putzmeister concrete pump-BSA 1407 One
4 LIUGONG CLG 853 Wheel loader, 3 ton capacity One
5 Concrete mixture machine Sixteen
Pow
er g
ener
ator
Electrical Power Generator
1 150 KVA diesel generator model P-150E, FG Wilson, England One
2 100 KVA diesel generator model P-100, FG Wilson,England Two set
3 30 KVA diesel generator, SDMO & FG Wilson Five
4 Diesel engine powered A/C generator. Ten unit
5 Diesel engine powered DC arc welding mc Tow unit
6 Welding transformers 200 amps Twelve set
Vehi
cles 1 Sedan Car Two
2 Pickup Trucks Three
3 Motor bike Six
Geot
echn
ical s
urve
y
1 Spindle type rotary boring machine
1.1 Model TBM-88, Toney Boring Japan Two
1.2 Model YBM-2Z, Japan One
1.3 Model IES-100 One
2 Cable tool/percussion boring equipment Ten unit
3 Plate bearing (surface) testing equipment- including bearing plate, hydraulic jack, dial gauges, reaction frame.
Two set
4 Dynamic cone penetration testing equipment. Two set
5 Leveling machine Sokia-B20 One unit
6 Complete soil machineries laboratory One lot
15 IES
Hydraulic rotary boring rig for construction of large diameter bored RC pilesoilmec SR-30, Italy
Hydraulic rotary boring rig for construction of large diameter bored RC pileMAIT HR-180, Italy
DMS control pannel of hydraulic rigsoilmec SR-30
16 IES
Hydraulic powered doubleclamped vibrotary hammermodel ICE 1423C, Netherland
Motorized Hydraulic power packmodel ICE 300PP, Netherland
Air compressor (screw type) AIRMAN model PDS125S, Japan
17 IES
Footstep hydraulic pile drivermodel TDJB62B, NHM China
Open ended single acting diesel hammerfor driving pre-cast concrete pileDELMAG model D36, Germany
Concrete batching plant, capacity 30 m3/hr SIMEM JUMPER 750, Italy
18 IES
Concrete stationarty pump, Putzmeister model 1407C, Germany
Wheel loader, LIUGONGmodel CLG853, China
Concrete transit mixture truck capacity 7cem on TATA carrier and drum GREAVESmodel 65XL, India
19 IES
Mechanical Table drive rotary boring machine for construction for constructionof large diameter bored RC pile
Spindle type rotary drilling machine for deep boring and coring, Toney Boring
model TBM-88, Japan
Steel plate girder, 1700mm X 12000mmfor pile load test
Spindle type rotary drilling machine for deep boring and
coring model IES-100
Spindle type rotary drilling machine for deep boring and coring YBM Boring Co.model YBM-2Z, Japan
20 IES
Pile integrity testerPDI model PIT-V, USA
Pile signal analizer, TDR2, UK
PDA hardware set; Data acquisition unitmodel PAX-8 & PAX-4, with accelerometer, strain
gauges and accessories, Pile Dynamic Inc, USA
Pocket penetrometer
21 IES
800 ton capacity singel actinghydraulic jack with spherical seat
SUNRUN model CSLS-80012, Taiwan
Impact hammer blow counterSAXIMETER, Pile Dynamics Inc., USA
Motorized hydraulic power pack, 40 L tankSUNRUN model SPE-2, Taiwan
Vibrating-wire load cells, data logger, readout unit,strain gauges displacement transducerand accessories (100-2000ton)GEOKON, USA, 4900
22 IES22Bo
red
Pile Bored cast-in-situ RC pile technology is the most popular
deep foundation construction method, which introduced
in the country, by few foreign companies, since mid fifties
of last century. Unfortunately, no significant advancement
have been accomplished to improve quality, rather than
acquire few hydraulic powered rotary boring rig by general
contractors in last three to four years. Introduction of such
sophisticated hydraulic rigs is definitely a forward step but
machines by themselves do not ensure good quality.
We are Emphasising on the construction technique that
may ensure quality of bored pile as well as the economy.
We feel that quality of bored pile can be ensured by adding
a few activities in methodology such as skills of worker,
overall management and few techniques. Based on our
past experience and knowledge, we have developed and
established following activities, which can improve quality of
bored pile substantially.
Essence of our services:
• Develop proper methodology.
• Use proper equipment.
• Central quality control management.
• Proper borehole flashing technique.
• Proper concrete pouring technique.
Name of few completed Bored Pile works2013-14
1200φ & 1000φ bored pile for Gangachara bridge over river
Teesta at Rangpur under LGED. Main contractor- WMCE-
NAVANA JV.
1000φ bored pile for Khilgaon Flyover loop atKhilgaon,
Dhaka under LGED. Main contractor- WMCE-NAVANA JV
1200φ & 1000φ bored pile for bridge over river Kaliganga at
Manikgonj under LGED. Main contractor- WMCE-NAVANA JV
1200φ & 1000φ bored pile for bridges at different location
Comilla under Eastern Bangladesh Bridge Improvement
Project of RHD contract CP-03. Main contractor- Monico-
DIENCO JV
2012-2013
1000φ 45m deep bored pile for bridge on river Mahananda
at Chapai Nawabgonj under LGED. Main contractor- WMCE-
NAVANA JV
1200φ & 1000φ 52m deep bored pile for bridge on
river Titash at Bancharampur Comilla under LGED. Main
contractor- WMCE-NAVANA JV
23 IES
Hazrat Shah Paran Bridge on Sylhet Bypass,pile foundation constructed by IES
2011-2012
1250φ & 750φ 52m deep bored pile for Gaffargaon-Shaltia
bridge at Gaffargaon, Mymensingh under LGED. Main
contractor- Mir Akhter Husssin Ltd
1000φ & 750φ 43m deep bored pile for Mirpur-Airport
Road Flyover, Dhaka under 16 ECB, Corp of Engineers
Bangladesh Army. Main contractor- Mir Akhter Hossain Ltd
2010-11
900φ & 750φ 33m deep bored pile for bridge- at Uttara 3rd
Dhaka, Phase under RAJUK. Main contractor- Monico Ltd
1000φ 28m deep bored pile for bridge number: 01, 03,
04 for Hatirjheel- Begunbari Khal Intigrated Development
Project, Dhaka under 16 ECB, Corp of Engineers
Bangladesh Army.
2009-10
900φ & 1000φ 30m deep pile for clinker silo at
Meghnaghat, Narayengonj. Client- Unique Cement Ltd
2007-08
1200φ 58m deep pile for Kanaighat bridge of LGED over
river Surma at Sylhet. Main contractor- Abdul Monem Ltd,
Bangladesh
900φ 30m deep pile for Banani-Gulshan link bridge LGED
on Banani-Gulshan road, Dhaka. Main contractor- Abdul
Monem Ltd, Bangladesh
2006-07
1000φ 33m deep pile for Kin Bridge of RHD over river
Surma at Sylhet. Main contractor- Abdul Monem Ltd,
Bangladesh
2003-04
750φ 28m deep pile for 3rd Surma Shah Paran Bridge over
river Surma at Sylhet under STJRIP project of RHD. Main
contractor- Monico Ltd
750φ 27m deep pile for 225m long Hatubhanga RC
Guarder Bridge over river Bangshi at Mirzapore. Main
contractor- Monico Ltd
2003-04
1000φ & 600φ 25m deep pile for LAFARGE SURMA
CEMENT PLNT at Chattak, Sylhet. Main contractor- Laersen &
Toubro Ltd, India
2002-03
900φ & 750φ pile for Dhaka-Sylhet Road Project Contract
1-B Aushkandi-Sylhet Section under RRMP-III Project of
RHD. IRCON International Ltd, India
24 IES
Construction work of 450 MW combined cycle power plant (north), Ashugonj600φ Depth -30m bore RC pile constructed by IES
25 IES
Construction work of PGCB Head Office building, Dhaka1000φ Depth -44m Nos-330 bore RC pile constructed by IES
810m PC box girder bridge, Gaforgaon, Mymensingh700φ & 1250φ, Depth-38m & 52m Nos-203 bored RC pile constructed by IES
26 IES
Bridge No-4, Hatirjheel Integrated Development Project, Dhaka900φ, Depth-26m, Nos-91 bored RC pile constructed by IES
Bridge 01, Hatirjheel Intregrated Development Project, Dhaka1200φ Depth-32m, Nos-86 bored RC Pile constructed by IES
Banani-Gulshan link bridge LGED on Banani-Gulshan road, Dhaka 900φ, Depth-30m bored RC pile constructed by IES
27 IES
Mirpur-Airpoet Road & Overpass atBanani Rail Corssing (part-1)
1000φ, Depth-43m, Nos-243bored RC pile constructed by IES
Mohanondha Bridge, Chapainawabgong 1000φ, Depth -45m
Nos-54 constructed by IES
Construction work of PGCB Head Office building, Dhaka1000φ Depth -44m borehole flashing by air lift pumping
under reverse flow done by IES
28 IES
Clinker SILO, Fresh Cement, Meghna Ghat, Narayangonj1000φ, Depth- 27.50mNos-132 bored RC pile constructed by IES
Overpass-02, Hatirjheel Integrated Development Project Dhaka750φ Depth-26m, Nos-96 bored RC pile constructed by IES
Bridge no-10, 3rd phase of Uttara Model Town, Dhaka900φ & 1000φ, Depth-32m,Nos-118 bored RC pile constructed by IES
29 IES
Construction work of PGCBHead Office building, Dhaka
7 m long casing drivingvibratory hammer done by IES
Permanent casing driving for1000φ bored RC pile at bridge over
Kaliganga river, Manikgonj done by IES
New Academy Building,American International School Dhaka
750φ, Depth-14mNos-42 bore RC pile constructed by IES
30 IES
Driv
en C
oncr
ete
Pile
Timber trunks were used as foundation piles in ancient times
but, with time, steel and concrete took over as the preferred
materials. Driven pile technology was first introduced in
Bangladesh for the first sea port in Chittagong. Large steam
and pneumatic hammers were used in that project. But after
independence of Bangladesh in 1971, the technology not
moved forward.
Currently, Public Works Department and other government
and private organizations emphasis the use of concrete
pre-cast driven piles for building foundations. Considering
the market demand, IES procured numbers of new and
refurbished open end diesel hammers and pile drivers. At
the moment, IES has a fleet of diesel hammer based pile
drivers and skilled workers.
IES, also equipped with sophisticated software GRL WEAP
for drivability analysis and automatic hammer blow counter
ESAXIMETER of Pile Dynamics Inc, USA. Drivability analysis
and hammer performance test enable piling contractor to
select most appropriate hammer for driving piles.
31 IES
Major work done Driven Pile
2013-2014
350mm square 18m long 650 nos pre-cast pile for Judicial
Complex, Laksmipur under Public Works Department.
350mm square 33m long 2500 nos pre-cast pile for Shahid
Sayed Najrul Islam Medical College Hospital, Kishoregonj
Public Works Department.
2012-2013
400 mm square 35 m long 3800 nos pre-cast pile for Uttara
Apartment Project under RAJUK, Dhaka.
2011-2012
350mm square 15m long 617 nos pre-cast pile for Baridhara
Crown, Baridhara, Dhaka. Main contractor-
2010-2011
375mm square 19m long pre-cast pile for RAB-7 Head
Quarter Patenga, Chittagong under Public Works Department,
Chittagong.
2010-2011
350mm square 23m long 200 nos pre-cast pile for Jessore
Madical College Hospital, Jessore under Public Works
Department.
2009-2010
350mm square 15m long 1100 nos pre-cast pile for Advance
Police Town at Saver, Gazipur
2010-2011
375mm square 18m long pre-cast pile for Petromax Refinary
at Mongla, Bagerhat.
2009-2010
400mm square 18m long pre-cast pile for bridge- at
Keranigonj,Dhaka, under In Land Container Terminal (ICT) at
Pangaon, Dhaka of BIWTA.
32 IES
Uttara Apartment Project, Dhaka400mm square, 35m long, Nos-3800pre-cast pile, D46 diesel hammer in operation
Lifting of 350mm square 23m longpre-cast concrete pile to check the damagedetected by high strain dynamic test of pile
33 IES
Syed Nazrul Islam Medical College, Kishoregonj350mm square 33m long,
Nos-2800 pre-cast pile constructed by IES
Petromax Refinery Project, Mongla350mm square, 15m long,
Nos- 590 pre-cast pile K35 diesel hammer in operation
34 IES
Pile
Load
Test To evaluate movement and deformation of pile
shaft under load are the main objectives of pile load
test. During early stages, IES started pile load test
work, their 1st job was to conduct pile load test in
compression on a pre-cast concrete pile for a bridge
at Talma, PS- Boda, District- Panchagar under Local
Government Engineering Department. Journey
started at Talma with a 60t static axial pile load test,
presently capable and equipped to conduct very high
tonnage load test, up to 2500 ton test. We are now on
the top of the list of pile load testing contractor of the
country.
Apart from these, IES is now fully equipped with all
the latest technology and devices used in industrially
and technologically advanced countries. Very recently,
IES has introduced instrumented pile load test. Few of
them are mentioned below:
• Measuring applied load by load cell, up to 2000
ton,
• Pile movement measured by displacement
transducer.
• Use of hemi-spherical seat to minimize eccentric
load.
• Data logger and electric readout unit for electronic
data acquisition.
• Measuring deformation of concrete pile shaft
by using onetime concrete embedment strain
gauges at different level of pile shaft.
Presently, following pile load test services available
with us:
• High tonnage static axial compression pile load
test by kentledge method using concrete block.
• High tonnage static axial compression pile load
test by anchor method.
• High tonnage static axial uplift/ tensile pile load
test.
• Lateral pile load test.
1350 ton compressive load test by kent ledge method with 1500 ton surchange load capacity concrete block at
Zanjira approach road & selected bridge end facilities ICB: PMB/Approach Road/01 Project done by IES
Few Major WorksTest Load Project/Year Qty.
900-1350 ton Padma Bridge Approach Road- 2014 10
750-1250 ton 450 MW Ashugonj South TPP - 2013 6
550 ton Khilgaon Flyover Loop- 2013 1
650 ton Mogbazar-Mouchak Flyover- 2013 1
350- 550 ton Eastern bridge Project, Comilla 10
350- 550 ton Eastern bridge Project, Chittagong 10
550- 800 ton Mirpur-Airport Road Flyover 3
35 IES
Dhaka-Chittagong railway development project(Truck doubling between Laksham-Chinki Astana)
700 ton compressive load testby anchor method done by IES
450 MW combined cyclepower plant (south), Ashugonj
1250 ton compressive loadtest by anchore method done by IES
Upgradation of Khulna 225 MWcombined cycle power plant, Khulna
600 ton compressive loadtest by anchore method done by IES
36 IES
Vibrating-wire load cells, data logger, readout unit, strain gaugesdisplacement transducer and accessories (100-2000ton) GEOKON, USA, 4900
Saidabad water treatment plant project phase-II250 ton uplift test done by IES
Hydraulic jack, dial gauges placement for1350 ton compressive load test atZanjira approach road & selected bridge end facilitiesICB: PMB/Approach Road/01 project done by IES
37 IES
Bibiyana Expansion ProjectVertical Compression Load test
by Anchore Method done by IES
2nd Titas along with approach rail linewith all other related work
750 ton compressive load testby kent ledge method done by IES
Moghbazar-Mouchak Flyover Project. WO-06625 ton compressive load test
by kent ledge method done by IES
38 IES
High
Stra
in D
ynam
ic Te
stin
g of
Pile Estimation of pile capacity by using driving formula
were introduced in early 1940s by very prominent
engineer including Karl Terzhaghi. About a decade
later EA Smith of Raymond Pile Driving Company
developed a numerical method to estimate pile
capacity using wave propagation. Dynamic formulas
have largely been replaced by more accurate wave
equation analysis and high strain dynamic testing,
although formulas are still occasionally used in spite
of their inaccuracies and the fact that they cannot
predict stresses during driving.
Now a day, the PILE DRIVING ANALYZER system
(PDA) is the most widely employed system for
Dynamic Load Testing and pile driving monitoring
worldwide to asses the capacity of piles, PDA also
evaluates resistance profile, skin and toe resistance.
shaft integrity and investigates driving stresses and
hammer performance during pile installation.
IES procured two PDA hardware set (PAX-8 & PAX-4)
and software and have been practicing since last
few years. Few of IES engineers also took overseas
training to obtain proficiency certificate, please visit
www.pdaproficiencytest.com to see proficiency
level. Since the beginning we did PDA for projects
like, Lafarge Surma Cement Plant, 150 MW
Shikolbaha Picking Power Plant, Mayor Hanif Flyover
project, Saidabad Water Treatment Plant, Dhaka,
Hatirjheel project, 334 MW Duel Fuel Power Plant
at Meghnaghat, 443 MW Bibiana II Power Plant,
Mogbazar-Mouchak Flyover, 22000 Flat Project of
RAJUK and many more.
PAX pile driving analyzer used in high strain dynamic testing of pile
39 IES
Major PDA work finished• Syed Nazrul Islam Medical College, Kishoreganj
• 250 MW Power Plant, Burhanuddin, Bhola
• 443 MW Power Plant Bibiana-II,
• 334 MW Duel Fuel Power Plant, Meghnaghat, Narayengonj
• 22000 apartment project at Uttara 3rd phase, Dhaka
• Mayor Hanif Flyover, Dhaka
• Hatirjheel Integrated Development project, Dhaka
Equipment for PDA• Pile Dynamic Analyzer model PAX-8 and PAX-4 of Pile Dynamics Inc, USA
• Smart strain gauges
• Accelerometer piezoelectric and piezoresistive
Please visit www.pdaproficiencytest.com to see the list of certified Engineers for PDA Worldwide
Engineer's proficiency certificate for high strain dynamic testing of pile
40 IES
Strain transducer and accelerometer settingduring high strain dynamic testing of pile
Construction of 102m long Arch Bridge, Dhakacantonment- high strain dynamic testing of pile done by IES
Eastern bridge project contract-3, Kawtali bridgehigh strain dynamic testing of pile done by IES
41 IES
Bridge over Shikolbaha river, Chittagonghigh strain dynamic testing of pile done by IES
Dhaka-Chittagong Railway Development Project (DCRDP) Track doubling between Laksham and Chinki Astanahigh strain dynamic testing of pile done by IES
Moghbazar-Mouchak Flyover Project. WO-06high strain dynamic testing of pile done by IES
42 IES
546.600m long pre-stressed Girder Bridge over Mohanondha river, Chapainawabgonjhigh strain dynamic testing of pile done by IES
Sayed Nazrul Islam Medical College, Kishoregonjhigh strain dynamic testing of pile work done by IES
Force vs Velocity Graph shown afterhigh strain dynamic testing of pile field work
43 IES
344.908 MW (MET) Gas Fired combined cycle power plant, Bibiyana (II)
high strain dynamic testing workof pile done by IES
Zanjira approach road & selectedbridge facilities ICB: PMB/01
high strain dynamic testing workof pile done by IES
Saidabad water treatment plant phase-IIDhaka high strain dynamictesting of pile done by IES
44 IES
Pile
Inte
grity
Test
ing
Wor
k A pile integrity test is a method of testing deep
foundation to asses the defects, faults, change in
diameter of the pile shaft. The method also known as
low strain dynamic test, sonic echo test, and low strain
integrity test.
The technique is developed based on wave
propagation theory. A light impact is applied to a pile
top that produce a low strain. The impact produces
a compression wave that travels down the pile at a
constant wave speed and reflects when encounter a
change in cross sectional area or void/crack in material
or weak concrete.
This procedure is performed with a hand held hammer
to generate an impact, an accelerometer or geophone
placed on top of the pile to be tested to measure
the response to the hammer impact, and a data
acquisition and interpretation electronic instrument.
The test works well in concrete or timber foundations
that are not excessively slender. Usually the method is
applied to recently constructed piles that are not yet
connected to a structure
This method is standardized by ASTM with designation
D5882 “Standard Test Method for Low Strain Integrity
Testing of Piles”.
Pile Integrity tester, PDI, USA
Field PC
Geophone3.7kg Rubber Mallet
1.7kg Rubber Mallet
45 IES
Geot
echn
ical I
nves
tigat
ion
Wor
kGeotechnical investigation is an engineering practice
to evaluate soil and rock parameters those are required
for design a appropriate foundation of engineering
structure. Comprehensive, precise, detail and reliable
investigation can reduce construction cost, time
and human safety substantially. On the other hand
improper geotechnical investigation always deceives
or betrays engineers and entrepreneurs. Most of the
foundation designs are being done in Bangladesh
on the basis of SPT N-value. Many design engineers
need only SPT N-value. Due to versatility of SPT, many
correlations are available, which enables engineers
to estimate soil parameters like shear strength, unit
weight, relative density, volume compressibility etc. It
is very important to determine SPT N-value correctly,
precisely without forgery and fraudulent. Improper
instruments, instrumental error, human error,
deliberate intentions, fabrication of data in the field
by manipulation are the major cause of unreliable
SPT N-values. Upon pin pointing the causes, IES
introduced following activities in geotechnical
investigation, which can reduce un-reliabilities:
• Auto trip gear for releasing hammer- ensures
requsit energy and precludes human error.
• Proper instrument- precludes instrumental error.
• Capturization video footage of SPT activity by
digital camera- precludes data fabrication in field.
• SPT N-values re-counted from captured movie.
• Reliable lab test.
Oedometer for one dimensional consolidation test
Unconfined compression test apparatus
46 IES
Overseas Clients
MTHojgaard as, DemarkGeotechnical Investigation, Static compression & uplift pile load test, crosshole sonic logging, Pile integrity test and Pile dynamic test PDA for Saidabad Water Treatment Plant Phase-II of Dhk WASA
Simplex Infra Structure Ltd, IndiaTesting Work Gulistan-Jatrabari Flyover, Dhaka
Japan Weather Association, JapanRader station at Khepupara, Cox'sbaxer and Moulavibazer
Siam Tone Co., Ltd, ThailandRader station at Khepupara, Cox'sbaxer and Moulavibazer
Larsen & Toubro Ltd, IndiaLafarge Surma Cement Plant at Chattak
IRCON International Ltd, IndiaDhaka-Sylhet Road Project
The TATA Power Company Ltd, IndiaIshwardi-Khulna Power Transmission Project
China Geo Engineering Co, ChinaDhaka-Sylhet Road Project
China Harbor Engineering Co, ChainaAtrai river bridge on Hatikumrul-Banpara Road project
The First Northeast Electric Power Enginering Company (NEPC) 344.908 MW (NET) gas fired combined cycle power station at Bibiyana-II, Bangladesh337 MW/350 MW (NET) duel fuel combined cycle power plant Meghana Ghat, Bangladesh
LTL Global Engineering Services (Pvt.) Limited, Srilanka Constructio of 52.2 MW RAJ-LANKA power plant, Nator, Rajshahi, Bangladesh50 MW duel fuel (HFO/GAS) fired power plant, Jangalia, Comilla
Shimizu CorporationConstruction of public food storage under Peoples Republic of Bangladesh
HIFAB International ABSub regional Transport Project Preparatory Facility (Road Component: Package-2)
Rosatom Group, RussiaDrilling works at Rooppur Nuclear Power Plant
LIST OF FEW MAJOR CLIENTS
47 IES
Bangladesh Clients
Navana Construction Ltd.Monico Ltd.Mir Akter Hossain Ltd.Bangladesh RailwayAbdul Monem Ltd (AML)Islam Trading Consortium Ltd. (ITCL)Al-Amin Construction Ltd.United GroupRangs GroupConcord Engineering & Construction Ltd.Bangladesh Erectors Ltd.Pubali International Ltd.Square Pharmaceuticals Ltd.The ACME Laboratories Ltd.MI Cement Factory Ltd.Ruby Cement Heidelberg Cement GroupBuilding for Future Ltd. (BFL)Hamid Construction Ltd. (HCL)
Orion GroupSpectra Engineers Ltd.Bengle Development Corporation (BDC)National Civil EngineersMAX AutomobileToma Construction & Co. Ltd.Advanced Development TechnologiesM.M Builders & Engineers Ltd.Meghna Group of Industries LimitedNational Development Engineers Ltd. (NDE)Square Consumer Product Ltd.Dulal Brothers Ltd.Walton Hi-Tech Industries Ltd.ACI Ltd.Local Government Engineering Department (LGED)Public Works Department (PWD)Raod and Highways Department (RHD)Engineering Construction Battalion, Bangladesh Army
Bridge No-4, Hatirjheel Integrated Development Project, Dhaka 900φ, Depth-26m, Nos-91 bored RC pile constructed by IES
48 IES
Diesel hammer working principle
Cylinder
Fuel Pump
Strike Plate
Tripping Explosion Exhaust Scavanging
Ram
Air undercompression
Exhaust port
Anvil
Hammar cushion
Design: Nipun/DrikPhoto: Wahid Adnan/Drik
Production: Drik, ([email protected])
Icon Engineering Services49/1A, Purana Paltan Line, Purana PaltanDhaka-1000, BangladeshPhone: +880 (2) 8319710, 9336764 Fax: 9336764Email: [email protected]
www.iconengg.com