BILL PRICE & DAVID ELDER // 7 NOVEMBER 2013
07 NOVEMBER 2013
Building Europes Tallest
The Shard LondonBill Price & Dave Elder
CTBUH AWARDS 2013
7/23/2019 11 Shard Price
3/67
The Shard
CTBUH AWARDS 2013 THE SHARD SLIDE 2
1. Background2. Planning
3. Design Development
4. Safety
5. Top Down & Basement
6. Craneage
7. Pre-Assembly
8. The Spire
7/23/2019 11 Shard Price
4/67
The Shard Location
CTBUH AWARDS 2013 THE SHARD SLIDE 3
7/23/2019 11 Shard Price
5/67
The Shard Location
Canary WharfThe CityWest End
Westminster Tower BridgeLondon Eye
Parliament St PaulsJUBILEE LINE
CTBUH AWARDS 2013 THE SHARD SLIDE 4
7/23/2019 11 Shard Price
6/67
The Shard Location
Guys and St Thomas GLA Tower Bridge
Southwark Cathedral
London Bridge Station
More London Tower of London
CTBUH AWARDS 2013 THE SHARD SLIDE 5
7/23/2019 11 Shard Price
7/67
The Shard Height
Freedom Tower
541m
Eiffel Tower
324mThe Shard
306m
One Canada Square
235m
CTBUH AWARDS 2013 THE SHARD SLIDE 6
7/23/2019 11 Shard Price
8/67
The Shard Team
Client: Sellar Property Group on behalf of LBQ Ltd
Architect: Renzo Piano Building Workshop / Adamson Associates
Structural Engineer: WSP Group
Services Engineer: Arup
Project Manager: Turner + Townsend
Cost Consultant: Davis Langdon
Main Contractor: Mace
CTBUH AWARDS 2013 THE SHARD SLIDE 7
7/23/2019 11 Shard Price
9/67
The Shard Key Data
Gross Internal Area 127,000m2
Net Internal Area 85,000m2
Residential 5,800m2
Hotel 17,800m2
Offices 55,600m2
Retail 5,600m2
CTBUH AWARDS 2013 THE SHARD SLIDE 8
Volume of Concrete 54,000m3
Weight of Steel 11,000 Tones
Lifts 44
Area of Faade 56,000m2
Population 8,000
Car Parking Spaces 48
7/23/2019 11 Shard Price
10/67
The Shard Key People
CTBUH AWARDS 2013 THE SHARD SLIDE 9
IRVINE SELLAR
KEN LIVINGSTONERENZO PIANO
7/23/2019 11 Shard Price
11/67
The Shard Design Development
Canaletto, The Thames & The City, 1746-47
CTBUH AWARDS 2013 THE SHARD SLIDE 10
7/23/2019 11 Shard Price
12/67
The Shard Design Development
CTBUH AWARDS 2013 THE SHARD SLIDE 11
7/23/2019 11 Shard Price
13/67
The Shard Design Development
CTBUH AWARDS 2013 THE SHARD SLIDE 12
7/23/2019 11 Shard Price
14/67
The Shard Design Development
CTBUH AWARDS 2013 THE SHARD SLIDE 13
7/23/2019 11 Shard Price
15/67
The Shard Design Development
Celebration at Design museum, Irvine Sellar, Renzo Piano,
Ken Livingstone and many others present
Planning
99 00 01 02 03 04 05
Renzo Piano appointed
Design Development
Called in
(July)
Public
Inquiry
(April)
Successful
outcome (Nov)
Submit
(March)
Approval
March)
CTBUH AWARDS 2013 THE SHARD SLIDE 14
7/23/2019 11 Shard Price
16/67
The Shard Design Development
Spire 75-87 (14)
Viewing Gallery 68-72 (5)
Plant 66-67 (2)
Apartments 53-65 (13)
Hotel 34-52 (19)
Restaurants 31-33 (3)
Plant 29-30 (2)
Offices 04-28 (25)
Reception, retail 00-03 (3)
Basement plant B1-B3 (3)
CTBUH AWARDS 2013 THE SHARD SLIDE 15
7/23/2019 11 Shard Price
17/67
The Shard Design Development
CTBUH AWARDS 2013 THE SHARD SLIDE 16
7/23/2019 11 Shard Price
18/67
The Shard Design Development
CTBUH AWARDS 2013 THE SHARD SLIDE 17
7/23/2019 11 Shard Price
19/67
The Shard Wind Tunnel
CTBUH AWARDS 2013 THE SHARD SLIDE 18
7/23/2019 11 Shard Price
20/67
The Shard The Core: Shear Walls
CTBUH AWARDS 2013 THE SHARD SLIDE 19
7/23/2019 11 Shard Price
21/67
The Shard The Core: Wing Walls
CTBUH AWARDS 2013 THE SHARD SLIDE 20
7/23/2019 11 Shard Price
22/67
The Shard The Core: Hat Truss
CTBUH AWARDS 2013 THE SHARD SLIDE 21
7/23/2019 11 Shard Price
23/67
The Shard Office Levels
L09
CTBUH AWARDS 2013 THE SHARD SLIDE 22
7/23/2019 11 Shard Price
24/67
The Shard Office Levels
CTBUH AWARDS 2013 THE SHARD SLIDE 23
7/23/2019 11 Shard Price
25/67
The Shard Hotel & Residential
L45
CTBUH AWARDS 2013 THE SHARD SLIDE 24
7/23/2019 11 Shard Price
26/67
The Shard Floors: Steel V Concrete
CTBUH AWARDS 2013 THE SHARD SLIDE 25
7/23/2019 11 Shard Price
27/67
The Shard Terminology
CTBUH AWARDS 2013 THE SHARD SLIDE 26
7/23/2019 11 Shard Price
28/67
The Shard Transfers
CTBUH AWARDS 2013 THE SHARD SLIDE 27
7/23/2019 11 Shard Price
29/67
The Shard Cladding
CTBUH AWARDS 2013 THE SHARD SLIDE 28
7/23/2019 11 Shard Price
30/67
The Shard Plant
CTBUH AWARDS 2013 THE SHARD SLIDE 29
7/23/2019 11 Shard Price
31/67
The Shard Plant
CTBUH AWARDS 2013 THE SHARD SLIDE 30
7/23/2019 11 Shard Price
32/67
The Shard Plant
CTBUH AWARDS 2013 THE SHARD SLIDE 31
7/23/2019 11 Shard Price
33/67
The Shard Sustainability
Public transport hub
Mixed use building
Local jobs and training
BREEAM Excellent achievedTriple skin intelligent faade
CTBUH AWARDS 2013 THE SHARD SLIDE 32
7/23/2019 11 Shard Price
34/67
The Shard Sustainability
95% of demolition materials recycled
50% of steelwork from recycled sources
70% GGBs in basement slab (saving 700 tonnes of cement)
Natural ventilation10% Co2 saving annually from use of CHP
CTBUH AWARDS 2013 THE SHARD SLIDE 33
7/23/2019 11 Shard Price
35/67
The Shard Preconstruction
CTBUH AWARDS 2013 THE SHARD SLIDE 34
7/23/2019 11 Shard Price
36/67
The Shard Location
CTBUH AWARDS 2013 THE SHARD SLIDE 35
7/23/2019 11 Shard Price
37/67
The Shard Project Charter
Challenge
Construct the Tallest Building in Europe above
London Bridge Station
Objectives
Safely to work safely home
Be at one with our neighbours
Deliver on time and on budget
Commitment
One team culture committed to success of The Shard
A mind-set to keep the project ahead of the curve
A team that continuously delivers value
CTBUH AWARDS 2013 THE SHARD SLIDE 36
7/23/2019 11 Shard Price
38/67
The Shard Health & Safety
CTBUH AWARDS 2013 THE SHARD SLIDE 37
safely to work safely home 8 Million Man hours worked
250 million commuters thro London Bridge Station
7/23/2019 11 Shard Price
39/67
The Shard Construction Program
2009 2010 2011 2012 2013
01. Piling
02. Ground Floor
03. Top Down Construction
04. Steelframe (L00-L40)
05. Concrete Core
06. Concrete Frame (L40-L72)
07. Cladding
08. Spire (L72-L87)
09. Plant/MEP Installations
10. Physical Completion
10. Fit Out
11. Project Completion
Logistics Personnel
Snagging & Final Clean
External Works
Station Works
Internal Walls/Builderswork
S&C FinishesLift & Escalator Installations
MEP Installations & Equipment
Cladding & Envelope
Steelwork
Main Core & Superstructure Concrete
1500
1000
500
London 2012
Games
CTBUH AWARDS 2013 THE SHARD SLIDE 38
7/23/2019 11 Shard Price
40/67
The Shard Top Down Core Construction
CTBUH AWARDS 2013 THE SHARD SLIDE 39
7/23/2019 11 Shard Price
41/67
The Shard Top Down Core Construction
CTBUH AWARDS 2013 THE SHARD SLIDE 40
7/23/2019 11 Shard Price
42/67
The Shard Top Down Core Construction
CTBUH AWARDS 2013 THE SHARD SLIDE 41
7/23/2019 11 Shard Price
43/67
The Shard Top Down Core Construction
CTBUH AWARDS 2013 THE SHARD SLIDE 42
7/23/2019 11 Shard Price
44/67
The Shard Top Down Core Construction
CTBUH AWARDS 2013 THE SHARD SLIDE 43
7/23/2019 11 Shard Price
45/67
The Shard Top Down Core Construction
CTBUH AWARDS 2013 THE SHARD SLIDE 44
7/23/2019 11 Shard Price
46/67
The Shard Core Constraints
CTBUH AWARDS 2013 THE SHARD SLIDE 45
7/23/2019 11 Shard Price
47/67
The Shard Basement Construction
CTBUH AWARDS 2013 THE SHARD SLIDE 46
7/23/2019 11 Shard Price
48/67
The Shard Basement Construction
CTBUH AWARDS 2013 THE SHARD SLIDE 47
7/23/2019 11 Shard Price
49/67
The Shard Top Down Core Construction
CTBUH AWARDS 2013 THE SHARD SLIDE 48
7/23/2019 11 Shard Price
50/67
The Shard Craneage Strategy
Dont compromise on crane positions, consider
the optimum location for each stage of the project
Crane strategy need to adapt the
progress on the works
CTBUH AWARDS 2013 THE SHARD SLIDE 49
7/23/2019 11 Shard Price
51/67
The Shard Craneage Strategy
CTBUH AWARDS 2013 THE SHARD SLIDE 50
7/23/2019 11 Shard Price
52/67
The Shard Craneage Strategy
CTBUH AWARDS 2013 THE SHARD SLIDE 51
7/23/2019 11 Shard Price
53/67
The Shard Craneage Strategy
CTBUH AWARDS 2013 THE SHARD SLIDE 52
7/23/2019 11 Shard Price
54/67
The Shard Craneage Strategy
CTBUH AWARDS 2013 THE SHARD SLIDE 53
7/23/2019 11 Shard Price
55/67
The Shard British Weather/Downtime
CTBUH AWARDS 2013 THE SHARD SLIDE 54
7/23/2019 11 Shard Price
56/67
The Shard British Weather/Downtime
CTBUH AWARDS 2013 THE SHARD SLIDE 55
Affected by season
Affected by height
Activity
Unpredictable at Height
2010
2011
2012
Height 0m to 100m
Height 100m to 200m
Height 200m to 300m
J F M A M J J A S O N D
21% 19% 24% 17% 24% 21% 23% 15% 52% 51% 44% 41%
J F M A M J J A S O N D
10% 8% 17% 7% 0% 6% 16% 16% 30% 29% 34% 27%
J F M A M J J A S O N D
80% 68% 68% 54% 53%
7/23/2019 11 Shard Price
57/67
The Shard Hoists
CTBUH AWARDS 2013 THE SHARD SLIDE 56
http://www.cybertects.co.uk/gallery2/v/architecture/london/shard/20100525_0136.jpg.html?g2_imageViewsIndex=17/23/2019 11 Shard Price
58/67
The Shard Cladding
CTBUH AWARDS 2013 THE SHARD SLIDE 57
7/23/2019 11 Shard Price
59/67
The Shard Jump Lifts
CTBUH AWARDS 2013 THE SHARD SLIDE 58
Deflection deck
Protection deck
Working Deck
Install Platform
Cathead
Elevator
Doors
Rope Drum
7/23/2019 11 Shard Price
60/67
The Shard Jump Lifts
CTBUH AWARDS 2013 THE SHARD SLIDE 59
7/23/2019 11 Shard Price
61/67
The Shard RC Frame/Screens
CTBUH AWARDS 2013 THE SHARD SLIDE 60
7/23/2019 11 Shard Price
62/67
The Shard Pre-Assembly: Plant
CTBUH AWARDS 2013 THE SHARD SLIDE 61
7/23/2019 11 Shard Price
63/67
The Shard Pre-Assembly: Spire
CTBUH AWARDS 2013 THE SHARD SLIDE 62
7/23/2019 11 Shard Price
64/67
The Shard Pre-Assembly: Spire
CTBUH AWARDS 2013 THE SHARD SLIDE 63
7/23/2019 11 Shard Price
65/67
The Shard Pre-Assembly: Spire
CTBUH AWARDS 2013 THE SHARD SLIDE 64
March 2012
7/23/2019 11 Shard Price
66/67
The Shard The Spire
CTBUH AWARDS 2013 THE SHARD SLIDE 65
May/June 2012
7/23/2019 11 Shard Price
67/67
The Shard Inauguration Ceremony
July 2012