10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
10 SEMSinar™ Series, Part 7,Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
Don’t over work this issue, you already have the information
Inspection criteria requirements
How much in the way of supplies are you required to have
Software to Automate your Mechanical Integrity Program & Pre
startup review
10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
IntroductionBrady Austin – Webinar PresenterSEMS and Regulatory Compliance Expert
Ken Smith- PanelistCEO – SEMS Services
Ed Sattar - PanelistCEO, 360Factors.com
George Bunker- PanelistDrilling EHS Professional
Ron White - PanelistVP Operaions, I3P, LLC – SEMS Audit Service Provider (ASP)
10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
10 SEMSinar™ Series, Part 7,Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
Don’t over work this issue, you already have the information
Inspection criteria requirements
How much in the way of supplies are you required to have
Software to Automate your Mechanical Integrity Program & Pre
startup review
10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
Don’t over work this issue, you already have the information
You must develop and implement written procedures that provide instructions to ensure the mechanical integrity and safe operation of critical equipment through inspection, testing, and quality assurance.
Your mechanical integrity program must encompass all equipment and systems used to prevent or mitigate uncontrolled releases of hydrocarbons, toxic substances, or other materials that may cause environmental or safety consequences.
Your procedures must address the design, procurement, fabrication, installation, calibration, and maintenance of your equipment and systems in accordance with the manufacturer’s design and material specifications.
10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
10 SEMSinar™ Series, Part 7,Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
Don’t over work this issue, you already have the information
Inspection criteria requirements
How much in the way of supplies are you required to have
Software and Tools to Scale and Automate your SEMs Compliance
10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
Is compliance risk?Inspection criteria requirements
The frequency of inspections and tests must be in accordance with BSEE
regulations and meet the manufacturer’s recommendations.
Inspections and tests can be performed more frequently if determined to be
necessary by prior operating experience.
Documentation must identify the individual who performed the inspection or
test; include a description of the inspection or test performed and the results of
the inspection test.
10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
Your SEMS program must require that the commissioning process include
a pre-startup safety and environmental review.
Below are a few of the criteria that should be met:
a) Construction and equipment are in accordance with applicable specifications.
b) Safety, environmental, operating, maintenance, and emergency procedures are in place and are adequate.
c) Safety and environmental information is current.
d) Hazards analysis recommendations have been implemented as appropriate.
e) Training of operating personnel has been completed.
f) Programs to address management of change and other elements of this subpart are in place.
g) Safe work practices are in place.
Pre-Start Up Review
10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
10 SEMSinar™ Series, Part 7,Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
Don’t over work this issue, you already have the information
Inspection criteria requirements
How much in the way of supplies are you required to have
Software and Tools to Scale and Automate your SEMs Compliance
10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
How much in the way of supplies are you required to have?
10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
10 SEMSinar™ Series, Part 7,Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
Don’t over work this issue, you already have the information
Inspection criteria requirements
How much in the way of supplies are you required to have
Software to Automate your Mechanical Integrity Program & Pre
startup review
10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
Mechanical Integrity Automation through Software
10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
Policy and Procedure Automation
10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
Automate Your Mechanical Integrity Program
10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
Continuous Third Party Audits..
10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
Thank You for Attending 10 SEMSinar™ Series, Part 7,
10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
Thank You for Attending 10 SEMSinar™ Series, Part 6,
Contact Information
Steve PattersonVP of [email protected]
Corporate Headquarters360Factors, Inc13801 Burnet Road Suite 100Austin Texas, 78727Phone: 866-385-2341
10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
To Be Continued...
• Semptember SEMSinar™ Part 8 Element 10 - Emergency Response & Control
Date & Time will be sent to you