YOU ARE DOWNLOADING DOCUMENT

Please tick the box to continue:

Transcript
Page 1: 1 BOSTON PLANT RESEARCH PROPOSAL Amy CroxtonJeffrey Reich Euston LewisClinton Smith Erica Mack.

1

BOSTON PLANT RESEARCHPROPOSAL

Amy Croxton Jeffrey Reich

Euston Lewis Clinton Smith

Erica Mack

Page 2: 1 BOSTON PLANT RESEARCH PROPOSAL Amy CroxtonJeffrey Reich Euston LewisClinton Smith Erica Mack.

2

GUN PATCHES

Page 3: 1 BOSTON PLANT RESEARCH PROPOSAL Amy CroxtonJeffrey Reich Euston LewisClinton Smith Erica Mack.

3

HISTORY

• Founded in 1987 in Trenton, NJ• 20 US Offices, 12 International Offices• Designs include

--Olympic village, Aquatic Center @ GA Tech, BMW plant near GSP

• Awards include--American Design Firm of the Year (6 years running)

Page 4: 1 BOSTON PLANT RESEARCH PROPOSAL Amy CroxtonJeffrey Reich Euston LewisClinton Smith Erica Mack.

4

PROPOSAL

In response to your request (Fox-Rich Textiles), we propose:

--Boston Pilot Cutting Plant near Fox-Rich Textiles in Fall River, Mass.

Page 5: 1 BOSTON PLANT RESEARCH PROPOSAL Amy CroxtonJeffrey Reich Euston LewisClinton Smith Erica Mack.

5

PILOT PLANT

Page 6: 1 BOSTON PLANT RESEARCH PROPOSAL Amy CroxtonJeffrey Reich Euston LewisClinton Smith Erica Mack.

6

DIE CUTTER

Page 7: 1 BOSTON PLANT RESEARCH PROPOSAL Amy CroxtonJeffrey Reich Euston LewisClinton Smith Erica Mack.

7

POSITIVE IMPACTS

• Reduced material transportation costs• Increased profits• Increased flexibility• No waste• Community• Possibility to be subcontracted• Increased economy

Page 8: 1 BOSTON PLANT RESEARCH PROPOSAL Amy CroxtonJeffrey Reich Euston LewisClinton Smith Erica Mack.

8

SHIPPING

Monthly Shipping Costs

$0

$10,000$20,000

$30,000$40,000

$50,000$60,000

$70,000

Contracted Plant Pilot Plant

Plants

Co

st

Page 9: 1 BOSTON PLANT RESEARCH PROPOSAL Amy CroxtonJeffrey Reich Euston LewisClinton Smith Erica Mack.

9

PLANT COSTS

51,000

105,000

$0

$20,000

$40,000

$60,000

$80,000

$100,000

$120,000

Pilot Plant Contracted Plant

Total Plant Costs (based on 20,000,000 patches)

Page 10: 1 BOSTON PLANT RESEARCH PROPOSAL Amy CroxtonJeffrey Reich Euston LewisClinton Smith Erica Mack.

10

COSTS

Number of Patches vs Cost of Patch

0

0.0010.002

0.003

0.004

0.0050.006

0.007

0.008

20 23 26 29 32 35 38

Number of patches (millions)

Co

st p

er P

atch

Contracted Plant

Pilot Plant

Page 11: 1 BOSTON PLANT RESEARCH PROPOSAL Amy CroxtonJeffrey Reich Euston LewisClinton Smith Erica Mack.

11

NEGATIVE IMPACTS

• Increased expenses

• Start-up costs

• Increased responsibility

• Infrastructure overload

Page 12: 1 BOSTON PLANT RESEARCH PROPOSAL Amy CroxtonJeffrey Reich Euston LewisClinton Smith Erica Mack.

12

CONCLUSION

• Results of implementing proposal– Savings of at least $40,000 per month– In house policies– Ability to control costs

• Why can’t you wait?– IT’S HUNTIN’ SEASON!


Related Documents