Lean Six Sigma Yellow Belt Training
View the full interactive online version by signing up at
http://www.goleansixsigma.com/free-lean-six-sigma-training/
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�1 467
-
!
1. Yellow Belt Online Training
1.1 Welcome to Yellow Belt Training
A
Notes:
Hello! Welcome to the Lean Six Sigma workshop for Yellow Belt
candidates. This training will be an interactive and engaging way
to learn the fundamentals of Lean and Six Sigma.
!As with other offerings from GoLeanSixSigma.com, the focus will
be on making these concepts user friendly and accessible.
Enjoy!
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�2 467
-
1.2 What's Your First Name?
A
Notes:
Before we begin, please type your first name in the blue box
below. We'll be using your name to address you throughout the
course, which will help make this more fun and interactive for you!
When you're finished typing your name, just click the green
"Submit" button.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�3 467
-
Greeting (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�4 467
-
1.3 Yellow Belt Learning Objectives
A
Notes:
The Yellow Belt learning objectives are simple - as a result of
this training you will understand:
!• The basic tools and principles that underlie the Lean Six
Sigma improvement methods
• How to identify opportunities to improve a process and how to
establish goals
• How to plan for and collect data to uncover root causes of
issues
• How to implement simple but effective improvements techniques
and concepts
• How to sustain the gains of process improvements
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�5 467
-
1.4 Yellow Belt Modules
A
Notes:
This is a list of all the modules that are a part of this
training. When you’re done with Yellow Belt Training, you can get
your Yellow Belt Certification. You can also opt to take the Green
Belt Training and gain an even greater mastery of the Lean Six
Sigma toolkit.
!We'll provide you with links to do either or both at the end of
this Training, or you can click the Resources button at the top of
this slide and select Yellow Belt Certification or Green Belt
Training from the menu.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�6 467
-
Lean Six Sigma Introduction (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�7 467
-
8 Wastes (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�8 467
-
Lean Six Sigma Roles (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�9 467
-
DMAIC Overview (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�10 467
-
DEFINE (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�11 467
-
MEASURE (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�12 467
-
ANALYZE (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�13 467
-
IMPROVE (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�14 467
-
CONTROL (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�15 467
-
1.5 Module: Introduction to Lean Six Sigma
A
Notes:
What is Lean Six Sigma? Let’s find out in these next few
slides.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�16 467
-
1.6 What is Lean Six Sigma?
A
Notes:
Lean Six Sigma is a combination of two powerful methodologies:
Lean and Six Sigma. The Lean toolkit provides ways to streamline
processes by reducing Waste and the Six Sigma toolkit provides
tools to reduce Defects by conducting root cause analysis.
Together, they provide the fastest, most effective way to improve
processes.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�17 467
-
1.7 What is a Lean Process?
A
Notes:
A Lean process is achieved by removing “Waste“, which is any
activity not required to complete a process.
!After removing Waste, the only steps remaining will be those
required to produce a product or service that is of value to a
Customer.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�18 467
-
1.8 What is a Six Sigma Process?
A
Notes:
A Six Sigma process is one that produces only 3.4 Defects per
million opportunities (otherwise known as DPMO). This means that
Six Sigma can also be thought of as a goal where processes
encounter close to zero Defects, and do so consistently.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�19 467
-
1.9 Where did Lean Six Sigma come from?
A
Notes:
Where did Lean Six Sigma come from?
!Lean actually originated with Henry Ford and his invention of
the assembly line. But it was perfected by Toyota in Japan with the
creation of the Toyota Production System.
!Six Sigma originated at Motorola where they were able to bring
their production of pagers up to Six Sigma levels with close to
zero Defects.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�20 467
-
1.10 Why do organizations use Lean Six Sigma?
A
Notes:
Organizations use the powerful toolkits offered by Lean Six
Sigma to increase revenue, decrease costs, improve efficiency and
develop effective people and teams.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�21 467
-
Increase Revenue (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�22 467
-
Decreases Costs (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�23 467
-
Increases Efficiency (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�24 467
-
Effective People (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�25 467
-
1.11 Welcome to Bahama Bistro!
A
Notes:
At this point, we’d like to introduce you to our friends at the
Bahama Bistro, a fictional tropical restaurant. We’ll make frequent
trips to Bahama Bistro in order to demonstrate the tools and
techniques in each module.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�26 467
-
1.12 Bahama Bistro: Naming Activity
A
Notes:
Before we continue, let's assign names to each of the people
we'll meet at Bahama Bistro, which includes a customer, a manager,
a host, a server, a busboy, and a chef. Simply type in one name in
each of the six blue boxes below, and when you're finished, click
the green "Submit Names" button.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�27 467
-
1.13 Bahama Bistro: Meet the People
A
Notes:
Thanks for naming all the people at Bahama Bistro. Now, let's
learn more about each of them by clicking on their pictures.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�28 467
-
Customer (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�29 467
-
Manager (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�30 467
-
Host (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�31 467
-
Server (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�32 467
-
Busboy (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�33 467
-
Chef (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�34 467
-
2. Module: Roles
2.1 Module: Lean Six Sigma Roles
A
Notes:
In a typical organization, there are a number of roles that help
ensure a robust rollout of Lean Six Sigma. Not all organizations
appoint individuals to each of these positions, but the following
outlines the roles along with a description of the responsibilities
for each.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�35 467
-
2.2 Lean Six Sigma Roles: Learning Objectives
A
Notes:
By the end of this module you will gain a better understanding
of where different types of belts come from, what they are, what
the differences are between them and key roles that support the
belts.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�36 467
-
2.3 Lean Six Sigma Belt Levels
A
Notes:
The use of belt levels come from Karate and gives Lean Six Sigma
some of the attributes of martial arts. People don’t actually walk
around in robes and belts as they would at your neighborhood dojo,
but as in Karate, the different belt colors indicate different
skill levels.
!Each level has corresponding implications for a person’s job
description. Let’s take a look at what the differing belt levels
mean in the world of Lean Six Sigma.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�37 467
-
2.4 Yellow Belt
A
Notes:
The title of Yellow Belt indicates that a person has a basic
understanding of Lean Six Sigma concepts and can help identify
opportunities and participate in applying improvements to
processes. They often work with Green Belts or Black Belts who
provide project leadership and training on additional tools and
concepts when it makes sense. Yellow Belts assist in projects on a
limited basis which does not interfere with their normal job
duties.
!Obtaining a Yellow Belt through training and certification is a
great place to start the Lean Six Sigma Journey.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�38 467
-
2.5 Green Belt
A
Notes:
Green Belts receive a greater level of training than Yellow
Belts and typically lead or participate as a member of a process
improvement team. They might dedicate 20% of their time to
improvement projects while still performing their normal job
duties. Green Belts have a strong, tactical understanding of the
most common Lean Six Sigma tools and they can deploy simple,
high-impact solutions with regularity. They are often a great
source of increased productivity and cost savings for typical
organizations.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�39 467
-
2.6 Black Belt
A
Notes:
Unlike Yellow Belts and Green Belts, Black Belts hold full-time
positions in Lean Six Sigma organizations. They are trained to lead
improvement teams, Green Belts and Yellow Belts. They provide
mentoring and support for Green Belts who are leading their own
teams and they provide advanced expertise on more complex processes
and projects.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�40 467
-
2.7 Master Black Belt
A
Notes:
The Master Black Belt role is also a full-time position and in
addition to mentoring Black Belts, they work with leadership to
strategically select and launch improvement projects. When they
work as a project leader they are often working on large,
cross-departmental, complex processes. Master Black Belts receive
the most training of any of the Lean Six Sigma Roles.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�41 467
-
2.8 Champion
A
Notes:
Champions have general understanding of Lean Six Sigma but their
role is primarily to help select, support and promote specific
projects to completion. They hold leadership positions within the
organization and are capable of removing barriers and obtaining
resources as needed by the project teams. Champions are often asked
to support a specific project or a suite of projects because they
have what you might call, “skin in the game.” They care about the
outcome. Champions are essential to smoothing the way to a culture
of process improvement.
!
2.9 Q&A #1: About Lean Six Sigma Roles
(Multiple Choice, 10 points, unlimited attempts permitted)
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�42 467
-
A
Feedback when correct:
That's right! You selected the correct response.
Feedback when incorrect:
You did not select the correct response.
!
Notes:
Correct Choice
Master Black Belt
Black Belt
X Green Belt
None of the above
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�43 467
-
Time for Q&A: This Lean Six Sigma role applies DMAIC and
Lean Six Sigma concepts while maintaining a different full time
position within a company. Please click on the correct answer.
!
Correct (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�44 467
-
Incorrect (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�45 467
-
Try Again (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�46 467
-
2.10 Learning Objectives Summary
A
Notes:
So let’s recap:
!The belt names originated in the martial art of Karate. Some
are full time like Black Belts and Master Black Belts and others
are part time such as Green Belts and Yellow Belts.
!And Champions are the critical sponsors of Lean Six Sigma
projects.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�47 467
-
3. Module: 8 Wastes
3.1 Module: The 8 Wastes
A
Notes:
Eliminating Waste is one of the underlying goals of Lean Six
Sigma. You might imagine the Waste of uneaten food that gets
regularly thrown out at Bahama Bistro, but we’re actually talking
about a much broader concept of the word “Waste.”
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�48 467
-
3.2 The 8 Wastes Learning Objectives
A
Notes:
By the end of this module, you will gain a better understanding
of each of The 8 Wastes of Lean. You will also be introduced to
examples of each type of Waste. And finally, you will understand
what to do when Waste is discovered.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�49 467
-
3.3 Waste is a Waste
A
Notes:
Since Toyota, a japanese company, perfected Lean, you’ll notice
that many tools and concepts have Japanese names. “Muda” means
Waste in Japanese.
!It’s important to eliminate Waste in order to spend more time
and resources on providing value to the customer.
!The more an organization can reduce Waste, the better!
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�50 467
-
3.4 Seeing with New Eyes
A
Notes:
Marcel Proust, Said “The real voyage of discovery consists not
in seeking new lands, but seeing with new eyes.” That is what
happens when you learn The 8 Wastes. You’ll start to identify the
Waste all around you. Sometimes, we have been surrounded by Waste
for so long, we become desensitized to it.
!Seeing with new eyes means that you recognize Waste that
previously went unnoticed at your workplace everyday,. People are
not a Waste, but their time might be focused on Wasteful
activities. You may hear coworkers complain about how there is too
much to do, but many of the activities they’re engaged in are
probably not adding value. The goal is to identify and eliminate
these non-value adding steps so people can spend more time on
activities that add and create value.
!Some of the prevailing attitudes about process change can be
summed up in the following expressions: “If it’s not broken, don’t
fix it.” or, “That’s the way we’ve always done it.” The result is
that processes are never questioned, never examined for improvement
potential.
!Applying new tools to the same old process can help people see
with new eyes. Applying The 8 Wastes provides this essential new
perspective.
!�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�51 467
-
!!
3.5 Learning to See with New Eyes
A
Notes:
Sometimes we don’t see the Waste because it’s been ignored for a
long time. Or maybe we didn’t realize it was there in the first
place.
!Looking for The 8 Wastes is an easy first step to reducing
Waste in an organization. It helps employees begin to see with new
eyes.
!!!!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�52 467
-
3.6 The 8 Wastes
A
Notes:
The acronym DOWNTIME is an easy way remember The 8 Wastes.
!The 8 Wastes are Defects, Overproduction, Waiting, Non-Utilized
Talent, Transportation, Inventory, Motion and Extra Processing.
!We’ll explore each Waste separately in the next few slides.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�53 467
-
3.7 Bahama Bistro: 8 Wastes
A
Notes:
Now, let's learn how The 8 Wastes affects Bahama Bistro. Before
we continue, let's hear what the Bahama Bistro Shift Manager has to
say. When you're ready, just click either the green button, or the
next button.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�54 467
-
3.8 Bahama Bistro: 8 Wastes & DOWNTIME
A
Notes:
Here are Bahama Bistro's 8 Wastes organized according to the
"DOWNTIME" acronym. Click on each one to learn more.
!Defects
!Defects mean something wasn’t created or completed correctly.
Defects usually results re-work or re-do’s, which means more time
and money spent fixing and correcting.
!Defects are usually defined by the customer. Customers don’t
want to receive products or services with Defects, nor do they want
to engage in processes that cause Defects.
!Defects will be different for each process. They can result in
missing information, non-working products or inadequate
services.
!Have you experienced a defect in a process recently? Did you
get the wrong order at a restaurant? Was your
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�55 467
-
flight cancelled? Were your hospital records inaccurate?
!What are some examples of Defects that you’ve experienced as a
customer?
!Overproduction
!Overproduction refers to producing something faster or in more
abundance than needed.
!In manufacturing this is sometimes done to keep a production
line busy or provide insurance against an unexpected increase in
orders.
!Think about meal portion sizes in restaurants, many times the
portions are too large for one person. Most people have to take the
rest home, throw it out or leave the meal unfinished.
!In administrative processes, an example of Overproduction could
be producing or printing reports that very few people read or
use.
!What are some of your examples of Overproduction?
!Waiting
!Waiting is one of most prevalent Wastes. Waiting refers to any
time there is a delay and customers are Waiting for goods or
services. This also happens internally when one colleague is
Waiting on another colleague for parts or information in order to
do their job.
!And internal wait time eventually leads to delays for
customers. Have you experienced a delay during visit an emergency
room? Going to the DMV? Checking out at a grocery store? These are
all times when you probably preferred not to wait.
!Wait time occurs in a production environment as well. If you’re
building a product, the unit is often sitting Waiting to be worked
on, Waiting for other parts to arrive, or Waiting to be
assembled.
!Can you think of a process that has significant amounts of wait
time?
!Non-Utilized Talent
!Non-Utilized Talent is the Waste of intellectual capital.
!This occurs when organization and/or managers fail to leverage
people’s skills, talents, knowledge or experience.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�56 467
-
Have you ever worked somewhere where your opinions and input
were not valued?
!Or maybe you’ve heard the saying, “don’t think, just do.”
Meaning someone else will make all the decisions and you are
meant to just follow instructions.
!People feel underutilized and underappreciated in this type of
environment and the organization misses out on critical talent and
know-how. In the case where products or services lie Waiting for
“experts”, the underutilization of intellectual capital often leads
to the Waste of “Waiting.”
!Can you think of examples where people’s talents, creativity,
or knowledge is being underutilized?
!Transportation (TOUCHES)
!Transportation or “touches” is a Waste that refers to the
movement of materials or information.
!This could be the result of poor layout or poor planning. In
the service industry, Transportation can refer to moving
information and services between people or departments. The more
people there are who have to “touch” the unit whether it’s for
review, approval or reporting, the more time the process takes and
the more opportunity there is for errors.
!In manufacturing, Transportation can result in physical damage
to the product or materials.
!Whether it results in Defects or delays, Transportation is also
a potential Waste of money.
!Can you think of some examples of the Waste of Transportation
or “touches”?
!Inventory
!Inventory is another potential Waste. There was a time when
Inventory was considered an asset, but storing and holding
Inventory costs money and is now considered a liability.
!Long lead times for receiving products or information can cause
cash Flow issues, especially if there is a lot of money tied up in
Inventory. The more Inventory you have, the more you have to count
it, move it, clean it, and store it. There are carrying costs to
having too much Inventory. There is also the risk of obsolescence
and damage.
!Inventory Waste also applies to ordering office supplies, such
as having too many printer cartridges on hand or having a year’s
supply of paper. These might not be the right order quantities and
could be adjusted to the “right” amount.
!Organizations such as car manufacturers and technology
companies have adopted the Just-In-Time concept, They order just
the right amount at just the right time.
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�57 467
-
!What are some examples of Inventory Waste?
!Motion
!The Waste of Motion refers to excessive movement involved in a
given task. People can get confused between the Waste of
Transportation and the Waste of Motion.
!Transportation is when the unit going through the process is
moved around too much. Motion is when the people that do the
process move around too much.
!Nurses provide a good example. On average, nurses walk 7-8
miles per day in their job. Significant organizational efforts have
been made by certain healthcare facilities to allow them to spend
more time with patients instead of walking around looking for
supplies, wheelchairs or other needed items to do their job.
!Workstation analysis helps identify the best way to organize
the nursing station in order to minimize unnecessary movement for
nurses.
!In general, excess Motion indicates that people are spending
more time moving around and less time adding value to their
customers.
!What are some other examples of the Waste of Motion?
!Extra-Processing
!The final Waste is excessive processing. This is most prevalent
in administrative or non-manufacturing processes.
!Have you ever experienced a process that seemed overly
complicated and thought to yourself, “There’s got to be an easier
way!”
!Complex processes often have unnecessary and redundant steps
that do not add value.
!Processes are like junk drawers in the kitchen. If you don’t
make a focused effort to clean it up every so often, it just fills
up with “stuff”. It’s the same for our processes. If we don’t make
an effort to “spring clean” our processes every once in a while,
the process just gets bigger and messier.
!What are some examples of the Waste of Extra-Processing?
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�58 467
-
Defects (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�59 467
-
Overproduction (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�60 467
-
Waiting (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�61 467
-
NonUtilizedTalent (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�62 467
-
Transportation (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�63 467
-
Inventory (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�64 467
-
Motion (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�65 467
-
Extra-Processing (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�66 467
-
3.9 Once Waste Is Identified
A
Notes:
Once identified, there are 4 things you could do with Waste:
!• Eliminate the cause of the Waste where possible
• Simplify the process or step that is creating the Waste
• Streamline - especially with complex processes
• And lastly, minimize the amount of Waste in the process
!Working with a team to identify and reduce Waste can be a way
to build confidence with quick wins for improving processes.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�67 467
-
3.10 Eliminating Waste At Bahama Bistro
A
Notes:
Back at Bahama Bistro, the Chef has learned how to eliminate a
specific type of Waste. When you're ready to learn more, click the
green button or the next button.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�68 467
-
3.11 Bahama Bistro Motion Waste: Before & After
A
Notes:
Let’s eliminate Waste at Bahama Bistro!
!In this example, the team at Bahama Bistro has discovered the
Waste of Waiting and the Waste of Motion from moving back and forth
from the stockroom. After assessing which were the high-volume
items, the team laid out the ingredients more strategically in
order to reduce their movement. Now, sandwiches are produced faster
and customers have a shorter wait!
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�69 467
-
After (Slide Layer)
A
3.12 Q&A: About Wastes
(Multiple Choice, 10 points, unlimited attempts permitted)
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�70 467
-
A
!
Feedback when correct:
That's right! You selected the correct response.
Feedback when incorrect:
You did not select the correct response.
!
Correct Choice
Transportation
X Motion
Excessive Processing
Overproduction
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�71 467
-
Notes:
Time for Q&A: Which Waste is it when the people that do the
process move around too much? Please click on the correct
answer.
!
Correct (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�72 467
-
Incorrect (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�73 467
-
Try Again (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�74 467
-
3.13 The 8 Wastes: Learning Objectives Summary
A
Notes:
So let’s recap. You know the definitions of all 8 Wastes, or
“muda” as the Japanese say. You can identify Waste in the
workplace, and you have new ways to go about eliminating each of
The 8 Wastes. You can see with new eyes!.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�75 467
-
4. Module: DMAIC Overview
4.1 Module: DMAIC Overview
A
Notes:
The 5 Phase method that underlies Lean Six Sigma is called DMAIC
which stands for Define, Measure, Analyze, Improve and Control.
We’re going to look at each of these Phases in detail and learn
about the tools and techniques involved within each Phase.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�76 467
-
4.2 Learning Objectives
A
Notes:
By the end of this module, you’ll gain a better understanding of
where and when DMAIC can be applied to a process. You’ll learn what
DMAIC stands for, and you’ll get a bird’s eye view of the different
Phases and their activities.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�77 467
-
4.3 Why DMAIC?
A
Notes:
Since DMAIC is used to uncover the root cause of problems, it’s
not the right method for implementing obvious solutions to obvious
problems. But if the cause of the problem is not entirely clear
then DMAIC is a great choice. It provides a step-by-step approach
to investigate root causes to problems.
!It’s a good choice in situations that require robust solutions
to long-standing problems.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�78 467
-
4.4 DMAIC Methodology
A
Notes:
DMAIC is the Six Sigma methodology used to conduct root cause
analysis.
!This methodology is a variation of the original PDCA or “Plan,
Do, Check, Act” methodology created by Walter Shewhart and Edward
Deming.
!DMAIC stands for Define, Measure, Analyze, Improve &
Control.
!During the Define Phase, the problem is outlined and scoped.
It’s critical to define exactly which problem is being addressed.
Once the issue is defined, the customer requirements are clarified
and a high-level map of the process provides a picture of the basic
process steps.
!During the Measure Phase, the process is assessed for how well
it meets the customer requirements outlined in the Define Phase.
Data collection is carefully planned and carried out so the process
can be better understood.
!Data analysis and process analysis characterize the main
efforts of the Analyze Phase where the focus is
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�79 467
-
uncovering the root causes of Defects and other forms of Waste.
The use of detailed Process Maps and different methods of charting
and graphing provide ways to develop and test hypotheses.
!Once the root causes are identified, the project can move into
the Improve Phase where solutions target the Waste uncovered in the
Analyze Phase. The goal is to improve the process Flow, remove root
causes, mistake-proof the process and provide increased value to
the customer.
!The fifth Phase, Control, is critical to maintaining the gains
achieved in the Improve Phase. Ongoing monitoring and Documentation
ensure that the DMAIC project continues to be a success.
!!!!!
4.5 DMAIC Roadmap
A
Notes:
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�80 467
-
Here is a high level roadmap of each DMAIC Phase. This shows the
actions, tools and deliverables for each Phase from a Yellow Belt
perspective. As a Lean Six Sigma practitioner moves through each of
the belt levels, the number of tools used within each Phase
increases.
!
Define (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�81 467
-
Measure (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�82 467
-
Analyze (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�83 467
-
Improve (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�84 467
-
Control (Slide Layer)
A
4.6 Q&A #1: About DMAIC
(Multiple Choice, 10 points, unlimited attempts permitted)
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�85 467
-
A
!
Feedback when correct:
That's right! You selected the correct response.
Feedback when incorrect:
You did not select the correct response.
!
Correct Choice
X Decrease the time between date of customer order and actual
order delivery
Design a process for getting and screening sales leads
Deploy a customer relationship management software system
Develop a new compression technology for storing music
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�86 467
-
Notes:
Time for Q&A: The DMAIC methodology is best suited for
applying to which of the following project ideas? Please click on
the correct answer.
!
Correct (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�87 467
-
Incorrect (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�88 467
-
Try Again (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�89 467
-
4.7 Learning Objectives Summary
A
Notes:
So let’s recap: DMAIC is the structure for Lean Six Sigma
problem solving. DMAIC stands for Define, Measure, Analyze, Improve
and Control. The method starts with the critical Define Phase since
that determines the focus of an improvement team’s efforts. The
Define module is next!
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�90 467
-
5. Module: Define Phase
5.1 Module: Define Phase
A
Notes:
The Define Phase for Yellow Belts includes modules that cover
what goes into the Project Charter, how to understand the Voice Of
The Customer and how to build a high-level map of the process.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�91 467
-
5.2 Learning Objectives
A
Notes:
By the end of this module, you’ll gain a better understanding of
the Define Phase, the tools and activities used to initiate
projects, and what kinds of barriers a project team might run
into.
!!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�92 467
-
5.3 DMAIC Roadmap: Define Phase
A
Notes:
Define is the first Phase of DMAIC. The main purpose of Define
is to gain clarity around the problem and process that the team is
looking to improve.
!!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�93 467
-
Define (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�94 467
-
Measure (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�95 467
-
Analyze (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�96 467
-
Improve (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�97 467
-
Control (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�98 467
-
5.4 Overview of Define Phase
A
Notes:
The 3 modules for the Define Phase are: Project Charter, Voice
Of The Customer and SIPOC.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�99 467
-
5.5 Why a Define Phase?
A
Notes:
The function of the Define Phase is to clearly establish the
focus of the improvement project. It’s important to spend time
up-front to ensure that everyone involved in the project agrees on
the issue, the goal and what exactly is being addressed.
!Just like the trajectory of a rocket ship - a lack of direction
up front will lead the project off course down the road.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�100 467
-
5.6 Sub-module: Project Charter
A
Notes:
Let’s learn about the Project Charter.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�101 467
-
5.7 Project Charter: Learning Objectives
A
Notes:
By the end of this module you’ll gain a better understanding of
why Project Charters are essential to good projects, the key parts
of a charter and how it becomes something called a “living
document” throughout the life of the project.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�102 467
-
5.8 What Is a Project Charter?
A
Notes:
The Project Charter provides the opportunity to put down on
paper exactly what’s going to be addressed, who’s going to address
it, what they estimate they’ll achieve and when they plan to
achieve it.
!You may not have all of the answers up front, but you’ll be
able to fill some of that information throughout the life of the
project since the charter is a changeable, “living document.”
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�103 467
-
5.9 Elements of a Project Charter
A
Notes:
This is a list of the charter contents, and we’ll go into depth
on some of the key elements.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�104 467
-
5.10 Project Charter: Business Case
A
Notes:
By answering this list of questions, it’s relatively easy to
build a strong business case for a project.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�105 467
-
5.11 Business Case Example at Bahama Bistro
A
Notes:
The business case should make it clear, as this one at Bahama
Bistro does, that this is a worthwhile project.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�106 467
-
5.12 Project Charter: Problem Statement
A
Notes:
As we mentioned earlier, if the root cause and solution are
clear then there is no need for DMAIC. This would be considered a
“just do it” project. The problem statement should provide a clear
picture what is happening, when it began along with the magnitude
and consequence of the problem.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�107 467
-
5.13 Problem Statement: Travel Example
A
Notes:
This second problem statement gives critical specifics that help
clarify that this is a worthwhile project.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�108 467
-
5.14 Problem Statement Examples at Bahama Bistro
A
Notes:
Again, the specifics of the second statement make it clear that
this issue is important to address.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�109 467
-
5.15 Project Charter: Goal Statement
A
Notes:
The rollout of the employee recognition program is a classic
example of a solution that is pre-determined. The second statement
provides specific and measurable information. The team with a goal
statement similar to this one would have a good sense of what would
make them successful.
!!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�110 467
-
5.16 Project Charter Definitions
A
Notes:
In a moment we’ll take a look at a completed charter where you
can see other aspects of the Project Charter, listed here, that
help clarify the project.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�111 467
-
5.17 Updating the Charter Throughout DMAIC
A
Notes:
As we mentioned, the Project Charter is a “living document.”
This means that as we study the process and make discoveries, we
will continue to update the Project Charter to reflect our expanded
understanding of the process and the project. The Project Charter
is also a great communication tool since there are bound to be
others interested in the progress of the project.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�112 467
-
5.18 Project: Reducing the Cycle Time at Bahama Bistro
A
Notes:
As you can see, the Bahama Bistro team is ready to start solving
the food delivery problem. Click on the "Click to read" button for
each section to learn more. When you're finished, click the "Next"
button at the bottom right to continue.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�113 467
-
Problem Statement (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�114 467
-
Goal Statement (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�115 467
-
Scope In/Out (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�116 467
-
Business Case & Benefits (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�117 467
-
Preliminary Plan / Timeline (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�118 467
-
Team Members (Slide Layer)
A
5.19 Q&A: Lean Six Sigma Project Charter
(Multiple Choice, 10 points, unlimited attempts permitted)
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�119 467
-
A
!
Feedback when correct:
That's right! You selected the correct response.
Feedback when incorrect:
You did not select the correct response.
!
Correct Choice
Project Scope
Preliminary Plan
X Business Case
Problem Statement
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�120 467
-
Notes:
Time for Q&A: Which of these Project Charter elements
describes the importance and the reason for doing the project?
Please click on the correct answer.
!
Correct (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�121 467
-
Incorrect (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�122 467
-
Try Again (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�123 467
-
5.20 Project Charter: Learning Objectives Summary
A
Notes:
So let’s recap. The Project Charter is an important, living
document that helps to define the project. You are now clear on the
Project Charter elements but there is more information available if
you’re interested. Check out the Resources button on the top right
of this player!
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�124 467
-
5.21 Sub-module: Define Value: Voice Of the Customer
A
Notes:
This next module explores the idea of the Voice Of The
Customer.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�125 467
-
5.22 Voice Of the Customer: Learning Objectives
A
Notes:
By the end of this module, you will gain a better understanding
of what we mean by the “Voice Of The Customer”, how we define
“customers”, how they differ from stakeholders and how to quantify
the customer requirements.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�126 467
-
5.23 Have you ever experienced a defect at a restaurant?
A
Notes:
Have you ever experienced a defect at a restaurant? At Bahama
Bistro, an example of a defect would be a customer who received a
cup of decaf instead of a cappuccino. But even if the customer got
what they ordered, if they had to wait more than 20 minutes for a
cappuccino that would also be a defect.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�127 467
-
5.24 What is the Voice Of the Customer?
A
Notes:
The Voice Of The Customer is critical because it helps an
organization decide where to focus improvement efforts. By
evaluating key drivers of customer satisfaction, an organization
can measure whether or not they are meeting their customer
requirements.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�128 467
-
5.25 Who Are Your Customers?
A
Notes:
Before we can identify our customers, we must first be clear on
what we mean by customer.
!There may be different types of customers for a given process
and there may be internal customers of a process. Internal
customers are different from paying customers since they are our
colleagues, but they are still customers of the process.
!!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�129 467
-
5.26 What Are Customer Requirements?
A
Notes:
Once you determine who receives the goods and services of a
specific process, it’s time to determine what the customer cares
about. Customer concerns are general categories of requirements, as
seen here. These are examples of common customer concerns.
!!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�130 467
-
5.27 Voice Of The Customer Example at Bahama Bistro
A
Notes:
Once the Voice Of The Customer is identified, continue to better
understand the customer requirements by converting comments or
“cues” into requirements. In other words, make the comment
measurable. Quantify in numbers what the customer requirement is
for that particular process.
!For example, many processes have a customer requirement of
Cycle Time, but for each process, the Cycle Time requirement might
be different.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�131 467
-
5.28 Who Are Your Stakeholders?
A
Notes:
Why is it important to know who the process stakeholders are?
Stakeholders are not the customers of the process, but you need
their support and buy-in in order to ensure the success of your
project.
!It’s important to think about who might be impacted by changes
you could make to the process and to reach out to those groups and
individuals to discuss the project plans. Stakeholders often have
valuable input and engaging them can help build their sense of
ownership about eventual process improvements.
!Some projects can fail due to a lack of internal acceptance. A
little communication goes a long way toward success!
!!!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�132 467
-
5.29 Q&A #1: Voice Of the Customer
(True/False, 10 points, unlimited attempts permitted)
A
!
Feedback when correct:
That's right! You selected the correct response.
Feedback when incorrect:
You did not select the correct response.
!
Correct Choice
True
X False
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�133 467
-
Notes:
Time for Q&A! True or False: The customer is the same as a
stakeholder.
!
Correct (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�134 467
-
Incorrect (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�135 467
-
Try Again (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�136 467
-
5.30 Voice Of the Customer: Learning Objective Summary
A
Notes:
So let’s recap:
!Customers can be internal or external and listening to their
voice helps us understand the requirements they have of the
process. These requirements are the focus of the problem statement
and resulting goal of each project.
!Stakeholders are different from the customers of the process
and consist of groups or individuals who might be impacted by
changes made to the process. Ensuring they are engaged in our
project is critical in order to ensure the acceptance and ultimate
success of each project.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�137 467
-
5.31 Sub-module: SIPOC
A
Notes:
This next module explores the high-level map known as a
SIPOC.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�138 467
-
5.32 SIPOC: Learning Objectives
A
Notes:
In this module you’ll gain a better understanding of why the
high level map is important, the key parts of the map and how to
build one.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�139 467
-
5.33 What is a SIPOC?
A
Notes:
The SIPOC is a high level Process Map. It might sound something
like the “Son of Spock”, but it’s actually an acronym that stands
for Suppliers, Inputs, Process, Outputs, and Customers. It’s a one
page map that outlines what comes into and out of the process, who
supplies inputs and who receives the goods and services as a
result.
!We will use the SIPOC througout the project as we build our
understanding of the process.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�140 467
-
5.34 SIPOC Example at Bahama Bistro:
Lunch Order to Delivery
A
Notes:
In this high-level map of Bahama Bistro we can see a lot of
suppliers, but if we follow the first one, it’s the patrons who
supply orders as inputs to the process.
!Once the order is placed there are six high-level steps that
take place. A member of the staff takes the order, it’s delivered
to the kitchen, the order is prepped and cooked, then it’s packaged
or plated and finally it’s delivered. The delivered lunch order is
the output and it’s received by the patron.
!There are other suppliers to the process such as the grocery or
the vendors providing food ingredients. And there are the sources
of paper plates and other packaging products.
!At the lower right you can see the customer requirements of the
lunch order including how fast they expect delivery, how hot they’d
like the soup and that they want the order they asked for. Having
this information on one page provides key information to the
project team.
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�141 467
-
!
5.35 Creating a SIPOC: Questions to Consider
A
Notes:
These are key questions to consider when building your own
high-level map.
!
5.36 Q&A: SIPOC
(Multiple Response, 10 points, unlimited attempts permitted)
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�142 467
-
A
!
Feedback when correct:
That's right! You selected the correct response.
Feedback when incorrect:
You did not select the correct response.
!
Correct Choice
X SIPOCs are a good method of defining the scope of a
project
SIPOCs are a detailed view of the process
SIPOCs stand for Standards, Inputs, Process, Outcomes, and
Concerns
X The outputs of a SIPOC are received by customers of the
process
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�143 467
-
Notes:
Time for Q&A. Which of the following are true regarding a
SIPOC?
!Please click on all the correct answers.
!
Correct (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�144 467
-
Incorrect (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�145 467
-
Try Again (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�146 467
-
5.37 Other Fun Maps
A
Notes:
There are other forms of maps created within the DMAIC process
depending on the type of project. These are examples of a few of
the different ways to map a process that are outlined in Green Belt
Training.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�147 467
-
5.38 SIPOC: Learning Objectives Summary
A
Notes:
So let’s recap:
!The SIPOC is a simple but powerful high-level map that puts the
end-to-end process on one page. There are a clear set of questions
that help Yellow Belts build a SIPOC for each project, and SIPOCs
include the high-level steps, the process outputs along with the
key customer requirements of those outputs.
!We’ll revisit the SIPOC throughout the DMAIC Phases.
!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�148 467
-
5.39 Update the Project Charter: Reducing the Cycle Time at
Bahama
Bistro
!
A
Notes:
After Completing Define, the Bahama Bistro team had some updates
to their Project Charter.
!1. The estimated date to complete Define was January 14th. The
team finished on January 18th, so the team
updated the date on the Project Charter. The team is on track to
start Measure.
2. The team forgot to include a host and a busboy as part of the
team. The team lead updated the team members on the Project
Charter.
3. Voice Of The Customer indicated that the Goal Statement
should change in order to reflect the customer requirement. The
original goal was to deliver lunch orders in under 35 minutes. Now,
that Voice Of The Customer data has been gathered, it’s clear that
customers prefer to have salads, sandwiches, and soups in under 16
minutes and entrees in under 20 minutes. We have updated the
Project Charter to reflect the true customer requirements.
4. In terms of scope, the chef asked if we were going to be
looking at our food vendors processes or delivery
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�149 467
-
schedule and the team decided that at this time, supplier
processes and delivery schedules are out of scope.
5. It’s also a good practice to document the project progress by
Phase. The team should document the Define Phase work, so that they
have the raw material for developing the project Storyboard.
!
Problem Statement (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�150 467
-
Goal Statement (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�151 467
-
Scope In/Out (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�152 467
-
Business Case & Benefits (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�153 467
-
Preliminary Plan / Timeline (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�154 467
-
Team Members (Slide Layer)
A
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�155 467
-
5.40 Define Phase Challenges
A
Notes:
In each Phase of DMAIC there are a few areas that might require
more effort. Make sure you have a clear commitment from the project
sponsor and the team members to work on the project. Make sure
everyone is agreed on the charter and that no one is using the
project as a way to implement their pre-conceived notion of a
solution.
!You may need more people on the team than initially thought,
but if it’s more than 6 or 7 it starts to resemble a sports team so
be careful not to over pack. It’s also okay to work the project on
your own, just make sure you reach out to your stakeholders and
subject matter experts as soon as possible for support.
!!
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�156 467
-
5.41 Checklist: Define Phase
A
Notes:
Every Phase of DMAIC ends with a checklist. This represents the
action items to be completed for the Phase. Take a look at what’s
left to do on your project.
!
5.42 Q&A: Define Phase
(Multiple Choice, 10 points, unlimited attempts permitted)
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�157 467
-
Thank you for previewing GoLeanSixSigma.com's
Lean Six Sigma Yellow Belt Training
You can view the full interactive online version by signing up
at
http://www.goleansixsigma.com/free-lean-six-sigma-training/
!
What’s Next?
Get Your Yellow Belt Certification:
http://www.goleansixsigma.com/lean-six-sigma-certification-yellow-belt/
Start Your Green Belt Training:
http://www.goleansixsigma.com/lean-six-sigma-training/
�
Copyright"2013"GoLeanSixSigma.com."All"Rights"Reserved.
ReproducAon"is"strictly"prohibited"without"prior"wriDen"consent."
� "of"�467 467