Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project
34

Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

Dec 18, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

Yarra Ranges Council – Smart Urban Futures

Lilydale Principal Pedestrian Network Demonstration Project

Page 2: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.
Page 3: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

Come for a 20 minute walk with me…

1. Walking Network - Mapping and Audit

2. Pre-Data Collection

3. Urban Acupuncture Approach

4. Collaboration and The Three E’s

5. Project Feedback

6. Post-Data Collection

7. Project Results – Evaluation and Impact

Page 4: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

55% of car trips are for distances

less than 1km(Outer Melbourne, Vista 2007)

Page 5: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.
Page 6: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.
Page 7: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

(Image courtesy – CDM Research)

Page 8: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

(Image courtesy – CDM Research)

Page 9: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

Strategic Perspective...setting out to create places for people

Safe Sustainable

Connected Prosperous

Active Healthy

= $1million over 3 years

=

Page 10: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

Consultatnt – TRACT Consultants)

PPN in blue

Page 11: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.
Page 12: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

2. Data Collection

Contractor : Jonathon Marsden Data

Click here for video – 27 Albert Hill Rd

Page 13: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

3. Urban Acupuncture – Project Determination

Page 14: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

Project Determination – West LilydaleNew : • 600m footpath• Pedestrianised

intersection• Timed wayfinding

signage x5

Plus :• Promotion Campaign• Education &

Enforcement

$158,000

Page 15: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

4. Collaboration and the 3 E’s

Getting the Environment right is not enough! Also need:

• Education (Infrastructure Promotion)

– “Made for Walking” target audiences x7– Key messages around benefits of walking

• Enforcement (Awareness Raising)

– Promotion of road rules– Driver and pedestrian Police actions– Speed trailers

Page 16: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.
Page 17: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.
Page 18: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

Consultant : Fluid Group

Page 19: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

Before and After - Western End

Page 20: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

Before and After - Western End

Page 21: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

Wayfinding Signage - Western End Trial

Page 22: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

Wayfinding Signage - Western End Trial

Page 23: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

Other Walking Infrastructure Projects:

• 4x footpath and intersection improvements• 6x pedestrian crossing plateaus• 3x pedestrian crossing plateau with WSUD

(Melbourne Water Social Research Project)• 2x POS Signal Wait Time Reduction• VicRoads Network Operating Plan Workshops• Street Trading Medallions• John Street Roundabout Pedestrian Crossing

Page 24: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

John Street Roundabout - before

Page 25: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

John Street Roundabout - after

Page 26: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

Almost all pedestrians now use the supervised

school crossing.

0%

25%

50%

75%

100%

Before AfterTreatment

Pro

po

rtio

n o

f p

ed

est

ria

ns

Time period

AllAMPM

But is it encouraging safe walking?

Page 27: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

Innovation and Learning

First crossing of its kind in Victoria“While this practice of locating pedestrian crossings at roundabouts goes against traditional traffic engineering practice, our view is that it is more consistent with observed human behaviours and can be designed with beneficial safety outcomes.”

(CDM Research)

Slow and steady wins the race

Page 28: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

Internal• Comprehensiveness of project and collaborative approach

positively received• Challenging road safety audits require persistence to resolve• Safety message and walking promotion message need

constant negotiation to ensure consistency

External• The need for explicit links between intercept survey data and

actual projects• Timed wayfinding signage positively received• Local retail economic benefits of increased walking are key

5. Overall Project Feedback

Page 29: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

Round 1 Round 2

Dates 15 April – 2 May, 2013 12 – 28 May, 2014

Weather 18.7‘C / 12mm 20.5‘C / 39mm

Round 1 Round 2

Dates 15 April – 2 May, 2013 12 – 28 May, 2014

Weather 18.7‘C / 12mm 20.5‘C / 39mm

All Walkers 195/day 229/day

Round 1 Round 2

Dates 15 April – 2 May, 2013 12 – 28 May, 2014

Weather 18.7‘C / 12mm 20.5‘C / 39mm

All Walkers 195/day 229/dayWalking for Transport 84/day 115/day

Round 1 Round 2

Dates 15 April – 2 May, 2013 12 – 28 May, 2014

Weather 18.7‘C / 12mm 20.5‘C / 39mm

All Walkers 195/day 229/dayWalking for Transport 84/day 115/day

% Change in All Walkers

% Change in Walking for Transport

+17%

+37%

6. Post-Data Collection

Page 30: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

7. Project Results

Benefits and Costs

www.heatwalkingcycling.org

Project Cost : $158,000

Project Health Benefits : $376,000(over 50years discounted at 3% and 33% apportionment)

Benefit Cost Ratio of 2.38:1

Page 31: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

Impact of “Lilydale – Made for Walking”

• PPN layer now GIS enabled to form basis for township CapEx planning and delivery

• Council decision to invest an extra $1.5M p.a. into new pedestrian infrastructure

• Ongoing data collection to maintain objectivity ($1,000p.a.)• Strength of collaborative approach cannot be overstated

Page 32: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

Flow on effects…

Page 33: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.

0% of car trips are for distances

less than1km(Outer Melbourne, Vista 2037)

Page 34: Yarra Ranges Council – Smart Urban Futures Lilydale Principal Pedestrian Network Demonstration Project.