    Good Practices 

  • 8/20/2019 YANN L3 03 GoodPractices a 01

    2/16

    > L3_33_Good_Practices_A_01 2  2

    1.1) Introduction 

    What is a Good Practices ?

    What is NOT Good Practices ?

  • 8/20/2019 YANN L3 03 GoodPractices a 01

    3/16

    > L3_33_Good_Practices_A_013 3

    1.2) Introduction 

    What is a Good Practices ?

    GOOD PRACTICE IS A METHOD

    TO SOLVE ONESPECIAL PROBLEM

    If there is no problem   no Cooking Recipeno Good Practice

    Question   What are our Business Problems ?

  • 8/20/2019 YANN L3 03 GoodPractices a 01

    4/16

    > L3_33_Good_Practices_A_014 4

    2.1) Good Practice Problem (1)

    A) Business Technical Problems by Stages

    1. Design / Engineering

    2. Configuration / Installation

    3. Validation

    4. Commissioning / Maintenance

    ⇒ Good Practices can be defined in any of these 4 Technical Stages(Nowadays Mainly Configuration / Installation)

    B) Business Problem Severity1. Blocking

    2. Major

    3. Minor

    4. … => define priority in Good Practice

  • 8/20/2019 YANN L3 03 GoodPractices a 01

    5/16

    > L3_33_Good_Practices_A_015 5

    2.2) Good Practice Problem (2)

    Good Practice Violation :

    => Problem reappears

    but can be Non ApplicableAcceptable for the business case

    => Problem Severity…

    Good Practice Application Ratio :

    % of obligation of the method

    Not applicable in business casen.a.

    Obsolete GP, still listed for previous reference0

    Optional highly depending of business case30

    Recommended common for most of the cases50

    Mandatory, derogation has to be clearly accepted70

    Fully mandatory, no derogation100

  • 8/20/2019 YANN L3 03 GoodPractices a 01

    6/16

    > L3_33_Good_Practices_A_016 6

    2.3) Good Practice Problem (3)

    Good Practice Life Cycle:

    Appears with specific trouble (when solved)

    Depends of PACiS System (FR, evolution, business case)Evolutes/dies with new methods

    Good Practice is World Wide Capitalize experience

    Save time in “common/tricky errors”

    Anybody can/should propose new practices Everybody must explain violation

  • 8/20/2019 YANN L3 03 GoodPractices a 01

    7/16

    > L3_33_Good_Practices_A_017 7

    Good Practices 

    On Design On Configuration 

    On Installation 

  • 8/20/2019 YANN L3 03 GoodPractices a 01

    8/16

    > L3_33_Good_Practices_A_018 8

    3) GP1 Design / Engineering

    A) Specific Functional Specification SCE Usage, starting DB

    B) Data List

    Policies Graph Tables (Color, Font, Stroke, Bitmaps)

    Archives / Logging / AlarmNaming DP and states labels

    Graphics SCE C264 LHMI

    System Map Mimic (ordered, names, IP, LBUS..)

    Help mimic (module/equipment animations)

    Automation FBD ILK and PSL outlined with FBD editor

    Isagraf outline

    Policies Wiring (DI, DI/DO, AIU, TMU), SWR

    SCS mapping (+empty), LBUS, TBUS

    Module / IED definition

  • 8/20/2019 YANN L3 03 GoodPractices a 01

    9/16

    > L3_33_Good_Practices_A_019 9

    4.1) GP2 Configuration (1)

    Classification of Configuration GP

    A) Naming

    B) Data Base

    C) Profiles / Archive

    D) Electric

    E) Scs

    F) Graphic

  • 8/20/2019 YANN L3 03 GoodPractices a 01

    10/16

    > L3_33_Good_Practices_A_0110 10

    4.1) GP2 Configuration (1)

    A) Naming

    B) Data Base

    DB

    Graph Tables (Color, Font, Stroke, Bitmaps)

    Profiles

    SCS SBUS, Boards, LBUS, TBUS, IED

    Graphics mimics, Groups, multistate

    Electric Bays, module (ANSI)..

    Automations UserFunction, input/output

    Version comment and reference documents

    Check no errors no warning (incremental)

  • 8/20/2019 YANN L3 03 GoodPractices a 01

    11/16

    > L3_33_Good_Practices_A_0111 11

    4.2) GP2 Configuration (2)

    C) Profiles / Archive (logging Alarm Klaxon)General Scs/Graphic, OI Server

    MV transmission

    Profile Split Electric/Scs

    No toggling/FSS/log

    Boolean (same for all, DPS motion, FSS)

    logging => archive, archive one state => all states…

    alarm is archived, audible if set…

    NO alarm / logging unknown

    for FAT C264=OI, all DP on State panel

    for SAT optimizationSystem profiles DIAG

    Klaxon one only with SPC DE Permanente…

  • 8/20/2019 YANN L3 03 GoodPractices a 01

    12/16

    > L3_33_Good_Practices_A_0112 12

    4.3) GP2 Configuration (3)

    D) ElectricBay/Module Typed object (link ANSI, IEC..)

    GroupSPS Forbidden (because of limitations)

    DP Typed, initial reset/open, no toggling/FSS/SBMC

    xPC Permanents, Permanents until FB (xPS/xPC), arch

    xPS/xPC no wiring/profile inversion

    MV AI acquisition 20%

    Synchrocheck Manual with default profile on

    … (look in training)

    PSL no loop, 3 blocks,

    SPS output (arch) + Control on State change

    Isagraf no relation Manage, In/out ruleUniqueness order running archived

  • 8/20/2019 YANN L3 03 GoodPractices a 01

    13/16

    > L3_33_Good_Practices_A_0113 13

    4.4) GP2 Configuration (4)

    E) Scs

    F) Graphic

    C264 toggling/transmission/acquisition

    Systrap policy

    LBUS 2,2,50, synchronization 1mn

    Port only software management

    T103 Acq GI period 20mn, same setting group param

    Disturbance channel order

    IED Disturbance file name, always setting group

    TBUS SBO > 10s…

    User rights no administration, no use of AllWin/mimic no resize…

    ActiveX sorting, no auto-refresh, printer

    Real time preconfigured

    Use GIF

  • 8/20/2019 YANN L3 03 GoodPractices a 01

    14/16

    > L3_33_Good_Practices_A_0114 14

    5) GP3 Install

    A) Commissioning Forms

    B) PC

    C) Ethernet

    D) Extern devices

    Directories manual, tools, sharingsaving installation reg, dat, …

    DCOM config

    Remote OI VNC or equivalent

    cable/wiring optical, RJ45… SWR contacts…

    SWx jumpers, form, incremental test

    C264 printer, modem

    Hopf extern synchro, redundancy

    RuggedCom …

    PACiS devices C264 upgrade, OI

    External devices

  • 8/20/2019 YANN L3 03 GoodPractices a 01

    15/16

    > L3_33_Good_Practices_A_0115 15

    6) Conclusion 

    Good Practice Addressed to special problem Application Ratio

    Process on GPCreated when facing problemEvolution with product and business

    ongoing listing of the practices (tool)

    COESpecification DCSR auditData Base audit

    Manufacturing auditSite audit