Good Practices
8/20/2019 YANN L3 03 GoodPractices a 01
2/16
> L3_33_Good_Practices_A_01 2 2
1.1) Introduction
What is a Good Practices ?
What is NOT Good Practices ?
8/20/2019 YANN L3 03 GoodPractices a 01
3/16
> L3_33_Good_Practices_A_013 3
1.2) Introduction
What is a Good Practices ?
GOOD PRACTICE IS A METHOD
TO SOLVE ONESPECIAL PROBLEM
If there is no problem no Cooking Recipeno Good Practice
Question What are our Business Problems ?
8/20/2019 YANN L3 03 GoodPractices a 01
4/16
> L3_33_Good_Practices_A_014 4
2.1) Good Practice Problem (1)
A) Business Technical Problems by Stages
1. Design / Engineering
2. Configuration / Installation
3. Validation
4. Commissioning / Maintenance
⇒ Good Practices can be defined in any of these 4 Technical Stages(Nowadays Mainly Configuration / Installation)
B) Business Problem Severity1. Blocking
2. Major
3. Minor
4. … => define priority in Good Practice
8/20/2019 YANN L3 03 GoodPractices a 01
5/16
> L3_33_Good_Practices_A_015 5
2.2) Good Practice Problem (2)
Good Practice Violation :
=> Problem reappears
but can be Non ApplicableAcceptable for the business case
=> Problem Severity…
Good Practice Application Ratio :
% of obligation of the method
Not applicable in business casen.a.
Obsolete GP, still listed for previous reference0
Optional highly depending of business case30
Recommended common for most of the cases50
Mandatory, derogation has to be clearly accepted70
Fully mandatory, no derogation100
8/20/2019 YANN L3 03 GoodPractices a 01
6/16
> L3_33_Good_Practices_A_016 6
2.3) Good Practice Problem (3)
Good Practice Life Cycle:
Appears with specific trouble (when solved)
Depends of PACiS System (FR, evolution, business case)Evolutes/dies with new methods
Good Practice is World Wide Capitalize experience
Save time in “common/tricky errors”
Anybody can/should propose new practices Everybody must explain violation
8/20/2019 YANN L3 03 GoodPractices a 01
7/16
> L3_33_Good_Practices_A_017 7
Good Practices
On Design On Configuration
On Installation
8/20/2019 YANN L3 03 GoodPractices a 01
8/16
> L3_33_Good_Practices_A_018 8
3) GP1 Design / Engineering
A) Specific Functional Specification SCE Usage, starting DB
B) Data List
Policies Graph Tables (Color, Font, Stroke, Bitmaps)
Archives / Logging / AlarmNaming DP and states labels
Graphics SCE C264 LHMI
System Map Mimic (ordered, names, IP, LBUS..)
Help mimic (module/equipment animations)
Automation FBD ILK and PSL outlined with FBD editor
Isagraf outline
Policies Wiring (DI, DI/DO, AIU, TMU), SWR
SCS mapping (+empty), LBUS, TBUS
Module / IED definition
8/20/2019 YANN L3 03 GoodPractices a 01
9/16
> L3_33_Good_Practices_A_019 9
4.1) GP2 Configuration (1)
Classification of Configuration GP
A) Naming
B) Data Base
C) Profiles / Archive
D) Electric
E) Scs
F) Graphic
8/20/2019 YANN L3 03 GoodPractices a 01
10/16
> L3_33_Good_Practices_A_0110 10
4.1) GP2 Configuration (1)
A) Naming
B) Data Base
DB
Graph Tables (Color, Font, Stroke, Bitmaps)
Profiles
SCS SBUS, Boards, LBUS, TBUS, IED
Graphics mimics, Groups, multistate
Electric Bays, module (ANSI)..
Automations UserFunction, input/output
Version comment and reference documents
Check no errors no warning (incremental)
8/20/2019 YANN L3 03 GoodPractices a 01
11/16
> L3_33_Good_Practices_A_0111 11
4.2) GP2 Configuration (2)
C) Profiles / Archive (logging Alarm Klaxon)General Scs/Graphic, OI Server
MV transmission
Profile Split Electric/Scs
No toggling/FSS/log
Boolean (same for all, DPS motion, FSS)
logging => archive, archive one state => all states…
alarm is archived, audible if set…
NO alarm / logging unknown
for FAT C264=OI, all DP on State panel
for SAT optimizationSystem profiles DIAG
Klaxon one only with SPC DE Permanente…
8/20/2019 YANN L3 03 GoodPractices a 01
12/16
> L3_33_Good_Practices_A_0112 12
4.3) GP2 Configuration (3)
D) ElectricBay/Module Typed object (link ANSI, IEC..)
GroupSPS Forbidden (because of limitations)
DP Typed, initial reset/open, no toggling/FSS/SBMC
xPC Permanents, Permanents until FB (xPS/xPC), arch
xPS/xPC no wiring/profile inversion
MV AI acquisition 20%
Synchrocheck Manual with default profile on
… (look in training)
PSL no loop, 3 blocks,
SPS output (arch) + Control on State change
Isagraf no relation Manage, In/out ruleUniqueness order running archived
8/20/2019 YANN L3 03 GoodPractices a 01
13/16
> L3_33_Good_Practices_A_0113 13
4.4) GP2 Configuration (4)
E) Scs
F) Graphic
C264 toggling/transmission/acquisition
Systrap policy
LBUS 2,2,50, synchronization 1mn
Port only software management
T103 Acq GI period 20mn, same setting group param
Disturbance channel order
IED Disturbance file name, always setting group
TBUS SBO > 10s…
User rights no administration, no use of AllWin/mimic no resize…
ActiveX sorting, no auto-refresh, printer
Real time preconfigured
Use GIF
8/20/2019 YANN L3 03 GoodPractices a 01
14/16
> L3_33_Good_Practices_A_0114 14
5) GP3 Install
A) Commissioning Forms
B) PC
C) Ethernet
D) Extern devices
Directories manual, tools, sharingsaving installation reg, dat, …
DCOM config
Remote OI VNC or equivalent
cable/wiring optical, RJ45… SWR contacts…
SWx jumpers, form, incremental test
C264 printer, modem
Hopf extern synchro, redundancy
RuggedCom …
PACiS devices C264 upgrade, OI
External devices
8/20/2019 YANN L3 03 GoodPractices a 01
15/16
> L3_33_Good_Practices_A_0115 15
6) Conclusion
Good Practice Addressed to special problem Application Ratio
Process on GPCreated when facing problemEvolution with product and business
ongoing listing of the practices (tool)
COESpecification DCSR auditData Base audit
Manufacturing auditSite audit