Page 1
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
1/33
XL – QA APPROVALS
ALU - QA
ALCATEL-LUCENT INDONESIA
Evolution A9100 BTS Installation Standard ABSTRACT This document describes the installation standard for indoor and outdoor part of A9100 BTS product
Domain : ALCATEL-LUCENT INDONESIA Process Owner : IMPLEMENTATION Type : INSTRUCTIONS, USER GUIDE Originator : DURMAWEL SAHARA Distrib. Codes : Internal: Y/N External: Y/N
Page 2
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
2/33
XL – QA APPROVALS
ALU - QA
TABLE OF CONTENTS
1 INSTALLATION INDOOR ........................................................................4
1.1 Indoor Tray (Top View).........................................................................4
1.1.1 Indoor Tray (Front View) ......................................................................5
1.2 GROUNDING SYSTEM ............................................................................6
1.2.1 Arrangement of Wiring Copper rod ..........................................................6
1.2.2 Connection Copper rod to Main Grounding Bar (MGB) ...................................7
1.2.3 Connection Grounding at BTS Radio, Transmission and Rectifier to MGB ...........8
1.3 FEEDER ENTRY ...................................................................................9
1.3.1 Installation Feeder Entry (height of feeder entry and dimension from base ........
floor of shelter (Inside view) ..................................................................9
1.3.2 Installation Feeder Entry (height of feeder entry and dimension from base ........
floor of shelter (Inside view) ................................................................ 10
1.3.3 Arrangement of Feeder Entry and Connection Grounding Arrester to Busbar ... 11
1.4 BTS INDOOR..................................................................................... 12
1.4.1 Connection Wiring Cable at the top BTS Radio.......................................... 12
1.4.2 Connection Wiring Board at BTS Radio Rack ............................................ 13
1.4.4 Connection Wiring Alarm and Traffic Cables at DDF External Alternative 1...... 14
1.4.5 Connection Wiring Alarm and Traffic Cables at DDF External Alternative 2...... 15
1.4.6 BTS Radio Installation (Side View) ......................................................... 16
1.5 POWER SUPPLY (RECTIFIER) ................................................................. 17
1.5.1 Connection Wiring Power Cable at Power Suply (Rectifier) .......................... 17
2 INSTALLATION OUTDOOR..................................................................... 18
2.1 Installation Position Feeder Coaxial at Vertical Tray of Tower and Installation ....
Feeder Clamp .................................................................................. 18
2.1.1 Installation Grounding Kit (at the top and bottom) .................................... 19
2.1.2 Installation Grounding Kit at Feeder Entry (Outdoor) ................................. 20
2.1.3 Installation Labelling, Wiring Jumper Cable and Grounding at Antenna........... 21 3 INSTALLATION ANTENNA TYPE APM 40.................................................... 22
3.1 Installation Antenna and Mounting Hardware Part 1................................... 22
3.2 Installation Antenna and Mounting Hardware Part 2................................... 23
3.3 Installation Antenna and Mounting Hardware Part 3................................... 24
3.4 Installation Antenna and Mounting Hardware Part 4................................... 25
3.5 Installation Antenna and Mounting Hardware Part 5................................... 26
Page 3
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
3/33
XL – QA APPROVALS
ALU - QA
4 GENERAL MATERIALS.......................................................................... 27
4.1 Feeder Entry.................................................................................... 27
4.2 Heat Shrinkable Sleeve (Condom).......................................................... 27
4.3 Cable Ties (Tie Wrap) Type CS-300X ...................................................... 28
4.4 Cable Ties (Tie Wrap) Type CS-390L ...................................................... 28
4.5 Cable Ties (Tie Wrap) Type CS-200L ...................................................... 29
4.6 Cable Ties (Tie Wrap) Type CS-150T ...................................................... 29
4.7 Labelling......................................................................................... 30
4.8 Connector ....................................................................................... 30
4.9 HHD Cavity Anchor ........................................................................... 31
4.10 Cable Shoe 1x35 ............................................................................... 31
4.11 Protection Edge ................................................................................ 31
4.12 Clamp Copper rod (SIMEL CH 10.70)....................................................... 32
4.13 Clamp Copper rod (SIMEL BB 50-80) ....................................................... 32
APPENDIX ................................................................................................ 33
DOCUMENT MANAGEMENT............................................................................ 33
Page 4
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
4/33
XL – QA APPROVALS
ALU - QA
1 INSTALLATION INDOOR
1.1 Indoor Tray (Top View)
Tech room/ShelterHeight of Ceiling : 3.00Height of Tray : 2.40
2000
560
2500
150
500
880 560
AC 1ACPDBAlarmAbove AC 2
Air InletUnder AC 2
BTS
EVO
900
MH
z
RACK
TRA
NS
& D
DF
PWR
SUPP
LYAC
BEL
LTY
PE C
SM 2
0
600
AC 1H : 2000
FEEDERENTRY
Clamp (@0.5m)Copper Rod
MGB
1 2 3 4 5
6 7 8 9 10
FEEDER ENTRY
1. MW2. Spare3. Antenna Sector 1A (NA)4. Antenna Sector 2A (PA)5. Antenna Sector 3A (QA)6. Spare7. Spare8. Antenna Sector 1B (NB)9. Antenna sector 2B (PB)10.Antenna Sector 3B (QB)
MW
Copper Rod
SPARE NA
SPARE SPARE NB
PA QA
PB QB
Hol
es f
or C
able
Wir
ing
and
Edge
Rub
ber
Prot
ecti
on
FEEDERENTRY
INSIDE VIEW(from Inside of Shelter)
Bracket Tray
SECTION A
Cable Tray
Scale : NTS
Support Tray
Shelter Wall
A
"A"
"A"
Notes :"A" (See BTS Installtion Side View on Page 16)
Bracket Tray
Bracket Tray Bracket Tray
Bracket Tray
Bracket Tray
Bracket Tray
70
150
550
Hole for Cable Pwr SupplyEdge Rubber Protection
Hol
e fo
r Ca
ble
Pwr
Supp
lyEd
ge R
ubbe
r Pr
otec
tion
HHD Molly Anchor
70
150
7015
0
70
150
Page 5
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
5/33
XL – QA APPROVALS
ALU - QA
1.1.1 Indoor Tray (Front View)
AC
DC Fan
`
TEC HN IC A L R OO MIN SIDE
M ain G rou nd B ar(M G B )
B us b ar fo r G rou nd A rres te r
C la m p (@ 1 m )
C op per R od
C ab le T ra y
C op per R od
B ra cke t T ra y
G roun dC ab le B C 3 5
54
32
1
109
87
6
B ra cke t T ra y
B ra cke t T ra y
B ra cke t T ra yB ra cke t T ra y
B ra cke t T ra y
B racke t T
ray
FAP
MW
Rack
B TSE vo lium
R ectifie r
G roun d ca b leB c 35
Page 6
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
6/33
XL – QA APPROVALS
ALU - QA
1.2 GROUNDING SYSTEM
1.2.1 Arrangement of Wiring Copper rod
Tech room/ShelterHeight of Ceiling : 3.00Height of Tray : 2.40
AC 1ACPDBAlarmAbove AC 2
Air InletUnder AC 2
AC 1H : 2000
Clamp (@0.5m)Copper Rod
MGB
Copper Rod
Bracket Tray
SECTION A
Cable Tray
Scale : NTS
Support Tray
HHD Molly Anchor
Shelter Wall
A Bracket Tray
Bracket Tray Bracket Tray
Bracket Tray
Bracket Tray
Bracket Tray
Page 7
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
7/33
XL – QA APPROVALS
ALU - QA
1.2.2 Connection Copper rod to Main Grounding Bar (MGB)
AC
DC Fan
`B us bar
M ain G rou nd. B ar
DETAIL AScale : NTS
Clamp simel CH
Copper Rod
Copper Rod
Cable Tray
Copper Rod
Main Grounding Bar (MGB)
"A "
Clamp simel CHCopper Rod
Copper Rod
Copper Rod
SIDE VIEWScale : NTS
to Main Grounding Bar
Cable Grounding
Cable Tray
Busbar
SS Bolt M8
Cable Shoe
M a in G ro u nd . B ar"B "
to Copper Rod
DETAIL BScale : NTS
to Busbar
Cable Grounding
SS Bolt M8
Cable Shoe
Cable Grounding
SS Bolt M8
Cable Shoe
G rou ndC a ble B C 35C o ppe r
R o d
HHD Molly Anchor Bracket Tray
HHD Molly Anchor
Cable Shoe
Busbar
Cable Tray
Ground Cable BC 35
Main Grounding Bar (MGB)
SIDE VIEWScale : NTS
SS Bolt M8
Cable Shoe
Bracket TrayHHD Molly Anchor
Page 8
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
8/33
XL – QA APPROVALS
ALU - QA
1.2.3 Connection Grounding at BTS Radio, Transmission and Rectifier to MGB
NOTES : This is Temporary Standard, The New Standard is on going validation by ALU & XL
Clamp simel CH
Copper Rod
Cable Tray
Cable Grounding BC35
SIDE VIEWScale: NTS
R e ctifie r
Clamp simel CH
Copper Rod
Cable Tray
Cable Grounding BC35
B T SE v o lium
R a d io T r a n s m is s io n
IDU
Rack 19"
AC
DC Fan
`
T E C H N IC A L R O O MIN S ID E
M ain G rou nd B a r(M G B )
B us b ar fo r G rou nd A rres te r
C la m p (@ 1 m )
C op per R od
C ab le T ra y
C op pe r R od
B ra cke t T ra y
G roun dC ab le B C 3 5
54
32
1
109
87
6
B ra cke t T ra y
B ra c ke t T ra y
B ra ck e t T ra yB ra cke t T ra y
B ra cke t T ra y
B racke t T
ray
FAP
MW
Rack
B TSE vo lium
R ectifie r
Clamp simel CH
Copper Rod
Cable Tray
Cable Grounding BC35
Bracket TrayBracket TrayBracket Tray
G roun d ca b leY /G B C 3 5
Page 9
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
9/33
XL – QA APPROVALS
ALU - QA
1.3 FEEDER ENTRY
1.3.1 Installation Feeder Entry (height of hole feeder entry and dimension from base floor of shelter (Inside View)
INSIDE VIEW(From The Inside Technical Room/Shelter)
1 2 3 4 5
6 7 8 9 10
FFEDER ENTRY
520
280
INSIDE VIEW
3000
2700
2400
1 2 3 4 5
6 7 8 9 10
500
Notes :
1. MW2. Spare3. Antenna Sector 1A (NA)4. Antenna Sector 2A (PA)5. Antenna Sector 3A (QA)6. Spare7. Spare8. Antena Sector 1B (NB)9. Antenna Sector 2B (PB)10. Antenna Sector 3B (QB)
1
5
40
45
50
55
60
65
70
75
80
1
2
3
4
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
HO
LES
UN
ITS
10
15
20
30
35
25
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21MW RACK 19"
Distribution Module
Hariff
POWERSUPPLY
2500
MW Spare
Spare Spare
NA PA QA
NB PB QB
Page 10
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
10/33
XL – QA APPROVALS
ALU - QA
1.3.2 Installation Feeder Entry (height of hole feeder entry and dimension from base floor of shelter (Inside View – Isometric)
DC Fan
B usba r
B usba r
54
32
1
109
87
6
FEEDER ENTRY
INSIDE VIEW ISOMETRICScale ~ NTS
2700
GroundingCable Y/G 1x35
Copper Rod
Copperbar
INSIDE VIEW(From The Inside Technical Room/Shelter)
FFEDER ENTRY
Notes :
1. MW2. Spare3. Antenna Sector 1A (NA)4. Antenna Sector 2A (PA)5. Antenna Sector 3A (QA)6. Spare7. Spare8. Antenna Sector 1B (NB)9. Antenna Sector 2B (PB)10. Antenna Sector 3B (QB)
1 2 3 4 5
6 7 8 9 10
520
280
MW Spare
Spare Spare
NA PA QA
NB PB QB
500
Page 11
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
11/33
XL – QA APPROVALS
ALU - QA
1.3.3 Arrangement of Feeder Entry and Connection Grounding Arrester to Busbar
C able En try
L ightn ing Arreste r
C la m p F eederTyp e Double
C onn ecto r 1 /2" - 7/ 16 m ale
C oa xia l Feeder 7/ 8" (6 feed er)
C onnec to r 7 /8 " - 7/1 6 fem a le
B ra cket L
70 0
NAPA
QA
NBPB
QB
C able Jum p er 1 /2" to BT S R adio
Cop per ba r in sta lled d irectlyto M ain G round B ar (M G B)
C able g round BC 35 in sta lled d irec tlyto M ain G round Bar (M G B)
G rounding B usb ar
G rounding C ab leArreste r
C op per rod
NAPA
QA
NAPA
QA
Labe l Labe l
Page 12
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
12/33
XL – QA APPROVALS
ALU - QA
1.4 BTS INDOOR
1.4.1 Connection Wiring Cable at the top BTS Radio
NOTES : This is Temporary Standard, The New Standard is on going validation by ALU & XL
Power Cable (black)
Cable Power(Blue Color)
JUMPER CABLE
LABEL
ALARM CABLE GREY
METAL SHIELDCONNECT TO BTS
CABLE TRAY
EDGE RUBBER PROTECTION
COPPER ROD
JUMPER CABLE
JUMPER CABLE
Cable Power (Blue)
Cable Abis (Grey)
CABLE TRAY
EDGE RUBBER PROTECTION
DETAIL WARING CABLE ALARAM, PCM, POWER & GROUNDING
METAL SHIELD
Cable Black (Black)
Cable Alarm (Grey)
HOLES FOR CABLE WIRING
PAPB
QA
QB
NA
NB
JUMPER CABLE
Ground CableY/G BC 35
Cable Power(Blue Color)Cable Traffic(Grey Color)
-48 V 0 V
Page 13
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
13/33
XL – QA APPROVALS
ALU - QA
1.4.2 Connection Wiring Cables at BTS Radio Rack
TX
POWERENABLE
OFF
TEST
RX0
RX1
TXBCCHFAULTY
RSLOP
PWR TRE1
P ANT B
TX
POWERENABLE
OFF
TEST
RX0
RX1
TXBCCHFAULTY
RSLOPPWR
TX
POWERENABLE
OFF
TEST
RX0
RX1
TXBCCHFAULTY
RSLOPPWR
ON
OM ALARM
RX0AOUT2
RX1AOUT2
RX0BOUT2
RX1BOUT2
RX0BOUT1
RX1BOUT1
RX0AOUT1
RX1AOUT1
ANT A
ANT B
TXAIN1
TXAIN2
TXAOUT
TXBIN2
TXBIN1
TXBOUT
ON
OM ALARM
RX0AOUT2
RX1AOUT2
RX0BOUT2
RX1BOUT2
RX0BOUT1
RX1BOUT1
RX0AOUT1
RX1AOUT1
ANT A
ANT B
TXAIN1
TXAIN2
TXAOUT
TXBIN2
TXBIN1
TXBOUT
ON
OM ALARM
RX0AOUT2
RX1AOUT2
RX0BOUT2
RX1BOUT2
RX0BOUT1
RX1BOUT1
RX0AOUT1
RX1AOUT1
ANT A
ANT B
TXAIN1
TXAIN2
TXAOUT
TXBIN2
TXBIN1
TXBOUT
FANU FANU FANU
MNEMO
SERI
AL
ABIS1/2
BTS
CONNECT
ON
AREA
I
BTS
TERMINAL
TEST
OML
O&M
OMU
PS1
AB IS 1
AB IS 2
T RAN S F AU LT
PS2
FANU FANU FANU
FANU FANU FANU
Abis 1Abis 2Abis 3Abis 4XGPSXRTXBCB
Abis 1Abis 2Abis 3Abis 4
4 ABIS RELAYS
- 48 V 0 V
BTSINT
SR1
SR2
SR3
SR4
SR5
XGNDGND
XCLK2IN / OUT
XCLK1IN
XCLK1OUTALARMS INPUTS/OUTPUTS
TRE1
SU
MA
TRE1
Sector1
Sector2
ABIS CABLEfrom SU MA to Abis Port
RX C ABLEfrom TR E to AN C G
G SO 03 C ABLEfrom T RE to ANCG
G SO 04 C ABLEfrom AN CG to Top C onn. BT S
TO P C O NNEC TO R BTS
Q AN T B
Q AN T A
P ANT A
N ANT A
N ANT B
Sector3
Q ANT A
P ANT B
P ANT A
Q ANT B
N ANT B
N ANT A
Page 14
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
14/33
XL – QA APPROVALS
ALU - QA
1.4.3 Connection Wiring Alarm and Traffic Cables at DDF External Alternative 1
1
4
10
15
20
30
25
5
6
7
8
9
10
11
12
13
14
15
16
17
Grounding Cable
Alarm cable
Abis cable
Copper rod
CABLE TRAY INDOOR
DDF ALU
RADIO RACK 19"
DDF Additional
IDU
IDU
TX C
hann
el 1
-6 A
LU
RX C
hann
el 1
-6 A
LU
5
1
2
3
3 4 5 P6 7 8 9 10 11 12 13 P14 15 16 17P1 P2
Ala
rm 1
ALU
Ala
rm 2
ALU
Page 15
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
15/33
XL – QA APPROVALS
ALU - QA
1.4.4 Connection Wiring Alarm and Traffic Cables at DDF External Alternative 2
1
4
10
15
20
30
25
5
6
7
8
9
10
11
12
13
14
15
16
17
Grounding Cable
Alarm cable
Abis cable
Copper rod
CABLE TRAY INDOOR
DDF ALU
RADIO RACK 19"
DDF Additional
IDU
IDU
Alarm ALU
TX C
hann
el 1
-6 A
LU
RX C
hann
el 1
-6 A
LU
5
1
2
3
3 4 5 P6 7 8 9 10 11 12 13 P14 15 16 17P1 2
Alarm ALU
Page 16
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
16/33
XL – QA APPROVALS
ALU - QA
1.4.5 BTS Radio Installation (Side View)
32
2525
2
BTS EVO
Shelter Wall
HHD Molly Anchor
450
1800
"A"
DETAIL AScale : NTS
SIDE VIEWScale ~ 1:15
BTS EVO
ShelterWall
32
32
HHD Molly Anchor
Rail Z Support
DETAIL RAIL Z SUPPORTScale : NTS
ISOMETRIK VIEWScale : NTS
Page 17
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
17/33
XL – QA APPROVALS
ALU - QA
1.5 INSTALLATION OUTDOOR 1.5.1 Connection Wiring Power Cable at Power supply (Rectifier)
CABLE GROUNDING
CABLE TRAY
COPPER ROD
EDGE RUBBER PROTECTION
CABLE POWER BLACK
ABB
C50
NC 50 N
ON
ABB
C50
NC 50 N
ON
ABB
C50
NC 50 N
ON
ABB
C50
NC 50 N
ON
ABB
C50
NC 50 N
ON
ABB
C50
NC 50 N
ON
ABB
C50
NC 50 N
ON
ABB
C50
NC 50 N
ON
ABB
C50
NC 50 N
ON
ABB
C50
NC 50 N
ON
To BTS
Black Cable
Blue Cable
MCB50A
MCB50A
MCB50A
MCB50A
MCB50A
MCB50A
MCB50A
MCB50A
MCB50A
MCB50A
TERMINAL GROUNDING RECTIFIERCOPPER BAR
POWER CABLE
ABB
C50
NC 50 N
ON
MCB50A
Power Cable
"A"
DETAIL A
Cable Pin Lug
MCB 50A
CABLE POWER BLUE
Page 18
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
18/33
XL – QA APPROVALS
ALU - QA
2 INSTALLATION OUTDOOR 2.1 Installation Position Feeder Coaxial at Vertical Tray of Tower and Installation Feeder Clamp
COAXIAL FEEDER 7/8"
LADDER TRAY
GROUNDING KITS
TIE WRAP
TIE WRAP
BUSBAR
ISOLATOR
FEEDER CLAMP FOR 7/8"Every 0.8 ~ 1.0 meter
To Antenna Sector 1B (NB)
To Antenna Sector 1A (NA)
To Antenna Sector 2B (PB).To Antenna Sector 2A (PA)
To Antenna Sector 3B (QB).
To Antenna Sector 3A (QA).
Page 19
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
19/33
XL – QA APPROVALS
ALU - QA
2.1.1 Installation Grounding Kit (at the top and bottom)
L i g h t n i n gP r o t e c t i o n
70.00m
B U SB A R 1
GR OU ND IN G KIT(BA C K TO BA CK ) T
O T
OW
ER
MG
B
AN
TE
NN
A S
UP
PO
RT
(BA
CK
TO
bA
CK
GR OU ND IN G KIT(BA C K TO BA CK ) SPA RE SP
AR
E
TO
TO
WE
R M
GB
D ETA ILB U SB A R 1
B U S B A R 2
D E T A IL BU SBA R 3A T H O R IZO N T A L T R A Y
ISO
LA
TO
R
ISO
LA
TO
R
ISO
LA
TO
R
ISO
LA
TO
R
TR
AY
BU
S B
AR
B U S B A R 3
D ET A IL B U SBA RA T V ER T IC A L T R A Y
TR
AY
BU
S B
AR
GR OU ND IN G TOA NTE NN A SEC TOR(BA C K TO BA CK )
D ETA ILB U SB A R 2
Page 20
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
20/33
XL – QA APPROVALS
ALU - QA
2.1.2 Installation Grounding Kit at Feeder Entry (Outdoor)
Busbar
HORIZONTAL TRAY
DETAIL BUSBAR AT HORIZONTAL TRAY & GROUNDING KIT
CABLE TIES (Tie Wrap)
Isolator
Wall
Feeder Hole
Heat Shringkable Sleeve(Condom)
10 cm
30 cm
To Antenna Sector 1A (NA)To Antenna Sector 1B (NB)To Antenna Sector 2A (PA)To Antenna Sector 2B (NB)To Antenna Sector 3A (QA)To Antenna Sector 3B (QB)
Coaxial Feeder
Grounding Kits
Vertical Tray
Cable Ground Kits
Busbar
Grounding Kits
Coaxial Feeder 7/8"
Horizontal Tray
CableGround
CABLE TIES
GROUNDING KITS
Cable Shoe
SS Bolt M8
Busbar
NA
Heat Shrinkable(Condom)
Feedery Entry
CoverFeeder Holes
Label
NB
NA
NB
PAQA
PBQB
Page 21
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
21/33
XL – QA APPROVALS
ALU - QA
2.1.3 Installation Labelling, Wiring Jumper Cable and Grounding at Antenna
NOTES : This is Temporary Standard, The New Standard is on going validation by ALU & XL
B U S B A R
G R O U N DIN G K IT(B A C K T O B A C K ) T
o T
OW
ER
MG
B
B U S B A R
ISO
LA
TO
R
ISO
LA
TO
R
D E T A IL B U S B A R A T V E R T IC A L T R A Y
TR
AY
A N T E N NA S E C T O R(B A C K T O B A C K )
G R O U N D IN G C A BL E
T IE W R A P
G R O U N D IN G C AB L E
T IE W RA P
F EE D E R C AB LE
T IE W RA P
F EE D E R C AB LE
T IE W RA P
NA
L A BE L
L AB E L L AB E L
TR
AYB
US
BA
R
NB
PA
PB
QA
QB
NAQB
PANB
Page 22
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
22/33
XL – QA APPROVALS
ALU - QA
3 INSTALLATION ANTENNA TYPE APM40 3.1 Installation Antenna and Mounting Hardware Part 1
Page 23
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
23/33
XL – QA APPROVALS
ALU - QA
3.2 Installation Antenna and Mounting Hardware Part 2
Page 24
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
24/33
XL – QA APPROVALS
ALU - QA
3.3 Installation Antenna and Mounting Hardware Part 3
Page 25
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
25/33
XL – QA APPROVALS
ALU - QA
3.4 Installation Antenna and Mounting Hardware Part 4
Page 26
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
26/33
XL – QA APPROVALS
ALU - QA
3.5 Installation Antenna and Mounting Hardware Part 5
Page 27
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
27/33
XL – QA APPROVALS
ALU - QA
4 GENERAL MATERIALS 4.1 Feeder Entry :
4.2 Heat Shrinkable Sleeve (Condom) :
Material from Steel grade ST 41 Dimension : 280 x 3 x 520
Material from Rubber Raychem Code : 75/22 ER 3310
Page 28
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
28/33
XL – QA APPROVALS
ALU - QA
4.3 Cable Ties (Tie Wrap) Type CS-300X :
4.4 Cable Ties (Tie wrap) Type CS-390L :
Code Material SIGMA TIES CS – 300X Dimension : 7.6 x 270 Function : Installation Outdoor (at Top Antenna)
Code Material SIGMA TIES CS – 390L Dimension : 4.8 x 270 Function : Installation Indoor (at Jumper Cable)
Page 29
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
29/33
XL – QA APPROVALS
ALU - QA
4.5 Cable Ties (Tie wrap) CS 200L :
4.6 Cable Ties (Tie wrap) CS 150 T :
Code Material SIGMA TIES CS – 200L Dimension : 3.6 x 180 Function : Installation Indoor (at Alarm & PCM Cable)
Code Material SIGMA TIES CS – 150L Dimension : 3.6 x 140 Function : Installation Indoor (for Connection cable at top BTS radio)
Page 30
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
30/33
XL – QA APPROVALS
ALU - QA
4.7 Labelling :
4.8 Connector :
Labelling, material from Acrilique Function : Label Identification
Heat shrinkable sleeve 1/2 DIN Male
7/8 DIN Female O-Ring
CONNECTOR 7/8 RFS
Page 31
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
31/33
XL – QA APPROVALS
ALU - QA
4.9 HHD Cavity Anchor : 4.10 Cable Shoe :
4.11 Protection Edge :
HHD CAVITY ANCHOR Specification Screw Ø5x45mm (Hilti) Function : Fixation for equipment, accessories and bracket cable tray at Gypsum wall.
Cable Shoe 1x35mm
PROTECTION EDGE Specification from Rubber L2000mm
Page 32
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
32/33
XL – QA APPROVALS
ALU - QA
4.12 Clamp Copper rod (SIMEL CH 10.70) :
4.13 Clamp Copper rod (SIMEL BB 50- 80) :
Page 33
8DK 02 05 04 01 00 PCZZA ED 00
EFFECTIVE DATE : 10 SEPTEMBER 2007
XL - RND
33/33
XL – QA APPROVALS
ALU - QA
APPENDIX
NA
RELEVANT DOCUMENTS AND WEB SITES
# Title of the document/web site Reference/Web link [1] Mounting HW APM40, Radio Frequency Systems http://www.rfsworld.com/ [2] Evolution A9100 BTS Installation Manual 3BK 17226 0001 RJZZA Ed.09
ABBREVIATIONS AND ACRONYMS
Wording Definition ALU Alcatel-Lucent
DOCUMENT MANAGEMENT
Location of the reference of this document (electronic copy): ISO9000\3.Work Instruction
HISTORY
Short description of significant changes to previous edition: Edition Originated
Date Effective Date Originator Change Description
00 15 Aug 07 01 Sept 07 Durmawel Sahara First Release
END OF DOCUMENT