What are the essential considerations in developing a robust Pre-K to 8 model? • Considerations for Pre-K to 8 Schools• Conditions needed to support Pre-K to 8 Schools
How do we effectively engage the Patrick Henry and West End Community in a discussion about the Patrick Henry School of the Future?
Do we move forward with the planning/feasibility study in accordance with the Scope of Work?
Essential Questions
3
www.acps.k12.va.us www.acps.k12.va.us
Considerations for Pre-K to 8 Schools Educational continuity - fewer transitions Structure supports personalization/relationships Intimate environment/small school identity More leadership opportunities for middle grade
students Offers families choice at the middle grades Stronger family partnerships Continues the ‘Child’ focus of the elementary grades Students tend to feel safer
www.acps.k12.va.us www.acps.k12.va.us
Considerations for Pre-K to 8 Schools Limited academic course selection Fewer special facilities (science labs, CTE labs, etc.) Fewer opportunities for sports programs Media Center needs a wider selection of materials Certification issues for teachers can make
assignments more challenging Broader focus than just adolescence
www.acps.k12.va.us www.acps.k12.va.us
Pre-K to 8 Academic Outcomes Studies show mixed results compared to
Traditional Middle Schools Growing body of research indicates Math and
Reading achievement higher in Pre-K to 8 than Traditional Middle School
Academic advantage disappears in High School
www.acps.k12.va.us www.acps.k12.va.us
Conditions Neededto Support Pre-K to 8 Schools
Division support/Initiative: Multiple Schools Clear Vision and Mission that stands apart from
Elementary & Middle Schools (Branding & Communication) Unique curriculum offerings Clearly defined leadership and extracurricular
opportunities for adolescents Teacher support for working with Pre-K to Adolescence Clear parental roles
www.acps.k12.va.us www.acps.k12.va.us
Three-tiered Approach: Core Group • Meets Bi-weekly• Membership: Staff members representing ACPS
School Board, administration, facilities, & special projects; City Department of Recreation, Parks & Cultural Activities (RPCA); City Department of General Services(DGS) and project manager
Community Engagement
8
www.acps.k12.va.us www.acps.k12.va.us
Patrick Henry Community Engagement Committee: • PHCEC Meets Monthly• Membership:
The Core Group plus representative members of the community. Care was taken to include a diverse group from each neighborhood & surrounding schools
Community Meetings• Monthly/Quarterly• Membership:
Open to anyone interested in the project
Community Engagement
9
www.acps.k12.va.us www.acps.k12.va.us
Current and projected enrollment across the Division, and in the West End in particular
The Pre-K to 8 educational specifications created in the Fall of 2011
Examples of Schools that included both primary and middle school grades (Pre-K to 8, K to 8, 1 to 8)
Characteristics of the ideal Pre-K to 8 School
Community Meeting Topics
10
www.acps.k12.va.us www.acps.k12.va.us
Participants suggested goals for the overall project include creating a site that is:
• Open and welcoming to the community• Easily accessible by multiple modes of transport,
and from all directions• Respectful of the natural resources and the sense of
open space the site provides
Evolving Design Principles
11
www.acps.k12.va.us www.acps.k12.va.us
Aerial View of the Site
12
www.acps.k12.va.us www.acps.k12.va.us
Community members were asked to envision a 16 - hour day where citizens accessed both the school and recreation center during the school day and attended a myriad of activities until late in the evening.
General Principle - Community
13
www.acps.k12.va.us www.acps.k12.va.us
Participants suggested: • The Recreation Center entrance be separate from
the School and along Taney Avenue• Providing well-lit and marked trails in the wooded
area that include information highlighting the history and natural resources of the site
• Providing lighting at athletic fields to maximize utility. Shield lighting by locating fields on the interior of the site to minimize impact on surrounding residential units
General Principle - Community
14
www.acps.k12.va.us www.acps.k12.va.us
Site access must provide clear entry and exit for daily use vehicles, buses, pedestrians and neighbors and support shared parking.
General Principle - Systems
15
www.acps.k12.va.us www.acps.k12.va.us
Participants suggested:• Locate loading docks & bus drop-off point close to
the edge of the site to minimize impact• Separate drop-off and pick-up for cars, buses and
early childhood classes• Maximize the permeable surface on parking spaces
and pedestrian walkways
General Principle - Systems
16
www.acps.k12.va.us www.acps.k12.va.us
The School and Recreation Center must be environmentally sustainable and connect the students to the natural features of the site which provide rich opportunities for outdoor learning.
General Principle - Ecology
17
www.acps.k12.va.us www.acps.k12.va.us
In order to accomplish this, participants suggested:• Orient structures on the site to maximize
opportunities for natural light and minimize impact on building envelope
• Use water features such as a splash park to irrigate the garden
• Link science curriculum to the design of the building systems
General Principle - Ecology
18
www.acps.k12.va.us www.acps.k12.va.us
Concept 1: • Expansion/reconfiguration/renovation of the existing
facility to house 800 students Concept 2:• Construction of a new Patrick Henry Pre-K to 8 School
on the existing property to house 800 students and demolition of the existing facility
• Concept 3:• Renovation of the existing facility and construction of an
addition to create a new Patrick Henry Pre-K to 8 School to house 800 students
Concepts for Scope of Work
19
www.acps.k12.va.us www.acps.k12.va.us
In addition, coordination with City staff from the Department of Recreation, Parks and Cultural Activities (RPCA) and the Department of General Services (DGS) is essential, to align school planning with the City-funded new Recreation Center on the site.
Concepts for Scope of Work
20
www.acps.k12.va.us www.acps.k12.va.us
A table of design criteria to be used in the project development specifically for Patrick Henry
A survey of the existing building condition A survey of existing site and utilities including
stormwater management considerations Research on all potential environmental constraints
of issues that influence early determinations of the project’s feasibility, timing and cost
Public meetings with City, ACPS officials and community stakeholders
Scope of Work - Tasks
21
www.acps.k12.va.us www.acps.k12.va.us
A concept design that is reasonable and technically feasible for achieving the project goals
Community meetings to gather input and feedback from stakeholders
Opinion of probable cost, a preliminary cost estimate for each proposed project concept
Following review & approval by ACPS Educational Facilities Staff/Patrick Henry Core Group, a final report
Scope of Work - Deliverables
22
www.acps.k12.va.us www.acps.k12.va.us
Timeline:• November 2013 – Notice to Proceed• May 2014 – Feasibility Study School Board
report• June 2014 –School Board Decision on
approved Concept• FY15 – Design of approved concept
Scope of Work - Deliverables
23
www.acps.k12.va.us
Interim Superintendent School BoardKaren A. Graf, Chairman
Kelly C. BoozRonnie Campbell William E. CampbellPatricia Ann HennigStephanie A. Kapsis
Christopher J. LewisMarc Williams
Justin Keating, Vice ChairmanDr. Alvin L. Crawley
Continue community engagement to review & provide feedback on the final report by the A/E
Continue community engagement to advance the design and further develop Pre-K to 8 model (in collaboration with Jefferson-Houston)
Work with RPCA to expand community involvement as we develop recreational opportunities on and around the site
Continue to engage City officials to determine if the construction start date, July 1, 2015 is appropriate
Considerations
www.acps.k12.va.us www.acps.k12.va.us
Pre-K to 8 Reviews• Tamer, M. (Fall, 2012). Do middle schools make sense? Ed. At
http://www.gse.harvard.edu/news-impact/2012/09/do-middle-schools-make-sense/ retrieved 10/29/13
• Northwest Regional Educational Laboratory (Summer, 2012). What the research says (or doesn’t say) about K-8 Versus Middle School Grade Configurations. Education Northwest at http://educationnorthwest.org/news/1694 retrieved 10/29/13
• Blair, L. (April, 2008). Back to the future: The shift to K-8 schools. SEDL Letter at http://www.sedl.org/pubs/sedl-letter/v20n01/k-8_schools.html retrieved 10/29/13
• Rockoof, J.E. and Blockwood, B.B. (Fall, 2010). How and why middle schools harm student achievement. Education Next at http://educationnext.org/files/ednext_20104_68.pdf retrieved 10/29/13
• Vyrnes, V. and Ruby, A. Comparing achievement between K-8 and middle schools: A large scale empirical study. Center for Social Organization of Schools, Johns Hopkins University at http://www.csos.jhu.edu/new/Comparing%20Achievement.pdf retrieved 10/29/13
• Rockoff, J. E. and Lockwood, B. B. (Dec., 2010). Stuck in the middle: Impacts of grade configuration in public schools. Journal of Public Economics, 94, 1051-1061.
• Wiles, J. (2009). Developing Successful K-8 Schools. Corwin Press, Thousand Oaks, CA.