Top Banner
What About Run? Rob England Two Hills Ltd Your pic
12

What about run? Considerations for Agile/DevOps: its not over once its live

Jun 19, 2015

Download

Technology

Rob England

‘Define, Build and Test’ is only part of the story. We also have to Run it, possibly long after Build is done and the team disbanded.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: What about run? Considerations for Agile/DevOps: its not over once its live

What About Run?

Rob EnglandTwo Hills Ltd

Your pic

Page 2: What about run? Considerations for Agile/DevOps: its not over once its live
Page 3: What about run? Considerations for Agile/DevOps: its not over once its live

Terminology

Service Management

ITSM

ITIL

Page 4: What about run? Considerations for Agile/DevOps: its not over once its live

Traditional ITSM • Real IT

• To Protect and Serve

• The old and the new

Page 5: What about run? Considerations for Agile/DevOps: its not over once its live

Paths to the mountain

Page 6: What about run? Considerations for Agile/DevOps: its not over once its live

Operations Some experiences

• Gov.uk

• A website outsourcer

• Agile development teams

Page 7: What about run? Considerations for Agile/DevOps: its not over once its live

Design for Operation• Resilience

• Scalability

• Monitoring

• Database independence

• Compliance

Page 8: What about run? Considerations for Agile/DevOps: its not over once its live

Operational issues• Impact on users

• Operating model

• Security vs openness

• Service levels

• Compliance and audit

• Archiving

• Productionised tools

Page 9: What about run? Considerations for Agile/DevOps: its not over once its live

The future For CD and DevOps

• process over technology

• legacy systems

• complex value chains

• mainstream

• The Hype Cycle

Gartner Hype Cycleexpectations

timeITI

L

DevOps

Page 10: What about run? Considerations for Agile/DevOps: its not over once its live

The future For ITSM

• risk profiles: fail fast

• Change Management facilitator

• automation

• infrastructure as code

• learning culture

• trust culture

Page 11: What about run? Considerations for Agile/DevOps: its not over once its live

TakeawaysITSM describes the world

No silver bullet

Learn from each other

Devops Enterprise: WIP

Page 12: What about run? Considerations for Agile/DevOps: its not over once its live

Thanks for listening…Rob EnglandTwo Hills Ltd www.twohills.co.nzFollow me @theitskeptic

Your pic