Wave and Tidal Energy Lindsay Leask Senior Policy Manager Offshore Renewables
17

Wave and Tidal Energy - European Commission · wave and tidal energy proposals. Survey Deploy and Monitor Three main factors: 1. Environmental sensitivity (of the development location)

Mar 01, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Wave and Tidal Energy - European Commission · wave and tidal energy proposals. Survey Deploy and Monitor Three main factors: 1. Environmental sensitivity (of the development location)

Wave and Tidal Energy

Lindsay Leask

Senior Policy Manager – Offshore Renewables

Page 2: Wave and Tidal Energy - European Commission · wave and tidal energy proposals. Survey Deploy and Monitor Three main factors: 1. Environmental sensitivity (of the development location)

Total Installed Capacity in Scotland

<<Enter the text of your slide here>>

Page 3: Wave and Tidal Energy - European Commission · wave and tidal energy proposals. Survey Deploy and Monitor Three main factors: 1. Environmental sensitivity (of the development location)

Emissions Reductions in Scotland

<<Enter the text of your slide here>>

Page 4: Wave and Tidal Energy - European Commission · wave and tidal energy proposals. Survey Deploy and Monitor Three main factors: 1. Environmental sensitivity (of the development location)

Installed Capacity by Technology

<<Enter the text of your slide here>>

Page 5: Wave and Tidal Energy - European Commission · wave and tidal energy proposals. Survey Deploy and Monitor Three main factors: 1. Environmental sensitivity (of the development location)

Pre-operational Capacity in Scotland

<<Enter the text of your slide here>>

Page 6: Wave and Tidal Energy - European Commission · wave and tidal energy proposals. Survey Deploy and Monitor Three main factors: 1. Environmental sensitivity (of the development location)

Risk: Unduly onerous requirements pre-deployment (survey & baseline evidence gathering) and post deployment (monitoring) Impacts: • Punishes first movers • High costs of engaging with complex

procedures • Delays as developers are unwilling to take

on financial exposure before achieving consent

RUK

Licensing - Striking the Right Balance

Page 7: Wave and Tidal Energy - European Commission · wave and tidal energy proposals. Survey Deploy and Monitor Three main factors: 1. Environmental sensitivity (of the development location)

Marine (Scotland) Act 2010

• Compliments the UK Marine and Coastal Access Act 2009

• Covers:

• Marine Planning • Marine Licensing • Marine Protected Areas

Page 8: Wave and Tidal Energy - European Commission · wave and tidal energy proposals. Survey Deploy and Monitor Three main factors: 1. Environmental sensitivity (of the development location)

Planning Scotland’s Seas

Page 9: Wave and Tidal Energy - European Commission · wave and tidal energy proposals. Survey Deploy and Monitor Three main factors: 1. Environmental sensitivity (of the development location)

Planning Scotland’s Seas

Vision: • Clean • healthy • safe • productive • biologically

diverse oceans and seas

• managed to meet the long term needs of nature and people.

Page 10: Wave and Tidal Energy - European Commission · wave and tidal energy proposals. Survey Deploy and Monitor Three main factors: 1. Environmental sensitivity (of the development location)

Planning Scotland’s Seas

• generate electricity equivalent to 50% of Scotland's gross annual electricity consumption from renewable sources by 2015 and 100% by 2020

• To contribute to achieving

the decarbonisation target of 50gCO2/kWh by 2030 to cut carbon emissions from electricity generation by more than four-fifths.

Page 11: Wave and Tidal Energy - European Commission · wave and tidal energy proposals. Survey Deploy and Monitor Three main factors: 1. Environmental sensitivity (of the development location)

Have we:

• Reduced the risk for first

movers?

• Reduce consenting costs?

• Reduce delays?

Page 12: Wave and Tidal Energy - European Commission · wave and tidal energy proposals. Survey Deploy and Monitor Three main factors: 1. Environmental sensitivity (of the development location)

Survey, Deploy and Monitor

to provide regulators, and developers, with an efficient risk-based approach for taking forward wave and tidal energy proposals.

Page 13: Wave and Tidal Energy - European Commission · wave and tidal energy proposals. Survey Deploy and Monitor Three main factors: 1. Environmental sensitivity (of the development location)

Survey Deploy and Monitor

Three main factors:

1. Environmental sensitivity (of the

development location)

2. Scale of Development; and

3. Device or Technology Classification

Page 14: Wave and Tidal Energy - European Commission · wave and tidal energy proposals. Survey Deploy and Monitor Three main factors: 1. Environmental sensitivity (of the development location)

Europe’s largest,

consented tidal stream

development

86MW

61 turbines

Page 15: Wave and Tidal Energy - European Commission · wave and tidal energy proposals. Survey Deploy and Monitor Three main factors: 1. Environmental sensitivity (of the development location)

• consent is conditional upon the Company deploying the turbines in stages

• Stage One of the Development being limited to a maximum of 6 turbines

• all Subsequent Stages of the Development being subject to the prior written approval of the Scottish Ministers

Phased Development

Page 16: Wave and Tidal Energy - European Commission · wave and tidal energy proposals. Survey Deploy and Monitor Three main factors: 1. Environmental sensitivity (of the development location)

Have we:

• Reduced the risk for first

movers?

• Reduce consenting costs?

• Reduce delays?

Conclusion

Page 17: Wave and Tidal Energy - European Commission · wave and tidal energy proposals. Survey Deploy and Monitor Three main factors: 1. Environmental sensitivity (of the development location)

Thank you.

Lindsay Leask

Senior Policy Manager – Offshore Renewables

[email protected]

scottishrenewables.com