25-5-2009 Challenge the future Delft University of Technology Water management in urban areas Design, Building site preparation Dr. ir. Frans H.M. van de Ven
41

Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

Aug 25, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

25-5-2009

Challenge the future

DelftUniversity ofTechnology

Water management in urban areasDesign, Building site preparation

Dr. ir. Frans H.M. van de Ven

Page 2: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

2Water management in urban areas – Design, Building site preparation | 41

The urban water assignment

Administrative assignment:• Safety � ”dry feet”• Healthy environment

• Public health

• Ecologic quality

• “Pleasant living and work environment for all layers of the society”

Technical assignment:• Surface water• Water quality

• Ground water

Page 3: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

3Water management in urban areas – Design, Building site preparation | 41

Steps

• Step 1: The surface water

• 1.a. Separate urban water from surrounding water

• 1.b. Determine the drainage options

• 1.c. Determine water level, freeboard, dHmax

• 1.d. Determine the needed storage

• 1.e. What do we calculate as storage ?

• 1.f. Reduce damage when exceeding the design standard

• 1.g. Hydraulic discharge capacity

• Step 2. The water quality

• Step 3. Ground water

• 3.a. Drainage depth, drain dept, drainage level

• 3.b. Type of drainage system

• 3.c. Lay-out of system

• 3.d. Type of drainage tube

Step by step approach

Page 4: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

4Water management in urban areas – Design, Building site preparation | 41

Step 1: The surface water

Page 5: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

5Water management in urban areas – Design, Building site preparation | 41

1.a. Separate urban water from

surrounding water

With a weir or pumping station

Because:

1. Strict standards

• Water level variations

• Water quality

2. Other ground level

3. Other interest (party)

4. Other water administrators

5. Other operational control

citycity

Page 6: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

6Water management in urban areas – Design, Building site preparation | 41

1.b. Determine the drainage options

• Fast drainage � Slow Drainage

• “spread” discharge peak

Drainage city ���� Drainage river basin

Page 7: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

7Water management in urban areas – Design, Building site preparation | 41

City can help rural area !

Enquiry on connection city � river basin

From results:

maximal discharge capacity Qmax

[mm/day of l/s/ha]

Of urban area

1.b. Determine the drainage optionsDrainage city ���� Drainage river basin

Page 8: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

8Water management in urban areas – Design, Building site preparation | 41

1.c. Determine water level, freeboard,

dHmax

As a function of:

• Consolidation

• Seepage

• Hydraulic gradient

for sewer-discharge

• Desirable ground water-

regime

• Drainage

dHdHmaxmax

FreeboardFreeboard

and FreeboarddHmaxandand FreeboarddHmax

Page 9: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

9Water management in urban areas – Design, Building site preparation | 41

1.c. Determine water level, freeboard,

dHmaxKnown values

12 - 14Design discharge

(mm/day)

0.3 – 0.5dHmax (m) T=10 year

0.9 – 1.3Freeboard (m)

2004

Page 10: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

10Water management in urban areas – Design, Building site preparation | 41

1.d. Determine the required storage

Page 11: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

11Water management in urban areas – Design, Building site preparation | 41

1.d. Storage � Discharge capacity

• Storage and discharge are “exchangeable” !• Slow discharge small box

• Needed Storage = function of

discharge capacity and velocity water input

Depending on urban design

Page 12: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

12Water management in urban areas – Design, Building site preparation | 41

1.d. Determine the required storage

• ‘Reservoir-model

precipitation-discharge model

Hydrological model

Precipitation (t)

Discharge capacity Q

Precipitation discharge

STORAGE(t)

- losses- delay

seepage and drainage water

Discharge capacity Q

Precipitation discharge

STORAGE(t)

- losses- delay

seepage and drainage water

Page 13: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

13Water management in urban areas – Design, Building site preparation | 41

1.d. Determine the required storage

• Reservoir precipitation-discharge

model

Take in account:

• Water losses

• Disconnected area

• Infiltration, vegetated swails

Precipitation (t)

FAST

- Losses

- Delays

Storage (t)

Qseepage,

drains

SLOW

- Losses

- Delays

Hydrological model

Page 14: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

14Water management in urban areas – Design, Building site preparation | 41

1.d. Determine the required storageExtreme value statistics

Use 100 years precipitation data=> 100 years of stored volume

=> how much storage needed 1x / per 10, 20 …100 year?

(Statistics afterwards)

Page 15: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

15Water management in urban areas – Design, Building site preparation | 41

1.d. Determine required storageResults

Storage-Discharge-capacity-lines

Discharge capacity (l/s/ha)

storagem3/ha

0,5 1,0 1,5 2,0 2,5T = 20 year

T = 10 year

T = 5 year

Discharge capacity (l/s/ha)

storagem3/ha

0,5 1,0 1,5 2,0 2,5T = 20 year

T = 10 year

T = 5 year

storagem3/ha

0,5 1,0 1,5 2,0 2,5T = 20 year

T = 10 year

T = 5 year

storagem3/ha

0,5 1,0 1,5 2,0 2,5T = 20 year

T = 10 year

T = 5 year

Page 16: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

16Water management in urban areas – Design, Building site preparation | 41

1.d. Storage – discharge capacity

lines

Storagem3/ha

Discharge capacity (l/s/ha)0,5 1,0 1,5 2,0 2,5

T = 20 year

T = 10 year

Option 1

Option 2

Qmax

Storagem3/ha

Discharge capacity (l/s/ha)0,5 1,0 1,5 2,0 2,5

T = 20 year

T = 10 year

Option 1

Option 2

Qmax

Page 17: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

17Water management in urban areas – Design, Building site preparation | 41

1.d. Storage – discharge capacity curvesStoragem3/ha

Discharge capacity (l/s/ha)0,5 1,0 1,5 2,0 2,5

T = 20 year

T = 10 year

Qmax

WATCH OUT:

small Q � Large Storage

in case of extreme weather

Page 18: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

18Water management in urban areas – Design, Building site preparation | 41

1.d. Storage – discharge capacity curves

0

50

100

150

200

250

300

350

400

450

500

0,0 2,0 4,0 6,0 8,0 10,0 12,0 14,0 16,0 18,0 20,0 22,0 24,0 26,0 28,0 30,0

Discharge capacity [mm/dag]

surfa

ce w

ater

sto

rag

e [m

3/h

a]

T=5T=10T=25T=50T=100T=250

200 m3/ha

Results

Page 19: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

19Water management in urban areas – Design, Building site preparation | 41

1.e. Storage in m3 to storage in m2

What do we consider as storage ?

• Asurface water x dHmax

2. Storage on the river bank or in an inundation area ?

3. [ Storage on the street (or verge) and in the ground

is deducted in the storage-discharge model! ]

Page 20: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

20Water management in urban areas – Design, Building site preparation | 41

1.e. What do we consider as storage ?

Storage on river bank and inundation area

Start situationStart situationStart situation

more surface watermore surface water

And / or inundation areaAnd / or inundation area

Page 21: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

21Water management in urban areas – Design, Building site preparation | 41

Example:

dHmax = 0,4 m

B = 200 m3/ha

So A surface water = 5 %

• A surface water can also realized as inundation area

• Keep enough hydraulic capacity in the canal

1.e. Storage in m3 to storage in m2

Page 22: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

22Water management in urban areas – Design, Building site preparation | 41

1.f. Reduce damage when exceeding

the design standard

Most forgotten step!!

• Enough storage on the street, verge, green areas, etc.

• High barrier in basements

• Enough drainage, crawlspaces and roads

• Vital infrastructure parts “high” water secure

(electrics, mobile network, drinking water, gas)

Page 23: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

23Water management in urban areas – Design, Building site preparation | 41

1.f. Storage on the street

0,15 mfloor

street

0,3 mfloor

street

0,15 mfloor

street

0,3 mfloor

street

Page 24: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

24Water management in urban areas – Design, Building site preparation | 41

1.g. Hydraulic discharge capacity

Discharge by U-gutter (Japan)

Page 25: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

25Water management in urban areas – Design, Building site preparation | 41

Step 2. The water quality

Page 26: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

26Water management in urban areas – Design, Building site preparation | 41

2. Water quality standards & values

Water framework directive• Water body => GEP, MEP => take measures

Functions => standards • Fishing water, swimming water, …

Policy “vierde Nota Waterhuishouding”• Make use of ecological processes• Deal with pollution sources• Make selective disconnectionsWhich direction should we choose?

Page 27: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

27Water management in urban areas – Design, Building site preparation | 41

2. Usage demands good quality

Functions as:

• Ecologic diversity

• Irrigation water

• Fishing water

• Swim water

• Energy supply

• …

demand Good water qualityso: 1. Control sources!

over flows, traffic, building material, air pollution, pesticides, dogs, etc.

2. Stimulate ecological purification3. Monitoring & testing4. [Adjusting …]

Page 28: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

28Water management in urban areas – Design, Building site preparation | 41

2. Ecological purification

Stimulate• Settlement• Flow velocity• Sun light

Rain sewer

sedimentationzone

Flow / turbulention

Rain sewer

sedimentationzone

Flow / turbulention

Page 29: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

29Water management in urban areas – Design, Building site preparation | 41

2. Improve water quality

• Has a influence on organization

• Of the surface water

• And the neighborhood

• So after step 1

• (Design quantity surface water)

• Add design in favor of water

quality and ecology

Page 30: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

30Water management in urban areas – Design, Building site preparation | 41

Step 3. Ground water

• Strongly related to step 1 and step 2

• Depended on soil,

geo-hydrology, construction

• More parties responsible :

• Private space

• Municipality for public area and discharge private

Page 31: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

31Water management in urban areas – Design, Building site preparation | 41

3. Ground water control

Can be achieved by:

• Raising the ground level

• Larger freeboard / lowering water

level

• More intensive drainage (drainage,

IT-sewer, canals)

OR less strict standards because of

• Controlling consolidation

• Buildings without crawlspaces

• Design of street

• Wet gardens and public green

Page 32: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

32Water management in urban areas – Design, Building site preparation | 41

3. Ground water control

By means of:

• Raising the ground level elaborate later

• Larger freeboard / lowering water level see step 1

• More drainage (sewer, canal) elaborate now

Or less strict standards because of:

• Controlling consolidation

• Buildings without crawlspaces see step 1

• Design of street

Page 33: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

33Water management in urban areas – Design, Building site preparation | 41

3. Ground water control

Variables:

• Drainage depth

• Drainage- or discharge level

• Depth of drain pipe

• Drainage system

• Lay-out / location of the drain

• Drain pipe type and covering

• Diameter drainage pipe

Design step by step

Page 34: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

34Water management in urban areas – Design, Building site preparation | 41

3.a. Drainage depth, depth of drain

pipe, drainage level

Drainage depth = function (design area and buildings)see standards / guidelines

Drainage level = < freeboard or pump drainage

Choose with help of a hydrological model (simple or complex)

Because of - seepage (quantity & quality of that water)- infiltration rain water- relation with the type of drainage system

Page 35: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

35Water management in urban areas – Design, Building site preparation | 41

3.a. Standards on drainage-depthDepends on usage in building and living phase

• static: drainage-depth with discharge design

• dynamic:

• Ground water level with exceeding frequently

(e.g.: 0,7 m-mv and max. 14 days/year)

• GHG (average highest ground water level)

Page 36: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

36Water management in urban areas – Design, Building site preparation | 41

3.b. Type of drainage system

Page 37: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

37Water management in urban areas – Design, Building site preparation | 41

3.b. Type of drainage system

Public space:“Road-fill drainage”, “sewer trench drains”, preferably on property borders, vegetated swale, infiltration trench with drain

Private space:Ring drain or building-block drain

DO NOT discharge on storm sewers from improved separated system;Do discharge on storm sewer of normal separated systems.

Enough cleaning points!Preferably enable digging up

Page 38: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

38Water management in urban areas – Design, Building site preparation | 41

3.c. Lay-out of system

Estimate drain distance L with Hooghoudt:

q = (8 * K2 * d * h + 4 * K1 * h2) / L2

Page 39: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

39Water management in urban areas – Design, Building site preparation | 41

3.c. Lay-out of system

Where can we lay pipes?

• Where in public area (building

side phase)

• Where in private area

(constructor)

• Maintenance (living phase,

municipality)

Page 40: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

40Water management in urban areas – Design, Building site preparation | 41

3.d. Type of drainage tube

Tubes:

• PVC corrugated tube

• IT sewer pipe

• Covering materials:

• polypropeen (non woven) or granular

• in sand O90 > 450; O90 of 600-700 often suitable

O90 –figure means, that 90 % of the pores are smaller than a micrometer

Page 41: Water management in urban areas - TU Delft OCW...Water management in urban areas –Design, Building site preparation 2| 41 The urban water assignment Administrative assignment: •Safety

41Water management in urban areas – Design, Building site preparation | 41

Summary:

The urban water assignment combines

• Surface water

• Water quality

• Ground water

These factor are directly related with

• The urban design of the site

• Controlling consolidation

• ….

And therefore have to be dealt with at the same time