    Energy from Waste with Combined Heat and Power Facility, Oxwellmains

    Appendix B

    Indicative EfW Plant Construction and Commissioning Timeline

  • 7/30/2019 Waste to Energy Project Planning

    2/5

    Energy from Waste with Combined Heat and Power Facility, Oxwellmains

  • 7/30/2019 Waste to Energy Project Planning

    3/5

    ID Task Name1 MILESTONES - CLIENT ACTIVITIES2 CONTRACT AWARD3 Approval Process and Mechanical basic design4 Submission Turbine Design Specification5 Approval Electrical and Process control basic design6 WtE Plant Floorslab, Levels and Foundations Acceptance

    Constraint towards Civil works project programme7 Electrical Power Supply to LV Switchboards Available8 Plant Utility systems Operational9 Waste Available for Crane Drivers Training

    10 Start waste combustion11 TAKE OVER of delivery scope WtE plant12 TAKE OVER1314 BASIC DESIGN15 Mobilise project team, set-up project standards16 Project Kick-off Meeting17 H&M Balance , PFD's18 Prel iminary P&ID's19 Preliminary General Arrangement20 Preliminary Civil Drawings, Load List21 Preliminary Equipment Data Sheets22 Prel iminary EIA Data2324 DETAILED ENGINEERING25 Process Design - P&ID's for Construction26 General Arrangement Drawings27 Civil design: foundations, superstructures .28 EIA Engineering for Construction, IO list, Consumer list 29 Process Control Programming30 Specification Low Voltage Switchboards31 Design Furnace Gra te32 Specification Furnace auxiliary equipment33 Design Boiler 34 CFD Modelling

    35 Design Auxiliary Equipment WtE plant36 Design Turbine, Condensor and Auxiliary Equipment37 Submission AS BUILT documentation Furnace / Boiler 3839 EQUIPMENT PURCHASE40 Contracting civil design and realisation company41 Furnace Grate42 Furnace Auxil iary Equipment43 Auxil iary Equipment WtE plant44 Turbine, Condensor and Auxiliary Equipment45 Low Voltage Switchboards46

    CONTRACT AWARD

    Submission Turbine Design Specification

    WtE Plant Floorslab, Levels and Foundations Acceptance Constraint towards Civil works project programme

    Electrical Power Supply to LV Switchboards AvailablePlant Utility systems Operational

    Waste Available for Crane Drivers TrainingStart waste combustionTAKE OVER of delivery scope WtE plant

    TAKE OVER

    M-1 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28

    DUNBARTURN-KEY WASTE to ENERGY & FLUE GAS CLEANING PLANT

    Electro - mechanical scope of supply

    page 1 of 3

    doc nr : 4061_Sch4_Q4_incCFDdate : Fri 29/01/10By : PHo / Approv : ICAR - EP

  • 7/30/2019 Waste to Energy Project Planning

    4/5

    ID Task Name47 EQUIPMENT MANUFACTURING48 Furnace Grate49 Furnace Auxil iary Equipment50 Boiler Steelstructure and Pressure parts51 Auxil iary WtE plant Equipment52 Turbine, Condensor and Auxiliary Equipment53 Low Voltage Switchboards5455 CIVIL WORKS / INDICATIVE56 Opening site, Commencement of the works57 Substructure works, foundations, floorslab

    5 8 Sup erstr ucture s59 Walls, roof 60 Finishing accommodations, surroundings6162 EQUIPMENT INSTALLATION63 TRAIN # A64 Furnace Grate6 5 Fu rn ace Auxi lia ry Equ ipmen t66 Boiler Steelstructure and Pressure parts67 Flue Gas Cleaning Plant68 TRAIN # B69 Furnace Grate

    7 0 Fu rn ace Auxi lia ry Equ ipmen t71 Boiler Steelstructure and Pressure parts72 Flue Gas Cleaning Plant73 BALANCE OF PLANT74 Auxi li ary WtE p lant Equ ipment75 Turbine , Condensor and Auxil iary Equipment76 Piping77 MCC's , Elect ri ca l Cab ling WtE Plan t78 Elect ri ca l Cabl ing Turbine Plan t7980 COMMISSIONING AND START-UP81 TRAIN # A

    8 2 Cold Co mmission ing W tE Pl ant8 3 War m Co mmissi on ing WtE Pl an t84 Start Burners, Curing Refractory, Boiler Cleaning85 Boiler Coo l Down, F ina l Inspec tion86 Start-up WtE Plant87 Start Waste Incineration, Fine tuning8 8 Stea m De liver y, Fin e tuning89 TRAIN # B9 0 Cold Co mmission ing W tE Pl ant9 1 War m Co mmissi on ing WtE Pl an t92 Start Burners, Curing Refractory, Boiler Cleaning93 Boiler Coo l Down, F ina l Inspec tion

    M-1 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28

    DUNBARTURN-KEY WASTE to ENERGY & FLUE GAS CLEANING PLANT

    Electro - mechanical scope of supply

    page 2 of 3

    doc nr : 4061_Sch4_Q4_incCFDdate : Fri 29/01/10By : PHo / Approv : ICAR - EP

  • 7/30/2019 Waste to Energy Project Planning

    5/5

    ID Task Name94 Start-up WtE Plant95 Start Waste Incineration, Fine tuning9 6 Stea m De liver y, Fin e tuning97 Commissioning Turbine - Condensor Plant98 Cold Commissioning Turbine = Condensor Plant99 Warm Commiss ion ing Condensor P lant

    100 Warm Commiss ion ing Turb ine P lan t101 TEST RUN

    M-1 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28

    DUNBARTURN-KEY WASTE to ENERGY & FLUE GAS CLEANING PLANT

    Electro - mechanical scope of supply

    page 3 of 3

    doc nr : 4061_Sch4_Q4_incCFDdate : Fri 29/01/10By : PHo / Approv : ICAR - EP