Page 1
24 Januari 2014 24 January 2014
P.U. (A) 30
WARTA KERAJAAN PERSEKUTUAN
FEDERAL GOVERNMENT
GAZETTE
PERINTAH JALAN-JALAN PERSEKUTUAN (PENGURUSAN PERSENDIRIAN) (PUNGUTAN TOL)
(LEBUH RAYA JURU-JALAN DUTA-BUKIT RAJA, LEBUH RAYA UTARA SELATAN HUBUNGAN TENGAH DAN LEBUH RAYA KUALA LUMPUR-JOHOR BAHRU)
(PINDAAN) (NO. 2) 2014
FEDERAL ROADS (PRIVATE MANAGEMENT) (COLLECTION OF TOLLS) (JURU-JALAN DUTA-BUKIT RAJA
EXPRESSWAY, NORTH SOUTH EXPRESSWAY CENTRAL LINK AND KUALA LUMPUR-JOHORE BAHRU EXPRESSWAY)
(AMENDMENT) (NO. 2) ORDER 2014
DISIARKAN OLEH/
PUBLISHED BY JABATAN PEGUAM NEGARA/
ATTORNEY GENERAL’S CHAMBERS
Page 2
P.U. (A) 30
2
AKTA JALAN-JALAN PERSEKUTUAN (PENGURUSAN PERSENDIRIAN) 1984
PERINTAH JALAN-JALAN PERSEKUTUAN (PENGURUSAN PERSENDIRIAN) (PUNGUTAN TOL) (LEBUH RAYA JURU-JALAN DUTA-BUKIT RAJA, LEBUH RAYA UTARA
SELATAN HUBUNGAN TENGAH DAN LEBUH RAYA KUALA LUMPUR-JOHOR BAHRU) (PINDAAN) (NO. 2) 2014
PADA menjalankan kuasa yang diberikan oleh seksyen 2 Akta Jalan-Jalan Persekutuan
(Pengurusan Persendirian) 1984 [Akta 306], Menteri membuat perintah yang berikut:
Nama dan permulaan kuat kuasa
1. (1) Perintah ini bolehlah dinamakan Perintah Jalan-Jalan Persekutuan
(Pengurusan Persendirian) (Pungutan Tol) (Lebuh Raya Juru-Jalan Duta-Bukit
Raja, Lebuh Raya Utara Selatan Hubungan Tengah dan Lebuh Raya Kuala Lumpur-
Johor Bahru) (Pindaan) (No. 2) 2014.
(2) Perintah ini mula berkuat kuasa pada 25 Januari 2014.
Pindaan perenggan 2
2. Perintah Jalan-Jalan Persekutuan (Pengurusan Persendirian) (Pungutan Tol)
(Lebuh Raya Juru-Jalan Duta-Bukit Raja, Lebuh Raya Utara Selatan Hubungan Tengah
dan Lebuh Raya Kuala Lumpur-Johor Bahru) 2002 [P.U. (A) 171/2002], yang disebut
“Perintah ibu” dalam Perintah ini, dipinda—
(a) dalam subperenggan 2(1)—
(i) dalam teks bahasa Inggeris, dengan menggantikan perkataan
“Third A Schedule” dengan perkataan “Third Schedule A”; dan
(ii) denggan menggantikan “Jadual Ketiga A” dengan perkataan “Jadual
Ketiga B”; dan
(b) dalam subsubperenggan (2)(2)(a)—
Page 3
P.U. (A) 30
3
(i) dalam teks bahasa Inggeris, dengan menggantikan perkataan
“Third A Schedule” dengan perkataan “Third Schedule A”; dan
(ii) dengan menggantikan perkataan “Jadual Ketiga A” dengan
perkataan “Jadual Ketiga B”.
Pindaan Jadual Ketiga A
3. Jadual Ketiga A kepada Perintah ibu dipinda, dalam teks bahasa Inggeris,
dengan menggantikan perkataan “THIRD A SCHEDULE” dengan perkataan
“THIRD SCHEDULE A”.
Jadual baru Ketiga B
4. Perintah ibu dipinda dengan memasukkan selepas Jadual Ketiga A jadual yang
berikut:
“JADUAL KETIGA B
KADAR TOL BAGI TEMPOH DARI 25 JANUARI 2014 HINGGA 31 DISEMBER 2015 BAGI
PERSIMPANGAN BERTINGKAT BUKIT GAMBIR
Plaza Tol Masuk: Bukit Gambir
(1)
Plaza Tol Keluar
(2)
Tol Kena Dibayar (RM) Mengikut Kelas Kenderaan
Kelas 1 Kelas 2 Kelas 3 Kelas 4 Kelas 5
1. Juru 68.20 102.30 136.30 34.10 51.10 2. Bukit Tambun 67.30 101.00 134.50 33.70 50.40 3. Jawi 65.70 98.50 131.20 32.80 49.20 4. Bandar Baharu 63.80 95.80 127.60 31.90 47.80 5. Bukit Merah 61.50 92.20 122.80 30.70 46.00 6. Taiping Utara 60.00 89.90 119.80 30.00 44.90 7. Changkat Jering 57.80 86.70 115.50 28.90 43.30 8. Kuala Kangsar 54.90 82.40 109.70 27.50 41.10 9. Ipoh Selatan 51.40 77.10 102.70 25.70 38.50 10. Simpang Pulai 49.70 74.60 99.40 24.90 37.30 11. Gopeng 48.40 72.70 96.90 24.30 36.30 12. Tapah 44.40 66.60 88.70 22.20 33.20 13. Bidor 42.60 63.90 85.20 21.30 31.90
Page 4
P.U. (A) 30
4
14. Sungkai 40.70 61.10 81.40 20.40 30.50 15. Slim River 38.10 57.20 76.20 19.10 28.60 16. Behrang 36.00 54.00 72.00 18.10 27.00 17. Tanjong Malim 34.40 51.70 68.90 17.30 25.80 18. Lembah Beringin 33.10 49.70 66.30 16.60 24.80 10. Bukit Tagar 31.90 47.80 63.70 16.00 23.90 20. Bukit Beruntung 30.60 46.00 61.20 15.40 22.90 21. Sungai Buaya 29.80 44.80 59.60 15.00 22.30 22. Rawang 28.60 42.90 57.20 14.30 21.40 23. Rawang Selatan 27.90 41.90 55.80 14.00 20.90 24. Sungai Buloh Utara 27.20 40.90 54.40 13.70 20.40 25. Sungai Buloh 26.90 40.40 53.80 13.50 20.10 26. Jalan Duta 27.50 41.30 55.00 13.80 20.60 27. Kota Damansara 26.10 39.20 52.30 13.10 19.60 28. Damansara 25.90 38.80 51.70 13.00 19.40 29. Subang 25.30 38.00 50.60 12.70 19.00 30. Setia Alam 25.90 38.70 51.70 12.90 19.40 31. Bukit Raja 26.00 38.90 52.00 13.00 19.50 32. Shah Alam 24.80 37.10 49.40 12.30 18.60 33. Ebor 24.00 36.00 47.90 12.00 18.00 34. Seafield 23.90 35.80 47.80 11.90 18.00 35. USJ 23.40 35.10 46.70 11.70 17.50 36. Putra Heights 22.80 34.20 45.50 11.40 17.10 37. Bandar Saujana Putra 22.30 33.30 44.40 11.10 16.70 38. Putrajaya 22.70 34.10 45.50 11.40 17.10 39. KLIA 21.20 31.50 41.80 10.80 16.00 40. Sungai Besi 21.70 32.60 43.60 10.90 16.30 41. UPM 20.30 30.50 40.60 10.20 15.20 42. Kajang 20.10 30.10 40.10 10.00 15.00 43. Bangi 19.20 28.70 38.30 9.60 14.40 44. Putra Mahkota 18.20 27.30 36.40 9.10 13.70 45. Nilai 17.10 25.60 34.10 8.50 12.80 46. Seremban 14.60 21.80 29.10 7.30 10.90 47. Port Dickson 14.20 21.30 28.40 7.10 10.70 48. Senawang 13.70 20.60 27.50 6.90 10.30 49. Pedas Linggi 11.50 17.20 23.00 5.70 8.60 50. Simpang Ampat 8.40 12.50 16.70 4.20 6.30 51. Ayer Keroh 5.40 8.20 10.90 2.70 4.10 52. Jasin 3.60 5.40 7.20 1.80 2.70 53. Tangkak 1.80 2.80 3.70 0.90 1.40 54. Pagoh 2.20 3.40 4.50 1.10 1.70 55. Yong Peng Utara 8.10 12.10 16.20 4.00 6.10 56. Air Hitam 10.70 16.10 21.50 5.40 8.10 57. Machap 11.80 17.60 23.50 5.90 8.80 58. Simpang Renggam 13.70 20.50 27.30 6.80 10.30 59. Sedenak 16.20 24.30 32.40 8.10 12.10 60. Kulai 18.00 27.00 36.00 9.00 13.50
Page 5
P.U. (A) 30
5
61. Senai Utara 19.20 28.90 38.50 9.60 14.40 62. Skudai 19.70 29.50 39.30 9.80 14.70
Plaza Tol Keluar: Bukit Gambir
(1)
Plaza Tol Masuk
(2)
Tol Kena Dibayar (RM) Mengikut Kelas Kenderaan
Kelas 1 Kelas 2 Kelas 3 Kelas 4 Kelas 5
1. Juru 68.20 102.30 136.30 34.10 51.10 2. Bukit Tambun 67.30 101.00 134.50 33.70 50.40 3. Jawi 65.70 98.50 131.20 32.80 49.20 4. Bandar Baharu 63.80 95.80 127.60 31.90 47.80 5. Bukit Merah 61.50 92.20 122.80 30.70 46.00 6. Taiping Utara 60.00 89.90 119.80 30.00 44.90 7. Changkat Jering 57.80 86.70 115.50 28.90 43.30 8. Kuala Kangsar 54.90 82.40 109.70 27.50 41.10 9. Ipoh Selatan 51.40 77.10 102.70 25.70 38.50 10. Simpang Pulai 49.70 74.60 99.40 24.90 37.30 11. Gopeng 48.40 72.70 96.90 24.30 36.30 12. Tapah 44.40 66.60 88.70 22.20 33.20 13. Bidor 42.60 63.90 85.20 21.30 31.90 14. Sungkai 40.70 61.10 81.40 20.40 30.50 15. Slim River 38.10 57.20 76.20 19.10 28.60 16. Behrang 36.00 54.00 72.00 18.10 27.00 17. Tanjong Malim 34.40 51.70 68.90 17.30 25.80 18. Lembah Beringin 33.10 49.70 66.30 16.60 24.80 19. Bukit Tagar 31.90 47.80 63.70 16.00 23.90 20. Bukit Beruntung 30.60 46.00 61.20 15.40 22.90 21. Sungai Buaya 29.80 44.80 59.60 15.00 22.30 22. Rawang 28.60 42.90 57.20 14.30 21.40 23. Rawang Selatan 27.90 41.90 55.80 14.00 20.90 24. Sungai Buloh Utara 27.20 40.90 54.40 13.70 20.40 25. Sungai Buloh 26.90 40.40 53.80 13.50 20.10 26 Jalan Duta 27.50 41.30 55.00 13.80 20.60 27. Kota Damansara 26.10 39.20 52.30 13.10 19.60 28. Damansara 25.90 38.80 51.70 13.00 19.40 29. Subang 25.30 38.00 50.60 12.70 19.00 33. Setia Alam 25.90 38.70 51.70 12.90 19.40 31. Bukit Raja 26.00 38.90 52.00 13.00 19.50 32. Shah Alam 24.80 37.10 49.40 12.30 18.60 33. Ebor 24.00 36.00 47.90 12.00 18.00 34. Seafield 23.90 35.80 47.80 11.90 18.00 35. USJ 23.40 35.10 46.70 11.70 17.50 36. Putra Heights 22.80 34.20 45.50 11.40 17.10
Page 6
P.U. (A) 30
6
KELAS KENDERAAN
Kelas 1: Kenderaan yang mempunyai dua gandar dan tiga atau empat roda (tidak
termasuk teksi dan bas)
Kelas 2: Kenderaan yang mempunyai dua gandar dan lima atau enam roda (tidak
termasuk bas)
Kelas 3: Kenderaan yang mempunyai tiga gandar atau lebih (tidak termasuk bas)
Kelas 4: Teksi
Kelas 5: Bas
Bagi maksud mengira bilangan gandar dan roda sesebuah kenderaan, gandar dan roda
mana-mana treler yang ditarik oleh kenderaan itu hendaklah termasuk sebagai
sebahagian daripada gandar dan roda kenderaan itu.”.
37. Bandar Saujana Putra 22.30 33.30 44.40 11.10 16.70 38. Putrajaya 22.70 34.10 45.50 11.40 17.10 39. KLIA 21.20 31.50 41.80 10.80 16.00 40. Sungai Besi 21.70 32.60 43.60 10.90 16.30 41. UPM 20.30 30.50 40.60 10.20 15.20 42. Kajang 20.10 30.10 40.10 10.00 15.00 43. Bangi 19.20 28.70 38.30 9.60 14.40 44. Putra Mahkota 18.20 27.30 36.40 9.10 13.70 45. Nilai 17.10 25.60 34.10 8.50 12.80 46. Seremban 14.60 21.80 29.10 7.30 10.90 47. Port Dickson 14.20 21.30 28.40 7.10 10.70 48. Senawang 13.70 20.60 27.50 6.90 10.30 49. Pedas Linggi 11.50 17.20 23.00 5.70 8.60 50. Simpang Ampat 8.40 12.50 16.70 4.20 6.30 51. Ayer Keroh 5.40 8.20 10.90 2.70 4.10 52. Jasin 3.60 5.40 7.20 1.80 2.70 53. Tangkak 1.80 2.80 3.70 0.90 1.40 54. Pagoh 2.20 3.40 4.50 1.10 1.70 55. Yong Peng Utara 8.10 12.10 16.20 4.00 6.10 56. Air Hitam 10.70 16.10 21.50 5.40 8.10 57. Machap 11.80 17.60 23.50 5.90 8.80 58. Simpang Renggam 13.70 20.50 27.30 6.80 10.30 59. Sedenak 16.20 24.30 32.40 8.10 12.10 60. Kulai 18.00 27.00 36.00 9.00 13.50 61. Senai Utara 19.20 28.90 38.50 9.60 14.40 62. Skudai 19.70 29.50 39.30 9.80 14.70
Page 7
P.U. (A) 30
7
Penggantian Jadual Ketiga Belas
5. Perintah ibu dipinda dengan menggantikan dalam Jadual Ketiga Belas dengan
jadual yang berikut:
Page 8
P.U. (A) 30
8
PETA LEBUH RAYA JURU - JALAN DUTA - BUKIT RAJA,
LEBUH RAYA UTARA SELATAN HUBUNGAN TENGAH DAN
LEBUH RAYA KUALA LUMPUR - JOHOR BAHRU
JOHOR
NEGERI SEMBILAN
MELAKA
PAHANG
TERENGGANU
KUALALUMPUR
SELANGOR
PERAK
SELAT MELAKA
JADUAL KETIGA BELAS [ Subperenggan 2(3) ]
KELANTAN
KEDAHPULAU
PINANG
MAP OF JURU - JALAN DUTA - BUKIT RAJA EXPRESSWAY,
NORTH SOUTH EXPRESSWAY CENTRAL LINK AND
KUALA LUMPUR - JOHORE BAHRU EXPRESSWAY
JOHOR
NEGERI SEMBILAN
MELAKA
PAHANG
TERENGGANU
KUALALUMPUR
SELANGOR
PERAK
SELAT MELAKA
THIRTEENTH SCHEDULE [ Subparagraph 2(3) ]
KELANTAN
KEDAHPULAU
PINANG
“JADUAL KETIGA BELAS
[subperenggan 2(3)]
”.
Page 9
P.U. (A) 30
9
Dibuat 22 Januari 2014 [KKR.PUU.110-1/7/1; PN(PU2)426/LIV]
DATUK HAJI FADILLAH BIN HAJI YUSOF Menteri Kerja Raya
Page 10
P.U. (A) 30
10
FEDERAL ROADS (PRIVATE MANAGEMENT) ACT 1984
FEDERAL ROADS (PRIVATE MANAGEMENT) (COLLECTION OF TOLLS) (JURU-JALAN DUTA-BUKIT RAJA EXPRESSWAY, NORTH SOUTH EXPRESSWAY CENTRAL LINK AND
KUALA LUMPUR-JOHORE BAHRU EXPRESSWAY) (AMENDMENT) (NO. 2) ORDER 2014 IN exercise of the powers conferred by section 2 of the Federal Roads (Private
Management) Act 1984 [Act 306], the Minister makes the following order:
Citation and commencement
1. (1) This order may be cited as the Federal Roads (Private Management)
(Collection of Tolls) (Juru-Jalan Duta-Bukit Raja Expressway, North South
Expressway Central Link and Kuala Lumpur-Johore Bahru Expressway)
(Amendment) (No. 2) Order 2014.
(2) This Order comes into operation on 25 January 2014.
Amendment of paragraph 2
2. The Federal Roads (Private Management) (Collection of Tolls) (Juru-Jalan Duta-
Bukit Raja Expressway, North South Expressway Central Link and Kuala Lumpur-Johore
Bahru Expressway) Order 2002 [P.U. (A) 171/2002], which is referred to as the
“principal Order” in this Order, is amended—
(a) in subparagraph 2(1)—
(i) in the English language text, by substituting for the words “Third A
Schedule” the words “Third Schedule A”; and
(ii) by substituting for the words “Third Schedule A” the words “Third
Schedule B”; and
(b) in subsubparagraph 2(2)(a)—
Page 11
P.U. (A) 30
11
(i) in the English language text, by substituting for the words “Third A
Schedule” the words “Third Schedule A”; and
(ii) by substituting for the words “Third Schedule A” the words “Third
Schedule B”.
Amendment of Third A Schedule
3. The Third A Schedule to the principal Order is amended, in the English
language text, by substituting for the words “THIRD A SCHEDULE” the words
“THIRD SCHEDULE A”.
New Third Schedule B
4. The principal Order is amended by inserting after the Third Schedule A the
following schedule:
“THIRD SCHEDULE B
RATES OF TOLL FOR THE PERIOD FROM 25 JANUARY 2014 UNTIL 31 DECEMBER 2015 FOR BUKIT GAMBIR INTERCHANGE
Entry Toll Plaza: Bukit Gambir
(1)
Exit Toll Plaza
(2)
Toll Payable (RM) According to Classes of Vehicle
Class 1 Class 2 Class 3 Class 4 Class 5
1. Juru 68.20 102.30 136.30 34.10 51.10 2. Bukit Tambun 67.30 101.00 134.50 33.70 50.40 3. Jawi 65.70 98.50 131.20 32.80 49.20 4. Bandar Baharu 63.80 95.80 127.60 31.90 47.80 5. Bukit Merah 61.50 92.20 122.80 30.70 46.00 6. Taiping North 60.00 89.90 119.80 30.00 44.90 7. Changkat Jering 57.80 86.70 115.50 28.90 43.30 8. Kuala Kangsar 54.90 82.40 109.70 27.50 41.10 9. Ipoh South 51.40 77.10 102.70 25.70 38.50 10. Simpang Pulai 49.70 74.60 99.40 24.90 37.30 11. Gopeng 48.40 72.70 96.90 24.30 36.30 12. Tapah 44.40 66.60 88.70 22.20 33.20 13. Bidor 42.60 63.90 85.20 21.30 31.90
Page 12
P.U. (A) 30
12
14. Sungkai 40.70 61.10 81.40 20.40 30.50 15. Slim River 38.10 57.20 76.20 19.10 28.60 16. Behrang 36.00 54.00 72.00 18.10 27.00 17. Tanjong Malim 34.40 51.70 68.90 17.30 25.80 18. Lembah Beringin 33.10 49.70 66.30 16.60 24.80 19. Bukit Tagar 31.90 47.80 63.70 16.00 23.90 20. Bukit Beruntung 30.60 46.00 61.20 15.40 22.90 21. Sungai Buaya 29.80 44.80 59.60 15.00 22.30 22. Rawang 28.60 42.90 57.20 14.30 21.40 23. Rawang South 27.90 41.90 55.80 14.00 20.90 24. Sungai Buloh Utara 27.20 40.90 54.40 13.70 20.40 25. Sungai Buloh 26.90 40.40 53.80 13.50 20.10 26. Jalan Duta 27.50 41.30 55.00 13.80 20.60 27. Kota Damansara 26.10 39.20 52.30 13.10 19.60 28. Damansara 25.90 38.80 51.70 13.00 19.40 29. Subang 25.30 38.00 50.60 12.70 19.00 30. Setia Alam 25.90 38.70 51.70 12.90 19.40 31. Bukit Raja 26.00 38.90 52.00 13.00 19.50 32. Shah Alam 24.80 37.10 49.40 12.30 18.60 33. Ebor 24.00 36.00 47.90 12.00 18.00 34. Seafield 23.90 35.80 47.80 11.90 18.00 35. USJ 23.40 35.10 46.70 11.70 17.50 36. Putra Heights 22.80 34.20 45.50 11.40 17.10 37. Bandar Saujana Putra 22.30 33.30 44.40 11.10 16.70 38. Putrajaya 22.70 34.10 45.50 11.40 17.10 39. KLIA 21.20 31.50 41.80 10.80 16.00 40. Sungai Besi 21.70 32.60 43.60 10.90 16.30 41. UPM 20.30 30.50 40.60 10.20 15.20 42. Kajang 20.10 30.10 40.10 10.00 15.00 43. Bangi 19.20 28.70 38.30 9.60 14.40 44. Putra Mahkota 18.20 27.30 36.40 9.10 13.70 45. Nilai 17.10 25.60 34.10 8.50 12.80 46. Seremban 14.60 21.80 29.10 7.30 10.90 47. Port Dickson 14.20 21.30 28.40 7.10 10.70 48. Senawang 13.70 20.60 27.50 6.90 10.30 49. Pedas Linggi 11.50 17.20 23.00 5.70 8.60 50. Simpang Ampat 8.40 12.50 16.70 4.20 6.30 51. Ayer Keroh 5.40 8.20 10.90 2.70 4.10 52. Jasin 3.60 5.40 7.20 1.80 2.70 53. Tangkak 1.80 2.80 3.70 0.90 1.40 54. Pagoh 2.20 3.40 4.50 1.10 1.70 55. Yong Peng North 8.10 12.10 16.20 4.00 6.10 56. Air Hitam 10.70 16.10 21.50 5.40 8.10 57. Machap 11.80 17.60 23.50 5.90 8.80 58. Simpang Renggam 13.70 20.50 27.30 6.80 10.30 59. Sedenak 16.20 24.30 32.40 8.10 12.10 60. Kulai 18.00 27.00 36.00 9.00 13.50
Page 13
P.U. (A) 30
13
61. Senai North 19.20 28.90 38.50 9.60 14.40 62. Skudai 19.70 29.50 39.30 9.80 14.70
Exit Toll Plaza: Bukit Gambir
(1)
Entry Toll Plaza
(2)
Toll Payable (RM) According to Classes of Vehicle
Class 1 Class 2 Class 3 Class 4 Class 5
1. Juru 68.20 102.30 136.30 34.10 51.10 2. Bukit Tambun 67.30 101.00 134.50 33.70 50.40 3. Jawi 65.70 98.50 131.20 32.80 49.20 4. Bandar Baharu 63.80 95.80 127.60 31.90 47.80 5. Bukit Merah 61.50 92.20 122.80 30.70 46.00 6. Taiping North 60.00 89.90 119.80 30.00 44.90 7. Changkat Jering 57.80 86.70 115.50 28.90 43.30 8. Kuala Kangsar 54.90 82.40 109.70 27.50 41.10 9. Ipoh South 51.40 77.10 102.70 25.70 38.50 10. Simpang Pulai 49.70 74.60 99.40 24.90 37.30 11. Gopeng 48.40 72.70 96.90 24.30 36.30 12. Tapah 44.40 66.60 88.70 22.20 33.20 13. Bidor 42.60 63.90 85.20 21.30 31.90 14. Sungkai 40.70 61.10 81.40 20.40 30.50 15. Slim River 38.10 57.20 76.20 19.10 28.60 16. Behrang 36.00 54.00 72.00 18.10 27.00 17. Tanjong Malim 34.40 51.70 68.90 17.30 25.80 18. Lembah Beringin 33.10 49.70 66.30 16.60 24.80 19. Bukit Tagar 31.90 47.80 63.70 16.00 23.90 20. Bukit Beruntung 30.60 46.00 61.20 15.40 22.90 21. Sungai Buaya 29.80 44.80 59.60 15.00 22.30 22. Rawang 28.60 42.90 57.20 14.30 21.40 23. Rawang South 27.90 41.90 55.80 14.00 20.90 24. Sungai Buloh Utara 27.20 40.90 54.40 13.70 20.40 25. Sungai Buloh 26.90 40.40 53.80 13.50 20.10 26. Jalan Duta 27.50 41.30 55.00 13.80 20.60 27. Kota Damansara 26.10 39.20 52.30 13.10 19.60 28. Damansara 25.90 38.80 51.70 13.00 19.40 29. Subang 25.30 38.00 50.60 12.70 19.00 30. Setia Alam 25.90 38.70 51.70 12.90 19.40 31. Bukit Raja 26.00 38.90 52.00 13.00 19.50 32. Shah Alam 24.80 37.10 49.40 12.30 18.60 33. Ebor 24.00 36.00 47.90 12.00 18.00 34. Seafield 23.90 35.80 47.80 11.90 18.00 35. USJ 23.40 35.10 46.70 11.70 17.50 36. Putra Heights 22.80 34.20 45.50 11.40 17.10
Page 14
P.U. (A) 30
14
37. Bandar Saujana Putra 22.30 33.30 44.40 11.10 16.70 38. Putrajaya 22.70 34.10 45.50 11.40 17.10 39. KLIA 21.20 31.50 41.80 10.80 16.00 40. Sungai Besi 21.70 32.60 43.60 10.90 16.30 41. UPM 20.30 30.50 40.60 10.20 15.20 42. Kajang 20.10 30.10 40.10 10.00 15.00 43. Bangi 19.20 28.70 38.30 9.60 14.40 44. Putra Mahkota 18.20 27.30 36.40 9.10 13.70 45. Nilai 17.10 25.60 34.10 8.50 12.80 46. Seremban 14.60 21.80 29.10 7.30 10.90 47. Port Dickson 14.20 21.30 28.40 7.10 10.70 48. Senawang 13.70 20.60 27.50 6.90 10.30 49. Pedas Linggi 11.50 17.20 23.00 5.70 8.60 50. Simpang Ampat 8.40 12.50 16.70 4.20 6.30 51. Ayer Keroh 5.40 8.20 10.90 2.70 4.10 52. Jasin 3.60 5.40 7.20 1.80 2.70 53. Tangkak 1.80 2.80 3.70 0.90 1.40 54. Pagoh 2.20 3.40 4.50 1.10 1.70 55. Yong Peng North 8.10 12.10 16.20 4.00 6.10 56. Air Hitam 10.70 16.10 21.50 5.40 8.10 57. Machap 11.80 17.60 23.50 5.90 8.80 58. Simpang Renggam 13.70 20.50 27.30 6.80 10.30 59. Sedenak 16.20 24.30 32.40 8.10 12.10 60. Kulai 18.00 27.00 36.00 9.00 13.50 61. Senai North 19.20 28.90 38.50 9.60 14.40 62. Skudai 19.70 29.50 39.30 9.80 14.70
CLASS OF VEHICLES
Class 1: Vehicles having two axles and three or four wheels (excluding taxis and buses)
Class 2: Vehicles having two axles and five or six wheels (excluding buses)
Class 3: Vehicles having three axles or more (excluding buses)
Class 4: Taxis
Class 5: Buses
For the purpose of calculating the number of axles and wheels of a vehicle, the axles and
wheels of any trailer towed by the vehicle shall be included as part of the axles and
wheels of the vehicle.”.
Page 15
P.U. (A) 30
15
Substitution of the Thirteenth Schedule
5. The principal Order is amended by substituting for the Thirteenth Schedule the
following schedule:
Page 16
P.U. (A) 30
16
PETA LEBUH RAYA JURU - JALAN DUTA - BUKIT RAJA,
LEBUH RAYA UTARA SELATAN HUBUNGAN TENGAH DAN
LEBUH RAYA KUALA LUMPUR - JOHOR BAHRU
JOHOR
NEGERI SEMBILAN
MELAKA
PAHANG
TERENGGANU
KUALALUMPUR
SELANGOR
PERAK
SELAT MELAKA
JADUAL KETIGA BELAS [ Subperenggan 2(3) ]
KELANTAN
KEDAHPULAU
PINANG
MAP OF JURU - JALAN DUTA - BUKIT RAJA EXPRESSWAY,
NORTH SOUTH EXPRESSWAY CENTRAL LINK AND
KUALA LUMPUR - JOHORE BAHRU EXPRESSWAY
JOHOR
NEGERI SEMBILAN
MELAKA
PAHANG
TERENGGANU
KUALALUMPUR
SELANGOR
PERAK
SELAT MELAKA
THIRTEENTH SCHEDULE [ Subparagraph 2(3) ]
KELANTAN
KEDAHPULAU
PINANG
“THIRTEENTH SCHEDULE [subparagraph 2(3)]
”.
Page 17
P.U. (A) 30
17
Made 22 January 2014 [KKR.PUU.110-1/7/1; PN(PU2)426/LIV] DATUK HAJI FADILLAH BIN HAJI YUSOF Minister of Works