Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

Aug 23, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

1

Warner College of Natural Resources Addition

April 2013 (updated July 2016)

Page 2: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

2

Table of contents

1) Executive summary Pg 3 2) Justification Pg 3

a. Program information b. Existing conditions Pg 4

i. Current enrollment (CSU) ii. College space needs summary table

c. Total new space requirements Pg 6

i. 2020 Vision Statement ii. Room/area sf by function

d. Alternative analysis Pg 7 3) Project Description

i. Structural narrative ii. Mechanical/electrical narrative

iii. LEED Goal iv. Flood mitigation analysis v. Architectural narrative

vi. Applicable codes 4) Project Schedule, cost estimates, financing Pg 12

i. Project schedule and phasing ii. Proposed financing plan

iii. Cost estimate with description of methodology employed 5) Appendices

a. Utility map b. Flood plain map c. Floor plans d. Conceptual Renderings e. Project budget f. Cost estimate g. LEED checklist

Page 3: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

3

Executive Summary The Warner College of Natural Resources (WCNR) is located on Main Campus. The proposed project will add approximately 37,400gsf of new space for the college, to the south of the existing building. The project will house flipped classrooms, instructional laboratories, a Student Success Center, offices and meeting/collaboration spaces. The project budget is estimated at $20.2M and is funded through donations, Student Facility Fees and University Resources.

At a time of globalization and with the world population surpassing seven billion, there has never been a more important time to strengthen and expand comprehensive programs and facilities to educate the next generation of natural resource and environmental leaders. The world’s vulnerable watershed health; the need for global environmental literacy, sustainable resource management, and energy needs are just some of the complex challenges that are driving a growing demand for well-trained natural resource professionals.

The Warner College of Natural Resources at Colorado State University has grown to be internationally recognized as one of the leading natural resource colleges in the nation for its comprehensive education, innovative research and collaborative outreach programs.

As part of CSU’s 2020 planning, Warner College is on track to grow by 30% in the next seven years, and continues to attract and retain outstanding students and world-renowned professors and researchers who are creating solutions for today’s toughest natural resource challenges. The College continues to see increasing enrollment trends, and is continually working to diversify its educational programs and foster innovation through interdisciplinary and community-based collaboration. The College has been dedicated to staying at the forefront of natural resource education, and successfully raised more than $65 million during the CSU Campaign to help fund 42 new scholarships, 5 new chairs, new programs, and infrastructure improvements.

Warner College’s students, faculty and staff continue to efficiently use existing facilities to meet education and research needs to the best of their ability. However, these facilities have definite limitations that are obstructing the College’s ability to support students’ learning needs and expand worldwide capacity for natural resource stewardship. The growing student body is in need of collaborative space that inspires discovery, of innovative classrooms that expand learning opportunities, and a common place where they can work together.

The WCNR addition is centered around the needs of the students, from the large auditorium to the teaching labs to the collaboratorium area on the 5th floor. It has been designed to tell the story of Natural Resources, with an emphasis on water in the ecosystem. The building will serve as the focus of community outreach and student engagement, and it will allow the college to grow its reach, enrich education, propel discovery, and increase its impact on the world.

Page 4: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

4

Justification

Program Information

The Warner College of Natural Resources (WCNR) was one of the first programs established to meet the need for resource managers and information early in the 20th century. The College played a major role in the development of ecosystem science during the 1970’s and has continued to be at the forefront of research in global change science, biodiversity and invasive species. The College, throughout its history, has maintained close ties to government agencies, non-profit groups and private industry for research and outreach partnerships. It has expanded its programs, faculty and student diversity so that today it is the largest and most disciplinarily complete college of natural resources in the country. WCNR has 5 world class departments: (1) Ecosystem Science and Sustainability, (2) Fish Wildlife and Conservation Biology, (3) Forest & Rangeland Stewardship, (4) Geosciences, and (5) Human Dimensions of Natural Resources. Together they offer eight undergraduate majors, eight minors and 18 concentrations, in addition to eight MS degrees and six PhD degrees. In addition, it houses 12 Centers and Institutes, such as the Natural Resource Ecology Lab (NREL), the Colorado State Forest Service (CSFS), the Center for Environmental Management of Military Lands (CEMML) and the Western Forest Fire Research Center (WestFire). These academic, research and outreach programs combine to embody the overall Colorado State University mission, which is: “Inspired by its land-grant heritage, CSU is committed to excellence, setting the standard for public research universities in teaching, research, service and extension for the benefit of the citizens of Colorado, the United States and the world.” Existing Conditions The Warner College of Natural Resources Undergraduate enrollment has grown 38% since 2009 and Graduate enrollment has grown 7% in that same timeframe. Undergraduate Enrollment Trends by College (Primary Majors Only) Spring Spring Spring Spring SP12-SP13 SP09-SP13 SP05-SP13

2005 2009 2012 2013 Change Change Change

Agricultural Sciences

1,161

1,133

1,224

1,214

-1%

7%

5% Applied Human Sciences 3,442 3,917 3,893 3,796 -2% -3% 10% Business 1,989 1,863 2,083 2,093 0% 12% 5% Engineering 1,403 1,414 1,729 1,916 11% 36% 37% Intra-University 2,487 2,171 1,934 2,002 4% -8% -20% Liberal Arts 4,608 4,497 4,735 4,528 -4% 1% -2% Natural Sciences 3,039 2,682 3,134 3,283 5% 22% 8% Vet Med & Bio Sci 500 589 623 626 0% 6% 25% Warner Coll of Nat Res 941 939 1,253 1,298 4% 38% 38% University Total 19,570 19,205 20,608 20,756 1% 8% 6%

Page 5: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

5

Graduate Enrollment Trends by College (Primary Majors Only)

Spring 2005

Spring 2009

Spring 2012

Spring 2013

SP12-SP13 Change

SP09-SP13 Change

SP05-SP13 Change

Agricultural Sciences

213

228

254

237

-7%

4%

11%

Applied Human Sciences 860 744 643 645 0% -13% -25% Business 146 170 225 228 1% 34% 56% Engineering 547 473 571 607 6% 28% 11% Intra-University 224 158 247 259 5% 64% 16% Liberal Arts 549 598 628 594 -5% -1% 8% Natural Sciences 534 559 592 590 0% 6% 10% Vet Med & Bio Sci 313 317 351 295 -16% -7% -6% Warner Coll of Nat Res 240 209 221 223 1% 7% -7% University Total 3,626 3,456 3,732 3,678 -1% 6% 1%

Most significantly, the new Department of Ecosystem Science and Sustainability (DESS) enrolled its first freshman class of 140 students. It is anticipated that DESS alone will increase student numbers conservatively by 250 undergraduate and 50 graduates. The Warner College of Natural Resources building was constructed in 1975 and has had no significant renovation or additions. An analysis of space needs for the College determined that its Departments and Programs are currently operating at a significant deficit for the curriculum, enrollment, faculty numbers and level of research. The space shortage is particularly high in the areas of instructional laboratories, laboratory service, classrooms, study space and meeting space, as seen in the table below. One of the earliest iterations of this program plan included research laboratories as well as instructional laboratories. However, as the concept developed it was determined that the new addition needed to be about the students, not the researchers. As a result, this project mainly addresses the classroom, instructional lab, study, exhibit and lounge/meeting space deficits identified in the audit.

Page 6: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

6

New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach and extension programs to address today’s critical natural resource and environmental challenges. Below is the WCNR’s Vision for 2020.

The table below identifies the type and GSF of new space required

Metric 2012 2020

Total WCNR Student Body 1,677 2,322(38%)

% Non-Resident 25% 40%

Retention Rate 83% 90%

Diversity 9% 15%

Transfer Students 52% 52%

Graduation 65% 80%

International Students 50 100

Faculty 61 84

Total Research Expenditures $48 million $60 million

Number of Research Centers 12 15

Number of Extension Positions 3 6

Number On-Line Degree Seeking Students 50 320

Alumni Participation Rate 7.5% 20%

Page 7: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

7

Alternative analysis Multiple building concepts were developed for this project. The required adjacency to the Wagar and Forestry buildings makes an addition on this site the most efficient approach to addressing the College’s space deficiency. Project Description

Architectural Narrative The project is envisioned as a new 3-story building with basement, built to the south of the existing Natural Resources building. Dominant materials for the building will be steel and glass, with local sandstone used. Precast concrete or limestone will be used in the spandrels. Floor heights will match the existing Warner College. Outdoor balcony and rooftop decks will bring students outdoors to enjoy the views. The entire building has been designed to tell the story of Natural Resources, and share it with the University and wider community. The addition will create an opportunity for a new, highly visible entrance from the

Page 8: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

8

Academic Spine. The main floor will be the focus of the teaching and student success center with a large flipped classroom. Structural Narrative It is anticipated that a steel frame will be utilized in the construction of the new Facility. Cast in place concrete over corrugated steel deck will comprise the floor system. All of this will be supported on cast in place concrete foundation systems. A slab on grade will be placed on properly placed sub grade as recommended by the Geotechnical Engineer. Any spaces or labs which require vibration sensitive equipment will be designed to meet vibration criterion. All structural design will be performed in accordance with the current International Building Code and will adhere to design and construction standards of Colorado State University. Mechanical/Electrical Narrative Mechanical All new and renovated facilities will follow the CSU standards for mechanical systems design. They will be tied to the Metasys system with Johnson Controls. The facility will be connected to the CSU district heating plant steam pipe and distributed through fan coil units. Air conditioning and ventilation will be provided with a rooftop air handling packaged unit. Rooftop equipment will be screened and integrated into the design. Plumbing There will be a recirculating waterfall feature in the building along with two large teaching labs. New water service to this addition will be needed. Fire Protection The building will be fully sprinkled. Electrical Service The electrical service will be obtained from the feeder to the south of the site. Electrical Distribution The electrical distribution system will provide power for lighting and equipment operation. The primary equipment will be the boiler, combustion fans, hot water distribution pumps and an air-handling unit to heat the building. Energy efficient lighting and controls will be used to minimize power demand and consumption. In addition, natural lighting should be provided to minimize use of electricity. Telecommunications Telecommunications fiber connection is required for this project to provide remote monitoring and control through the CSU Johnson Control system. The fiber connection will be routed into the facility. Utilities Narrative There are adequate utilities at the site to service the facility. These include water mains, sewer mains, storm water mains, and irrigation mains. LEED Goal/Fort Collins Utility Rebate Program Senate Bill 07-051 directs that state buildings undergoing substantial renovation or new construction conform to the High Performance Certification Program. The Office of the State Architect has stated that USGBC LEED-NC Gold is the targeted standard of this program, or at a minimum, the highest obtainable LEED standard. The most current LEED publication at the time of design will be used. The inclusion of high performance standards is an integral part of the project, beginning at the program plan stage.

The goal of this project is LEED Gold.

Page 9: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

9

Flood Mitigation Analysis The first Master Drainage Plan for CSU was completed by Ayres Associates in June 1996. On July 28, of the following year, Fort Collins experienced a significant storm event that caused approximately $150 million in damages to campus facilities. Very few of the master planned facilities were constructed prior to the 1997 flood. A draft Master Plan Update was completed in January 2001 with the purpose of identifying the best possible drainage improvement alternatives. The current Master Plan Update was completed by Ayres Associates in April 2008 and includes the as-built analysis of the Phase I and II improvements that were constructed.

The existing floodplain on the CSU campus is the result of the following:

• Off-site flows entering the CSU campus from the City of Fort Collins Canal Importation Basin. These flows enter campus from the west side of Shields with a particular concentration at the Shields and Elizabeth Street intersection.

• CSU campus encompasses approximately 375 acres of mixed use development. Much of the campus is developed and highly impervious (which generates a lot of runoff) with the exception of the open space and recreation fields.

• Existing storm drainage system is small and complex, and provides very little conveyance capacity during large storm events, so most of the storm flows travel via overland or surface flow.

The current Master Drainage Plan document is a summary of the work that has been done, and also provides a guide for additional work that still needs to be done. This Master Plan also serves as a warning as to the complexity and sensitivity of CSU’s storm drainage system. No additional work of any kind should be done without looking at the impacts to the storm drainage conveyance and flooding elevations. CSU Standards The CSU Building Construction Standards Manual is available at: http://www.facilities.colostate.edu/index.asp?url=construction/constr_standards

The CSU Standards are to be used as guidelines for design. They are divided into 3 parts for use by Architects and Engineers: the first part is administrative; the second part discusses requirements for design and deliverables at each stage of the design process; the third part consists of the technical standards arranged by CSI division. The Standards are a work in progress, and as such, any question about the applicability of a standard should be discussed with the project manager. The Standards should never be referenced or copied in Contract Documents – the design is expected to embody and conform to the Standards. Contractors are not to be directed to review the Standards as a contract requirement.

List of applicable codes

The following approved building codes and standards have been adopted by State Buildings Programs (SBP) as the minimum requirements to be applied to all state-owned buildings and physical facilities including capital construction and controlled maintenance construction projects.

The 2009 edition of the International Building Code (IBC) (as adopted by the Colorado State Buildings Program as follows: Chapter 1 as amended, Chapters 2-35 and Appendices C and I)

Page 10: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

10

The 2009 edition of the International Mechanical Code (IMC)

(as adopted by the Colorado State Buildings Program as follows: Chapters 2-15 and Appendix A)

The 2009 edition of the International Energy Conservation Code (IECC)

(as adopted by the Colorado State Buildings Program)

The 2011 edition of the National Electrical Code (NEC)

(National Fire Protection Association Standard 70) (as adopted by the Colorado State Electrical Board)

The 2009 edition of the International Plumbing Code (IPC)

(as adopted by the Colorado Examining Board of Plumbers as follows: Chapter 1 Section 101.2,102, 105, 107, Chapters 2-13 and Appendices B, D, E, F and G)

The 2009 edition of the International Fuel Gas Code (IFGC)

(as adopted by the Colorado Examining Board of Plumbers as follows: Chapter 1 Section 101,102, 105, 107, Chapters 2-8 and Appendices A, B, and C)

The National Fire Protection Association Standards (NFPA)

(as adopted by the Department of Public Safety/Division of Fire Safety as follows with editions shown in parentheses: NFPA-1 (2006), 11 (2005), 12 (2005), 12A (2004), 13 (2002), 13D (2002), 13R (2002), 14 (2003), 15 (2001), 16 (2003), 17 (2002), 17A (2002), 20 (2003), 22 (2003), 24 (2002), 25 (2002), 72 (2002), 409 (2004), 423 (2004), 750 (2003) and 2001 (2004))

The 2010 edition of the ASME Boiler and Pressure Vessel Code

(as adopted by the Department of Labor and Employment/Boiler Inspection Section as follows: sections I, IV, V, VIII-Divisions 1 and 2 and 3, 1X, X including the 2011 addenda and B31.1, 2010 edition.)

The 2011 edition of the National Boiler Inspection Code (NBIC)

(as adopted by the Department of Labor and Employment/Boiler Inspection Section)

The 2009 edition of the Controls and Safety Devices for Automatically Fired Boilers CSD-1

(as adopted by the Department of Labor and Employment/Boiler Inspection Section)

The 2007 edition of the Boiler and Combustion Systems Hazards Code, NFPA 85

(as adopted by the Department of Labor and Employment/Boiler Inspection Section)

The 2007 edition of ASME A17.1 Safety Code for Elevators and Escalators

(as adopted by the Department of Labor and Employment/Conveyance Section and as amended by ASME International)

The 2005 edition of ASME A17.3 Safety Code for Existing Elevators and Escalators

Page 11: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

11

(as adopted by the Department of Labor and Employment/Conveyance Section and as amended by ASME International)

The 2005 edition of ASME A18.1 Safety Standard for Platform Lifts and Stairway Chairlifts

(as adopted by the Department of Labor and Employment/Conveyance Section and as amended by ASME International)

The current edition of the Rules and Regulations Governing the Sanitation of Food Service Establishments

(as adopted by the Department of Public Health and Environment/Colorado State Board of Health)

The 2003 edition of ICC/ANSI A117.1, Accessible and Usable Buildings and Facilities

(as adopted by the Colorado General Assembly as follows: CRS 9-5-101, as amended, for accessible housing)

Note: Additional codes, standards and appendices may be adopted by the state agencies and institutions in addition to the minimum codes and standards herein adopted by State Buildings Programs.

1. The 2009 edition of the IBC became effective on July 1 of 2010. Consult the state electrical and plumbing boards and the state boiler inspector and conveyance administrator and the Division of Fire Safety for adoption of current editions and amendments to their codes.

2. Projects should be designed and plans and specifications should be reviewed based upon the approved codes at the time of A/E contract execution. If an agency prefers to design to a different code such as a newer edition of a code that State Buildings Programs has not yet adopted, the agency must contact SBP for approval and then amend the A/E contract with a revised Exhibit C, Approved State Building Codes. Please note that the state plumbing and electrical boards enforce the editions of their codes that are in effect at the time of permitting not design.

3. The state’s code review agents, or the State Buildings Programs approved agency building official, shall review all documents for compliance with the codes stipulated herein. Note: The Department of Public Health and Environment, Division of Consumer Protection will review drawings for food service related projects.

4. This policy does not prohibit the application of various life safety codes as established by each agency for specific building types and funding requirements. NFPA 101 and other standards notwithstanding, approved codes will supersede where their minimum requirements are the most restrictive in specific situations. If a conflict arises, contact State Buildings Programs for resolution.

5. It is anticipated that compliance with the federal Americans with Disabilities Act Accessibility Guidelines for Buildings and Facilities (ADAAG) and Colorado Revised Statutes Section 9-5-101 will be met by compliance with the 2009 International Building Code and

Page 12: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

12

ICC/ANSI A117.1. However, each project may have unique aspects that may require individual attention to these legislated mandates.

6. The 2006 edition of the International Building Code (IBC) is to be applied to factory-built nonresidential structures as established by the Division of Housing within the Department of Local Affairs.

Appendices

Appendices are provided to supplement the basic provisions of the codes. Approved IBC Appendices are as follows:

1. Mandatory

IBC Appendix Chapter C - Agricultural Buildings

IBC Appendix Chapter I - Patio Covers

2. Optional

Any non-mandatory appendix published in the International Building Code may be utilized at the discretion of the agency. Use of an appendix shall be indicated in the project code approach.

B. Amendments

1. International Building Code, Chapter 1 as amended

C. Referenced Codes

1. While not adopted in entirety, portions of the following codes are referenced in the International Building Code (IBC), the International Mechanical Code (IMC), the International Energy Conservation Code (IECC) the International Plumbing Code (IPC), and the International Fuel Gas Code (IFGC). These following codes would be applied as reference standards. 2009 International Fire Code (IFC) 2009 International Existing Building Code (IEBC)

D. Referenced Standards

The IBC, IMC, IECC, IPC and IFGC standards shall be utilized to provide specific, or prescriptive, requirements on how to achieve the requirements established in the code. These standards may be unique to the code or may be derived from other established industry standards. Recognized standards may also be used to show compliance with the standard of duty established by the code.

Project schedule, cost estimates and financing

Page 13: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

13

Schedule/phasing Once necessary approvals and financing are in place, the project is estimated to take 20 months to complete. Financing The project will be funded through donations to the Warner College of Natural Resources, as well as Student Facility Fees and University Cash. Cost estimate/methodology A professional cost estimate was obtained for this project, located in the Appendices. CSU standards specify that the A/E document 20% of the construction budget in bid alternates to cover potential volatility in the construction market as the project progresses.

Appendices

1. Utility map 2. Flood plain map 3. Floor plans 4. Renderings 5. Total project budget 6. Cost estimate 7. LEED checklist

Page 14: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

***

CL

O

S

E

/

O

F

F

C

L

O

S

E

/

O

F

F

NATURAL

TELECOM

83

FORESTRY

81

RESEARCH LAB

NAT. RESOURCES

82

COMPUTER

86

SCIENCE

RESOURCES

N

Legend

Scale: 1" = 20'

20' 10'0' 40'

Colorado State UniversityMichael Smith Natural Resources Building Addition

AutoCAD SHX Text
1994 4/0
AutoCAD SHX Text
1988-#2AWG
AutoCAD SHX Text
1975 #2 AWG
AutoCAD SHX Text
1975 #2 AWG
AutoCAD SHX Text
1975
AutoCAD SHX Text
#2AWG
AutoCAD SHX Text
1994 4/0
AutoCAD SHX Text
BRANCH 7b1
AutoCAD SHX Text
BRANCH 7b
AutoCAD SHX Text
BRANCH 7b
AutoCAD SHX Text
VALVE #16A
AutoCAD SHX Text
17C
AutoCAD SHX Text
17E
AutoCAD SHX Text
Isotope Drive
AutoCAD SHX Text
103
AutoCAD SHX Text
102
AutoCAD SHX Text
FORESTRY A
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
I-2 1/2"PVC
AutoCAD SHX Text
I-2 1/2"PVC
AutoCAD SHX Text
I-2"PVC
AutoCAD SHX Text
I-2 1/2"PVC
AutoCAD SHX Text
FORESTRY B
AutoCAD SHX Text
1"CU
AutoCAD SHX Text
S-4"
AutoCAD SHX Text
S-6"
AutoCAD SHX Text
S-6"
AutoCAD SHX Text
S-10"
AutoCAD SHX Text
S-6"
AutoCAD SHX Text
S-10"
AutoCAD SHX Text
S-10"
AutoCAD SHX Text
S-4"
AutoCAD SHX Text
S-6"
AutoCAD SHX Text
S-6"
AutoCAD SHX Text
S-10"
AutoCAD SHX Text
ABAND. IN PLACE S-6"
AutoCAD SHX Text
S-4"
AutoCAD SHX Text
S-4"
AutoCAD SHX Text
S-6"
AutoCAD SHX Text
S-8"
AutoCAD SHX Text
S-6"
AutoCAD SHX Text
S-4"
AutoCAD SHX Text
C10
AutoCAD SHX Text
S-6"
AutoCAD SHX Text
S-6"
AutoCAD SHX Text
S-4"
AutoCAD SHX Text
W
AutoCAD SHX Text
(Depth %%P10' below grade)
AutoCAD SHX Text
4"CI
AutoCAD SHX Text
W-6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
ABAND. W-6"CI
AutoCAD SHX Text
1 1/4"CU
AutoCAD SHX Text
6"CI
AutoCAD SHX Text
W-2" ABAND. IN PLACE
AutoCAD SHX Text
FISH-2 1/2"
AutoCAD SHX Text
2"?
AutoCAD SHX Text
FISH-W-2 1/2"-not yet in use
AutoCAD SHX Text
8"
AutoCAD SHX Text
2"
AutoCAD SHX Text
FISH-2 1/2"
AutoCAD SHX Text
W-2 1/2"pvc
AutoCAD SHX Text
CW (2)6"
AutoCAD SHX Text
(Vents in Tunnel)
AutoCAD SHX Text
CW (2)8"
AutoCAD SHX Text
CW(2)16"(SDR13.5)
AutoCAD SHX Text
CW (2)24"
AutoCAD SHX Text
EF(f)
AutoCAD SHX Text
VM2
AutoCAD SHX Text
VS2
AutoCAD SHX Text
I4
AutoCAD SHX Text
LIGHTING CONTROLLER
AutoCAD SHX Text
IN TUNNEL
AutoCAD SHX Text
U4
AutoCAD SHX Text
NR10
AutoCAD SHX Text
NR2
AutoCAD SHX Text
NR4
AutoCAD SHX Text
NR6
AutoCAD SHX Text
NR8
AutoCAD SHX Text
FR7
AutoCAD SHX Text
FR1
AutoCAD SHX Text
FR4
AutoCAD SHX Text
FR5
AutoCAD SHX Text
NR9
AutoCAD SHX Text
NR1
AutoCAD SHX Text
NR3
AutoCAD SHX Text
NR5
AutoCAD SHX Text
NR7
AutoCAD SHX Text
VM5
AutoCAD SHX Text
(8)
AutoCAD SHX Text
(8)
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
MOUNTED ON
AutoCAD SHX Text
PHOTO CELL
AutoCAD SHX Text
(7)
AutoCAD SHX Text
(7)
AutoCAD SHX Text
U3
AutoCAD SHX Text
U2
AutoCAD SHX Text
U1(3)
AutoCAD SHX Text
G-1"
AutoCAD SHX Text
3/4"
AutoCAD SHX Text
G-1"
AutoCAD SHX Text
GENERATOR
AutoCAD SHX Text
G-1"
AutoCAD SHX Text
G-1"
AutoCAD SHX Text
ABAND. 1"-NGAS
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
T
AutoCAD SHX Text
TUAG-2
AutoCAD SHX Text
TUAG-1A
AutoCAD SHX Text
TUCA-2
AutoCAD SHX Text
TUCA-2A
AutoCAD SHX Text
TUCA-1
AutoCAD SHX Text
TUCA-3
AutoCAD SHX Text
S-6"
AutoCAD SHX Text
S-6"
AutoCAD SHX Text
C-2"
AutoCAD SHX Text
C-1 1/2"
AutoCAD SHX Text
A-1 1/2"
AutoCAD SHX Text
S-2"
AutoCAD SHX Text
C-1 1/2"
AutoCAD SHX Text
A-3/8",1/2"
AutoCAD SHX Text
S-12"
AutoCAD SHX Text
A-1"
AutoCAD SHX Text
A-3/4"
AutoCAD SHX Text
C-2"
AutoCAD SHX Text
A-3/4"
AutoCAD SHX Text
A-3/4"
AutoCAD SHX Text
A-3/4",1/2"
AutoCAD SHX Text
S-6"
AutoCAD SHX Text
C-1 1/2"
AutoCAD SHX Text
A-1 1/2"
AutoCAD SHX Text
S-3"
AutoCAD SHX Text
C-1 1/2"
AutoCAD SHX Text
S-8"
AutoCAD SHX Text
TUSO-3E
AutoCAD SHX Text
TUSO-3F
AutoCAD SHX Text
TUSO-3G
AutoCAD SHX Text
A-2"
AutoCAD SHX Text
FPU 13,14
AutoCAD SHX Text
(1)1 1/4"PVC
AutoCAD SHX Text
FPU 3
AutoCAD SHX Text
FPU 10
AutoCAD SHX Text
FPU 13,14
AutoCAD SHX Text
Aband. (4)4"PVC (cndut damaged)
AutoCAD SHX Text
A
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CB
AutoCAD SHX Text
CO
AutoCAD SHX Text
CB
AutoCAD SHX Text
FD
AutoCAD SHX Text
SD-10"
AutoCAD SHX Text
SD-4"
AutoCAD SHX Text
SD-10"
AutoCAD SHX Text
SD-5"??
AutoCAD SHX Text
ABANDONED
AutoCAD SHX Text
SD-12"
AutoCAD SHX Text
SD-4"
AutoCAD SHX Text
GRAVEL PIT
AutoCAD SHX Text
F.D. &
AutoCAD SHX Text
SD-10"
AutoCAD SHX Text
SD
AutoCAD SHX Text
SD
AutoCAD SHX Text
SD
AutoCAD SHX Text
SD-8"
AutoCAD SHX Text
SD
AutoCAD SHX Text
SD-10"
AutoCAD SHX Text
SD
AutoCAD SHX Text
SD-10"
AutoCAD SHX Text
8"
AutoCAD SHX Text
SD-10"
AutoCAD SHX Text
SD
AutoCAD SHX Text
SD
AutoCAD SHX Text
F-4"PVC-(BRT-FO)
AutoCAD SHX Text
(2)1"PVC
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
CA3
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
UA11
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
UA10
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
UA9
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
UA8
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
UA7
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
UA6
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
UA5
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
AG7
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
AG5
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
AG2
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
AG3
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
AG4
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
AG9
AutoCAD SHX Text
C10-1
AutoCAD SHX Text
GT
AutoCAD SHX Text
C11
AutoCAD SHX Text
C11-1
AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
MC83
AutoCAD SHX Text
126
AutoCAD SHX Text
127
AutoCAD SHX Text
128
AutoCAD SHX Text
92
AutoCAD SHX Text
17#
AutoCAD SHX Text
ANODE WITH
AutoCAD SHX Text
TEST STATION
AutoCAD SHX Text
17#
AutoCAD SHX Text
C5
AutoCAD SHX Text
C4
AutoCAD SHX Text
V
AutoCAD SHX Text
V
AutoCAD SHX Text
QD
AutoCAD SHX Text
ZV
AutoCAD SHX Text
ZV
AutoCAD SHX Text
ZV
AutoCAD SHX Text
ZV
AutoCAD SHX Text
ZV
AutoCAD SHX Text
ZV
AutoCAD SHX Text
ZV
AutoCAD SHX Text
ZV
AutoCAD SHX Text
ZV
AutoCAD SHX Text
ZV
AutoCAD SHX Text
ZV
AutoCAD SHX Text
ZV
AutoCAD SHX Text
ZV
AutoCAD SHX Text
ZV
AutoCAD SHX Text
ZV
AutoCAD SHX Text
ZV
AutoCAD SHX Text
ZV
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
v
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
(CURVE INTENTIONAL)
AutoCAD SHX Text
2' SIDEWALK
AutoCAD SHX Text
CHASE
AutoCAD SHX Text
2' SIDEWALK
AutoCAD SHX Text
CHASE
AutoCAD SHX Text
8" CHILL WTR LINE DEFLECTED DUE TO OBSTURCTION DURING BORING (SEPT. 2007)
AutoCAD SHX Text
(2) 8"CW (HDPE, 9/07)
AutoCAD SHX Text
Tc (2)4"PVC (9/07)
AutoCAD SHX Text
NEW SPLICE
AutoCAD SHX Text
??-Unfound-??
AutoCAD SHX Text
MH
AutoCAD SHX Text
(8/08)
AutoCAD SHX Text
S-8"PVC
AutoCAD SHX Text
MH
AutoCAD SHX Text
ABAND IN PLACE S-8" (8/08)
AutoCAD SHX Text
S-3"(STL)
AutoCAD SHX Text
STM COND 1-1/4"
AutoCAD SHX Text
W-6"DI
AutoCAD SHX Text
(WTRLINE RUNS UNDER UTIL TUNNEL)
AutoCAD SHX Text
**
AutoCAD SHX Text
W-6"DI-FIRELINE
AutoCAD SHX Text
(WTRLINE RUNS UNDER UTIL TUNNEL)
AutoCAD SHX Text
**
AutoCAD SHX Text
CURBSTOP WTR-VAL
AutoCAD SHX Text
(2) CW 4" HDPE
AutoCAD SHX Text
SD 6" PVC (7/08)
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
PVC CONDUIT (4)1", (2)1-1/4"
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
DROP MH
AutoCAD SHX Text
CB
AutoCAD SHX Text
MH
AutoCAD SHX Text
SD-10" RCP
AutoCAD SHX Text
STAND PIPE
AutoCAD SHX Text
SHALLOW NGAS LINE 1" PE NGAS LINE 2" 2" BELOW FINISH GRADE
AutoCAD SHX Text
W-8"
AutoCAD SHX Text
W-8"
AutoCAD SHX Text
(Partial lengths of pipes abandoned in place-Oct. 2007)
AutoCAD SHX Text
(3)1" PVC CONDUIT
AutoCAD SHX Text
1" PVC CONDUIT
AutoCAD SHX Text
6"
AutoCAD SHX Text
(4)2" PVC CONDUIT (1)3" PVC CONDUIT (SEPT. 2007)
AutoCAD SHX Text
S-3"
AutoCAD SHX Text
E
AutoCAD SHX Text
2"Copper- Domestic line
AutoCAD SHX Text
J
AutoCAD SHX Text
J
AutoCAD SHX Text
Aband. in Place
AutoCAD SHX Text
Aband. in Place
AutoCAD SHX Text
EMPTY CONDUIT
AutoCAD SHX Text
(2) CW 6"
AutoCAD SHX Text
RETURN
AutoCAD SHX Text
SUPPLY
AutoCAD SHX Text
(Chill Wtr lines go under tunnel)
AutoCAD SHX Text
(Chill Wtr lines 45%%D up)
AutoCAD SHX Text
(Buried)
AutoCAD SHX Text
(2) CW 6"
AutoCAD SHX Text
MC152
AutoCAD SHX Text
I-2 1/2"PVC
AutoCAD SHX Text
I-2"PVC
AutoCAD SHX Text
I-2"PVC
AutoCAD SHX Text
I-2 1/2"PVC
AutoCAD SHX Text
ZV
AutoCAD SHX Text
ZV
AutoCAD SHX Text
ZV
AutoCAD SHX Text
ZV
AutoCAD SHX Text
ZV
AutoCAD SHX Text
QD
AutoCAD SHX Text
QD
AutoCAD SHX Text
QD
AutoCAD SHX Text
University Ave.
AutoCAD SHX Text
C-6"
AutoCAD SHX Text
S-16"
AutoCAD SHX Text
A-2"
AutoCAD SHX Text
C-6"
AutoCAD SHX Text
S-16"
AutoCAD SHX Text
S-2"
AutoCAD SHX Text
C-1"
AutoCAD SHX Text
S-2"
AutoCAD SHX Text
C-1"
AutoCAD SHX Text
SD-4" PERFORATED PIPE
AutoCAD SHX Text
RED NUT
AutoCAD SHX Text
RED NUT
AutoCAD SHX Text
CW-24" Supp
AutoCAD SHX Text
CW-24" Rtrn
AutoCAD SHX Text
CW-8" Supp-HDPE
AutoCAD SHX Text
CW-8" Rtrn-HDPE
AutoCAD SHX Text
CW-24" Supp
AutoCAD SHX Text
CW-24" Rtrn
AutoCAD SHX Text
1994 - 4/0
AutoCAD SHX Text
INTO TUNNEL
AutoCAD SHX Text
HDPE COUPLERS
AutoCAD SHX Text
9' SECTION
AutoCAD SHX Text
8"
AutoCAD SHX Text
8"
AutoCAD SHX Text
8"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
8"
AutoCAD SHX Text
8"
AutoCAD SHX Text
G-2"
AutoCAD SHX Text
ABAND. W-6"CI
AutoCAD SHX Text
CS1
AutoCAD SHX Text
CS2
AutoCAD SHX Text
CS3
AutoCAD SHX Text
University
AutoCAD SHX Text
COMM.
AutoCAD SHX Text
TELEPHONE and F/O
AutoCAD SHX Text
SITE LIGHTING
AutoCAD SHX Text
CHILL WATER
AutoCAD SHX Text
STEAM-CONDENSATE
AutoCAD SHX Text
STEAM
AutoCAD SHX Text
STORM SEWER
AutoCAD SHX Text
WATER
AutoCAD SHX Text
WATER-ABANDONED
AutoCAD SHX Text
POWER
AutoCAD SHX Text
SAN. SEWER
AutoCAD SHX Text
GAS
AutoCAD SHX Text
IRRIGATION
AutoCAD SHX Text
STORM SEWER ABAND
AutoCAD SHX Text
IRRIG. ABAND.
Page 15: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach
Page 16: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach
Page 17: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

10' - 0"

213' - 1 3/8"

325' - 1 3/8"

437' - 1 3/8"

T.O. PARAPET +/-50' - 0"

BSMT - alternate-9' - 4"

10' - 0"

213' - 1 3/8"

325' - 1 3/8"

437' - 1 3/8"

T.O. PARAPET +/-50' - 0"

BSMT - alternate-9' - 4"

1" = 20'-0"0 WEST ELEVATION CONCEPT

1" = 20'-000 SOUTH ELEVATION CONCEPT

Page 18: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

N102

118

120A

120B

120

121

117B

103

108 106 105

117

110

112 115

113

109107A

107C

107D

107B

N121N117

N115

N119

N114

N101

N122

130

N120 N106

N107

N125

103B

103A

104

N105

N110117A

N109

N108

N104

107

N114A

N112

131

UP

UP

DN

DN

81

COMPUTER

University Ave.

A B C D E F Gga

01

23

45

6

78

01

02

03

Electrical

IDF Women Men

All

Gender

Elevator

Student Success

Center Conference

830 sf

Student Success Center

1270 sf

Remove existing

entry vestibule.

Study RoomsCoffee Bar

Wi-Fi

Lounge

500 sf

Two Story

Biophilic

Branding Wall

110-120 Seat Flipped Classroom 2900 sf

0' -

7"

Edge of existing building

Hatched area not in

construction

150 sf 140 sf 215 sf

1" = 30'-0"1

Ground Floor - Base Bid

Page 19: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

226

228A228

229

225A

225

221

225B

223

217

215

214

213

211

210

209

206A

206B206204

N203

202

200

207

212

205

205A

201

222A 220A 218A

216218220222

224

233

234

235

236

237

238

232

240C

227

231

240

240D

240E

200A 200B 200C202A

206D 206C

200D

N209

N208

N201

N222

N223

N220N206

N207

N224N213

217A

N210

N217

N219

OPEN

TO

BELOW

BELOW

TO

OPEN

OPEN

TO

BELOW

To Forestry

DN

DN

UP

A B C D E F Gga

01

23

45

6

78

01

02

03

Elevator

48 Seat Teaching

Lab 1500 sf

36 Seat Teaching

Lab 1050 sf

Sp

ecim

en S

tora

ge

360

sf

Open to

BelowCollege Flipped

Classroom/Laptop Lab

1700 sf

Study/Informal Gathering 400 sf

Co

llab

ora

tio

n/C

on

fere

nce

450s

f

Infill to connect second level of

addition to existing building.

Sto

rag

e

Edge of existing building

Hatched area not in construction

Electrical

IDF Women Men

All

Gender

1" = 30'-0"2

Second Floor - Base Bid

Page 20: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

336A 336 338

340

340A 341C 341B

341A

301

301B

301A

306B

306D

306C

305

304

304A

303

302

342

324D

324C

324B

324A

324329

331

333

337 337A

339

324E

327

328

330

332

334

335

341

322B322D 322E

318A

316

311

316A

318322

326

325

323 321 320

319

317A317

315

313

312

310

309

308

307

N305

N306

N307

N312

N320

N301

N313

N303

N304N322

N317

N319

322A

N309 N308

N303A

306

306A

322F 322G

UP

UP

A B C D E F Gga

01

23

45

6

78

01

02

03

Elevator

Flexible Conference

Room

1300 sf

Break/Catering

Sh

ared

Off

ice

(3) Private

Offices

(2) Private

OfficesShared Office

(5) Private Offices

Shared Office

Ter

race

400

sf

LactationWomen Men

All

Gender

Level 3 has 3000 sf of office as shown in Base Bid

IDF

Electrical

(3) Private

Offices

(2) Shared Offices

Edge of existing building

Remodel hatched area to

accommodate new hallway.

1" = 30'-0"3

Third Floor - Base Bid

Page 21: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

DN

DN

A B C D E F G

7

65

4

32

1

a g

0

8

h iA B C D E F Gga

01

23

45

6

78

01

02

03

Co

llab

ora

tio

n/C

on

fere

nce

475

sf

JanitorWomen MenAll

Gender

Reception/Shared

OfficeDean's Office /

Shared Office

Sh

ared

Off

ice

(3) Private

Offices

(6) Private Offices

Shared Office Shared Office

Dea

n's

Off

ice

/

Sh

ared

Off

ice

Executive Conference

950 sf

Terrace 380 sfLevel 4 has 3250 sf of office as shown in Base Bid

IDF

Electrical

Shared Office

Private Office

Elevator

Edge of existing buildingEdge of existing building

1" = 30'-0"4

Fourth Floor - Base Bid

Page 22: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

Project Title: Warner College of Natural Resources Addition-South AdditionBudget Full buildout

12-Aug-15 Estimated Costs Remarks

Reference also space Analysis

Site Survey, Geotechnical $ 35,000

Consultants - Architects, Engineers, Vibration, Acoustics $ 1,563,181 assumes DB lump sum delivery Advertisements $ 1,500

CSU Facilities Project Management $ 370,000

Independent Code Review $ 24,000

Construction code inspections $ 20,000

Construction materials inspections $ 125,000

PFA plan review fee $ 33,600

DB RFP preparation $ 200,000

Total Professional Services $ 2,372,281

New Space -41,096 sqft @$344.44/sqft $ 14,155,500 assumes DB lump sum delivery

Renovation Space - _____@$____/sqft $ -

Site Work Service/Utilities $ 431,941

Site Improvements/Landscaping $ 300,000 Includes University Drive Modification

Subtotal Construction Costs $ 14,887,441

Fixed Equipment $ 500,000

Moveable Equipment/Furniture $ 250,000

CSU Communications (estimate from telecom) $ 300,000

Total Equipment and Furnishings Costs $ 1,050,000

Relocation Costs- Custodial Equipment $ 50,000

Total Miscellaneous Costs $ 50,000

$ 18,359,722

Project Contingency 5% for New Construction $ 917,986

Project Contingency additional $ 200,000 tie in to existing building

Total Contingency $ 1,117,986

19,477,708$ includes 4.48% from 8/2015 to 12/2016 and

assumes Design Build (DB) lump sum delivery method

Art in Public Places $ -

19,477,708$

Escalation to Dec 2017-4.0% 20,256,817$

Escalation to Dec 2018-4% 21,067,089$

Escalation to Dec 2019-4% 21,909,773$

Total Project Cost / sqft 474$

COLORADO STATE UNIVERSITYFacilities Planning Design and Construction

Project Budget-South Addition - Dec 2016 construction midpoint

Project Budget

Professional Services

Construction

Equipment & Furnishings

This opinion of probable cost is made on the basis of the experience, qualifications and best judgement of a professional cost consultant familiar with the construction industry, combined with the professional experience of Facilities Management. FM cannot guarantee that proposals, bids or actual construction costs will not vary from this cost estimate due to market conditions at the time of bid. Scope and schedule changes during design and/or construction will result in higher cost.

Miscellaneous

Subtotal Project Cost

Project Contingency

Subtotal Budget- midpoint of construction at 12/2016

Page 23: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

August 4, 2015Conceptual Statement of Probable Cost Statement of Probable Cost

Fort Collins, COCSU Warner College of Natural Resources

383 INVERNESS PKWY, SUITE 240 • ENGLEWOOD • COLORADO • 80112

PHONE: 303-948-7224 • FAX: 303-948-7230

Cumming Project No. 15-00572.02

Prepared for Colorado State University

Page 24: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COConceptual Statement of Probable Cost

Page1. Project Introduction / Qualifications

a. Introduction.............................................................................................................................................................. 3

2. Cost Summariesa. Executive Summary................................................................................................................................................. 7

b. Construction Cost Summary By System.................................................................................................................. 8

3. Control Areasa. Schedule Of Areas And Control Quantities.............................................................................................................. 9

4. Construction Cost Back Upa. Building.................................................................................................................................................................... 11

b. Sitework................................................................................................................................................................... 21

TABLE OF CONTENTS

August 4, 2015

Prepared by Cumming Page 2 of 23

Page 25: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COConceptual Statement of Probable Cost 08/04/15

1 Conceptual Drawing Package Based on drawing package dated 6/16/15 received 7/28/15

General Contractor's Overhead and ProfitJobsite general conditions, home office overhead, profit, and bond are shown on the Summary of this estimate. It is our opinion that for this project, a rate of 12.0% is appropriate to cover these mark-ups. (6.0% for General Conditions, 2.0% for Bonds & Insurance and 4.0% for Overhead and Profit)

Sources for PricingThis estimate was prepared by a team of qualified cost consultants experienced in estimating construction costs at all stages of design. These consultants have used pricing data from Cumming’s database for construction, updated to reflect current conditions in the Fort Collins, CO area. In some cases, quotes were solicited from outside sources to substantiate in-house pricing data.

Subcontractor's Mark-upsDepending on the trade, subcontractor mark-ups can range from 5% to 15% of the raw cost for that particular item of work. It should be noted that Design Assist Sub Contractors may influence Sub Contractor costs.

Design AllowancesAn allowance of 10.0% for undeveloped design details has been included in the summary of this estimate. As the design of each system is further developed, details which historically increase cost became apparent and must be incorporated into the estimate.

Basis for QuantitiesThis estimate combines an approach of detailed line items (when possible for scope to be ascertained from design information) along with high-level parametric pricing for scope yet to be designed (structural, mechanical, electrical, etc.)

Basis for Unit CostsUnit costs as contained herein are based on current Fort Collins prices for on-campus work. Subcontractor’s overhead and profit is included in each line item unit cost. This overhead and profit covers each subcontractor’s cost for labor burden, materials and equipment sales taxes, field overhead, home office overhead, and profit. The general contractor’s overhead and profit is shown separately on the Summary.

Costs included herein have been based upon a construction period of 12 months. Any costs for excessive overtime to meet accelerated schedule milestone dates are not included in this estimate.

The Portion of Work for this estimate involves the construction of a new 4-story building plus basement, housing academic as well as administrative functions. Façade is a combination of storefront and curtainwall glazing in conjunction with stone veneer walls. Sitework costs have been included under a separate cost segregation.

INTRODUCTION

Project Description

Basis of Estimate

This estimate is based on the following conceptual drawing packages:

Construction Schedule

Prepared by Page 3 of 23

Page 26: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COConceptual Statement of Probable Cost 08/04/15

INTRODUCTION

Start Date Finish Date

Design & Engineering Aug-15 Jun-16 331 Days 11 Months 0.9 Years

Construction Jul-16 Jul-17 365 Days 12 Months 1.0 Years

Estimated start date: Jul-16Estimated completion date: Jul-17Midpoint of construction: Dec-16

Year Rate2015 3.5%2016 3.0%2017 3.0%

1 Complete core and shell costs23 Boxes, conduit, and pull-string for tele/data system (equipment / cabling excluded)4 Complete audio-visual system, including cabling and equipment5 Site utilities are included as allowances only pending further design

Construction ContingencyConstruction contingency is carried at the summary level at 5%.

Items Included in the Estimate

Overhang canopy at west entry

Schedule

Duration

Escalation AllowanceAll subcontract prices herein are reflective of current prices. Escalation has been included on the summary level to take through to a mid point of construction.

Jun-

15

Sep-

15

Dec

-15

Mar

-16

Jul-1

6

Oct

-16

Jan-

17

May

-17

Aug

-17

Design & Engineering

Construction

Executive Schedule

Prepared by Page 4 of 23

Page 27: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COConceptual Statement of Probable Cost 08/04/15

INTRODUCTION

12 Costs of hazardous material surveys, abatements, and disposals3 Costs of offsite construction4 Costs of existing building / modular demolition5 Substantial site utility rework other than minor allowances included in estimate6 Professional fees, inspections and testing7 Plan check fees and building permit fees8 Furnishings, fixtures, and equipment (FF&E)91011121314

Items Affecting the Cost Estimate1 Modifications to the scope of work included in this estimate.2 Restrictive technical specifications or excessive contract conditions.3 Any specified item of equipment, material, or product that cannot be obtained from at least 3 different sources.4 Any other non-competitive bid situations.5 Bids delayed beyond the projected schedule.6 Floor-to-floor height assumed to be 13'-0" average7 Demising partition at flipped classrooms assumed to be solid-wall rather than operable partition8 Mechanical pricing assumes tie-in to campus loop9 Coffee shop area is assumed to entail hookups (electrical, water, waste) for a mobile coffee cart10 Estimate assumes a men's / women's public restroom at level one, plus an additional two gender neutral

restrooms at levels 2, 3, and 411 "Teaching labs" are understood to be dry labs, not requiring special exhaust hoods, plumbing, or casework12 Mechanical, electrical, structural, and low-voltage systems are allowances only pending further design

Green roofs

Kitchen or food preparation areas

Escalation beyond mid-point of construction

Statement of Probable CostCumming has no control over the cost of labor and materials, the general contractor’s or any subcontractor’s method of determining prices, or competitive bidding and market conditions. This opinion of the probable cost of construction is made on the basis of the experience, qualifications, and best judgment of a professional consultant familiar with the construction industry. Cumming, however, cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from this or subsequent cost estimates.

Cumming has no control over the quality, completeness, intricacy, constructability, or coordination of design documents. Cumming also has no control over the amount of funds available for the project. We, therefore, cannot be responsible for any design revision costs incurred in the event that this estimate is in excess of the budget.

Cumming’s staff of professional cost consultants has prepared this estimate in accordance with generally accepted principles and practices. This staff is available to discuss its contents with any interested party.

Plant investment fees

Items Excluded from the Base Estimate

Tele/data cabling / equipment

Fees associated with tying in to campus loop

Skylights

Prepared by Page 5 of 23

Page 28: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COConceptual Statement of Probable Cost 08/04/15

INTRODUCTION

It is recommended that further cost estimates be prepared throughout design by Cumming to determine overall cost changes subsequent to the preparation of this preliminary estimate. These future estimates will have detailed breakdowns indicating materials by type, kind, and size, priced by their respective units of measure.

Recommendations for Cost ControlCumming recommends that the Owner and the Architect carefully review this entire document to insure that it reflects their design intent. Requests for modifications of any apparent errors or omissions to this document must be made to Cumming within ten days of receipt of this estimate, otherwise, it will be understood that the contents have been concurred with and accepted. If the project is over budget, or there are unresolved budgeting issues, alternate systems/schemes should be evaluated before proceeding into further design phases.

Prepared by Page 6 of 23

Page 29: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COConceptual Statement of Probable Cost 08/04/15

Element Area Low Median High Low Median High

Baseline

A BUILDING 41,096 SF $327.23 $344.45 $361.67 $13,447,725 $14,155,500 $14,863,275

B SITEWORK 24,000 SF $25.01 $26.33 $27.65 $600,344 $631,941 $663,538

C REDUCTION FOR SALES TAX EXEMPTION ($196,673) ($207,024) ($217,375)

D CONSTRUCTION CONTINGENCY (5%) $692,570 $729,021 $765,472

SUB-TOTAL CONSTRUCTION COST 41,096 SF $353.90 / SF $372.53 / SF $391.16 / SF $14,543,966 $15,309,438 $16,074,910

Cost / SF Total

EXECUTIVE SUMMARY

Prepared by Cumming Page 7 of 23

Page 30: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COEstimate Summary by Category (4-Story Option)Conceptual Statement of Probable Cost 08/04/15

ElementSubtotal Total Cost/SF Subtotal Total Cost/SF Subtotal Total Cost/SF

A) Shell (1-5) $4,523,202 $110.06 $4,523,202 $110.061 Foundations $117,743 $117,7432 Vertical Structure $845,312 $845,3123 Floor & Roof Structures $1,045,087 $1,045,0874 Exterior Cladding $2,258,123 $2,258,1235 Roofing and Waterproofing $256,936 $256,936

B) Interiors (6-7) $1,324,476 $32.23 $1,324,476 $32.236 Interior Partitions, Doors and Glazing $711,516 $711,5167 Floor, Wall and Ceiling Finishes $612,960 $612,960

C) Equipment and Vertical Transportation (8-9) $1,034,467 $25.17 $1,034,467 $25.178 Function Equipment and Specialties $636,967 $636,9679 Stairs and Vertical Transportation $397,500 $397,500

D) Mechanical and Electrical (10-13) $4,071,813 $99.08 $193,130 $8.05 $4,264,943 $103.7810 Plumbing Systems $399,648 $399,64811 Heating, Ventilation and Air Conditioning $1,520,277 $1,520,27712 Electrical Lighting, Power and Communications $2,038,905 $193,130 $2,232,03513 Fire Protection Systems $112,983 $112,983

E) Site Construction (14-16) $295,885 $12.33 $295,885 $7.2014 Site Preparation and Demolition $53,533 $53,53315 Site Paving, Structures & Landscaping $143,352 $143,35216 Utilities on Site $99,000 $99,000

Subtotal Cost $10,953,957 $266.55 $489,015 $20.38 $11,442,973 $278.44

General Conditions 6.0% $657,237 $15.99 $29,341 $1.22 $686,578 $16.71Bonds & Insurance 2.0% $232,224 $5.65 $10,367 $0.43 $242,591 $5.90General Contractor Fee 4.0% $473,737 $11.53 $21,149 $0.88 $494,886 $12.04Design Contingency 10.0% $1,231,716 $29.97 $54,987 $2.29 $1,286,703 $31.31Escalation to MOC, 12/30/16 4.48% $606,629 $27,082 $633,710 $15.42

Total Construction Cost $14,155,500 $329.69 $631,941 $25.20 $14,787,441 $359.83

A BUILDING 41,096 sf

SITEWORK 24,000 sf

TOTAL

41,096 sf

B

Prepared by Cumming Page 8 of 23

Page 31: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COConceptual Statement of Probable Cost

Schedule of Areas and Control Quantities

Prepared by Page 9 of 23

Page 32: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesSchedule of Areas and Control QuantitiesConceptual Statement of Probable Cost 08/04/15

Schedule of Areas SF

1. Enclosed Areas (x 100%)

Basement 1,996Level 1 12,800Level 2 10,300Level 3 9,650Level 4 6,350

Total Enclosed 41,096

2. Unenclosed Areas (x 50%)

Outdoor Deck (Level 2) 1,550Outdoor Deck (Level 3) 250Outdoor Deck (Level 4) 250

Total Unenclosed 1,025

Total Gross Floor Area 42,121

Prepared by Page 10 of 23

Page 33: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COConceptual Statement of Probable Cost

BUILDING

Prepared by Cumming Page 11 of 23

Page 34: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COConceptual Statement of Probable Cost 08/04/15

PROJECT SUMMARY - BUILDING

Element Subtotal Total Cost / SF Cost / SF

A) Shell (1-5) $4,523,202 $110.061 Foundations $117,743 $2.87

2 Vertical Structure $845,312 $20.57

3 Floor & Roof Structures $1,045,087 $25.43

4 Exterior Cladding $2,258,123 $54.95

5 Roofing and Waterproofing $256,936 $6.25B) Interiors (6-7) $1,324,476 $32.23

6 Interior Partitions, Doors and Glazing $711,516 $17.31

7 Floor, Wall and Ceiling Finishes $612,960 $14.92C) Equipment and Vertical Transportation (8-9) $1,034,467 $25.17

8 Function Equipment and Specialties $636,967 $15.50

9 Stairs and Vertical Transportation $397,500 $9.67D) Mechanical and Electrical (10-13) $4,071,813 $99.08

10 Plumbing Systems $399,648 $9.72

11 Heating, Ventilation and Air Conditioning $1,520,277 $36.99

12 Electrical Lighting, Power and Communications $2,038,905 $49.61

13 Fire Protection Systems $112,983 $2.75E) Site Construction (14-16)

14 Site Preparation and Demolition15 Site Paving, Structures & Landscaping16 Utilities on Site

Subtotal $10,953,957 $266.55

General Conditions 6.0% $657,237 $15.99

Subtotal $11,611,195 $282.54

Bonds & Insurance 2.0% $232,224 $5.65

Subtotal $11,843,419 $288.19

General Contractor Fee 4.0% $473,737 $11.53

Subtotal $12,317,156 $299.72

Design Contingency 10.0% $1,231,716 $29.97

Subtotal $13,548,871 $329.69

Escalation 4.48% $606,629 $14.76

TOTAL ESTIMATED CONSTRUCTION COST $14,155,500 $344.45

Total Area: 41,096 SF

Prepared by Cumming Page 12 of 23

Page 35: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COConceptual Statement of Probable Cost 08/04/15

DETAIL ELEMENTS - BUILDING

Element Quantity Unit Unit Cost Total

1 FoundationsLayout 12,800 sf slab $0.17 $2,112Continuous Footings at Perimeter, allow 4'-0" x 2'-0" 403 lf

Concrete, 4000 psi 131 cy $165.00 $21,672Formwork 1,612 sf $4.95 $7,979Reinforcement (180# / cy) 23,643 lbs $0.89 $21,066Excavation 197 cy $14.30 $2,817Backfill 66 cy $12.10 $795Haul excess 131 cy $13.20 $1,734

Continuous Footings at Shear Wall, allow 4'-0" x 2'-0" 33 lfConcrete, 4000 psi 11 cy $165.00 $1,775Formwork 132 sf $4.95 $653Reinforcement (180# / cy) 1,936 lbs $0.89 $1,725Excavation 16 cy $14.30 $231Backfill 5 cy $12.10 $65Haul excess 11 cy $13.20 $142

Spread Footing, Allow 6'-0" x 6'-0" x 2'-0" 16 eaConcrete, 4000 psi 47 cy $165.00 $7,744Formwork 1,152 sf $4.95 $5,702Reinforcement (180# / cy) 8,448 lbs $0.89 $7,527Excavation 70 cy $14.30 $1,007Backfill 23 cy $12.10 $284Haul excess 47 cy $13.20 $620

Grade Beams, allow 2'-0" x 2'-0" 100 lfConcrete, 4000 psi 16 cy $165.00 $2,689Formwork 400 sf $4.68 $1,870Reinforcement (180# / cy) 2,933 lbs $0.89 $2,614Excavation 24 cy $14.30 $350Backfill 8 cy $12.10 $99Haul excess 16 cy $13.20 $215

MiscellaneousElevator pits 2 ea $8,250.00 $16,500Perimeter drain 403 lf $19.25 $7,758

Total - Foundations $117,743

2 Vertical StructureBasement Excavation

Mass excavation, including 1:1 lay back 2,564 cy $7.15 $18,331Backfill 1,588 cy $11.00 $17,467Export, assume 2 mile round trip 976 cy $8.80 $8,587Temporary shoring Assume Not Required

Cast-In-Place Concrete Retaining Walls at Basement, 12" 2,160 sfConcrete 88 cy $181.50 $15,972Formwork 4,320 sf $13.75 $59,400Reinforcement (250# / cy) 22,000 lbs $0.94 $20,570Finish to wall, outer face 2,160 sf $0.61 $1,307Waterproofing applied to inner face 2,160 sf $4.95 $10,692

Prepared by Cumming Page 13 of 23

Page 36: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COConceptual Statement of Probable Cost 08/04/15

DETAIL ELEMENTS - BUILDING

Element Quantity Unit Unit Cost Total

Cast-In-Place Concrete Fin Wall, 24" 1,848 sfConcrete 151 cy $181.50 $27,330Formwork 3,696 sf $11.55 $42,689Reinforcement (200# / cy) 30,116 lbs $0.94 $28,158Finish to walls 3,696 sf $0.61 $2,236

Cast-In-Place Exterior Architectural Concrete Walls, 8" 6,266 sfConcrete 170 cy $181.50 $30,889Formwork 12,532 sf $11.55 $144,745Reinforcement (200# / cy) 34,038 lbs $0.94 $31,825Finish to walls, standard 12,532 sf $0.61 $7,582

Cast-In-Place Concrete Shear Walls, 12" 2,600 sfConcrete 106 cy $181.50 $19,226Formwork 5,200 sf $11.55 $60,060Reinforcement (200# / cy) 21,185 lbs $0.94 $19,808Finish to walls 5,200 sf $0.61 $3,146

Cast-In-Place Concrete Columns, Allow 24" x 24" 32 eaConcrete 271 cy $187.00 $50,709Formwork 13,312 sf $9.35 $124,467Reinforcement, allow 300 lbs / cy 81,351 lbs $0.94 $76,063Finish to columns 13,312 sf $0.61 $8,054

Structural Steel Studrails, allowance per column/slab intersection 32 ea $500.00 $16,000

Total - Vertical Structure $845,312

3 Floor & Roof StructuresSlab On Grade, allow 5" thick

Concrete including placing 217 cy $165.00 $35,852Formwork 403 lf $4.95 $1,995Gravel sub base - 6" 12,800 sf $1.38 $17,600Reinforcing steel (1.2 #/sf) 15,360 lb $0.94 $14,362Finish to slab 12,800 sf $0.55 $7,040Vapor barrier 12,800 sf $0.28 $3,520Add for thickened edges 16 cy $165.00 $2,709

Cast-in-Place Beams, Allow 24" x 24" 1,600 lfConcrete 261 cy $176.00 $45,890Formwork 9,600 sf $8.80 $84,480Reinforcing steel, allow 200 lbs / cy 52,148 lb $0.94 $48,759Finish 9,600 sf $0.55 $5,280

Cast-In-Place Concrete Slabs, 6", Floor 28,296 sfConcrete, 5000 psi 576 cy $176.00 $101,446Formwork to soffit 28,296 sf $8.80 $249,005Formwork slab edge 1,738 sf $0.94 $1,625Reinforcing steel, allow 4 lbs / sf 113,184 lb $0.55 $62,251Finish 28,296 sf $0.44 $12,450

Cast-In-Place Concrete Slabs, 6", Roof 12,033 sfConcrete, 5000 psi 245 cy $176.00 $43,141Formwork to soffit 12,033 sf $8.80 $105,890Formwork slab edge 1,200 sf $0.94 $1,122

Prepared by Cumming Page 14 of 23

Page 37: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COConceptual Statement of Probable Cost 08/04/15

DETAIL ELEMENTS - BUILDING

Element Quantity Unit Unit Cost Total

Reinforcing steel, allow 4 lbs / sf 48,132 lb $0.55 $26,473Finish 12,033 sf $0.44 $5,295

MiscellaneousMiscellaneous metals, allowance 41,096 sf $0.28 $11,301Expansion joint at interface with existing building 521 lf $302.50 $157,603

Total - Floor & Roof Structures $1,045,087

4 Exterior CladdingExterior Walls And Parapets

Exterior Metal StudsMetal stud framing, 6" 18 ga at typical exterior wall 7,778 sf $5.50 $42,779Metal stud framing, 2 1/2" 18 ga. at column furring 1,716 sf $3.85 $6,607Metal stud framing, 6" 18 ga. at exterior soffits 2,976 sf $5.50 $16,368

SheathingExterior walls, densglas, vertical 9,494 sf $2.48 $23,498Exterior walls, densglas, horizontal at exterior soffits 2,976 sf $2.72 $8,102

Exterior Wall InsulationR-19 batt insulation, exterior walls and returns, semi-rigid including foil backing 10,754 sf $0.94 $10,055

Gypsum Board to interior of exterior5/8" thick gypsum board X, finished, interior of exterior 7,778 sf $2.20 $17,112

Exterior GlazingStorefront window system, low-E, double pane 2,145 sf $66.00 $141,570Curtainwall system, exterior 11,552 sf $82.50 $953,040

Exterior Stone finishBuff Sandstone veneer, panelized 7,778 sf $44.00 $342,232Buff Sandstone veneer, panelized at exterior columns 1,716 sf $44.00 $75,504

Exposed Concrete 6,266 sfPremium finish for exposed exterior side 6,266 sf $1.65 $10,339

Exterior Soffit FinishArchitectural wood deck finish 2,833 sf $27.50 $77,908Plaster finish 143 sf $10.45 $1,494

Exterior DoorsHM Door Sets, HM frames and Hardware

Double HM door sets 3 ea $2,750.00 $8,250Aluminum Door Sets, Frames and Hardware, Glazed in Aluminum Frame

Single aluminum door set at roof deck 4 ea $3,300.00 $13,200Double aluminum door sets at entry vestibules 2 pr $6,600.00 $13,200Double aluminum door sets at roof deck 1 pr $6,600.00 $6,600

Miscellaneous PremiumsExterior Panic hardware, per leaf 4 ea $495.00 $1,980Automatic door opening, per double leaf set 2 ea $3,025.00 $6,050

Aluminum Sunshades/Roof canopiesExterior sunshades, horizontal, 12" 1,512 lf $137.50 $207,900Exterior sunshades, horizontal, 24" 504 lf $275.00 $138,600

Exterior SignageBuilding signage, "WARNER" raised letters on stone 1 ls $6,050.00 $6,050Building signage, "NATURAL RESOURCES" etched on glass 1 ls $7,150.00 $7,150Miscellaneous exterior signage, allowance 1 ls $5,500.00 $5,500

Prepared by Cumming Page 15 of 23

Page 38: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COConceptual Statement of Probable Cost 08/04/15

DETAIL ELEMENTS - BUILDING

Element Quantity Unit Unit Cost Total

MiscellaneousExterior glass railing at roof deck 137 lf $330.00 $45,210Miscellaneous façade enhancements, allowance 1 ls $50,000 $50,000Firesafing at perimeter walls 3,034 lf $7.19 $21,827

Total - Exterior Cladding $2,258,123

5 Roofing and WaterproofingRoofing

TPO roof system, 60-mil, white 9,354 sf $6.60 $61,736Glasmat, 5/8" mechanically fastened 9,354 sf $2.20 $20,579Paver / pedestal system at roof decks 2,050 sf $16.50 $33,825

Roof InsulationTapered rigid roof insulation 9,354 sf $3.85 $36,013

Flashing/CounterflashingFascia at roof perimeter 894 lf $22.00 $19,668

Sheetmetal, allowance 41,096 sf $0.44 $18,082Roof Accessories

Access hatch and ladder 1 ea $2,640.00 $2,640Entry Canopies

Entry canopy, including metal fascia and plaster soffit, complete with structure and roofing 629 sf $88.00 $55,352

MiscellaneousCaulking allowance 41,096 gfa $0.22 $9,041

Total - Roofing and Waterproofing $256,936

6 Interior Partitions, Doors and GlazingInterior Construction

Interior PartitionsAdministration Areas, Medium Density 6,600 sf $12.50 $82,500Circulation / Common Areas, Low Density 13,100 sf $8.00 $104,800Back of House Areas, Medium Density 2,896 sf $10.50 $30,408Restrooms, High Density 1,000 sf $15.00 $15,000Academic Areas, Medium Density 17,500 sf $12.50 $218,750

Interior GlazingAdministration Areas 6,600 sf $1.50 $9,900Circulation / Common Areas 13,100 sf $2.50 $32,750Back of House Areas 2,896 sf $0.25 $724Restrooms 1,000 sf None RequiredAcademic Areas 17,500 sf $1.50 $26,250

Interior DoorsAdministration Areas, Medium Density 6,600 sf $5.00 $33,000Circulation / Common Areas, Low Density 13,100 sf $3.50 $45,850Back of House Areas, Medium Density 2,896 sf $4.00 $11,584Restrooms, High Density 1,000 sf $12.50 $12,500Academic Areas, Medium Density 17,500 sf $5.00 $87,500

Total - Interior Partitions, Doors and Glazing $711,516

Prepared by Cumming Page 16 of 23

Page 39: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COConceptual Statement of Probable Cost 08/04/15

DETAIL ELEMENTS - BUILDING

Element Quantity Unit Unit Cost Total

7 Floor, Wall and Ceiling FinishesInterior Finishes:

Administration Areas 6,600 sf $12.00 $79,200Circulation / Common Areas 13,100 sf $18.00 $235,800Back of House Areas 2,896 sf $10.00 $28,960Restrooms 1,000 sf $24.00 $24,000Academic Areas 17,500 sf $14.00 $245,000

Total - Floor, Wall and Ceiling Finishes $612,960

8 Function Equipment and SpecialtiesCasework

Millwork at study nooks, allowance per area 3 ea $15,000.00 $45,000Base cabinetry / countertop at executive board room 10 lf $275.00 $2,750Miscellaneous casework 41,096 sf $2.75 $113,014

Window TreatmentMechoshade at exterior glazing, motorized at curtainwall 11,552 sf $24.20 $279,558Mechoshade at exterior glazing, manual at storefront 2,145 sf $13.75 $29,494

Toilet Compartments at Level 1Handicap, solid phenolic 2 ea $1,155.00 $2,310Standard, solid phenolic 2 ea $1,045.00 $2,090Urinal screen, solid phenolic 1 ea $495.00 $495

Miscellaneous SpecialtiesPremium for entry features, including information wall 1 ls $20,000.00 $20,000Installation of OFCI items, allowance 41,096 sf $0.55 $22,603Interior railing, allow glass with aluminum cap 262 lf $275.00 $72,050Fire-rated glass at atrium, allowance pending design 1 ls $25,000.00 $25,000Miscellaneous specialties, allowance 41,096 sf $0.55 $22,603

Total - Function Equipment and Specialties $636,967

9 Stairs and Vertical TransportationStairs, Including Railings

Stair, metal pan, concrete fill, 4'-8" wide 5 flt $15,500.00 $77,500Elevators, Traction

Passenger elevator, traction, 5-stop, allwoance 2 ea $150,000.00 $300,000Passenger elevator cab finish, allowance 2 ea $10,000.00 $20,000Service elevator cab finish Assume Standard

Total - Stairs and Vertical Transportation $397,500

10 Plumbing SystemsGeneral Plumbing Equipment

Sump pump,duplex - 1 hp 1 ea $6,182.00 $6,182Sanitary Fixtures

Water closet, fv 10 ea $1,221.00 $12,210Urinal, wall, fv 2 ea $1,155.00 $2,310Lavatory, wall 10 ea $968.00 $9,680

Prepared by Cumming Page 17 of 23

Page 40: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COConceptual Statement of Probable Cost 08/04/15

DETAIL ELEMENTS - BUILDING

Element Quantity Unit Unit Cost Total

Floor drain 9 ea $194.70 $1,752Floor sink - 12" dia w/grate 1 ea $366.30 $220Hose bibb 1 ea $163.90 $164Wall hydrant, freezeless, w/lock 2 ea $337.70 $675

Rough-insRough-in at plumbing fixtures 22 ea $825.00 $18,150Rough-in at floor sink or floor drain 10 ea $355.30 $3,411

Waste / VentWaste/vent piping 41,096 sf $3.03 $124,315

Domestic WaterDomestic water piping 41,096 sf $3.10 $127,480Trap primer w/water tubing to drain 4 ea $421.30 $1,517

Roof DrainageRoof drainage system 41,096 sf $1.90 $78,206

Condensate DrainageCondensate drainage to HVAC equipment 2 ea $1,342.00 $2,684

Miscellaneous PlumbingSleeves 6 ea $69.19 $415Commissioning assistance only 16 hr $77.22 $1,236Fire stopping 41,096 sf $0.22 $9,041

Total - Plumbing Systems $399,648

11 Heating, Ventilation and Air ConditioningChilled Water Equipment

CHW pump, 7-1/2 hp, 2 ea $6,413.00 $12,826VFD to CHW pump, 7-1/2 hp, 2 ea $3,168.00 $6,336

Heating Water EquipmentHW pump, 5 hp 2 ea $5,984.00 $11,968VFD to HW pump, 5 hp 2 ea $2,354.00 $4,708

Chilled Water DistributionChilled water mains 500 lf $68.20 $34,100Equipment CHW connections 41,096 sf $0.94 $38,425

Heating Water DistributionHeating water branch piping to reheat coils 41,096 sf $4.68 $192,124Heating water mains 500 lf $60.50 $30,250HW rough-in to equipment 41,096 sf $0.33 $13,5623/4" VAV/CV coil conn assembly 47 ea $825.00 $38,7481" unit/cabinet heater conn assembly 5 ea $1,254.00 $6,270

Air-Side EquipmentAir Handling Unit, VAV - CHS,HW - Custom (Temtrol) 51,400 cfm $5.89 $302,489Condensing unit, 1 ton 3 ea $1,035.10 $3,105Refrigerant lineset for split systems 360 lf $19.91 $7,168Unit Heater 20-30 MBH 2 ea $2,167.00 $4,334Cabinet Heater 10-30 MBH 3 ea $1,716.00 $5,148Fan Coil Unit 400 CFM w/DX coil 3 ea $3,355.00 $10,065VAV box w/ reheat, 12", 2000 cfm max 47 ea $885.50 $41,589Smoke relief/exhaust fans 1,500 cfm $0.90 $1,353Duct sound attenuation 102,800 cfm $0.24 $24,878

Prepared by Cumming Page 18 of 23

Page 41: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COConceptual Statement of Probable Cost 08/04/15

DETAIL ELEMENTS - BUILDING

Element Quantity Unit Unit Cost Total

Air DistributionDuctwork, galvanized steel 47,670 lbs $7.25 $345,560Duct insulation, wrap/liner 20,970 sf $2.20 $46,134Flexible duct, insulated, 12" avg 790 lf $17.93 $14,165Combination fire / smoke damper 24 ea $898.70 $21,725Install duct smoke detector 4 ea $168.30 $673Manual volume damper 239 ea $54.45 $13,004Ceiling diffusers 158 ea $110.00 $17,387Ceiling registers 115 ea $92.84 $10,712Ceiling return grille 18 ea $80.74 $1,443

HVAC Direct Digital ControlsDDC to chilled water system 1 ls $2,453.00 $2,453DDC to heating water system 1 ls $2,453.00 $2,453DDC to AHU 2 ea $23,210.00 $46,420DDC to split system fancoil/condenser) 3 ea $3,652.00 $10,956DDC to pump 4 ea $2,376.00 $9,504DDC VAV/CV box controller 47 ea $1,155.00 $54,247DDC to unit/cabinet heaters/misc equip and coils 5 ea $1,133.00 $5,665DDC fire/ smoke damper dry contact monitoring 24 ea $448.80 $10,849DDC to VFD controllers 4 ea $1,408.00 $5,632DDC to sump pump/ sewage ejector 1 ea $1,837.00 $1,837CO2 Sensor 18 ea $1,122.00 $20,196DDC to security, elev, fire alarm etc 1 ls $3,850.00 $3,850DDC tie-in to existing work station 1 ea $3,300.00 $3,300Sole source ATC contractor 1 ls $35,420.00 $35,420

MiscellaneousTest / balance / start-up HVAC 250 hr $73.59 $18,398Access doors 24 ea $138.60 $3,351Commissioning assistance only 53 hr $73.59 $3,863Piping identification 1 ls $1,650.00 $1,650Rigging of major equipment 1 ls $6,424.00 $6,424Fire stopping 41,096 sf $0.33 $13,562

Total - Heating, Ventilation and Air Conditioning $1,520,277

12 Electrical Lighting, Power and CommunicationsElectrical

Normal service and distribution, panels and feeders 41,096 sf $4.68 $192,124Emergency battery inverter 1 ls $28,160.00 $28,160Mechanical equipment connections 41,096 sf $2.31 $94,932Convenience power, including premium for floor outlets 41,096 sf $5.37 $220,603Lighting and lighting control 41,096 sf $14.03 $576,371

Sepcial Electrical SystemsFire alarm system w flame / smoke detectors 41,096 sf $3.30 $135,617Telephone / data systems, rough-only 41,096 sf $4.95 $203,425CATV Systems 41,096 sf $0.83 $33,904Audio / visual system, rough only 41,096 sf $2.20 $90,411Audio / visual system equipment 41,096 sf $6.05 $248,631P/A rough-in (conduit, boxes, and pull-string) 41,096 sf $1.38 $56,507

Prepared by Cumming Page 19 of 23

Page 42: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COConceptual Statement of Probable Cost 08/04/15

DETAIL ELEMENTS - BUILDING

Element Quantity Unit Unit Cost Total

Security access control 41,096 sf $2.75 $113,014CCTV systems 41,096 sf $1.10 $45,206

Total - Electrical Lighting, Power and Communications $2,038,905

13 Fire Protection SystemsAutomatic Sprinkler System 41,096 sf $2.66 $109,398Automatic Sprinkler System - Covered canopies 1,025 sf $3.50 $3,585

Total - Fire Protection Systems $112,983

Prepared by Cumming Page 20 of 23

Page 43: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COConceptual Statement of Probable Cost

SITEWORK

Prepared by Cumming Page 21 of 23

Page 44: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COConceptual Statement of Probable Cost 08/04/15

PROJECT SUMMARY - SITEWORK

Element Subtotal Total Cost / SF Cost / SF

A) Shell (1-5)1 Foundations2 Vertical Structure3 Floor & Roof Structures4 Exterior Cladding5 Roofing and Waterproofing

B) Interiors (6-7)6 Interior Partitions, Doors and Glazing7 Floor, Wall and Ceiling Finishes

C) Equipment and Vertical Transportation (8-9)8 Function Equipment and Specialties9 Stairs and Vertical Transportation

D) Mechanical and Electrical (10-13) $193,130 $8.0510 Plumbing Systems11 Heating, Ventilation and Air Conditioning12 Electrical Lighting, Power and Communications $193,130 $8.05

13 Fire Protection SystemsE) Site Construction (14-16) $295,885 $12.33

14 Site Preparation and Demolition $53,533 $2.23

15 Site Paving, Structures & Landscaping $143,352 $5.97

16 Utilities on Site $99,000 $4.13

Subtotal $489,015 $20.38

General Conditions 6.0% $29,341 $1.22

Subtotal $518,356 $21.60

Bonds & Insurance 2.0% $10,367 $0.43

Subtotal $528,723 $22.03

General Contractor Fee 4.0% $21,149 $0.88

Subtotal $549,872 $22.91

Design Contingency 10.0% $54,987 $2.29

Subtotal $604,860 $25.20

Escalation to MOC, 12/30/16 4.48% $27,082 $1.13

TOTAL ESTIMATED CONSTRUCTION COST $631,941 $26.33

Total Area: 24,000 SF

Prepared by Cumming Page 22 of 23

Page 45: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

CSU Warner College of Natural ResourcesFort Collins, COConceptual Statement of Probable Cost 08/04/15

DETAIL ELEMENTS - SITEWORK

Element Quantity Unit Unit Cost Total

12 Electrical Lighting, Power and CommunicationsExterior lighting allowance at pedestrian circulation areas 5,800 sf $3.85 $22,330Electrical site service and distribution, allowance 1000 kva 1 ls $125,600 $125,600Low Voltage distribution, allowance 1 ls $45,200 $45,200

Total - Electrical Lighting, Power and Communications $193,130

14 Site Preparation and DemolitionSite Clearance

Site clearing, allowance including partial hardscape demo 24,000 sf $0.55 $13,200Earthwork

Field staking / layout 24,000 sf $0.11 $2,640Rough grading, cut and fill, allow 3'-0" average 2,933 cy $8.80 $25,813Fine grading 24,000 sf $0.28 $6,600Erosion control 24,000 sf $0.22 $5,280

Total - Site Preparation and Demolition $53,533

15 Site Paving, Structures & LandscapingHardscape

Sidewalk, broom-finish concrete 5,000 sf $6.60 $33,000Hardscape paving at outdoor study patio 800 sf $9.35 $7,480

LandscapePlanting

Landscaping and irrigation, allowance 3,250 sf $6.60 $21,450Site Walls

Seatwall, 18" wide, tapering to grade 164 lf $275.00 $45,100Raised planter wall, 12" wide x 18" high 54 lf $198.00 $10,692Raised planter wall, 12" wide x 18" high, radius 50 lf $237.60 $11,880

MiscellaneousMonument signage 1 ls $5,500.00 $5,500Site furnishings (tables, benches, umbrellas, etc.) allowance 1 ls $5,500.00 $5,500Site specialties (bike racks, trash containers, etc.) allowance 1 ls $2,750.00 $2,750Patio tables, chairs, and umbrellas By Owner

Total - Site Paving, Structures & Landscaping $143,352

16 Utilities on SiteSite Utilities

Miscellaneous utility demo, relocation and connections, allow 1 ls $11,000.00 $11,000Water distribution system, allowance 1 ls $22,000.00 $22,000Gas distribution system, allowance 1 ls $11,000.00 $11,000Sanitary sewer system, allowance 1 ls $22,000.00 $22,000Storm system , allowance 1 ls $33,000.00 $33,000

Total - Utilities on Site $99,000

Prepared by Cumming Page 23 of 23

Page 46: Warner College of Natural Resources Addition April 2013 ... · New Space Requirements In addition to increasing student enrollments, WCNR is developing new academic, research, outreach

LEED 2009 for New Construction and Major Renovations Project Name

Project Checklist Date

Possible Points: 26Y ? N Y ? N

Y Prereq 1 Credit 4 1 to 2Credit 1 1 Credit 5 1 to 2Credit 2 5 Credit 6 Rapidly Renewable Materials 1Credit 3 Brownfield Redevelopment 1 Credit 7 1Credit 4.1 6Credit 4.2 1 Possible Points: 15Credit 4.3 Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles 3Credit 4.4 2 Y Prereq 1

Credit 5.1 Site Development—Protect or Restore Habitat 1 Y Prereq 2

Credit 5.2 Site Development—Maximize Open Space 1 Credit 1 1Credit 6.1 Stormwater Design—Quantity Control 1 Credit 2 1Credit 6.2 Stormwater Design—Quality Control 1 Credit 3.1 1Credit 7.1 Heat Island Effect—Non-roof 1 Credit 3.2 1Credit 7.2 1 Credit 4.1 1Credit 8 Light Pollution Reduction 1 Credit 4.2 1

Credit 4.3 1Possible Points: 10 Credit 4.4 1

Credit 5 1Y Prereq 1 Credit 6.1 Controllability of Systems—Lighting 1

Credit 1 Water Efficient Landscaping 2 to 4 Credit 6.2 1Credit 2 Innovative Wastewater Technologies 2 Credit 7.1 1Credit 3 2 to 4 Credit 7.2 Thermal Comfort—Verification 1

Credit 8.1 1Possible Points: 35 Credit 8.2 1

Y Prereq 1 Possible Points: 6Y Prereq 2

Y Prereq 3 Credit 1.1 1Credit 1 1 to 19 Credit 1.2 1Credit 2 1 to 7 Credit 1.3 1Credit 3 2 Credit 1.4 1Credit 4 2 Credit 1.5 1Credit 5 3 Credit 2 1Credit 6 2

Possible Points: 4Possible Points: 14

Credit 1.1 1Y Prereq 1 Credit 1.2 1

Credit 1.1 1 to 3 Credit 1.3 1Credit 1.2 Building Reuse—Maintain 50% of Interior Non-Structural Elements 1 Credit 1.4 1Credit 2 1 to 2Credit 3 1 to 2 Possible Points: 110

Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110

Construction IAQ Management Plan—During Construction

Outdoor Air Delivery Monitoring

Indoor Environmental Quality

Minimum Indoor Air Quality PerformanceEnvironmental Tobacco Smoke (ETS) Control

Increased Ventilation

Regional Priority Credits

Innovation and Design Process

Low-Emitting Materials—Adhesives and SealantsLow-Emitting Materials—Paints and Coatings

Construction IAQ Management Plan—Before Occupancy

Total

Regional Priority: Specific Credit

Water Use Reduction

Minimum Energy PerformanceFundamental Refrigerant Management

Daylight and Views—Views

LEED Accredited Professional

Daylight and Views—Daylight

Optimize Energy Performance

Energy and Atmosphere

Innovation in Design: Specific Title

Water Use Reduction—20% Reduction

Low-Emitting Materials—Composite Wood and Agrifiber ProductsLow-Emitting Materials—Flooring Systems

Indoor Chemical and Pollutant Source Control

Thermal Comfort—DesignControllability of Systems—Thermal Comfort

Sustainable Sites

Alternative Transportation—Public Transportation Access

Site SelectionDevelopment Density and Community Connectivity

Construction Activity Pollution Prevention

Materials and Resources, Continued

Water Efficiency

Building Reuse—Maintain Existing Walls, Floors, and Roof

Alternative Transportation—Parking Capacity

Heat Island Effect—Roof

Recycled ContentRegional Materials

Certified Wood

Alternative Transportation—Bicycle Storage and Changing Rooms

Regional Priority: Specific CreditRegional Priority: Specific CreditRegional Priority: Specific Credit

Innovation in Design: Specific TitleInnovation in Design: Specific TitleInnovation in Design: Specific TitleInnovation in Design: Specific Title

Materials Reuse

Storage and Collection of Recyclables

Materials and Resources

Fundamental Commissioning of Building Energy Systems

Construction Waste Management

Enhanced CommissioningOn-Site Renewable Energy

Enhanced Refrigerant ManagementMeasurement and VerificationGreen Power