    VSL STRAND POST-TENSIONING SYSTEMS

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    2/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    3/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    4/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    5/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    6/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    7/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    8/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    9/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    10/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    11/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    12/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    13/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    14/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    15/41

    Page T 7

    Unit A B C D E F G H J K L

    6-2 175 170 80 75 55 60 25 41 140 M10 40

    6-3 215 210 95 90 55 60 25 58 170 M10 40

    6-4 235 230 115 110 60 60 25 76 180 M10 40

    6-5 265 260 130 125 60 60 25 94 200 M10 40

    Notes

    All dimensions in [mm]

    System applicable to strands with Ap = 140 mm2or Ap = 150 mm2

    System can be used with corrugated steel duct or PT-Plusduct

    Grout Connection

    Grout Vent

    Anchorage BodyStrands

    Trumpet

    Wedges

    Flat DuctCoupler

    Protection Cap

    PT-PlusFlat Duct

    CONCRETE 20/25 MPa

    Unit P r R S U W6-2 35 6 12 10 120 200

    6-3 40 6 12 0 140 270

    6-4 40 7 12 10 160 320

    6-5 35 8 12 15 180 360

    Notes

    All dimensions in [mm]

    Strand Ap= 150mm2,fpk = 1860N/mm

    2 (GUTS), Fpk= 279kN

    Concrete: minimum required strength fc, cylinder / fc, cubein N/mm2at s tressing

    Local zone reinforcement bent and anchored in accordance wi th BS EN 199

    Reinforcement, edge distance and center spacing may be modi fied, contact

    For max. tendon force and temporary over stressing refer to 4.1 and 4.2.8 re

    Local Zone Reinforcement

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    16/41

    Page T 9

    2

    CONCRETE 20/25 MPa

    Unit P r R S U W X Ymin A B C

    6-2 35 6 12 10 120 200 240 160 175 115 80

    6-3 40 6 12 0 140 270 310 180 215 115 95

    6-4 40 7 12 10 160 320 360 200 235 120 115

    6-5 35 8 12 15 180 360 400 220 265 120 130

    Notes

    All dimensions in [mm] Min. yield strength for local zone reinforcement fy= 460N/mm2

    Strand Ap= 150mm2,fpk = 1770N/mm

    2 (GUTS), Fpk= 265kN For calculation of minimum edge distance refer to 4.4.1

    Concrete: minimum required strength fc, cylinder / fc, cubein N/mm2at s tressing r = number o f t urns , i nc l. l ength for anchor ing of reinforcement bar

    Local zone reinforcement bent and anchored in accordance wi th BS EN 1992 X = anchorage spacing

    Reinforcement, edge distance and center spacing may be modif ied, contact VSL Ymin = min. allowable slab thickness

    For max. tendon force and temporary over stressing refer to 4.1 and 4.2.8 resp.

    Spacing RecessLocal Zone Reinforcement

    CONCRETE 20/25 MPa

    Unit n R S t x T Umin U

    6-2 4 10 25 2 x 10 110 120

    6-3 4 12 30 2 x 12 130 1506-4 4 12 40 4 x 12 150 180

    6-5 4 16 40 4 x 12 170 200

    Notes

    All dimension in [mm]

    1) Depending on slab thickness and required concrete cover Umin U

    2) X = anchorage spacing. Minimum edge dis tance: X/2 + concrete cove

    3) transverse bars to be anchored acc. to general detailing rules

    Strand Ap= 150mm2,fpk = 1770N/mm

    2 (GUTS), Fpk= 265,5kN

    Concrete: minimum required strength fc, cylinder / fc, cubein N/mm2at stressin

    For max. tendon force and temporary over stressing refer to 4.1 and 4.2

    Local zone reinforcement bent and anchored in accordance with BS EN

    Reinforcement, edge distance and center spacing may be modified, con

    Local Zone Reinforcem

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    17/41

    Page T 11

    CONCRETE 20/25 MPa

    Unit P r R S U W X Ymin A B C

    6-2 35 6 12 10 120 200 240 160 175 115 80

    6-3 40 6 12 0 140 270 310 180 215 115 95

    6-4 40 7 12 10 160 320 360 200 235 120 115

    6-5 35 8 12 15 180 360 400 220 265 120 130

    Notes

    All dimensions in [mm] Min. yield strength for local zone reinforcement fy= 390N/mm2

    Strand Ap= 150mm2,fpk = 1770N/mm

    2 (GUTS), Fpk= 265kN For calculation of minimum edge distance refer to 4.4.1

    Concrete: minimum required strength fc, cylinder / fc, cubein N/mm2at s tressing r = number o f t urns , i nc l. l ength for anchoring o f reinforcement bar

    Local zone reinforcement bent and anchored in accordance wi th BS EN 1992 X = anchorage spacing

    Reinforcement, edge distance and center spacing may be modi fied, contact VSL Ymin = min. allowable slab thickness

    For max. tendon force and temporary over stressing refer to 4.1 and 4.2.8 resp.

    Spacing RecessLocal Zone Reinforcement

    2

    ANCHORAGE TYPE S 6-1 PLUS

    Unit A

    6-1 122

    Notes

    All dimensions in [mm]

    System applicable to strands with Ap = 140 mm2or Ap = 150 mm2

    Strand

    Grout Connection

    Protection Cap

    Wedge

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    18/41

    Page T 13

    Unit A B C D E F

    6-1 122 94 70 300 19 32

    Notes

    All dimensions in [mm]

    System applicable to strands with Ap = 140 mm2or Ap = 150 mm2

    Sleeve

    Heat Shrink Sleeve

    EncapsulatedAnchorage Body

    WedgeStrand

    Protection Cap

    PE sheated strandand waxed / greased

    Notes

    All dimension in [mm]

    Min. required concrete strength fc, cylinder / fc, cube=16/20 MPa at stressing

    For max. tendon force and temporary over stressing refer to 4.1 and 4.2.8

    X= anchorage spacing.

    X1= min spacing between l ast and first anchorage of grouped anchorages

    Nom. strand breaking load

    Fpk= 260.4 / 265.5kN

    Min. y

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    19/41

    Page T 15

    Unit A B C

    6-1 90 90 1250

    6-2 190 90 1250

    6-3 290 90 1250

    6-4 390 90 1250

    6-5 490 90 1250

    Notes

    All dimensions in [mm]

    System applicable to strands with Ap = 140 mm2or Ap = 150 mm2

    System can be used with corrugated steel duct or with PT-Plusduct

    20 / 25 fc,cyl / fc,cube in MPa

    Max. tendon force after lock-off

    80% of Fpk

    Min. concrete strength at stressingNom. strand breaking load

    Fpk= 260.4 / 265,5 / 279kN

    Crimped Strand Tails Bulb

    Strands

    Grout Connection

    End-Piece with Clip

    Spacer Bar

    PT-Plus Duct

    Unit

    6-2

    6-3

    6-4

    6-5

    Notes

    All dimensions in [mm]

    System applicable to strands with Ap = 140 mm2or Ap = 150 m

    System can be used with corrugated steel duct or with PT-Plus

    Nom. strand breaking load

    Fpk= 260.4 / 265.5 / 279kN

    Tension RingCompression Fittings

    Grout Connection

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    20/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    21/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    22/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    23/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    24/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    25/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    26/41

    Page T 29

    COUPLER TYPE K

    Unit A B C D F E

    6-3 430 160 210 150 76 118

    6-4 440 160 220 160 83 118

    6-7 560 160 320 190 95 128

    6-12 660 160 420 240 121 128

    6-15 770 160 530 270 133 128

    6-19 770 160 530 280 146 128

    6-22 910 160 630 310 159 128

    6-27 980 180 690 350 168 150

    6-31 970 180 660 360 178 150

    6-37 1200 200 870 400 203 168

    Notes

    All dimensions in [mm]

    System applicable to strands with Ap = 140 mm2or Ap = 150 mm2

    System can be used with Type GC or E bearing plate

    System can be used with corrugated steel duct or PT-Plusduct

    Compresion Fitting

    Steel Band

    Coupling Head K

    Grout Connection

    Trumpet K

    Tension Ring

    Duct

    Unit A B

    6-2 140 70

    6-4 170 80

    6-6 210 100

    6-12 300 160

    6-22 400 190 2

    Notes

    All dimensions in [mm]

    System applicable to strands with Ap = 140 mm2or Ap = 150 mm2

    System can be used with corrugated steel duct or with PT-Plusdu

    L: movement of coupling head due to tendon extensions

    Duct

    Retainer Plates

    Recess in Structural Concrete

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    27/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    28/41

    Page T 33

    Required cross-sectional area of hairpin bars if anchorage is an in

    at ~ 50% fy ):

    As.n = Po.

    As [mm2] cross-sectional area of one hai

    n [-] number of hairpin bars

    Po [kN] Prestressing force in the tendo

    fAext [mm] External diameter of duct

    T [mm] Concrete thickness

    X [mm] Required anchoring length acc

    fy [N/mm2] Yield strength of hairpin bars: m

    Min. required concrete strength fc, cylinder / fc, cube=23/28 MPaat time

    Concrete cover to ducts shall not be less than the external diamet

    Arrangement of multiple L anchorages depending on available con

    T3A ext T

    DEAD END ANCHORAGE TYPE L

    Unit A

    internal/external

    B

    internal/externalR min

    A

    internal/external

    B

    internal/externalR min

    6-2 50/55 45/50 600 50/55 45/50 600

    6-3 50/55 45/50 600 50/55 45/50 600

    6-4 55/60 50/55 600 55/60 50/55 650

    6-7 75/82 60/67 750 75/82 60/67 850

    6-12 90/97 80/87 1000 90/97 80/87 1100

    6-19 110/117 95/102 1300 110/117 95/102 1400

    6-22 110/117 95/102 1500 120/127 110/117 1500

    Notes

    All dimensions in [mm]

    System applicable to strands with Ap = 140 mm2or Ap = 150 mm2

    System can be used with corrugated steel duct or with PT-Plusduct

    For larger units contact VSL

    For strands with Fpk = 260.4 / 265.5 kN For strands with Fpk = 279 kN

    Duct

    Smooth Steel orSmooth HDPE Pipe

    Grout ConnectionGrout Connection

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    29/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    30/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    31/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    32/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    33/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    34/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    35/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    36/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    37/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    38/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    39/41

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    40/41

    Page T 57

    Str

    projec

  • 7/25/2019 Vsl Strand Post Tensioning Systems

    41/41

    VSL LOCATIONS

    HEADQUARTERS

    VSL INTERNATIONAL LTD.

    ARGENTINA

    BUENOS AIRES

    BRAZIL

    SAO PAULO

    CANADA

    TORONTO

    CHILE

    SANTIAGO

    COLOMBIA

    *BOGOTA

    MEXICO

    MEXICO

    PERU

    *LIMA

    LIMA

    UNITED STATES OF AMERICA *BALTIMORE, MD

    SOUTH AFRICA *JOHANNESBURG

    TUNISIA

    TUNIS

    AUSTRIA *WIEN

    CZECH REPUBLIC

    PRAGUE

    FRANCE *LABGE

    GERMANY

    BERLIN

    NETHERLANDS

    Verplaatsingstechnieken*ROSMALEN

    NORWAY *RUD

    POLAND

    WARSZAWA

    PORTUGAL

    PACO DE ARCOS

    VILA NOVA DE GAIA

    SPAIN

    BARCELONA

    SWEDEN *VSTERHANINGE

    SWITZERLAND

    SUBINGEN

    SAINT LEGIER

    TURKEY *ANKARA

    UNITED KINGDOM

    LUTON

    SULTANATE OF OMAN

    MUSCAT

    UNITED ARAB EMIRATES

    DUBAI, UAE

    DOHA, QATAR

    BRUNEI

    BRUNEI DARUSSALAM

    CHINA PRC

    HEFEI

    HONG KONG

    CHAI WAN

    INDIA

    CHENNAI

    INDONESIA

    JAKARTA

    JAPAN

    TOKYO

    KOREA

    SEOUL

    MALAYSIA

    KUALA LUMPUR

    PHILIPPINES

    MANDALUYONG CITY

    SINGAPORE

    SINGAPORE

    TAIWAN

    TAIPEI

    THAILAND

    BANGKOK

    VIETNAM

    HANOI

    HO CHI MINH CITY

    NEW SOUTH WALES

    QUEENSLAND

    VICTORIA

    SOUTH AUSTRALIA

    TASMANIA

    WESTERN AUSTRALIA