  • HARYANA POWER GENERATION CORPORATION LIMITED

    1 X 660 MW SUPERCRITICAL DCRTPP

    YAMUNANAGAR, HARYANA

    SPECIFICATION.NO. TCE.6417A-H-500-01

    CIVIL REQUIREMENTS

    VOLUME VI

    TATA CONSULTING ENGINEERS LIMITED TECHNOPOLIS, 5TH FLOOR, A-WING

    BP-4, SECTOR-V, SALT LAKE, KOLKATA 700 091

    INDIA

    MARCH 2012

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 1 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME (I) GENERAL CONDITION OF CONTRACT, PQR, ITB ETC

    SECTION

    NO. SPECIFICATION NO. REV. NO. TITLE

    NO. OF

    SHEETS

    A1 TCE.6417A-H-500-001 R0 INTRODUCTION 2

    A2 TCE.6417A-H-500-001 R0 INSTRUCTION TO BIDDERS 32

    A3 TCE.6417A-H-500-001 R0 PRE QUALIFICATION REQUIREMENTS 6

    A4 TCE.6417A-H-500-001 R0 GENERAL CONDITIONS OF CONTRACT 146

    A5 TCE.6417A-H-500-001 R0 INFORMATION FORMS 29

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 2 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME (II) GENERAL SCOPE OF ENQUIRY, PROJECT INFORMATION, SCHEDULE ETC

    SECTION

    NO. SPECIFICATION NO.

    REV.

    NO. TITLE

    NO. OF

    SHEETS

    A TCE.6417A-H-500-001 R0 SCOPE OF ENQUIRY 3

    B TCE. 6417A-H-500-001 R0 GENERAL PROJECT INFORMATION 9

    C1 TCE. 6417A-H-500-001 R0 SCOPE OF SUPPLY, TERMINAL POINTS, EXCLUSIONS.

    43

    C2 TCE. 6417A-H-500-001 R0 CODES AND STANDARDS 10

    C3 TCE. 6417A-H-500-001 R0 PERFORMANCE REQUIREMENTS AND PERFORMANCE GUARANTEES

    16

    C4 TCE. 6417A-H-500-001 R0 AVAILABILITY REQUIREMENTS 2

    C5 TCE. 6417A-H-500-001 R0 LAYOUT REQUIREMENTS 8

    C6 TCE. 6417A-H-500-001 R0 MAINTENANCE REQUIREMENTS 12

    C7 TCE. 6417A-H-500-001 R0 SPARE AND MAINTANANCE TOOLS & TACKLES

    4

    C8 TCE. 6417A-H-500-001 R0 PRE OPERATIONAL REQUIREMENTS 5

    C9 TCE. 6417A-H-500-001 R0 TENDER EVALUATION 1

    C10 TCE. 6417A-H-500-001 R0 PERFORMANCE TESTS 13

    C11 TCE. 6417A-H-500-001 R0 ERECTION REQUIREMENTS 5

    C12 TCE. 6417A-H-500-001 R0 QUALITY ASSURANCE REQUIREMENTS 190

    C13 TCE. 6417A-H-500-001 R0 PAINTING REQUIREMENTS 15

    C14 TCE. 6417A-H-500-001 R0 LIST OF SKETCHES/DRAWINGS ENCLOSED

    4

    C15 TCE. 6417A-H-500-001 R0 INFORMATION TO BE FURNISHED WITH BID

    8

    C16 TCE. 6417A-H-500-001 R0 DATA TO BE FURNISHED AFTER AWARD OF CONTRACT

    7

    C17 TCE. 6417A-H-500-001 R0 CONTRACTORS HEALTH AND SAFETY PROGRAMS

    23

    C18 TCE. 6417A-H-500-001 R0 LIST OF SPARES 138

    C19 TCE. 6417A-H-500-001 R0 LIST OF SUB VENDORS / SUB CONTRACTORS

    19

    C20 TCE. 6417A-H-500-001 R0 ENVIRONMENTAL MANAGEMENT 4

    TCE. 6417A-H-500-001 R0 DATASHEET A1 A3 14

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 3 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME (II) GENERAL SCOPE OF ENQUIRY, PROJECT INFORMATION, SCHEDULE ETC

    SECTION

    NO. SPECIFICATION NO.

    REV.

    NO. TITLE

    NO. OF

    SHEETS

    SECTION E

    E1 TCE. 6417A-H-500-001 R0 DOCUMENT DISTRIBUTION SCHEDULE 1

    E2 TCE. 6417A-H-500-001 R0 STORAGE OF MECHANICAL AND ELECTRICAL EQUIPMENT AT SITE

    10

    SCHEDULES F

    F1 TCE. 6417A-H-500-001 R0 SCHEDULE OF PRICE 1

    F2 TCE. 6417A-H-500-001 R0 OVERALL TIME SCHEDULE 1

    F3 TCE. 6417A-H-500-001 R0 SCHEDULE OF PERFORMANCE GUARANTEES

    19

    F4 TCE. 6417A-H-500-001 R0 SCHEDULE OF DEVIATIONS FROM TECHNICAL SPECIFICATION

    1

    F5 TCE. 6417A-H-500-001 R0 SCHEDULE OF DEVIATIONS FROM GENERAL CONDITIONS

    1

    F6 TCE. 6417A-H-500-001 R0 SCHEDULE OF BIDDERS EXPERIENCE 3

    F7 TCE. 6417A-H-500-001 R0 SCHEDULE OF START UP SPARES 1

    F8 TCE. 6417A-H-500-001 R0 SCHEDULE OF MANDATORY SPARES 1

    F9 TCE. 6417A-H-500-001 R0 SCHEDULE OF RECOMMENDED SPARES 1

    F10 TCE. 6417A-H-500-001 R0 SCHEDULE OF MAINTENANCE TOOLS AND TACKLES

    1

    F11 TCE. 6417A-H-500-001 R0 SCHEDULE OF PLACES OF TEST AND INSPECTION

    1

    F12 TCE. 6417A-H-500-001 R0 SCHEDULE OF QUALITY PLAN. 1

    F13 TCE. 6417A-H-500-001 R0 SCHEDULE OF CONSTRUCTION POWER REQUIREMENT

    1

    F14 TCE. 6417A-H-500-001 R0 SCHEDULE OF CONSTRUCTION WATER REQUIREMENT

    1

    F15 TCE. 6417A-H-500-001 R0 SCHEDULE OF CONSTRUCTION AREA REQUIREMENT

    2

    F16 TCE. 6417A-H-500-001 R0 SCHEDULE OF WEIGHT AND DIMENSIONS

    1

    F17 TCE. 6417A-H-500-001 R0 SCHEDULE OF MOTOR LOAD LIST 1

    F18 TCE. 6417A-H-500-001 R0 SCHEDULE OF SUB-VENDORS LIST 1

    F19 TCE. 6417A-H-500-001 R0 BIDDERS CHECK LIST 2

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 4 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME (II) GENERAL SCOPE OF ENQUIRY, PROJECT INFORMATION, SCHEDULE ETC

    SECTION

    NO. SPECIFICATION NO.

    REV.

    NO. TITLE

    NO. OF

    SHEETS

    F20 TCE. 6417A-H-500-001 R0 SCHEDULE OF CONTRACTORS RESOURCE DEPLOYMENT

    4

    F21 TCE. 6417A-H-500-001 R0 SCHEDULE OF THE PRESENT COMMITMENTS

    1

    F22 TCE. 6417A-H-500-001 R0 SCHEDULE OF FUEL REQUIREMENT TILL PG TEST

    1

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 5 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME III SPECIFIC MECHANICAL REQUIREMENTS FOR BTG AND BOP PACKAGE

    VOLUME III (A) SPECIFIC MECHANICAL REQUIREMENTS FOR BTG PACKAGE

    SECTION

    NO. SPECIFICATION NO. REV. NO. TITLE

    NO. OF

    SHEETS

    STEAM GENERATOR AND AUXILIARIES

    C1 TCE-6417A-H-500-001 R0 STEAM GENERATOR & AUXILIARIES 73

    STEAM GENERATOR AND AUXILIARIES DATA SHEET-A

    A1 TCE-6417A-H-500-001 R0 STEAM GENERATOR PRESSURE PARTS 5

    A2 TCE-6417A-H-500-001 R0 RAPH 2

    A3 TCE-6417A-H-500-001 R0 CENTRIFUGAL FANS-ID FANS 4

    A4 TCE-6417A-H-500-001 R0 AXIAL FANS-FD FANS 2

    A5 TCE-6417A-H-500-001 R0 AXIAL FANS-PA FANS 2

    A6 TCE-6417A-H-500-001 R0 SOOT BLOWING SYSTEM 2

    A7 TCE-6417A-H-500-001 R0 COAL BURNERS 2

    A8 TCE-6417A-H-500-001 R0 COAL MILLS 3

    A9 TCE-6417A-H-500-001 R0 COAL FEEDER & COAL PIPES 3

    A10 TCE-6417A-H-500-001 R0 FUEL OIL SYSTEM AND DAY TANKS 4

    A11 TCE-6417A-H-500-001 R0 FUEL OIL BURNER AND IGNITERS 1

    A12 TCE-6417A-H-500-001 R0 ELECTROSTATIC PRECIPITATOR 6

    A13 TCE-6417A-H-500-001 R0 DAMPERS & DUCTS 3

    A14 TCE-6417A-H-500-001 R0 STRAINERS 3

    A15 TCE-6417A-H-500-001 R0 SHELL AND TUBE HEAT EXCHANGER 3

    A16 TCE-6417A-H-500-001 R0 FLASH TANK 1

    A16 TCE-6417A-H-500-001 R0 SCAPH 1

    A18 TCE-6417A-H-500-001 R0 ID FANS - AXIAL 3

    A19 TCE-6417A-H-500-001 R0 SEAL AIR FANS 1

    STEAM GENERATOR AND AUXILIARIES DATA SHEET-B

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 6 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME III SPECIFIC MECHANICAL REQUIREMENTS FOR BTG AND BOP PACKAGE

    VOLUME III (A) SPECIFIC MECHANICAL REQUIREMENTS FOR BTG PACKAGE

    SECTION

    NO. SPECIFICATION NO. REV. NO. TITLE

    NO. OF

    SHEETS

    B1 TCE-6417A-H-500-001 R0 STEAM GENERATOR PERFORMANCE DATA 17

    B2 TCE-6417A-H-500-001 R0 HEAT RELEASE AND OTHER DATA 4

    B3 TCE-6417A-H-500-001 R0 STEAM GENERATOR PRESSURE PARTS 7

    B4 TCE-6417A-H-500-001 R0 REGENERATIVE AIR PREHEATER 4

    B5 TCE-6417A-H-500-001 R0 STEAM COIL AIR PREHEATER 2

    B6 TCE-6417A-H-500-001 R0 CENTRIFUGAL FANS 3

    B7 TCE-6417A-H-500-001 R0 FD & PA FANS-AXIAL FANS 3

    B8 TCE-6417A-H-500-001 R0 SOOT BLOWING SYSTEM 3

    B9 TCE-6417A-H-500-001 R0 FUEL OIL BURNERS AND IGNITORS 3

    B10 TCE-6417A-H-500-001 R0 COAL BURNERS 2

    B11 TCE-6417A-H-500-001 R0 COAL MILLS 3

    B12 TCE-6417A-H-500-001 R0 ROTARY GEAR SCREW PUMPS 2

    B13 TCE-6417A-H-500-001 R0 FUEL OIL HEATERS 2

    B14 TCE-6417A-H-500-001 R0 AIR AND FLUE GAS DUCTS AND DAMPER 2

    B15 TCE-6417A-H-500-001 R0 ELECTROSTATIC PRECIPITATOR 3

    B16 TCE-6417A-H-500-001 R0 THERMAL INSULATION AND REFRACTORY 2

    B17 TCE-6417A-H-500-001 R0 SEPARATOR DRAIN RECIRCULATION PUMP 1

    B18 TCE-6417A-H-500-001 R0 ATMOSPHERIC DRAIN TRANSFER PUMP 1

    B19 TCE-6417A-H-500-001 R0 HORIZONTAL CENTRIFUGAL PUMP 1

    B20 TCE-6417A-H-500-001 R0 DRAWINGS AND DETAILS 4

    B21 TCE-6417A-H-500-001 R0 FOUNDATION LOADING AT COLUMN BASES 1

    STEAM TURBINE GENERATOR & AUXILIARIES

    C2 TCE.6417A-H-500-001 R0 STEAM TURBINE GENERATOR & AUXILIARIES

    83

    STEAM TURBINE GENERATOR AND AUXILIARIES DATA SHEET-A

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 7 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME III SPECIFIC MECHANICAL REQUIREMENTS FOR BTG AND BOP PACKAGE

    VOLUME III (A) SPECIFIC MECHANICAL REQUIREMENTS FOR BTG PACKAGE

    SECTION

    NO. SPECIFICATION NO. REV. NO. TITLE

    NO. OF

    SHEETS

    A1 TCE.6417A-H-500-001 R0 UTILITY REQUIREMENTS 2

    A2 TCE.6417A-H-500-001 R0 STEAM TURBINE AND ACCESSORIES 7

    A3 TCE.6417A-H-500-001 R0 SURFACE CONDENSER AND ACCESSORIES

    3

    A4 TCE.6417A-H-500-001 R0 CONDENSER AIR EVACUATION EQUIPMENT AND ACCESSORIES

    3

    A5 TCE.6417A-H-500-001 R0 CONDENSATE EXTRACTION PUMPS AND ACCESSORIES

    3

    A6 TCE.6417A-H-500-001 R0 CLOSED FEED WATER HEATER AND ACCESSORIES

    3

    A7 TCE.6417A-H-500-001 R0 DEAERATING FEED WATER HEATER AND ACCESORIES

    3

    A8 TCE.6417A-H-500-001 R0 BOILER FEED PUMP AND ACCESSORIES 6

    A9 TCE.6417A-H-500-001 R0 CENTRAL LUBE OIL SYSTEM 3

    A10 TCE.6417A-H-500-001 R0 FEED WATER CHEMICAL DOSING SYSTEM 4

    A11 TCE.6417A-H-500-001 R0 STRAINERS 3

    A12 TCE.6417A-H-500-001 R0 SHELL AND TUBE HEAT EXCHANGERS 3

    A13 TCE.6417A-H-500-001 R0 CONDENSATE STORAGE TANK 2

    A14 TCE.6417A-H-500-001 R0 ON-LOAD CONDENSER TUBE CLEANING SYSTEM

    3

    STEAM TURBINE GENERATOR AND AUXILIARIES DATA SHEET-B

    B1 TCE.6417A-H-500-001 R0 STEAM TURBINE AND ACCESSSORIES 26

    B2 TCE.6417A-H-500-001 R0 SURFACE CONDENSER AND ACCESSORIES

    6

    B3 TCE.6417A-H-500-001 R0 CONDENSER AIR EVACUATION EQUIPMENT AND ACCESSORIES

    2

    B4 TCE.6417A-H-500-001 R0 CONDENSATE EXTRACTION PUMPS AND ACCESSORIES

    4

    B5 TCE.6417A-H-500-001 R0 CLOSED FEED WATER HEATER AND ACCESSORIES

    6

    B6 TCE.6417A-H-500-001 R0 DEAERATING FEED WATER HEATER AND ACCESSORIES

    5

    B7 TCE.6417A-H-500-001 R0 BOILER FEED PUMP AND ACCESORIES 7

    B8 TCE.6417A-H-500-001 R0 ROTARY GEAR/ SCREW PUMPS 2

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 8 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME III SPECIFIC MECHANICAL REQUIREMENTS FOR BTG AND BOP PACKAGE

    VOLUME III (A) SPECIFIC MECHANICAL REQUIREMENTS FOR BTG PACKAGE

    SECTION

    NO. SPECIFICATION NO. REV. NO. TITLE

    NO. OF

    SHEETS

    B9 TCE.6417A-H-500-001 R0 HP/LP BYPASS VALVES 1

    B10 TCE.6417A-H-500-001 R0 GLAND STEAM CONDENSER AND ACCESSORIES

    4

    B11 TCE.6417A-H-500-001 R0 OIL COOLER HEAT EXCHANGERS 4

    B12 TCE.6417A-H-500-001 R0 FEED WATER CHEMICAL DOSING SYSTEM 3

    B13 TCE.6417A-H-500-001 R0 VARIABLE SPEED HYDRAULIC COUPLINGS 2

    B14 TCE.6417A-H-500-001 R0 MISCELLANEOUS PUMPS 1

    B15 TCE.6417A-H-500-001 R0 CONDENSATE STORAGE TANK AND LP DRAIN CONDENSATE PUMP S (IF PROVIDED)

    2

    PIPING

    C3 TCE.6417A-H-500-001 R0 PIPING 21

    PIPING DATA SHEET-A

    A1 TCE.6417A-H-500-001 R0 THERMAL INSULATION FOR HOT SURFACES

    3

    A2 TCE.6417A-H-500-001 R0 MATERIAL SPECIFICATION FOR PIPING AND VALVES

    9

    WATER SYSTEM

    C4 TCE.6417A-H-500-001 R0 WATER SYSTEM 3

    WATER SYSTEM DATA SHEET-A

    A1 TCE.6417A-H-500-001 R0 DMCW PUMPS 2

    A2 TCE.6417A-H-500-001 R0 SG FILL PUMPS 2

    A3 TCE.6417A-H-500-001 R0 HOTWELL MAKE UP PUMPS 2

    A4 TCE.6417A-H-500-001 R0 STATOR COOLING PUMPS 2

    A5 TCE.6417A-H-500-001 R0 PLATE HEAT EXCHANGERS 3

    WATER SYSTEM DATA SHEET-B

    B1 TCE.6417A-H-500-001 R0 DMCW, SG FILL, HOTWELL MU, SW PUMPS 2

    B2 TCE.6417A-H-500-001 R0 PLATE HEAT EXCHANGERS 5

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 9 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME III SPECIFIC MECHANICAL REQUIREMENTS FOR BTG AND BOP PACKAGE

    VOLUME III (A) SPECIFIC MECHANICAL REQUIREMENTS FOR BTG PACKAGE

    SECTION

    NO. SPECIFICATION NO. REV. NO. TITLE

    NO. OF

    SHEETS

    CONDENSATE POLISHING UNIT

    C5 TCE.6417A-H-500-001 R0 CONDENSATE POLISHING UNIT 15

    CONDENSATE POLISHING UNIT DATASHEET A

    A1 TCE.6417A-H-500-001 R0 DATA SHEET A1 5

    CONDENSATE POLISHING UNIT DATAHSEET - B

    B1 TCE.6417A-H-500-001 R0 DATA SHEET B1 6

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 10 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME III SPECIFIC MECHANICAL REQUIREMENTS FOR BTG AND BOP PACKAGE

    VOLUME III (B) SPECIFIC MECHANICAL REQUIREMENTS FOR BOP PACKAGE

    SECTION

    NO. SPECIFICATION NO.

    REV.

    NO. TITLE

    NO. OF

    SHEETS

    WATER SYSTEM

    D4 TCE-6417A-H-500-001 R0 WATER SYSTEMS WRITE UP 19

    D4.1 TCE-6417A-H-500-001 R0 DATA SHEET A - RAW WATER & AHP PUMPS 2

    D4.2 TCE-6417A-H-500-001 R0 DATA SHEET A1- HYPO-CHLORINATION

    SYSTEM 1

    D4.2 TCE-6417A-H-500-001 R0 DATA SHEET A2 - PRE TREATMENT PLANT- 6

    D4.3 TCE-6417A-H-500-001 R0 DATA SHEET A1 - ACF 1

    D4.3 TCE-6417A-H-500-001 R0 DATA SHEET A2 ACID ALKALI SYSTEM 3

    D4.3 TCE-6417A-H-500-001 R0 DATA SHEET A3 DM PLANT 2

    D4.3 TCE-6417A-H-500-001 R0 DATA SHEET A4 - DUAL MEDIA FILTERS 2

    D4.3 TCE-6417A-H-500-001 R0 DATA SHEET A5 DM STORAGE TANKS 1

    D4.3 TCE-6417A-H-500-001 R0 DATA SHEET A6 NEUTRALISING PIT 1

    D4.4 TCE-6417A-H-500-001 R0 DATA SHEET A RUBBER EXPANSION JOINTS

    2

    D4.5 TCE-6417A-H-500-001 R0 DATA SHEET A MISC PUMPS 10

    D4.6 TCE-6417A-H-500-001 R0 WRITE UP CW/ACW PUMPS 10

    D4.6 TCE-6417A-H-500-001 R0 DATA SHEET A CW/ACW PUMPS 7

    D4.7 TCE-6417A-H-500-001 R0 DATA SHEET A BUTTERFLY VALVES 3

    D4.8 TCE-6417A-H-500-001 R0 DATA SHEET A STP WATER TREATMENT PLANT

    3

    D4.9 TCE-6417A-H-500-001 R0 DATA SHEET A CHEMICAL DOSING & SIDE STREAM FILTERATION SYSTEM

    4

    D4.10 TCE-6417A-H-500-001 R0 DATA SHEET A SELF CLEANING STRAINER 3

    WATER SYSTEM DATASHEET B

    D4.1 TCE-6417A-H-500-001 R0 DATA SHEET B - RAW WATER & AHP PUMPS 2

    D4.2 TCE-6417A-H-500-001 R0 DATA SHEET B - PRE TREATMENT PLANT- 2

    D4.3 TCE-6417A-H-500-001 R0 DATA SHEET B - DM PLANT 11

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 11 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME III SPECIFIC MECHANICAL REQUIREMENTS FOR BTG AND BOP PACKAGE

    VOLUME III (B) SPECIFIC MECHANICAL REQUIREMENTS FOR BOP PACKAGE

    SECTION

    NO. SPECIFICATION NO.

    REV.

    NO. TITLE

    NO. OF

    SHEETS

    D4.4 TCE-6417A-H-500-001 R0 DATA SHEET B - RUBBER EXPANSION JOINTS

    2

    D4.5 TCE-6417A-H-500-001 R0 DATA SHEET B - MISCELLANEOUS PUMPS 2

    D4.6 TCE-6417A-H-500-001 R0 DATA SHEET B CW/ACW PUMPS 1

    D4.7 TCE-6417A-H-500-001 R0 DATA SHEET B BUTTERFLY VALVES 2

    D4.8 TCE-6417A-H-500-001 R0 DATA SHEET B STP TREATMENT PLANT 3

    WATER SYSTEM DATASHEET C

    D4.1 TCE-6417A-H-500-001 R0 DATA SHEET C - DRAWINGS/DOCUMENTS TO BE SUBMITTED

    1

    D4.2 TCE-6417A-H-500-001 R0 DATA SHEET C PRE TREATMENT PLANT 1

    EFFLUENT TREATMENT PLANT

    D5 TCE-6417A-H-500-001 R0 EFFLUENT TREATMENT PLANT WRITE UP 3

    D5 TCE-6417A-H-500-001 R0 EFFLUENT TREATMENT PLANT GENERAL REQUIREMENTS

    2

    EFFLUENT TREATMENT PLANT - A

    D5 TCE-6417A-H-500-001 R0 EFFLUENT TREATMENT PLANT 5

    EFFLUENT TREATMENT PLANT - B

    D5 TCE-6417A-H-500-001 R0 EFFLUENT TREATMENT PLANT 9

    FIRE PROTECTION SYSTEM

    D6 TCE-6417A-H-500-001 R0 WRITE UP ON FIRE PROTECTION SYSTEM 18

    FIRE PROTECTION SYSTEM DATASHEET A

    D6 TCE-6417A-H-500-001 R0 FIRE PROTECTION SYSTEM 5

    FIRE PROTECTION SYSTEM DATASHEET B

    D6 TCE-6417A-H-500-001 R0 FIRE PROETCTION SYSTE, 3

    PIPING

    D7 TCE.6417A-H-500-001 R0 PIPING 21

    PIPING DATA SHEET-A

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 12 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME III SPECIFIC MECHANICAL REQUIREMENTS FOR BTG AND BOP PACKAGE

    VOLUME III (B) SPECIFIC MECHANICAL REQUIREMENTS FOR BOP PACKAGE

    SECTION

    NO. SPECIFICATION NO.

    REV.

    NO. TITLE

    NO. OF

    SHEETS

    A1 TCE.6417A-H-500-001 R0 THERMAL INSULATION FOR HOT SURFACES 2

    A2 TCE.6417A-H-500-001 R0 MATERIAL SPECIFICATION FOR PIPING AND VALVES

    5

    COAL HANDLING SYSTEM

    D8 TCE.6417A-H-500-001 R0 WRITE UP COAL HANDLING SYSTEM 33

    D8.01 TCE-6417A-H-500-001 R0 PROPERTIES OF COAL 1

    D8.1 TCE.6417A-H-500-001 R0 WRITE UP ROTASIDE WAGON TIPPLER 6

    D8.1 TCE.6417A-H-500-001 R0 DATASHEET A ROTASIDE WAGON TIPPLER 6

    D8.1.1 TCE.6417A-H-500-001 R0 WRITE UP ACCESSORIES FOR WAGON TIPPLER

    3

    D8.1.1 TCE.6417A-H-500-001 R0 DATASHEET A ACCESSORIES FOR WAGON TIPPLER

    3

    D8.1.2 TCE.6417A-H-500-001 R0 WRITE UP SIDE ARM CHARGER 5

    D8.1.2 TCE.6417A-H-500-001 R0 DATASHEET A SIDE ARM CHARGER 2

    D8.2 TCE.6417A-H-500-001 R0 WRITE UP UNIDIRECTIONAL STACKER RECLAIMER

    9

    D8.2 TCE.6417A-H-500-001 R0 DATASHEET A UNIDIRECTIONAL STACKER RECLAIMER

    6

    D8.3 TCE.6417A-H-500-001 R0 DATASHEET A COAL CONVEYING, CRUSHING & BUNKER FEEDEING SYSTEM

    26

    D8.4 TCE.6417A-H-500-001 R0 WRITE UP TRAVELLING TRIPPER 3

    D8.4 TCE.6417A-H-500-001 R0 DATASHEET A TRAVELLING TRIPPER 3

    D8.5 TCE.6417A-H-500-001 R0 DATASHEET A DUST EXTRACTION AND BUNKER VENTILATION SYSTEM

    5

    D8.5.1 TCE.6417A-H-500-001 R0 WRITE UP CENTRIFUGALS FANS 1

    D8.5.1 TCE.6417A-H-500-001 R0 DATASHEET A CENTRIFUGALS FANS 2

    D8.5.2 TCE.6417A-H-500-001 R0 DATASHEET A TUNNEL VENTILATION SYSTEM

    1

    D8.6 TCE.6417A-H-500-001 R0 WRITE UP DS SYSTEM 8

    D8.6 TCE.6417A-H-500-001 R0 DATASHEET A DS SYSTEM 2

    D8.6.1 TCE.6417A-H-500-001 R0 WRITE UP HORIZONTAL CENTRIFUGAL PUMPS

    3

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 13 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME III SPECIFIC MECHANICAL REQUIREMENTS FOR BTG AND BOP PACKAGE

    VOLUME III (B) SPECIFIC MECHANICAL REQUIREMENTS FOR BOP PACKAGE

    SECTION

    NO. SPECIFICATION NO.

    REV.

    NO. TITLE

    NO. OF

    SHEETS

    D8.6.1 TCE.6417A-H-500-001 R0 DATSHEET A HORIZONTAL CENTRIFUGAL PUMPS

    4

    D8.6.2 TCE.6417A-H-500-001 R0 COMPUTATION OF AIR / WATER REQUIREMENT

    1

    D8.7 TCE.6417A-H-500-001 R0 DATASHEET A - STOCK PILE RUN OFF WATER DISPOSAL SYSTEM COMMON COLLECTING POND

    2

    D8.7.1 TCE.6417A-H-500-001 R0 DATASHEET A COAL PILE RUN OFF PUMPS 1

    D8.8 TCE.6417A-H-500-001 R0 WRITE UP WATER SYSTEM FOR COAL HANDLING SYSTEM

    1

    D8.9 TCE.6417A-H-500-001 R0 DATASHEET A COAL SAMPLING UNIT 3

    D8.10 TCE.6417A-H-500-001 R0 WRITE UP BELT VULCANIZER 2

    D8.10 TCE.6417A-H-500-001 R0 DATASHEET A BELT VULCANIZER 1

    D8.11 TCE.6417A-H-500-001 R0 DATASHEET A SCREW COMPRESSOR 6

    D8.12 TCE.6417A-H-500-001 R0 DATASHEET A VENTILATION SYSTEM FOR MCC ROOM AND AC FOR CONTROL ROOMS

    2

    D8.13 TCE.6417A-H-500-001 R0 DATASHEET A DOZERS 6

    D8.14 TCE.6417A-H-500-001 R0 DATASHEET A SUMP PUMPS 1

    COAL HANDLING SYSTEM DATA SHEET B

    D8.1 TCE.6417A-H-500-001 R0 DATASHEET B ROTASIDE WAGON TIPPLER 1

    D8.1.1 TCE.6417A-H-500-001 R0 DATASHEET B ACCESSORIES FOR WAGON TIPPLER

    2

    D8.1.2 TCE.6417A-H-500-001 R0 DATASHEET B SIDE ARM CHARGER 2

    D8.2 TCE.6417A-H-500-001 R0 DATASHEET B UNIDIRECTIONAL STACKER RECLAIMER

    9

    D8.3 TCE.6417A-H-500-001 R0 DATASHEET B COAL CONVEYING, CRUSHING & BUNKER FEEDEING SYSTEM

    7

    D8.4 TCE.6417A-H-500-001 R0 DATASHEET B TRAVELLING TRIPPER 2

    D8.5 TCE.6417A-H-500-001 R0 DATASHEET B DUST EXTRACTION AND BUNKER VENTILATION SYSTEM

    2

    D8.5.1 TCE.6417A-H-500-001 R0 DATASHEET B CENTRIFUGALS FANS 2

    D8.6 TCE.6417A-H-500-001 R0 DATASHEET B DS SYSTEM 4

    D8.6.1 TCE.6417A-H-500-001 R0 DATSHEET B HORIZONTAL CENTRIFUGAL 2

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 14 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME III SPECIFIC MECHANICAL REQUIREMENTS FOR BTG AND BOP PACKAGE

    VOLUME III (B) SPECIFIC MECHANICAL REQUIREMENTS FOR BOP PACKAGE

    SECTION

    NO. SPECIFICATION NO.

    REV.

    NO. TITLE

    NO. OF

    SHEETS

    PUMPS

    D8.7 TCE.6417A-H-500-001 R0 DATASHEET B - STOCK PILE RUN OFF WATER DISPOSAL SYSTEM COMMON COLLECTING POND

    1

    D8.10 TCE.6417A-H-500-001 R0 DATASHEET B BELT VULCANIZER 1

    ASH HANDLING SYSTEM

    D9 TCE.6417A-H-500-001 R0 ASH HANDLING SYSTEM 25

    ASH HANDLING SYSTEM DATA SHEET A

    A1 TCE.6417A-H-500-001 R0 AIR COMPRESSOR 6

    A2 TCE.6417A-H-500-001 R0 BOTTOM ASH HOPPER & GATE 3

    A3 TCE.6417A-H-500-001 R0 CLINKER GRINDER 2

    A4 TCE.6417A-H-500-001 R0 ASH DISPOSAL EQUIPMENT-SLURRY PUMP 5

    A5 TCE.6417A-H-500-001 R0

    TWO STAGE PNEUMATIC CONVEYING SYSTEM FOR FLY ASH HANDLING

    7

    A6 TCE.6417A-H-500-001 R0 VACUUM PUMP 2

    A7 TCE.6417A-H-500-001 R0 ASH DISPOSAL EQUIPMENT-JET PUMP 2

    A8 TCE.6417A-H-500-001 R0 WEIGH BRIDGE 2

    A9 TCE.6417A-H-500-001 R0 FLY ASH SILO & ACCESSORIES 3

    A10 TCE.6417A-H-500-001 R0

    ASH DISPOSAL EQUIPMENT- DUST CONDITIONER, UNLOADER & ROTARY FEEDER

    3

    A11 TCE.6417A-H-500-001 R0 VOID

    A12 TCE.6417A-H-500-001 R0 AIR BLOWER 1

    A13 TCE.6417A-H-500-001 R0

    ASH DISPOSAL EQUIPMENT : SUMPS & TANKS

    1

    A14 TCE.6417A-H-500-001 R0

    ASH DISPOSAL EQUIPMENT -PIPING & FITTING

    3

    A15 TCE.6417A-H-500-001 R0 SLURRY LINE VALVES 2

    A16 TCE.6417A-H-500-001 R0 ASH HANDLING SYSTEM CLARIFIERS 3

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 15 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME III SPECIFIC MECHANICAL REQUIREMENTS FOR BTG AND BOP PACKAGE

    VOLUME III (B) SPECIFIC MECHANICAL REQUIREMENTS FOR BOP PACKAGE

    SECTION

    NO. SPECIFICATION NO.

    REV.

    NO. TITLE

    NO. OF

    SHEETS

    A17 TCE.6417A-H-500-001 R0

    UNLOADING SPOUT FOR ASH HANDLING SYSTEM

    1

    A18 TCE.6417A-H-500-001 R0 ASH HANDLING SYSTEM SUMP PUMPS 2

    A19 TCE.6417A-H-500-001 R0 VERTICAL TURBINE PUMP 5

    A20 TCE.6417A-H-500-001 R0 AIR DRYERS HOC TYPE 3

    A21 TCE.6417A-H-500-001 R0

    BA HOPPER COOLING WATER OVER FLOW TANK

    1

    A22 TCE.6417A-H-500-001 R0 FLUIDIZING AIR HEATER 1

    A23 TCE.6417A-H-500-001 R0

    BUFFER HOPPER, WETTING UNIT & BAG FILTER

    6

    A24 TCE.6417A-H-500-001 R0 VOID

    A25 TCE.6417A-H-500-001 R0 VOID

    A26 TCE.6417A-H-500-001 R0

    ASH HANDLING SYSTEM - RECOVERY WATER PUMPS

    3

    A27 TCE.6417A-H-500-001 R0 WATER PUMPS 4

    A28 TCE.6417A-H-500-001 R0 WATER LINE VALVES 2

    ASH HANDLING SYSTEM DATA SHEET B

    B1 TCE.6417A-H-500-001 R0 AIR COMPRESSOR 7

    B2 TCE.6417A-H-500-001 R0 AIR BLOWER AND HEATER 3

    B3 TCE.6417A-H-500-001 R0 AIR DRYERS HOC TYPE 2

    B4 TCE.6417A-H-500-001 R0

    ASH DISPOSAL EQUIPMENT- ASH SLURRY LINE VALVES

    2

    B5 TCE.6417A-H-500-001 R0 BOTTOM ASH HOPPER 2

    B6 TCE.6417A-H-500-001 R0 CLARIFIERS 4

    B7 TCE.6417A-H-500-001 R0 ASH HANDLING SYSTEM-CLINKER GRINDER 1

    B8 TCE.6417A-H-500-001 R0

    ASH DISPOSAL EQUIPMENT CONTINUOUS DUST CONDITIONER UNLOADER & ROTARY FEEDER

    3

    B9 TCE.6417A-H-500-001 R0

    ASH DISPOSAL EQUIPMENT FLY ASH SILO AND ACCESSORIES

    1

    B10 TCE.6417A-H-500-001 R0

    ASH DISPOSAL EQUIPMENT FLY ASH VALVES

    4

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 16 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME III SPECIFIC MECHANICAL REQUIREMENTS FOR BTG AND BOP PACKAGE

    VOLUME III (B) SPECIFIC MECHANICAL REQUIREMENTS FOR BOP PACKAGE

    SECTION

    NO. SPECIFICATION NO.

    REV.

    NO. TITLE

    NO. OF

    SHEETS

    B11 TCE.6417A-H-500-001 R0 ASH DISPOSAL EQUIPMENT - JET PUMP 1

    B12 TCE.6417A-H-500-001 R0

    ASH DISPOSAL EQUIPMENT PIPING & FITTINGS

    2

    B13 TCE.6417A-H-500-001 R0

    PRESSURE TYPE PNEUMATIC CONVEYING SYSTEM FOR FLY ASH HANDLING

    2

    B14 TCE.6417A-H-500-001 R0 ALL SLURRY, WATER & SLUDGE PUMPS 3

    B15 TCE.6417A-H-500-001 R0 ASH DISPOSAL EQUIPMENT SUMPS/TANKS 1

    B16 TCE.6417A-H-500-001

    R0 ASH DISPOSAL EQUIPMENT UNLOADING SPOUT

    1

    B17 TCE.6417A-H-500-001

    R0 VACUUM PUMP 1

    B18 TCE.6417A-H-500-001

    R0 WETTING UNIT 1

    EQUIPMENT HANDLING SYSTEM

    D10 TCE.6417A-H-500-001 R0 CRANES AND HOISTS 8

    D10 TCE.6417A-H-500-001 R0 EOT CRANES 16

    EQUIPMENT HANDLING SYSTEM DATA SHEET - A

    A1 TCE.6417A-H-500-001 R0 CHAIN PULLEY BLOCK 2

    A2 TCE.6417A-H-500-001 R0 MISC EOT CRANES 3

    A3 TCE.6417A-H-500-001 R0 TG HALL EOT CRANES 3

    A4 TCE.6417A-H-500-001 R0 ELECTRICALLY OPERATED HOISTS 2

    EQUIPMENT HANDLING SYSTEM DATA SHEET - B

    B1 TCE.6417A-H-500-001 R0 CHAIN PULLEY BLOCK 2

    B2 TCE.6417A-H-500-001 R0 EOT CRANES 6

    B3 TCE.6417A-H-500-001 R0 ELECTRICALLY OPERATED HOISTS 3

    COMPRESSED AIR SYSTEM

    D11 TCE.6417A-H-500-001 R0 COMPRESSED AIR SYSTEM 12

    COMPRESSED AIR SYSTEM DATA SHEET - A

    A1 TCE.6417A-H-500-001 R0 COMPRESSED AIR SYSTEM 5

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 17 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME III SPECIFIC MECHANICAL REQUIREMENTS FOR BTG AND BOP PACKAGE

    VOLUME III (B) SPECIFIC MECHANICAL REQUIREMENTS FOR BOP PACKAGE

    SECTION

    NO. SPECIFICATION NO.

    REV.

    NO. TITLE

    NO. OF

    SHEETS

    A2 TCE.6417A-H-500-001 R0 AIR DRYER 3

    COMPRESSED AIR SYSTEM DATA SHEET - B

    B1 TCE.6417A-H-500-001 R0 COMPRESSED AIR SYSTEM 7

    B2 TCE.6417A-H-500-001 R0 AIR DRYER 2

    AIR CONDITIONING & VENTILATION SYSTEM

    D12 TCE.6417A-H-500-001 R0 AIR CONDITIONING & VENTILATION SYSTEM 51

    AIR CONDITIONING & VENTILATION SYSTEM DATA SHEET - A

    A1 TCE.6417A-H-500-001 R0 CHILLER 5

    A2 TCE.6417A-H-500-001 R0 PAC/SPLIT AC 5

    A3 TCE.6417A-H-500-001 R0 FILTER 3

    A4 TCE.6417A-H-500-001 R0 FRESH AIR FAN 3

    A5 TCE.6417A-H-500-001 R0 AIR HANDLING UNIT 5

    A6 TCE.6417A-H-500-001 R0 THERMAL INSULATION 2

    A7 TCE.6417A-H-500-001 R0 CENTRIFUGAL PUMP 5

    A8 TCE.6417A-H-500-001 R0 COOLING TOWER 5

    A9 TCE.6417A-H-500-001 R0 AXIAL FLOW FAN 4

    A10 TCE.6417A-H-500-001 R0 CENTRIFUGAL FAN 2

    A11 TCE.6417A-H-500-001 R0 AIR WASHER 3

    A12 TCE.6417A-H-500-001 R0 UNITARY AIR FILTRATION 3

    A13 TCE.6417A-H-500-001 R0 ROOF EXTRACTOR 3

    AIR CONDITIONING & VENTILATION SYSTEM DATA SHEET - B

    B1 TCE.6417A-H-500-001 R0 CHILLER 9

    B2 TCE.6417A-H-500-001 R0 PAC/SPLIT AC 9

    B3 TCE.6417A-H-500-001 R0 FILTER 4

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 18 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME III SPECIFIC MECHANICAL REQUIREMENTS FOR BTG AND BOP PACKAGE

    VOLUME III (B) SPECIFIC MECHANICAL REQUIREMENTS FOR BOP PACKAGE

    SECTION

    NO. SPECIFICATION NO.

    REV.

    NO. TITLE

    NO. OF

    SHEETS

    B4 TCE.6417A-H-500-001 R0 FRESH AIR FAN 3

    B5 TCE.6417A-H-500-001 R0 AIR HANDLING UNIT 9

    B6 TCE.6417A-H-500-001 R0 THERMAL INSULATION 3

    B7 TCE.6417A-H-500-001 R0 CENTRIFUGAL PUMP 6

    B8 TCE.6417A-H-500-001 R0 COOLING TOWER 6

    B9 TCE.6417A-H-500-001 R0 AXIAL FLOW FAN 6

    B10 TCE.6417A-H-500-001 R0 CENTRIFUGAL FAN 5

    B11 TCE.6417A-H-500-001 R0 AIR WASHER 5

    B12 TCE.6417A-H-500-001 R0 UNITARY AIR FILTRATION 5

    B13 TCE.6417A-H-500-001 R0 ROOF EXTRACTOR 4

    EMERGENCY DG SETS

    D13 TCE.6417A-H-500-001 R0 EMERGENCY DG SETS 11

    A TCE.6417A-H-500-001 R0 EMERGENCY DG SETS DATA SHEET A 3

    B TCE.6417A-H-500-001 R0 EMERGENCY DG SETS DATA SHEET B 7

    FUEL OIL SYSTEM

    D14 TCE.6417A-H-500-001 R0 FUEL OIL SYSTEM 13

    NATURAL DRAFT COOLING TOWER

    D15 TCE.6417A-H-500-001 R0 NATURAL DRAFT COOLING TOWER 19

    MILL REJECT SYSTEM

    D16 TCE.6417A-H-500-001 R0 MILL REJECT SYSTEM 12

    MILL REJECT SYSTEM DATASHEET - A

    A1 TCE.6417A-H-500-001 R0 MRHS - PNEUMATIC CONVEYING SYSTEM 4

    A2 TCE.6417A-H-500-001 R0 PIPING & VALVES 2

    A3 TCE.6417A-H-500-001 R0 MRHS-AIR COMPRESSOR 7

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 19 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME III SPECIFIC MECHANICAL REQUIREMENTS FOR BTG AND BOP PACKAGE

    VOLUME III (B) SPECIFIC MECHANICAL REQUIREMENTS FOR BOP PACKAGE

    SECTION

    NO. SPECIFICATION NO.

    REV.

    NO. TITLE

    NO. OF

    SHEETS

    A4 TCE.6417A-H-500-001 R0 MRSH-SILO 3

    A5 TCE.6417A-H-500-001 R0 MRHS-PYRITE HOPPER 7

    A6 TCE.6417A-H-500-001 R0

    MRHS-COOLING/QUENCHING WATER PUMPS

    3

    MILL REJECT SYSTEM DATASHEET - B

    B1 TCE.6417A-H-500-001 R0 MRHS - PNEUMATIC CONVEYING SYSTEM 2

    B2 TCE.6417A-H-500-001 R0 VOID

    B3 TCE.6417A-H-500-001 R0 MRHS-AIR COMPRESSOR 7

    B4 TCE.6417A-H-500-001 R0 MRSH-SILO 1

    B5 TCE.6417A-H-500-001 R0 MRHS-PYRITE HOPPER 1

    B6 TCE.6417A-H-500-001 R0 MRHS-COOLING/QUENCHING WATER PUMPS

    1

    MILL REJECT SYSTEM DATASHEET - C

    C TCE.6417A-H-500-001 R0 MRHS SILO 1

    ELEVATORS

    D17 TCE.6417A-H-500-001 R0 ELEVATORS 4

    ELEVATORS DATASHEET A

    A1 TCE.6417A-H-500-001 R0 DATASHEET A1 ELEVATORS 3

    A2 TCE.6417A-H-500-001 R0 DATASHEET A2 ELEVATORS 1

    ELEVATORS DATASHEET B

    B TCE.6417A-H-500-001 R0 DATASHEET B ELEVATORS 3

    ELEVATORS DATASHEET C

    C TCE.6417A-H-500-001 R0 DATASHEET C - ELEVATORS 1

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 20 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME IV SPECIFIC ELECTRICAL REQUIREMENTS

    SECTION

    NO. SPECIFICATION NO. REV. NO. TITLE

    NO. OF

    SHEETS

    D1.0 TCE.6417A-H-500-001 R0 ELECTRICAL SYSTEM BROAD SCOPE OF WORK AND DESCRIPTION

    16

    D2.0 TCE.6417A-H-500-001 R0 GENERATOR & ACCESSORIES 66

    D2.1 TCE.6417A-H-500-001 R0 CONTROL & PROTECTION FOR GENERATOR AND ELECTRICAL AUXILIARIES

    26

    D3.0 TCE.6417A-H-500-001 R0 220kV SWITCH YARD EQUIPMENT & PROTECTIONS

    115

    D3.1 TCE.6417A-H-500-001 R0 SWITCHYARD SCADA SYSTEM 34

    D4.0 NOT USED

    D5.0 TCE.6417A-H-500-001 R0 POWER TRANSFORMERS 116

    D6.0 TCE.6417A-H-500-001 R0 RECTIFIER TRANSFORMERS 27

    D7.0 TCE.6417A-H-500-001 R0 ISOLATED PHASE BUS DUCT (IPBD) 30

    D8.0 TCE.6417A-H-500-001 R0 NGT & NGR 16

    D9.0 TCE.6417A-H-500-001 R0 SPBD & NSPBD 26

    D10.0 TCE.6417A-H-500-001 R0 SERVICE TRANSFORMERS 22

    D11.0 TCE.6417A-H-500-001 R0 HT SWITCHGEAR. 53

    D12.0 TCE.6417A-H-500-001 R0 LT SWITCHGEAR AND DISTRIBUTION BOARDS

    28

    D13.0 TCE.6417A-H-500-001 R0 MOTORS AND ACTUATORS 20

    D14.0 TCE.6417A-H-500-001 R0 VARIABLE FREQUENCY DRIVE 19

    D15.0 TCE.6417A-H-500-001 R0 CABLES 17

    D16.0 TCE.6417A-H-500-001 R0 LIGHTING SYSTEM 27

    D17.0 TCE.6417A-H-500-001 R0 DC SYSTEM 41

    D18.0 NOT USED

    D19.0 NOT USED

    D20.0 NOT USED

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 21 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    D21.0 TCE.6417A-H-500-001 R0 ELECTRICAL EQUIPMENT INSTALLATION WORK.

    34

    D22.0 TCE.6417A-H-500-001 R0 ELECTRICAL LABORATORY EQUIPMENT 44

    D23.0 TCE.6417A-H-500-001 R0 CONSTRUCTION POWER SUPPLY. 4

    D24.0 TCE.6417A-H-500-001 R0 COMMISSIONING CHECK LISTS. 18

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 22 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME V SPECIFC CONTROL AND INSTRUMENTATION REQUIREMENTS FOR BTG & BOP PACKAGE

    VOLUME V (A) - SPECIFC CONTROL AND INSTRUMENTATION REQUIREMENTS FOR BTG PACKAGE

    SECTION

    NO. SPECIFICATION NO. REV. NO. TITLE SHEETS NO.

    D5.1. TCE.6417A-H-500-001 R0 SYSTEM DESCRIPTION/ PLANT OPERATION PHILOSOPHY

    1 18

    D5.2.

    TCE.6417A-H-500-001 R0

    SYSTEM/EQUIPMENT/SERVICES TO BE FURNISHED.

    19 31

    D5.3. TCE.6417A-H-500-001 R0 DESIGN, PERFORMANCE AND FUNCTIONAL REQUIREMENTS

    32 75

    D5.4. TCE.6417A-H-500-001 R0 SPECIFICATION FOR DCS / INSTRUMENTS TO BE SUPPLIED

    76 111

    D5.5. TCE.6417A-H-500-001 R0 TESTS AND INSPECTION FOR I&C SYSTEM EQUIPMENT

    112 115

    D5.6. TCE.6417A-H-500-001 R0 OTHER SERVICES 116

    D5.7. TCE.6417A-H-500-001 R0 PERFORMANCE GUARANTEE 117 120

    D5.8. TCE.6417A-H-500-001 R0 CCTV SYSTEM 121 133

    D5.9. TCE.6417A-H-500-001 R0 AAMS & CMMS SYSTEM 134 142

    D5.10. TCE.6417A-H-500-001 R0 PLANT COMMUNICATION SYSTEM 143 182

    D5.11. TCE.6417A-H-500-001 R0 MAIN PLANT UPS SYSTEM 183 207

    D5.12. TCE.6417A-H-500-001 R0 CMIMS SYSTEM 208 214

    D5.13. TCE.6417A-H-500-001 R0 MANAGEMENT INFORMATION SYSTEM (MIS)

    215 217

    D5.14. TCE.6417A-H-500-001 R0 INTELLIGENT ACTUATOR 218 225

    TABLE - 1 TCE.6417A-H-500-001 R0 OPERATION AND CONTROL PHILOSOPHY AND SCOPE RESPONSIBILITY MATRIX

    226 233

    TABLE - 2 TCE.6417A-H-500-001 R0 CODES AND STANDARDS 234

    TABLE - 3 TCE.6417A-H-500-001 R0 DATA TO BE FURNISHED WITH THE BID 235 236

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 23 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME V SPECIFC CONTROL AND INSTRUMENTATION REQUIREMENTS FOR BTG & BOP PACKAGE

    VOLUME V (A) - SPECIFC CONTROL AND INSTRUMENTATION REQUIREMENTS FOR BTG PACKAGE

    SECTION

    NO. SPECIFICATION NO. REV. NO. TITLE SHEETS NO.

    TABLE - 4 TCE.6417A-H-500-001 R0 DATA TO BE FURNISHED AFTER AWARD OF CONTRACT 237 239

    TABLE - 5 VOID

    TABLE - 6 TCE.6417A-H-500-001 R0 LABORATORY AND TEST INSTRUMENTS 240 246

    TABLE - 7 TCE.6417A-H-500-001 R0 SIZE, MATERIAL & RATING FOR IMPULSE PIPES / TUBES & FITTINGS 247 250

    TABLE - 8 TCE.6417A-H-500-001 R0 GUIDELINES FOR PROVISION OF INSTRUMENTS 251 259

    TABLE - 9 TCE.6417A-H-500-001 R0 GUIDELINES FOR SELECTION OF FLOW ELEMENTS 260

    TABLE - 10 TCE.6417A-H-500-001 R0 CCR BACKUP PANEL DETAILS

    261 263

    TABLE - 11 TCE.6417A-H-500-001 R0 GUIDELINE FOR PROVISION OF ANALYTICAL MEASUREMENTS 264 265

    TABLE - 12 TCE.6417A-H-500-001 R0 TESTS TO BE PERFORMED FOR DCS/PLC / PROGRAMMABLE CONTROL SYSTEM

    266 269

    TABLE - 13 TCE.6417A-H-500-001 R0 FACTORY ACCEPTANCE TESTS & INSPECTION FOR DCS/PLCs 270 272

    TABLE - 14 TCE.6417A-H-500-001 R0 TESTS TO BE PERFORMED FOR INSTRUMENTS 273 274

    TABLE - 15 TCE.6417A-H-500-001 R0 FORMAT FOR ENGINEERING DOCUMENTATION (LISTS & SCHEDULES)

    275 278

    TABLE - 16 TCE.6417A-H-500-001 R0 TRAINING TO BE PROVIDED FOR OWNERS PERSONNEL 279

    TABLE - 17 TCE.6417A-H-500-001 R0 ERECTION, FIELD TESTING AND COMMISSIONING REQUIREMENTS 280- 285

    D 6.1. TCE.6417A-H-500-001 R0 SYSTEM DESCRIPTION/ PLANT OPERATION PHILOSOPHY 286 296

    D 6.2. TCE.6417A-H-500-001 R0 SCOPE OF WORK - SYSTEM/EQUIPMENT/SERVICES 297 304

    D 6.3. TCE.6417A-H-500-001 R0 DESIGN, PERFORMANCE AND FUNCTIONAL REQUIREMENTS

    305 319

    D 6.4. TCE.6417A-H-500-001 R0 TECHNICAL SPECIFICATION FOR PLC 320 330

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 24 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME V (B) - SPECIFC CONTROL AND INSTRUMENTATION REQUIREMENTS FOR BOP PACKAGE

    SECTION

    NO. SPECIFICATION NO. REV. NO. TITLE SHEETS NO.

    D 6.5. TCE.6417A-H-500-001 R0 TESTS AND INSPECTION FOR INTEGRATED BOP AUTOMATION SYSTEM EQUIPMENT

    331 335

    D 6.6. TCE.6417A-H-500-001 R0 OTHER SERVICES 336

    D 6.7. TCE.6417A-H-500-001 R0 PERFORMANCE GUARANTEE 337 339

    D 6.8. TCE.6417A-H-500-001 R0 UPS SYSTEM 340 365

    D 6.9. TCE.6417A-H-500-001 R0 FIRE DETECTION & ALARM SYSTEM 366 378

    TABLE-1 TCE.6417A-H-500-001 R0 OPERATIONAL & CONTROL PHILOSOPHY AND SCOPE RESPONSIBILITY MATRIX

    379 382

    TABLE-2 TCE.6417A-H-500-001 R0 CODES AND STANDARDS 383

    TABLE-3 TCE.6417A-H-500-001 R0 I&C DATA TO BE FURNISHED WITH THE BID

    384 385

    TABLE-4 TCE.6417A-H-500-001 R0 DATA TO BE FURNISHED AFTER AWARD OF CONTRACT

    386 388

    TABLE-5 VOID

    TABLE-6 TCE.6417A-H-500-001 R0 SIZE, MATERIAL & RATING FOR IMPULSE PIPES / TUBES & FITTINGS

    389 394

    TABLE-7 TCE.6417A-H-500-001 R0 GUIDELINES FOR PROVISION OF INSTRUMENTS AND SPECIFICATIONS

    395 418

    TABLE-8 TCE.6417A-H-500-001 R0 GUIDE LINES FOR SELECTION OF FLOW ELEMENTS

    419

    TABLE-9 VOID

    TABLE-10 TCE.6417A-H-500-001 R0 TESTS TO BE PERFORMED FOR PLC / PROGRAMMABLE CONTROL SYSTEM

    420 423

    TABLE-11 TCE.6417A-H-500-001 R0 FACTORY ACCEPTANCE TESTS FOR AUTOMATION BOPs

    424 426

    TABLE-12 TCE.6417A-H-500-001 R0 TESTS TO BE PERFORMED FOR INSTRUMENTS

    427 428

    TABLE-13 TCE.6417A-H-500-001 R0 FORMAT FOR ENGINEERING DOCUMENTATION - 1 (LISTS & SCHEDULES)

    429 434

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 25 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME V (B) - SPECIFC CONTROL AND INSTRUMENTATION REQUIREMENTS FOR BOP PACKAGE

    SECTION

    NO. SPECIFICATION NO. REV. NO. TITLE SHEETS NO.

    TABLE-14 TCE.6417A-H-500-001 R0 TRAINING TO BE PROVIDED FOR OWNERS PERSONNEL 435

    TABLE-15 TCE.6417A-H-500-001 R0 ERECTION, FIELD TESTING AND COMMISSIONING REQUIREMENTS 436 441

    TABLE-16 TCE.6417A-H-500-001 R0 FORMAT FOR ENGINEERING DOCUMENTATION - 2 442 445

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 26 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME VI SPECIFIC CIVIL REQUIREMENTS

    SECTION

    NO. SPECIFICATION NO. REV. NO. TITLE

    NO. OF

    SHEETS

    I. TCE.6417A-H-500-001 R0 GENERAL 3

    II. TCE.6417A-H-500-001 R0

    SCOPE OF WORK 5

    III. TCE.6417A-H-500-001

    R0 DOCUMENTS TO BE SUBMITTED BY BIDDER WITH EPC BID PERTAINING TO CIVIL WORKS

    4

    IV. TCE.6417A-H-500-001

    R0 DOCUMENTS TO BE SUBMITTED BY CONTRACTOR AFTER AWARD OF CONTRACT

    4

    V. TCE.6417A-H-500-001 R0 DESCRIPTION OF BUILDING,

    STRUCTURE, FACILITIES 39

    VI. TCE.6417A-H-500-001 R0

    TECHNICAL SPECIFICATION

    R0

    PART A - GENERAL REQUIREMENTS 12

    R0 PART B - LOADS AND LOAD

    COMBINATIONS 12

    R0 PART-C - REINFORCED CONCRETE

    STRUCTURES AND FOUNDATIONS 26

    R0

    PART-D - STEEL STRUCTURES 18

    R0

    PART-E - OUT DOOR CIVIL WORKS 7

    R0

    PART-F - FINISHING WORKS 30

    R0

    PART-G - COOLING TOWER 42

    R0

    PART-H R.C.C. CHIMNEY 52

    R0 PART-I - CODES, STANDARDS AND

    REFERENCES 5

    R0

    PART-J - TOWNSHIP 6

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 27 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME VII LIST OF DRAWING ENCLOSED

    SECTION

    NO. BID DRAWING NO. REV. NO. TITLE

    NO. OF

    SHEETS

    LIST OF MECHANICAL DRAWINGS

    1. TCE.6417A-100-GA-001 P1 PLOT PLAN 1

    2. TCE.6417A-540-SK-002 P1 TURBINE CYCLE SCHEME 1

    3. TCE.6417A-511-SK-003 P1 SCHEME OF STEAM AND WATER SYSTEM

    1

    4. TCE.6417A-512-SK-004 P1 SCHEME OF AIR AND FLUE GAS SYSTEM 1

    5. TCE.6417A-562-SK-005 P0 SCHEME OF LDO UNLOADING SYSTEM 1

    6. TCE.6417A-562-SK-006 P1 SCHEME OF HFO UNLOADING SYSTEM 1

    7. TCE.6417A-201-GA-007 P0 MAIN PLANT CROSS SECTION GENERAL ARRANGEMENT

    1

    8. TCE.6417A-201-GA-008 P1 TG EQUIPMENT FLOOR PLAN AT 0.00 M GENERAL ARRANGEMENT

    1

    9. TCE.6417A-201-GA-008A P0 TG EQUIPMENT FLOOR PLAN AT 8.50 M GENERAL ARRANGEMENT

    1

    10. TCE.6417A-201-GA-009 P0 TG EQUIPMENT FLOOR PLAN AT 17.0 M GENERAL ARRANGEMENT

    1

    11. TCE.6417A-201-GA-009A P1 TG EQUIPMENT FLOOR PLAN AT 24.0 M, 32.8 M, 38.0 M / 41.0 M GENERAL ARRANGEMENT

    1

    12. TCE.6417A-610- SK -010 P1 WATER BALANCE DIAGRAM 1

    13. TCE.6417A-640-SK-011 P1 FLOW DIAGRAM FOR COMPRESSED AIR SYSTEM

    1

    14. TCE.6417A-563-SK-012 P1 FLOW DIAGRAM COAL HANDLING SYSTEM

    1

    15. TCE.6417A-563-GA-013 P0 COAL HANDLING SYSTEM - CONVEYOR CROSS SECTION

    1

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 28 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    VOLUME VII LIST OF DRAWING ENCLOSED

    SECTION

    NO. BID DRAWING NO. REV. NO. TITLE

    NO. OF

    SHEETS

    16. TCE.6417A-563-GA-014 P0 LAYOUT OF COAL HANDLING SYSTEM 1

    17. TCE.6417A-570-SK-015 P0 FLOW DIAGRAM FOR BOTTOM ASH AND ECO ASH HANDLING SYSTEM

    1

    18. TCE.6417A-570-SK-016 P1 FLOW DIAGRAM FOR FLY ASH EVACUATION & WET DISPOSAL SYSTEM

    1

    19. TCE.6417A-570-SK-017 P1 FLOW DIAGRAM FOR ASH WATER CUM ASH SLURRY SYSTEM

    1

    20. TCE.6417A-570-SK-018 P1 FLOW DIAGRAM FOR FLY ASH SILO 1

    21. TCE.6417A-570-SK-019 P1 FLOW DIAGRAM FOR RECOVERY WATER SYSTEM

    1

    22. TCE.6417A-617-FD-020 P1 FIRE PROTECTION SYSTEM 1

    23. TCE.6417A-570-SK-022 P0 FLOW DIAGRAM FOR MILL REJECT SYSTEM

    1

    24. TCE.6417A-811-FD-023 P1 FLOW DIAGRAM FOR AIR CONDITIONING SYSTEM

    1

    25. TCE.6417A-811-FD-023 P0 G.A. OF RAW WATER & ASH WATER PUMP HOUSE

    1

    26. TCE.6417A-811-FD-024 P1 FLOW DIAGRAM FOR AIR WASHER UNIT 1

    27. TCE.6417A-811-FD-025 P1 FLOW DIAGRAM FOR UAF UNIT 1

    28. TCE.6417A-610-FD-026 P1 P&I DIAGRAM FOR CHEMICAL DOSING SYSTEM

    1

    29. TCE.6417A-610-SK-027 P0 SCHEMATIC DIAGRAM OF CW & ACW SYSTEM (SHEET-1 OF 2 & 2 OF 2)

    1

    30. TCE.6417A-610-FD-028 P0 P & I DIAGRAM OF EFFLUENT HANDLING SYSTEM

    1

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 29 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    LIST OF ELECTRICAL DRAWINGS

    SECTION

    NO. BID DRAWING NO. REV. NO.

    NO. OF

    SHEETS

    31. TCE.6417A-710-AU-3001 P1 KEY SINGLE LINE DIAGRAM 1

    32. TCE.6417A-739-AU-3002 P1 METERING & PROTECTION SLD FOR GENERATOR , GT AND UT

    1

    33. TCE.6417A-710-AU-3003 P1 INTERFACE DIAGRAM BETWEEN GRP, SWITCHGEAR AND DCS

    1

    34. TCE.6417A-710-AU-3004 P1 CONSTRUCTION POWER SLD 1

    35. TCE.6417A-710-AU-3005 P1 SUBSTATION AUTOMATION SYSTEM ARCHITECTURE

    1

    36. TCE.6417A-816-GL-3006 P0 INSTALLATION NOTES AND DETAILS FOR EARTHING AND LIGHTNING PROTECTION SYSTEM

    1

    37. TCE.6417A-815-GL-3007 P0 INSTALLATION NOTES AND DETAILS FOR ILLUMINATION SYSTEM

    1

    38. TCE.6417A-818-CT-3008 P0 INSTALLATION NOTES AND DETAILS FOR CABLING SYSTEM

    1

    39. TCE.6417A-718-AU-3009 P0 DC SYSTEM CONFIGURATION 1

    40. TCE.6417A-738-AU-3010 P1 METERING AND PROTECTION SLD FOR 220KV SWITCHYARD AND STATION TRANSFORMERS

    1

    41. TCE.6417A-738-GA-3011 P0 220KV SWITCHYARD LAYOUT 1

    LIST OF CONTROL AND INSTRUMENTATION SYSTEM DRAWINGS

    42. TCE.6417A-580-DA-0700 P1 INSTRUMENTATION AND CONTROL SYSTEM CONFIGURATION FOR BTG ISLAND

    1

    43. TCE.6417A-500-DA-0701 P1 INTEGRATED BOP SYSTEM ARCHITECTURE

    1

    44. TCE.6417A-500-DA-0702 P1 CCTV SYSTEM ARCHITECTURE 1

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 30 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    45.

    TCE.6417A-IC-500-SK-0703

    P1 TYPICAL DRIVE I/O INTERFACE FOR UNI-DIRECTIONAL DRIVES ABOVE 120 KW (415V/3.3 KV & 11 KV)

    1

    46. P1 TYPICAL DRIVE I/O INTERFACE FOR UNI-DIRECTIONAL DRIVES LESS THAN 120 kW (415 V)

    1

    47. P1

    TYPICAL INTELLIGENT INTERFACE FOR LT BI-DIRECTIONAL DRIVES (WITH INTEGRAL STARTER) FOR BTG PACKAGE

    1

    48. P1 TYPICAL DRIVE I/O INTERFACE

    FOR SOLENOIDS 1

    49. P0

    TYPICAL DRIVE I/O INTERFACE FOR 415V BI-DIRECTIONAL DRIVE (NON INTELLIGENT INTEGRAL STARTER) FOR BOP AREA

    1

    50. TCE.6417A-580-SK-0704 P1 TYPICAL SAMPLING SCHEME FOR SWAS 1

    51. TCE.6417A-IC-500-0705 P1 SCHEME FOR COMPUTERISED MAINTENANCE AND INVENTORY MANAGEMENT SYSTEM (CMIMS)

    1

    52. TCE.6417A-739-AU-3001 P1

    SINGLE PHASE PARALLEL REDUNDANT UPS WITH STATIC SWITCH AND SERVO CONTROOLED BYPASS SUPPLY SCHEME FOR MAIN PLANT UPS SYSTEM

    1

    53. TCE.6417A-739-AU-3002 P1

    SINGLE PHASE PARALLEL REDUNDANT UPS WITH STATIC SWITCH AND SERVO CONTROOLED BYPASS SUPPLY SCHEME FOR EACH BOP SYSTEM

    1

    LIST OF CIVIL DRAWINGS

    54. TCE-6417A-100-GA-5001 P1 NATURAL DRAFT COOLING TOWER -GENERAL ARRANGEMENT

    1

    55. TCE-6417A-266-GA-5002 P1 GA FOR 275M HIGH SINGLE STEEL FLUE CHIMNEY

    1

    56. TCE-6417A-231-SI-5003 P1 LAYOUT AND DETAILS OF ASH BUND 1

    57. TCE-6417A-213-RC-5004 P1 GA AND DETAILS OF WAGON TIPPLER 1

  • SPEC.NO. TCE.6417A-H-500-001

    TATA CONSULTING ENGINEERS LIMITED

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP

    YAMUNANAGAR, HARYANA

    CONTENTS

    SHEET 31 OF 31

    TCE FORM NO. 329 R5

    ISSUE R0

    58. TCE-6417A-231-SI-5005 P1 LAYOUT AND DETAILS OF RAW WATER RESERVOIR

    1

    59. TCE-6417A-231-SI-5006 P1 COAL STOCK PILE DRAINAGE SCHEME 1

  • TATA CONSULTING ENGINEERS LIMITED VOLUME:VI SEC-TION I

    SPEC.NO. TCE.6417A-H-500-001

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP YAMUNANAGAR, HARYANA

    GENERAL

    SHEET 1 of 267

    ISSUE R0

    TCE FORM 329 R5

    SECTION I GENERAL

    1.0 This specification covers the design, preparation of general arrangement drawings, fabrication drawings , supply of all labour, materials and con-struction of all civil, structural as well as architectural work on EPC basis for the proposed -1x660MW (Supercritical) DCRTPP Yamuna Nagar Unit-3 promoted by M/s. Haryana Power Generation Corporation Limited in the state of Haryana.

    2.0 Description of various items of works covered under this specification and

    nature of work in detail are given hereinafter. The complete work under this scope is referred to as CIVIL WORKS. Lists of various civil works to be covered under the scope of work given in SECTION II.

    3.0 The work to be performed under this specification consists of design, engi-

    neering and construction including providing all labour, materials, consum-ables, equipment, temporary works, temporary labour and staff township, constructional plant, fuel supply, transportation and all incidental works not shown or specified but reasonably implied or necessary for the completion and proper functioning of the plant, all in strict accordance with the specifi-cations, including revisions and amendments thereto as may be required during the execution of the work.

    4.0 All materials including cement, reinforcement steel and structural steel shall

    be arranged by the BIDDER. 5.0 The scope shall also include setting up by the BIDDER a complete testing

    laboratory in the field to carry out all relevant tests required for the civil works for the project.

    6.0 The work shall be carried out according to the design/drawings to be devel-

    oped by the BIDDER and approved by the OWNER. For all buildings, struc-tures, foundations, etc., necessary layout and details are to be developed by the BIDDER keeping in view the statutory & functional requirements of the plant and facilities and providing enough space and access for opera-tion, use and maintenance. Certain minimum requirements are indicated in this specification for guidance purpose only. However, the BIDDERs offer shall cover the complete requirements as per the best prevailing practices and to the complete satisfaction of the OWNER.

    7.0 BIDDER shall inspect the site, examine and obtain all information required

    and satisfy himself regarding matters and things such as access to site, communications, transport, right of way, the type and number of equipment and facilities required for the work, availability of local labour, materials and their rates, local working conditions, weather, tidal / flood levels, subsoil conditions, natural drainage, etc. Ignorance of the site conditions shall not be accepted by the Owner as basis for any claim for compensation or ex-tension of time. The submission of a bid by the BIDDER will be construed

  • TATA CONSULTING ENGINEERS LIMITED VOLUME:VI SEC-TION I

    SPEC.NO. TCE.6417A-H-500-001

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP YAMUNANAGAR, HARYANA

    GENERAL

    SHEET 2 of 267

    ISSUE R0

    TCE FORM 329 R5

    as evidence that such an examination was made and any later claims / dis-putes in regard to price quoted shall not be entertained or considered by the OWNER on account of ignorance of prevailing site conditions.

    8.0 GEOTECHNICAL INVESTIGATION

    Geotechnical Investigation carried out for the existing units is available with the OWNER and the same may be made available on request. However this report along with the recommendation given therein shall be considered by the BIDDER for reference only. OWNER does not take any responsibil-ity for the correctness of the details given in this report.

    BIDDER is advised to verify the content of report by taking few boreholes at site and analyze the same before submission of bids. Alternatively BIDDER may make his own assessment for the type of foundations envisaged based on this report at his own risk. In any case, the BIDDER has to carryout de-tailed geotechnical investigation after the award of contract, through some approved / reputed agency and has to submit geotechnical investigation re-port with foundation recommendations for OWNERs review & approval. The recommendation given in approved final report becomes binding on the CONTRACTOR. The CONTRACTOR is not eligible to increase his cost or demand any extension of time because the final report is in variance from preliminary report furnished by OWNER.

    9.0 SURVEY DATA

    9.1 The OWNER has not carried out a preliminary survey of the area. It is the responsibility of the BIDDER to verify the various features on his own before submission of bid. Detail Topography survey is to be done by the CON-TRACTOR.

    10.0 STATUTORY REQUIREMENT

    BIDDER shall comply with all the applicable statutory rules pertaining to Factory act, Fire safety rule of Tariff Advisory Committee, Water act for Pol-lution control, Civil Aviation Authority, Explosives act etc. Provisions of Safety, health and welfare according to Factories act shall also be complied with. Statutory clearances and norms of State Pollution Control Board shall be followed. BIDDER shall obtain approval of Civil / Architectural drawings from concerned authorities i.e. HPGCL, Rail ways, Govt/Regulatory/Statutory agencies as the case may be before taking up the construction work.

  • TATA CONSULTING ENGINEERS LIMITED VOLUME:VI SEC-TION I

    SPEC.NO. TCE.6417A-H-500-001

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP YAMUNANAGAR, HARYANA

    GENERAL

    SHEET 3 of 267

    ISSUE R0

    TCE FORM 329 R5

    11.0 QUALITY

    All the quality standards, tolerances, welding standards and other technical requirements shall be strictly adhered to.

    12.0 CONFLICT

    In case of any conflict between stipulations in various portions of the speci-fication, most stringent stipulation would be applicable for implementation by the bidder.

    13.0 CONSTRUCTION AND CONSTRUCTION SAFETY

    CONTRACTOR shall ensure that the work areas are free from water during construction and shall take all necessary precautions and measures to pre-vent ground water, storm water, etc., from entering the area so as to carry out the work in reasonably dry conditions in accordance with the construc-tion schedule.

    The CONTRACTOR shall dewater and maintain reasonably dry, the exca-vation for structures and all other areas of the site, where build up of water (in the opinion of ENGINEER In-charge) is likely to obstruct the progress of work, or lead to insanitary conditions by stagnation, or retard the speed of construction, or is detrimental to the safety of men, materials and equipment or is undesirable due to any other reasons. Diversion of natural drains, nallah, roads, overground or underground utili-ties, temporary structures, roads for construction etc. shall be done and maintained as per the direction of the ENGINEER In-charge.

    The contractor shall submit the details of construction safety procedures to be followed at site and also obtain the purchasers approval for each item of civil and structural works prior to execution of work.

    14.0 DEMOBILISATION

    On completion of work, the CONTRACTOR shall promptly demobilise from the site and leave the place in a manner as directed by the OWNER/ENGINEER-In-Charge, including cleaning of the area. COTRAC-TOR shall start demobilisation only after the successful completion of the contract.

    15.0 SCRAP AND PACKING MATERIAL All kinds of scraps generated from the construction materials including packing material shall be the properly accounted for and deemed to be property of the OWNER.

    HPHighlight

  • TATA CONSULTING ENGINEERS LIMITED VOLUME:VI SEC-TION II

    SPEC.NO. TCE.6417A-H-500-001

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP YAMUNANAGAR, HARYANA

    SCOPE OF WORK

    SHEET 4 of 267

    ISSUE R0

    TCE FORM 329 R5

    SECTION II - SCOPE OF WORK

    1.0 The works covered in this section consists of collection of all site related data, conducting site investigations, design, preparation of all construction drawings, supply of all labour & materials, construction, fabrication, erection, painting and testing where necessary, of all structures required for housing all equipment and civil works for all services required for the Power Plant defined in the specification document. The Civil works shall include those required for Installation, Commissioning, testing, operation and mainte-nance of the Power Plant. The Scope will cover but not limited to the follow-ing investigations/studies/buildings / structures / systems / facilities.

    2.0 The scope of work consists of all civil, structural and architectural works of

    the following:- 2.1 Site related investigations, and studies to freeze design parameters consist-

    ing of:-

    (a) Topographical Surveying

    (b) Geotechnical Investigation

    (c) Hydro geological Surveying

    (d) Hydrographic Surveying

    (e) Wind tunnel studies for NDCT and RCC Chimney

    (f) Surge Analysis for C.W. conduit.

    (g) Sump model study for C.W. Pump.

    2.2 Site development works, consisting of

    (a) Site clearance.

    (b) Site levelling and grading of complete plant area including

    excavation / filling with excavated/borrowed earth, compaction,

    levelling up to formation level and grading upto finished grade level for

    the plant.

    (c) All roads, drains and culverts within the plant premises.

    (d) Civil and structural works associated with plant potable water supply,

    storm water and sewage disposal system for entire plant areas.

    2.3 Construction enabling works

    (a) Construction water

    (b) Construction Power

    (c) Temporary Site Building/ Site office/stores

  • TATA CONSULTING ENGINEERS LIMITED VOLUME:VI SEC-TION II

    SPEC.NO. TCE.6417A-H-500-001

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP YAMUNANAGAR, HARYANA

    SCOPE OF WORK

    SHEET 5 of 267

    ISSUE R0

    TCE FORM 329 R5

    (d) Temporary workshop & Garage

    (e) Fabrication Yard

    (f) Quality Control Laboratory including soil testing, cement testing, cube

    testing facilities

    (g) Fuel Storage Area

    (h) Staff Welfare Facility

    2.4 Steam turbine generator buildings / steam turbine foundations and

    complete civil and structural works in turbine building.

    2.5 Control room/ Electrical bay structure.

    2.6 Mill and bunker bay structure and foundation including coal bunkers,

    feeder floor, tripper floor and tripper roof.

    2.7 Mill foundations and civil and structural works /trenches associated with mill

    reject handling system, mill reject silo, connecting rack and foundation.

    2.8 Steam generator building/foundations.

    2.9 ESP structures and foundations

    2.10 ESP inlet and outlet duct supporting structures and foundations.

    2.11 Fan foundations and fan handling systems.

    2.12 ESP control room and switchgear room.

    2.13 Steam generator elevator supporting structure and foundations.

    2.14 RCC single flue (steel) Chimney.

    2.15 Steam generator area paving (from TG building upto chimney end) including

    all sumps, foundations, trenches and structures.

    2.16 Interconnection galleries between boiler structure and TG building.

    Interconnection galleries between boiler floors and feeder / tripper floor/roof

    2.17 Interconnection from TG building to service building.

    2.18 Complete civil and structural works in switch yard including switchyard

    control building, fencing, gravel paving, roads etc.

    2.19 Transformer yard and associated works in the transformer yard. Rails shall

    be provided and laid by the Bidder.

    2.20 Transformer area paving.

    2.21 Civil and structural works for Coal handling system.

  • TATA CONSULTING ENGINEERS LIMITED VOLUME:VI SEC-TION II

    SPEC.NO. TCE.6417A-H-500-001

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP YAMUNANAGAR, HARYANA

    SCOPE OF WORK

    SHEET 6 of 267

    ISSUE R0

    TCE FORM 329 R5

    2.22 Civil and structural works for Ash handling system including ash disposal

    and ash dyke.

    2.23 Civil and structural works for Fuel oil handling system.

    2.24 Civil and structural works for D.M. Plant and DM water system.

    2.25 Civil and structural works for Raw water/Make up water system consisting of

    clarifiers, clarified water reservoir and pump house etc.

    2.26 Civil and structural works associated with raw water conveying to in-plant

    reservoir from STP including laying of pipeline.

    2.27 Civil works associated with raw water conveying from STP water reservoir

    to RO Plant including laying of pipeline.

    2.28 Civil l works associated with raw water conveying from WYC water reservoir

    to clarifier including laying of pipeline.

    2.29 Condenser cooling water system including laying of CW pipes from CW

    pump house/ NDCT within TG building including anchor blocks.

    2.30 Natural draft Cooling towers.

    2.31 Critical pipe supporting structures.

    2.32 Pipe and cable racks. Provision shall be made in pipe rack for routing pipes

    and cables.

    2.33 Civil and structural works associated with Fire Protection system.

    2.34 Earthing works for plant.

    2.35 Lube Oil Storage Tank.

    2.36 Air compressor + DG + Air washer building.

    2.37 AC plant building/room.

    2.38 Service building.

    2.39 Dozer shed

    2.40 Watch towers

    2.41 Parking shed

    2.42 Owner site office

    2.43 Effluent treatment system (ETP)

    2.44 All roads and drains within the plant boundary.

    2.45 Sewage system.

    2.46 Sewage treatment plant.

    HPHighlight

    HPHighlight

    HPHighlight

  • TATA CONSULTING ENGINEERS LIMITED VOLUME:VI SEC-TION II

    SPEC.NO. TCE.6417A-H-500-001

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP YAMUNANAGAR, HARYANA

    SCOPE OF WORK

    SHEET 7 of 267

    ISSUE R0

    TCE FORM 329 R5

    2.47 Lighting Mast.

    2.48 Horticulture and landscaping. Green Belt Development as per provision of

    MoE&F Clearance.

    2.49 Township (Bidder shall be required to furnish the price bid for Township

    separately. The work shall include Design, construction, installations, com-

    missioning, supplying, transporting, storing, inspecting etc for all kinds of Ar-

    chitectural, Civil, Structural, plumbing, sanitary, sewage disposal, electrifica-

    tion works (11Kv transmission line from the plant) if required, which are re-

    quired for making the township serviceable, functional, inhabitable to the sat-

    isfaction of the OWNER).

    2.50 Workshop building.

    2.51 Transformer foundations, trenches, maintenance pits, drain pits, sumps,

    fencing, paving etc associated with the building/system.

    2.52 Potable water, Service water systems

    2.53 Rain Water Harvesting Scheme including irrigation facility for plantation.

    2.54 Railway siding and track laying complying latest railway norm.

    2.55 Diesel locomotive shed.

    2.56 CHP Office complex

    2.57 Silo utility building

    2.58 Condensate storage tank foundation

    2.59 STP water pump house

    2.60 RO Plant and RO permeate storage tank

    3.0 It is not the intent to specify herein all the works in the scope of this contract.

    All other buildings, structures and works which are not specifically mentioned

    here but required for construction, operation and maintenance of the power

    plant are deemed to be included in the scope of the BIDDER without any ex-

    tra liability to OWNER. The works shall conform to high standards of design,

    engineering and workmanship. Design and construction shall conform in

    every respect to all local and state regulations governing such works and to

    stipulations of Indian Standards unless stipulated otherwise in detail specifi-

    cation.

    4.0 EXCLUSIONS

    HPHighlight

  • TATA CONSULTING ENGINEERS LIMITED VOLUME:VI SEC-TION II

    SPEC.NO. TCE.6417A-H-500-001

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP YAMUNANAGAR, HARYANA

    SCOPE OF WORK

    SHEET 8 of 267

    ISSUE R0

    TCE FORM 329 R5

    4.01 Construction of main approach road from the State /National highway to the plant main gate.

    4.02 Administrative buildings

    4.03 Permanent stores

    4.04 Canteen building

    4.05 Plant boundary compound wall

    4.06 Security house, gate complex.

    4.07 Fire Station/First aid centre.

  • TATA CONSULTING ENGINEERS LIMITED VOLUME:VI SEC-TION III

    SPEC.NO. TCE.6417A-H-500-001

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP YAMUNANAGAR, HARYANA

    DOCUMENTS TO BE SUBMITTED BY BIDDER WITH EPC BID

    SHEET 9 of 267

    ISSUE R0

    TCE FORM 329 R5

    SECTION III - DOCUMENTS TO BE SUBMITTED BY BIDDER WITH

    EPC BID PERTAINING TO CIVIL WORKS

    1.0 A report on foundation proposed for various structures, buildings and facili-

    ties based on the data available with the OWNER and further data collected by the BIDDER. Allowable safe bearing capacity for open foundation, depth of foundation, need for pile foundations, type ,length and capacity of piles in case piling is required, soil improvement if any required, special precaution against aggressive soil etc shall also be covered in the report.

    2.0 List of software proposed to be used in various areas for analysis, design,

    drafting as well as project monitoring along with their sources and validation report for software.

    3.0 List of all sub-contractors including Engineering Consultants that the BID-

    DER proposed to employ, in case the contract is awarded to BIDDER, indi-cating their addresses with telephone number, experience on similar jobs, name, qualification and experience of persons who shall be employed in the job on behalf of the sub-contractor etc shall be submitted to the OWNER. Only the Sub Contractor, approved by the OWNER shall be engaged by the CONTRACTOR on the job.

    4.0 Details of quality control laboratory which will be set up at site along with a

    list of testing equipment shall be furnished.

    5.0 Schedule of unit prices duly filled in with rates for major items. After the award of contract during the execution of work, if there is any change in scope of work, the following rates furnished by the CONTRAC-TOR which would be reviewed and accepted by the owner would form the basis of payment of such changes. Only those works listed for addition or deletion from scope in writing by the owner would be the basis for addition or deletion from the contract value.

    Item No.

    Brief Item Description Unit Rate (Rs)

    1. Excavation below existing ground/grade level at

    all depths, in all types of ordinary and hard soils

    (including soils intermixed with boulders, slag

    and slushy soils) including clearing away vege-

    tation, shoring/strutting as required, de-watering

    wherever necessary, levelling and ramming the

    foundation stratum, loading, transporting and

    unloading the excavated material to stack or fill

    cum.

  • TATA CONSULTING ENGINEERS LIMITED VOLUME:VI SEC-TION III

    SPEC.NO. TCE.6417A-H-500-001

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP YAMUNANAGAR, HARYANA

    DOCUMENTS TO BE SUBMITTED BY BIDDER WITH EPC BID

    SHEET 10 of 267

    ISSUE R0

    TCE FORM 329 R5

    Item No.

    Brief Item Description Unit Rate (Rs)

    including all lifts, etc. and back filling with se-

    lected excavated material in layers around

    foundations, trenches, etc. compact to achieve

    95% Proctor density all complete as per specifi-

    cations and as directed by the Engineer

    a) within plant boundary

    b) 5KM from plant boundary

    MEASUREMENT

    Excavation shall be paid based on foundation

    dimension multiplied by depth from ground level.

    In other words payment will not be made for

    working space, berms, side slopes etc

    cum.

    2. Providing and laying in position plain cement

    concrete of grade in levelling course/fill under or

    around foundations pits, slabs on grade, sumps,

    manholes, etc. at any depth with 40 mm down-

    graded coarse aggregates including curing,

    compacting, dewatering wherever necessary,

    etc. complete but including cost of providing

    formwork wherever required for the following

    mixes of grade:

    a) M10

    b) M15

    cum.

    3. Providing and placing reinforced cement con-

    crete of following grade and with 20 mm down-

    graded coarse aggregates for all structures at all

    heights including formwork, vibrating, curing,

    dewatering wherever necessary leaving cut

    outs, pockets, providing inserts etc., complete

    but excluding cost of providing reinforcement, all

    as per specifications and as directed by Engi-

    neer.

    a) M20

    b) M25

    c) M30

    d) M35

    cum.

  • TATA CONSULTING ENGINEERS LIMITED VOLUME:VI SEC-TION III

    SPEC.NO. TCE.6417A-H-500-001

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP YAMUNANAGAR, HARYANA

    DOCUMENTS TO BE SUBMITTED BY BIDDER WITH EPC BID

    SHEET 11 of 267

    ISSUE R0

    TCE FORM 329 R5

    Item No.

    Brief Item Description Unit Rate (Rs)

    4. Supplying, cleaning, cutting, bending, as per

    drawings and placing in position at all locations

    and levels including binding with soft annealed

    16G black wire, etc. complete as shown on

    drawings. High yield strength deformed bars

    conforming to IS:1786 are as follows

    a) Fe415

    b) Fe500

    (No payment will be made for binding wires)

    MT

    5. Supplying, detailing, fabricating, transporting to

    site and erecting in position, with provision of

    erection bolts, nuts and washers, welding cleats,

    stiffeners, gussets, base plates and all other fix-

    tures and splices etc. complete, including prepa-

    ration of surfaces and applying painting as per

    specification and approved fabrication drawings.

    MT

    a) Structural steel members fabricated entirely

    from plates conforming to IS:2062 Grade A such

    as built-up columns, plate girders, gantry gird-

    ers, box girders, etc.

    MT

    b) Structural steel members fabricated from rolled

    steel sections conforming to IS:2062 Grade A

    and rolled steel sections with cover / web plates

    such as columns (including those with bat-

    tens/lacings), beams, girders, trusses, purlins

    and trestles etc.

    MT

    6.0 All deviations from bid document shall be furnished by BIDDER in the for-mat given in the specification document. Deviation furnished elsewhere in the bid other than at the place titled Deviations will not be considered as deviations.

    7.0 Any exclusions from the scope mentioned and implied in these specifica-

    tions, shall be clearly mentioned by the BIDDER separately in a section ti-tled EXCLUSIONS. Only the details mentioned in this section shall be considered as exclusions. All works, other than these, shall be deemed to

  • TATA CONSULTING ENGINEERS LIMITED VOLUME:VI SEC-TION III

    SPEC.NO. TCE.6417A-H-500-001

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP YAMUNANAGAR, HARYANA

    DOCUMENTS TO BE SUBMITTED BY BIDDER WITH EPC BID

    SHEET 12 of 267

    ISSUE R0

    TCE FORM 329 R5

    be in the scope of this contract and shall be executed by the CONTRAC-TOR at no extra cost to the OWNER.

    8.0 List of equipment to be deployed by the Bidder and his associates is to be

    furnished.

    9.0 Bidders are requested to go through the bid documents carefully. In case of any contradiction/conflicts in various clauses given herein, the same shall be brought to the notice of the owner. Owners decision shall be binding on bidder and shall have no implication to Owner.

    10.0 Time being essence of contract, Bidder shall submit L-1, L-2 & L-3 schedule

    for engineering design and construction for each building/structure.

  • TATA CONSULTING ENGINEERS LIMITED VOLUME:VI SEC-TION IV

    SPEC.NO. TCE.6417A-H-500-001

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP YAMUNANAGAR, HARYANA

    DOCUMENTS TO BESUBMITTED BY CONTRAC-TOR AFTER AWRAD OF CONTRACT

    SHEET 13 of 267

    ISSUE R0

    TCE FORM 329 R5

    SECTION IV DOCUMENTS TO BE SUBMITTED BY CONTRAC-

    TOR AFTER THE AWARD OF CONTRACT

    The following documents are to be submitted for the approval/information of the OWNER/ OWNERS CONSULTANT, prior to commencement of fabrica-tion & erection / construction. Category of Documents / Drawings under ap-proval/ information shall be decided by the OWNER/ OWNERS CON-SULTANT prior to start of design engineering. Approval of these documents by the OWNER/ OWNERS CONSULTANT shall not relieve the Contractor of his responsibility for any errors and fulfilment of Contract requirements. All drawings shall be of standard sizes (Metric system) and shall be made on latest version of AUTOCAD or MICROSTATION. The list is not exhaus-tive but indicative only:

    (a) General plant layout drawing with co-ordinates of roads, watch towers, buildings and facilities, piping / cable corridors, provision of landscaping and green belt development, diversion drains, equipment lay down areas etc. (b) Drawing showing underground facilities with co-ordinates of these facili-ties like buried pipes, buried cables, trenches, ducts, sewer, drains, sumps, pits, culverts, foundations etc. (c) Geotechnical investigation report based on additional geotechnical inves-tigation carried out by CONTRACTOR along with foundation recommenda-tion for various buildings / structures / facilities. (d) Topographical survey drawings along with location and details of Bench mark, grid and boundary pillars based on detailed survey conducted after the award of work.

    (e) Write up on proposed storm water drainage system furnishing layout of the drains, types of drains and suggested disposal system.

    (f) Write up on proposed sewage disposal system for the toilet in various buildings and scheme for usage/ disposal of the clear water.

    (g) Write up on proposed treatment and disposal of effluent/waste water generated in the plant and scheme for usage/disposal of clear water.

    (h) A write up on dewatering system proposed at the time of construction where deep underground construction such as for Wagon tippler pit, Con-veyor tunnels, underground Transfer House, C.W. forebay and pump house etc. are to be executed. Where necessary, cofferdams, sheet piles, pump sumps, equipment and channels, troughs, inlet gutters, pipes and any other works required for the water control and discharge shall be considered. The write up shall include design calculations, drawings and shall be based on

  • TATA CONSULTING ENGINEERS LIMITED VOLUME:VI SEC-TION IV

    SPEC.NO. TCE.6417A-H-500-001

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP YAMUNANAGAR, HARYANA

    DOCUMENTS TO BESUBMITTED BY CONTRAC-TOR AFTER AWRAD OF CONTRACT

    SHEET 14 of 267

    ISSUE R0

    TCE FORM 329 R5

    IS:3764 and/or standard book. The cost of dewatering to be borne by CON-TRACTOR.

    (i) Study note on disposal of sewage and other effluent from the plant to sat-isfy the statutory requirement.

    (j) Design basis report for all buildings, facilities, services and structures. The design basis report shall cover the description of civil/ structural sys-tems and their components, and design criteria for the major components. The contractor's detailed design shall comply with the requirements defined herein for each system. The contractor shall submit the DBR document based on relevant stipulations and design criteria of the tender specification and giving his own additional design parameters for each building / structure and obtain OWNERs approval before proceeding with detailed designs. The contractors detailed design and scope of supply shall include all com-ponents and systems, whether included in the system descriptions or not but required to provide a complete and fully functional facility.

    (k) Architectural floor plans, elevations, cross sections and perspective view in colour of all buildings. For main plant building BIDDER shall submit two different schemes along with a report elaborating the underlying philosophy of the proposed architectural concepts.

    (l) Design calculations and drawings for foundations / substructure and su-perstructure of all buildings including Turbo generator building, Mill & Bun-ker building, Control & electrical building, service building, pump houses etc and other structures.

    (m) Design calculations including dynamic analysis and drawings for all foundations subjected to dynamic loads like foundations for TG, BFP, Mill, Fans (PA, FD, ID) etc. Design and drawing of vibration isolation system shall also be furnished in case such system is included along with supply of equipment.

    (n) Design calculations and drawings for all facilities and services like roads, culverts, bridges, paving, road / rail crossings, drainage pump house (if re-quired), drains, sewers, sewage pump house, sewage treatment plant, wa-ter supply, water tank, sumps, tunnels, trenches, ducts etc. (o) Drawings of all architectural works including claddings, partitions finish schedule, colour scheme (both internal and external), doors and windows, flooring and false ceiling, etc. (p) Design calculations and drawings for plumbing & building drainage and execution for entire plant.

    (q) Design calculations and drawings for structures for raw water / make up water system such as, but not limited to, intake, raw water reservoir, pump house, over head tank, etc.

  • TATA CONSULTING ENGINEERS LIMITED VOLUME:VI SEC-TION IV

    SPEC.NO. TCE.6417A-H-500-001

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP YAMUNANAGAR, HARYANA

    DOCUMENTS TO BESUBMITTED BY CONTRAC-TOR AFTER AWRAD OF CONTRACT

    SHEET 15 of 267

    ISSUE R0

    TCE FORM 329 R5

    (r) Design calculations and drawings for structures and foundations in switchyard, transformer yard, etc.

    (s) Design calculations and drawings for structures pertaining to Cooling wa-ter system.

    (t) Design calculations and drawings for civil structures / works associated with fuel oil handling system, ash handling system, coal handling system etc.

    (u) All other designs, details / drawings or any other submissions as indi-cated elsewhere in this specification and as required by the OWNER.

    (v) Details of corrosion protection measures for all structures and their foun-dations.

    (w) All design and drawings for the Cooling towers.

    (x) All design and drawings for RCC chimney.

    (y) Schedule for total quantity of concrete (grade wise), reinforcement steel (diameter wise) and structural steel (section wise) in all construction draw-ings. (z) Design calculations for important joint / connections for structural steel works. (aa) Construction and erection procedure for all major structures with spe-cific reference to main plant building, bunker structures, transfer towers, conveyor galleries, TG foundation and other machine foundations. (bb) Write up on various statutory requirements and their compliance for various buildings and facilities.

    (cc) Copies of all reports on investigation and studies carried out by the CONTRACTOR as per the scope.

    (dd) Sample design calculation and fabrication drawing of important struc-tures, such as TG building main framing, bunker building main framing, coal bunkers, crane girders, typical gallery, typical trestle and typical Junction tower for CHP or any other structure specifically called for by OWNER.

    (ee) Design calculations and drawings shall be submitted and reviewed only after approval of corresponding Mechanical/Electrical/System general arrangement drawings. The contractor shall submit approved GA drawings along with three (3) copies of design documents and four (4) copies of de-sign drawings for comments/approval of the OWNER/ OWNERS CON-SULTANT. Soft/electronic copy of 2D and 3D analysis file and drawing shall

    HPHighlight

  • TATA CONSULTING ENGINEERS LIMITED VOLUME:VI SEC-TION IV

    SPEC.NO. TCE.6417A-H-500-001

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP YAMUNANAGAR, HARYANA

    DOCUMENTS TO BESUBMITTED BY CONTRAC-TOR AFTER AWRAD OF CONTRACT

    SHEET 16 of 267

    ISSUE R0

    TCE FORM 329 R5

    be submitted. On final approval of the drawing and design, Contractor shall submit three (3) copies of design calculation and six (6) copies of the draw-ing with one soft copy in CD each to the OWNER for distribution.

    (ff) Two (2) copies each of detailed drawings/ fabrication drawings for all structures along with bar bending schedule/bill of materials shall be fur-nished to OWNER/ OWNER.S CONSULTANT. Finally eight (8) copies of each drawing along with one soft copy in CD shall be submitted to the OWNER for their distribution.

    (gg) As Built Drawings: "As-built" drawings shall be prepared by the CON-TRACTOR after completion of construction / erection incorporating all the changes, if any, done on Engineer's instruction/approval. After completion of construction, Contractor shall submit four (4) copies of the all drawings, irrespective of any changes during construction, marked As Built with one soft copy in CD each to the Owner. Two (2) copies of "As-built" drawings A3 size in bound form shall also be submitted.

    (hh) Design calculation and drawings for boiler and ESP foundation.

    (ii) Marking scheme identifying the equipment lay down areas.

    (jj) The contractor shall prepare bar bending schedules (BBS) based on the detailed reinforcement drawings. These shall be presented to the Engi-neer In-Charge for approval. Approval of these schedules by the Engineer In-Charge in no way absolves the contractor from full responsibility for their completeness and correctness in every way nor shall any claim for extra cost or time be allowed on the grounds of such errors or discrepancies which may arise between drawings and schedules.

    (kk) Each consignment of steel reinforcement shall be accompanied by a test certificate from the manufacturer showing that the steel has been tested and analysed and the date of such tests and analyses shall comply in all re-spects with the standards. The following tests shall be carried out on rein-forcement if so directed for by Owner. a) Cast analysis b) Carbon equivalent value c) Tensile strength, yield stress, elongation d) Bend test e) Bond classification f) Chemical analysis

  • TATA CONSULTING ENGINEERS LIMITED VOLUME:VI SEC-TION V

    SPEC.NO. TCE.6417A-H-500-001

    1 X 660 MW SUPERCRITICAL UNIT AT DCRTPP YAMUNANAGAR, HARYANA

    INVESTIGATION/STUDIES, BUILDING, STRUC-TURES AND FACILITIES

    SHEET 17 of 267

    ISSUE R0

    TCE FORM 329 R5

    SECTION V DESCRIPTION OF INVESTIGATION/STUDIES,

    BUILDINGS, STRUCTURES AND FACILITIES

    The description against each item is indicative only and not exhaustive. Al-though most of the systems are covered herein, any other system (Civil, Structural and Architectural) required for successful completion of the pro-ject shall form a part of this contract and shall be deemed to be included in the scope of works.

    1.0 SITE INVESTIGATIONS AND STUDIES TO FREEZE DESIGN PA-

    RAMETERS

    1.1 TOPOGRAPHICAL SURVEYING

    1.1.1 Precision Surveying shall be carried out under the direction and control of a Licensed Land Surveyor. The Contractor shall mobilise and use appropriate and adequate number of precision instruments and equipment required for successful completion of the work. Self-aligning levels shall be used for pre-cision level survey.

    All Bench Mark (BM) levels of the survey shall be established with reference to the nearest GTS bench mark available. Precision levelling shall be car-ried out for establishing the BM at site by carrying levels from GTS BM adopting double circuit levelling.

    1.1.2 All boundary lines shall be located with their distances, included angle and

    bearings and boundary pillars constructed. Number of pillars shall be ade-quate to mark the boundary limits without any dispute. A closed traverse survey shall be carried out to form the framework for the detailed survey work.

    1.1.3 Two reference line, North-South line and East-West line at right angles to

    each other shall be established with grid pillars constructed at 200 meters c/c in both directions in such a way that these pillars will not be disturbed during construction. Coordinates shall be painted on these grid pillars. Pil-lars shall also be painted using synthetic enamel paint for easy identification. Bench mark pillars shall be provided at least at 6 locations. MS plate of size 100x100x10 mm with 8mm dia MS lugs shall be fixed at the top of the benchmark pillar and Coordinates and elevation shall be punched on that plate. These pillars shall be properly protected to prevent their disturbance during construction activities. BM pillars shall be distinguished from grid pil-lars with different type of painting. Size of the pillars shall be 250x250.Length of BM pillars and grid pillars shall be 1000 (mimimum) mm below FGL and above FGL it shall be 600mm and 300mm respectively. All pillars shall be R.