Top Banner
District of Columbia Schools (Clusters II & III) Facility Condition Assessment Washington, DC Facility Engineering Associates, P.C. (FEA) assessed the condition and estimated the repair and renovation costs of specific schools for the District of Columbia Office of Property Management (DCOPM). Many of the buildings were of historic nature. As a consequence, any rehabilitative recommendations related to the building exteriors incorporated the requirements to maintain the building’s historic architecture. FEA reviewed the physical status of the twelve schools in Clusters II & III dividing the work into six general areas of concentration: A visual condition assessment A determination of maintenance and upgrade issues A feasibility assessment for the buildings to attain LEED Silver Certification Identification of opportunities to make the buildings energy efficient The development of a long-term capital repair/renewal project and an associated opinion of cost The development of a preventative maintenance program and identification of deferred maintenance items PRIMARY CLIENT REFERENCE Amar Singh Office of Property Management Office of Construction District of Columbia Government 2000 14 th Street, NW, 8 th Floor Washington, DC 20002 [email protected] VALUE OF CONTRACT: $220,000 SQ FT: 1,092,272 CLIENT BENEFITS Provided capital repair projections to build a strong 10-year plan Assisted with prioritization of maintenance items Recommended replacements, repairs, upgrades, or further investigations Enabled team to attain LEED for Existing Buildings certification SCOPE ITEMS
2

Vision Word Macro for Deltek Vision 5.1 - feapc.com Web viewFEA reviewed the physical status of the twelve schools in Clusters II & III dividing the ... Deltek Vision Word ... tcocherl

Feb 06, 2018

Download

Documents

trinhque
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Vision Word Macro for Deltek Vision 5.1 - feapc.com Web viewFEA reviewed the physical status of the twelve schools in Clusters II & III dividing the ... Deltek Vision Word ... tcocherl

District of Columbia Schools (Clusters II & III) Facility Condition Assessment Washington, DC

Facility Engineering Associates, P.C. (FEA) assessed the condition and estimated the repair and renovation costs of specific schools for the District of Columbia Office of Property Management (DCOPM). Many of the buildings were of historic nature. As a consequence, any rehabilitative recommendations related to the building exteriors incorporated the requirements to maintain the building’s historic architecture.

FEA reviewed the physical status of the twelve schools in Clusters II & III dividing the work into six general areas of concentration:

A visual condition assessment A determination of maintenance and upgrade

issues A feasibility assessment for the buildings to attain

LEED Silver Certification Identification of opportunities to make the

buildings energy efficient The development of a long-term capital

repair/renewal project and an associated opinion of cost

The development of a preventative maintenance program and identification of deferred maintenance items

PRIMARY CLIENT REFERENCEAmar SinghOffice of Property ManagementOffice of ConstructionDistrict of Columbia Government2000 14th Street, NW, 8th FloorWashington, DC [email protected]

VALUE OF CONTRACT: $220,000SQ FT: 1,092,272

CLIENT BENEFITS Provided capital repair projections

to build a strong 10-year plan Assisted with prioritization of

maintenance items Recommended replacements,

repairs, upgrades, or further investigations

Enabled team to attain LEED for Existing Buildings certification

SCOPE ITEMS Conduct a Facility Condition

Assessment (FCA) Perform a Hazardous Materials

Screening (HMS) Review of current maintenance

practices Development of a capital renewal

plan