Utility Tunnel Master Planning for the Future NC APPA - 2013
24

Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

May 12, 2018

Download

Documents

duongminh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

Utility Tunnel Master Planning

for the Future

NC APPA - 2013

Page 2: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• University Utility Tunnel System Overview

• Utility Tunnel System Improvement Planning –

1990’S to 2008

• University Avenue Emergency Tunnel

Repair/Master Plan Update

• Utility Tunnel System Improvement Planning –

2008 to Present

AGENDA

2 | Utility Tunnel Master Planning for the Future May 2013

Page 3: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• Mark Roach – University of Virginia, Associate

Director of Utilities Department

• Robert “Skip” Notte, PE, LEED AP – Associate

Vice President, UVA Client Manager (1999-

2010), Dewberry

• Devin Keeler, PE, LEED AP, SIT, CST-III – UVA

Client Manager (2010 – Present), Dewberry

• Emmett Simons, PE – Associate, Structural

Engineering Design Lead, Dewberry

Presenters

3 | Utility Tunnel Master Planning for the Future May 2013

Page 4: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• The University of

Virginia was Founded in

1819 by Thomas

Jefferson in

Charlottesville, Virginia.

• As of 2012, the

University supports

approximately 12,420

staff, 14,640

undergraduates, and

6,455 postgraduates on

Grounds.

UNIVERSITY UTILITY TUNNEL SYSTEM OVERVIEW

4 | Utility Tunnel Master Planning for the Future May 2013

Page 5: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• The University supports

over 550 buildings with

over 16 million gross

square feet (GSF).

• Many of the buildings

are serviced by central

utilities conveyed

through a network of

tunnels.

UNIVERSITY UTILITY TUNNEL SYSTEM OVERVIEW

5 | Utility Tunnel Master Planning for the Future May 2013

Page 6: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• Archive documents indicate

that the first utility tunnel

was constructed around

1895.

• There is approximately 6.5

miles of walk-thru tunnel,

box conduit and other

buried structures carrying

central utilities on Grounds.

• Approximately 4.1 miles is

active walk-thru tunnel.

6 | Utility Tunnel Master Planning for the Future May 2013

UNIVERSITY UTILITY TUNNEL SYSTEM OVERVIEW

Page 7: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

7 | Utility Tunnel Master Panning for the Future May 2013

UNIVERSITY UTILITY TUNNEL SYSTEM OVERVIEW

Tunnel

Box Conduit South West Quadrant

N

Page 8: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• The walk-thru tunnels vary

in size and cross-sectional

geometry.

• The walk-thru tunnels carry

multiple utilities including:

steam, pumped condensate,

medium temperature hot

water, low temperature hot

water, domestic hot water,

potable water, fire water,

telecom, and electrical.

8 | Utility Tunnel Master Planning for the Future May 2013

UNIVERSITY UTILITY TUNNEL SYSTEM OVERVIEW

Page 9: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• In 1998 the Director of

Energy and Utilities

completed a visual

inspection of the entire

walk-through utility tunnel

system.

• This inspection included

a recommendation to

complete the first tunnel

conditions and

assessment report.

9 | Utility Tunnel Master Planning for the Future May 2013

UTILITY TUNNEL SYSTEM IMPROVEMENT PLANNING

– 1990’S TO 2008

Page 10: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• Based on this

recommendation, MMM

Design completed a series of

tests and analysis evaluating

the existing utility tunnel

network.

• The conditions assessment

report was completed in 2000.

• The completion of this

assessment report launched

the tunnel rehabilitation work.

10 | Utility Tunnel Master Planning for the Future May 2013

UTILITY TUNNEL SYSTEM IMPROVEMENT PLANNING

– 1990’S TO 2008

Page 11: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• In addition to

rehabilitation, the

University identified

tunnel replacements

and expansions to

better serve the

Grounds.

• These projects

included both state and

non-state funding.

11 | Utility Tunnel Master Planning for the Future May 2013

UTILITY TUNNEL SYSTEM IMPROVEMENT PLANNING

– 1990’S TO 2008

Page 12: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• Once the 2000

assessment report was

complete, the University

proceeded with the

following projects: • “Big Bore” – replacement of

tunnel I and expansion of central

utilities to new facilities

• Tunnel G rehabilitation

• Tunnel Q rehabilitation

• Tunnel D rehabilitation

• Tunnel T rehabilitation

12 | Utility Tunnel Master Planning for the Future May 2013

UTILITY TUNNEL SYSTEM IMPROVEMENT PLANNING

– 1990’S TO 2008

Page 13: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• Emergency situation in

2008 required the repair

of 90 linear feet of tunnel

under the busiest

intersection on Grounds.

• In addition to the repair

of this tunnel, the

University believed that

an update was needed

of the 2000 conditions

assessment report. 13 | Utility Tunnel Master Planning for the Future May 2013

UTILITY TUNNEL SYSTEM IMPROVEMENT PLANNING

– 1990’S TO 2008

Page 14: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• While completing routine

maintenance, University

personnel identified a

potential concern with the

structural integrity of the

existing tunnel.

• The University,

Contractor, and Engineer

worked on an expedited

schedule to make repairs.

14 | Utility Tunnel Master Planning for the Future May 2013

UNIVERSITY AVENUE EMERGENCY TUNNEL

REPAIR/MASTER PLAN UPDATE

Page 15: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• Working together, the

design was completed in

2 weeks and approved by

review agencies.

• Contractor mobilized one

week after approval of

design.

• During initial excavation

issues were identified with

the original construction.

15 | Utility Tunnel Master Planning for the Future May 2013

UNIVERSITY AVENUE EMERGENCY TUNNEL

REPAIR/MASTER PLAN UPDATE

Page 16: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• It was determined that the

initial wall construction

utilized the rock removed

to create the trench as

large aggregate within the

cast-in-place wall.

• In addition, a closer

inspection of the MTHW

lines confirmed that their

useful life was rapidly

coming to an end.

16 | Utility Tunnel Master Planning for the Future May 2013

UNIVERSITY AVENUE EMERGENCY TUNNEL

REPAIR/MASTER PLAN UPDATE

Page 17: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• A redesign of the structural

repair and pipe replacement

was completed within one

week.

• Contractor utilized float in

other project schedules to

expedite delivery of

necessary materials.

• Project finished ahead of

schedule, and cost

approximately $390,000.

17 | Utility Tunnel Master Planning for the Future May 2013

UNIVERSITY AVENUE EMERGENCY TUNNEL

REPAIR/MASTER PLAN UPDATE

Page 18: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• Concurrent with the

design and construction

improvements to the

University Avenue project,

the engineer completed a

visual inspection of

approximately 1 mile of

tunnel that was

considered to have the

highest structural

concern.

18 | Utility Tunnel Master Planning for the Future May 2013

UNIVERSITY AVENUE EMERGENCY TUNNEL

REPAIR/MASTER PLAN UPDATE Tunnel Start Tunnel End Inspected in

2000 (MMM) Inspected in 2008 (Dewberry)

Repairs

A Point 16 Tunnel T (Near Bookstore)

Yes Yes Unknown

B Point 16 Clark Hall Yes Yes Full Concrete Encasement (Planned 2013)

C Tunnel B (Btwn Maury & Minor)

McCormick Bridge (East Side)

Yes - Full Concrete Encasement -(Estimated 2006)

D Point 16 Heat Plant Yes Yes Full Concrete Encasement Garrett to Rouss Hall (2012)

E Cobb Hall Tunnel D (11+75) Yes - Unknown

F Barringer Door Tunnel D (11+75) Yes - Unknown

G Tunnel D Multistory (14+15) Yes - Unknown

H Big Bore / Davis Vault Jordan Hall Yes - Partially Destroyed

I Heat Plant Medical School Bldg Yes - Unknown

J O’Hill Loading Dock Webb House Yes - Destroyed Capped at O’Hill

K O’Hill Loading Dock Maupin House (Now Serves Bldg 4)

Yes - Unknown

L O’Hill Loading Dock Thornton Hall Yes - Unknown

M Tunnel N &O (West End Thornton Hall)

Tunnel Q & Tunnel P (East End Thornton)

Yes - Unknown

N Ruffner Tunnel M & O (West End Thornton Hall)

Yes - Unknown

O Tunnel M & N (West End Thornton Hall)

Whitehead Road – Engineers Way

Yes - Unknown

P Tunnel M (East end Thornton Hall)

McCormick Bridge (West Side)

Yes Yes Full Concrete Encasement (2008)

Q Tunnel M & P (East End Thornton Hall)

Kerchof Hall Yes - Unknown

R Tunnel Q (East Side Thornton)

Thornton Mech Room (East Side Thornton)

Yes - Unknown

S Mem Gym Mary Munford Yes - Unknown

T Tunnel U (North of McCormick Bridge)

Memorial Gym Yes Yes Spot Repairs (2012)

U Tunnel T (North of McCormick Bridge)

Hancock House Yes Yes Full Strengthening top slab and encasement (2012)

V Tunnel A (Rodgers House) Newcomb Hall Yes - Unknown

W Tunnel T (S of Memorial Gym)

Central Grounds Parking Deck Yes - Unknown

X Campbell Hall Fayerweather Hall Yes - Unknown

AA* University Chapel (University Ave)

Bayly Museum - - Repairs in 2008 under University Avenue Only

Page 19: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• This update included a

thorough structural review

of all tunnels that had not

been strengthened

through projects over the

last 5 years.

• These included tunnels

labeled A, B, C, D

(partial), P, T, & U.

19 | Utility Tunnel Master Planning for the Future May 2013

UNIVERSITY AVENUE EMERGENCY TUNNEL

REPAIR/MASTER PLAN UPDATE

Page 20: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• The update included the

following:

• A detailed description of

issues observed tied to a

station.

• Recommendation of

improvements

• Professional opinion o

probable construction

cost

• Recommended

improvement period.

20 | Utility Tunnel Master Planning for the Future May 2013

UNIVERSITY AVENUE EMERGENCY TUNNEL

REPAIR/MASTER PLAN UPDATE

IMMEDIATE ACTION NECESSARY

Tunnel Station(s) Recommendation Magnitude of Cost

(Project Cost)

B General Keep all vehicles larger than a pick-up

truck away from this tunnel. Install/

maintain bollards.

$2,500

D

T

B 3+08 Replace steel roof beam $1,000

3+38 $1,000

D 4+00 to 4+20 Provide temporary horizontal bracing

of tunnel walls at 4’-0” o.c. until

permanent repair is constructed (See

Action Necessary Item)

$8,000

P 0+74 to 1+24 (End) Provide temporary vertical and

horizontal bracing of tunnel walls at

4’-0” o.c. until tunnel is replaced (See

Urgent Action Necessary Item)

$40,000

T 0+00 to 0+90 Provide temporary vertical and

horizontal bracing of tunnel walls at

4’-0” o.c. until tunnel portion is

replaced (See Urgent Action

Necessary Item)

$70,000

U 0+00 Provide temporary vertical shoring of

tunnel header beam until permanent

repair is performed (See Action

Necessary Item)

$2,000

U 5+85 to 6+00 Provide additional vertical and

horizontal shoring at 4’-0” o.c. until

permanent repair is performed (See

Urgent Action Necessary Item)

$12,000

U 8+84 (For 25 LF) Provide temporary horizontal shoring

of tunnel walls at 4’-0” o.c. until

permanent repair is performed (See

Urgent Action Necessary Item)

$10,000

Page 21: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• Based on the

recommendations of the

updated report, the

University has proceeded

with a dedicated funding

source and improvements.

• All projects are funded

through the capital budget,

and approximately $1

Million has been allocated

for the next two years.

21 | Utility Tunnel Master Planning for the Future May 2013

UTILITY TUNNEL SYSTEM IMPROVEMENT PLANNING

– 2008 TO PRESENT

Page 22: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• Since 2008, the University has

used this update to completed

the following (Approximately

2,900 linear feet): • Tunnel Q Strengthening

• Tunnel P Repairs

• Tunnel A Repairs

• Central Anchors Re-anchoring/Realignment

• Tunnel D, T, & U Strengthening

• Tunnel B Strengthening & MTHW

improvements

• West Complex Tunnel Strengthening

22 | Utility Tunnel Master Planning for the Future May 2013

UTILITY TUNNEL SYSTEM IMPROVEMENT PLANNING

– 2008 TO PRESENT

Page 23: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

• The University’s previous, current, and

future commitment to their utility tunnel

system allows for:

• Safe work environment for employees.

• Reliable distribution of central utilities

throughout campus.

• Proactive approach and template for future

funding requests.

• Access to archived Information and ability to

respond to emergency situations in an

efficient and cost effective approach.

• Plan for future growth of the University.

23 | Utility Tunnel Master Planning for the Future May 2013

UTILITY TUNNEL SYSTEM IMPROVEMENT PLANNING

– 2008 TO PRESENT

Page 24: Utility Tunnel Master Planning for the Future - NCAPPA€¦ · •University Utility Tunnel System Overview ... Utility Tunnel Master Planning for the Future May 2013 •Mark Roach

QUESTIONS????

24 Utility Tunnel Master Planning for the Future May 2013