UTILITIES UNDERGROUNDING PROGRAM 1 PAGE Contact Information Information Line: (619) 533-3841 Email: [email protected]Website: www.sandiego.gov/undergrounding SHERMAN HEIGHTS - PROJECT BLOCK 8G June 2012 ALLEY ALLEY G LOGAN AV S 17TH ALLEY ALLEY ALLEY ALLEY IRVING K ISLAND AVENUE COMMERCIAL STREET L STREET 2 1 S T STREET STREET STREET STREET 1 7 T H STREET 1 7 T H STREET AVENUE 94 5 19TH STREET 20TH STREET 21ST STREET 22ND STREET 24TH STREET MARKET STREET IMPERIAL AVENUE J STREET IMPERIAL AVENUE COMMERCIAL STREET 24TH STREET 17TH STREET 17TH STREET K STREET G STREET 141 11 2004 1844 229 46 30 1835 35 235 144 154 1918 47 219 244 207 69 53 101 220 40 141 1945 1930 1848 117 0 230 237 23 151 167 571 563 558 2045 370 400 328 360 656 320 340 637 352 651 359 420 445 2011 2025 2005 2025 428 2204 570 651 2014 544 645 334 422 1845 318 352 639 530 2019 541 1915 1921 0 1931 457 2002 1924 442 500 454 405 341 255 1901 529 633 1926 552 544 344 427 1925 516 2122 470 2252 455 265 563 361 2128 2258 422 2127 411 408 341 638 456 2140 330 344 506 265 610 2263 405 670 655 533 2129 2225 2405 2130 509 239 2220 2251 260 2243 2226 2295 532 441 2120 2200 2406 561 431 365 656 543 2235 533 250 2104 2119 135 2231 2258 2136 2264 220 142 2405 2250 115 130 2402 242 120 2280 2220 2144 239 2224 2212 2210 2254 2242 231 205 2027 220 155 1921 217 129 233 31 156 37 168 33 239 130 1944 142 2019 118 242 2010 2040 37 165 1932 21 202 136 2031 0 24 131 230 2005 530 369 0 437 440 419 632 506 642 507 355 638 323 430 1931 501 520 1830 2021 524 670 2029 368 451 415 2027 1940 2040 657 410 2020 251 366 2020 656 1846 1902 342 637 2015 332 368 454 331 2010 639 1917 402 463 545 1945 634 532 1911 562 441 624 517 470 623 430 671 403 345 555 531 429 444 642 312 667 610 2405 331 355 2257 2262 505 532 358 2227 2404 506 2109 2230 663 525 2106 462 443 641 253 2047 653 2261 2401 434 0 631 366 533 541 542 2401 667 2214 2262 464 329 301 442 404 554 630 519 2103 2245 665 252 530 216 2106 2287 118 2264 2228 220 2213 230 243 2219 2150 219 2255 2205 141 2238 2248 160 2249 165 2279 119 142 2127 2407 2402 2244 147 111 2267 2023 2017 2140 610 2252 527 515 2404 1710 CURRENT CONSTRUCTION AREA MAP: SHERMAN HEIGHTS UTILITIES UNDERGROUNDING PROGRAM DESCRIPTION The City of San Diego has been undergrounding utility lines since 1970. Approximately 1,200 miles of overhead utility lines remain to be undergrounded. The City, in cooperation with SDG&E, Cox Communications, Time Warner and AT&T, is currently undergrounding the utility lines in your commu- nity. PROJECT BLOCK 8G HIGHLIGHTS • 2 miles of utilities will be undergrounded • 345 private residences will have their utilities undergrounded • 22 street lights will be installed • 59 shade trees will be installed • 48 curb ramps will be installed • Streets will be resurfaced or slurry sealed curb-to-curb PROJECT BLOCK 8G CONSTRUCTION ACTIVITY PHASES • Construction start: December 2010 • Panel work: Dec. 2010- May 2012 • Trench work: Dec. 2010 - November 2011 • Cabling, cut-overs and streetlights: Nov. 2011 - Aug. 2012 • Overhead line removal: Summer 2012 • Street resurfacing: 2013 PROJECT BLOCK 8G CONSTRUCTION ACTIVITIES • Cabling work is currently taking place. WELCOME TO THE UTILITIES UNDERGROUNDING PROGRAM E-NEWS #15 This is the fifteenth e-news update to inform you of the progress of the Utilities Undergrounding Program in the Sherman Heights/8G Project Block area. Approximately once a month during construction, or when significant events occur, you will receive an e-mail update. SHERMAN HEIGHTS NORTH No Scale 25th Street 28th Street 27th Street 30th Street Broadway F Street Ocean View Blvd. Ocean View Blvd. Na Market Street Imperial Avenue Commercial Street G Street Island Avenue 20th Street 17th Street 24th Street 94 5 CURRENT CONSTRUCTION Area K Street L Street 32nd Street J Street VICINITY MAP: SHERMAN HEIGHTS Legend Sidewalk repairs, cabling, cut-over and overhead line removal activi- ties throughout project block
2
Embed
UTILITIES UNDERGROUNDING PROGRAM · 19TH STREET 20TH STREET 21ST STREET 22ND STREET 24TH STREET K STREET MARKET STREET IMPERIAL AVENUE ... Dec. 2010- May 2012 • Trench work: Dec.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
UTILITIES UNDERGROUNDING PROGRAM
1PAGEContact
Information
Information Line: (619) 533-3841Email: [email protected]: www.sandiego.gov/undergrounding
SHERMAN HEIGHTS - PROJECT BLOCK 8GJune 2012
21S
IEWBL
AL L E Y
AL L E Y
F
23R ALL
EY
24T
H
O C E ANV
G
AL L E Y
AL L E Y
AL L E Y
LO G ANAV
AL L E Y
AL L E Y
F S T
CESARE
CHAVEZ
ALLE Y
S17
TH
BE AR DSLE Y
JUL IAN
ALLE Y
P UE BL OAL L E Y
ALL
EY
HAR R ISO N
ALLE Y
S R -9 4 E B O N R A
ALLE Y
ALLE Y
AL L E Y
IR VING
AL L E Y
AL L E Y
AL L E Y
AL L E Y
AL L E Y
AL L E Y
AL L E Y
S16TH
KE
AR
NY
ISLAND AVENUE
COMMERCIAL STREET
L STREET
21S
TST
REET
S STREET
STREET
STREE
T
STRE
ET
STREET
STREET
17T
HST
REET
17T
HST
REET
AVENUEAVENUE
AVENUE
AVENUE
PARKWAY
94
519
TH S
TREE
T
20TH
STR
EET
21ST
STR
EET
22N
D S
TREE
T
24TH
STR
EET
K STREET
MARKET STREET
IMPERIAL AVENUE
J STREET
IMPERIAL AVENUE IMPERIAL AVENUE
COMMERCIAL STREET COMMERCIAL STREET
J STREET
ISLAND AVENUE
MARKET STREET
25TH
STR
EET
25TH
STR
EET
25TH
STR
EET
25TH
STR
EET
24TH
STR
EET
17TH
STR
EET
16TH
STR
EET
K STREET
17TH
STR
EET
K STREET
G STREET
1 4 1
1 1
2 0 0 4
1 8 4 4
2 2 9
4 6
3 0
1 8 3 5
3 5
2 3 5
1 4 4
1 5 4
19
18
4 7
2 1 9
2 4 4
20
7
6 9
5 3
1 0 1
2 2 0
4 0
1 4 1
19
45
1 9 3 0
18
48
1 1 7
0
2 3 0
2 3 7
2 3
1 5 1
1 6 7
5 7 1
5 6 3
5 5 8
2 0 4 5
3 7 0
4 0 0
3 2 8
3 6 0
6 5 6
3 2 0
3 4 0
6 3 7
3 5 2
6 5 1
3 5 9
4 2 0
4 4 5
2 0 1 1
20
25
20
05
20
25
4 2 8
2 2 0 4
5 7 0
6 5 1
2 0 1 4
5 4 4
6 4 5
3 3 4
4 2 2
18
45
31
8
3 5 2
6 3 9
5 3 0
2 0 1 9
5 4 1
1 9 1 5
1 9 2 1
0
19
31
4 5 7
20
02
19
24
4 4 2
5 0 0
4 5 4
4 0 5
3 4 1
2 5 5
19
01
5 2 9
6 3 3
1 9 2 6
5 5 2
5 4 4
3 4 4
4 2 7
19
25
5 1 6
21
22
4 7 0
22
52
4 5 5
2 6 5
5 6 3
3 6 1
21
28
22
58
4 2 2
2 1 2 7
4 1 1
4 0 8
3 4 1
6 3 8
4 5 6
2 1 4 0
3 3 0
3 4 4
5 0 6
2 6 5
61
0
22
63
4 0 5
6 7 0
6 5 5
5 3 3
21
29
22
25
2 4 0 5
21
30
5 0 9
23
9
22
20
22
51
2 6 0
22
43
22
26
2 2 9 5
5 3 2
44
1
21
20
2 2 0 0 24
06
5 6 1
4 3 1
3 6 5
6 5 6
5 4 3
22
35
5 3 3
25
0
21
04
2 1 1 9
13
5
22
31
22
58
21
36
22
64
2 2 0
1 4 2
24
05
22
50
11
5
1 3 0
24
02
2 4 2
12
0
2 2 8 0
22
20
21
44
2 3 9
22
24
22
12
22
10
22
54
22
42
2 3 1
20
5
2 0 2 7
2 2 0
1 5 5
19
21
2 1 7
1 2 9
2 3 3
3 1
1 5 6
3 7
1 6 8
3 3
2 3 9
1 3 0
19
44
1 4 2
20
19
1 1 8
2 4 2
2 0 1 0
2 0 4 0
3 7
1 6 5
1 9 3 2
2 1
2 0 2
1 3 6
2 0 3 1
0
2 4
1 3 1
2 3 0
20
05
5 3 0
3 6 9
0
4 3 7
4 4 0
4 1 9
6 3 2
5 0 6
6 4 2
5 0 7
3 5 5
6 3 8
3 2 3
4 3 0
19
31
5 0 1
5 2 0
18
30
20
21
5 2 4
6 7 0
20
29
3 6 8
4 5 1
4 1 5
20
27
19
40
20
40
6 5 7
4 1 0
2 0 2 0
2 5 1
3 6 6
20
20
6 5 6
18
46
1 9 0 2
3 4 2
6 3 7
2 0 1 5
3 3 2
3 6 8
4 5 4
3 3 1
20
10
6 3 9
19
17
4 0 2
4 6 3
5 4 5
1 9 4 5
6 3 4
5 3 2
1 9 1 1
5 6 2
4 4 1
6 2 4
5 1 7
4 7 0
6 2 3
4 3 0
6 7 1
4 0 3
3 4 5
5 5 5
5 3 1
4 2 9
4 4 4
6 4 2
3 1 2
6 6 7
6 1 0
24
05
3 3 1
3 5 5
22
57
22
62
5 0 5
5 3 2
3 5 8
22
27
24
04
5 0 6
2 1 0 9
22
30
6 6 3
5 2 5
21
06
4 6 2
4 4 3
6 4 1
2 5 3
2 0 4 7
6 5 3
22
61
24
01
4 3 4
0
6 3 1
3 6 6
5 3 3
5 4 15 4 2
24
01
6 6 7
22
14
22
62
4 6 4
3 2 9
3 0 1
4 4 2
4 0 4
5 5 4
6 3 0
5 1 9
2 1 0 3
22
45
6 6 5
2 5 2
5 3 0
2 1 6
21
06
22
87
1 1 8
22
64
22
28
2 2 0
22
13
2 3 0
2 4 3
22
19
2 1 5 0
2 1 9
22
552
20
5
1 4 1
22
38
22
48
1 6 0
22
49
1 6 5 22
79
11
9
1 4 2
2 1 2 7
24
07
24
02
22
44
14
7
1 1 1
22
67
20
23
20
17
2 1 4 0
6 1 0 2 2 5 2
5 2 7
5 1 5
24
04
1 7 1 0
CURRENT CONSTRUCTION AREA MAP: SHERMAN HEIGHTSUTILITIES UNDERGROUNDING PROGRAM DESCRIPTIONThe City of San Diego has been undergrounding utility lines since 1970. Approximately 1,200 miles of overhead utility lines remain to be undergrounded. The City, in cooperation with SDG&E, Cox Communications, Time Warner and AT&T, is currently undergrounding the utility lines in your commu-nity.
PROJECT BLOCK 8G HIGHLIGHTS• 2 miles of utilities will be undergrounded• 345 private residences will have their utilities
undergrounded• 22 street lights will be installed• 59 shade trees will be installed• 48 curb ramps will be installed• Streets will be resurfaced or slurry sealed curb-to-curb
PROJECT BLOCK 8G CONSTRUCTION ACTIVITY PHASES• Construction start: December 2010• Panel work: Dec. 2010- May 2012• Trench work: Dec. 2010 - November 2011• Cabling, cut-overs and streetlights: Nov. 2011 - Aug. 2012• Overhead line removal: Summer 2012• Street resurfacing: 2013
PROJECT BLOCK 8G CONSTRUCTION ACTIVITIES• Cabling work is currently taking place.
WELCOME TO THE UTILITIES UNDERGROUNDING PROGRAM E-NEWS #15This is the fifteenth e-news update to inform you of the progress of the Utilities Undergrounding Program in the Sherman Heights/8G Project Block area. Approximately once a month during construction, or when significant events occur, you will receive an e-mail update.
SHERMANHEIGHTS
NORTHNo Scale
La Jol
l a S
ceni
c D
rive
Gilm
an D
rive
5
52
La Jolla Parkway
Was
hington Street
Market Street
25th
St.
28th
St.
30th
St.
32nd
St.
Imperial Avenue
Commercial Street
Broadway
F Street
G Street
Ocean View Boulevard
Ocean View Blvd.
National Avenue
National Avenue
43rd St.
54th
St.
Adams Avenue
Morena Blvd.
Fairm
ont A
venu
e
Monroe Avenue
Montezuma Rd.
Lake Shore Drive
Murray Park Drive
Madra Ave n u e
College Avenue
Governor Drive
Imperial Avenue I
mperial Avenue
Logan Avenue
Roswell Street
Federal Blvd.
Aldine Avenue
Montazuma Road M
ontazuma Road
Cam
ino
Del
Rio
Genesee Ave.
Clairemont Dr.
Moraga Ave.
J utlan
d Dr.
S. Wood
m
an St. S. Woodm
an St.
Paradise Valley Rd.
Bullock Dr.
Alsacia St.
Skyline Dr.
Briarwood Rd.
Brookhaven Rd.
Alta View D
r.
Paradise Valley
Rd.
S. Worthington Sw
eet water Rd.
M
anza
na W
ay
Luna Avenue Cla
irem
ont M
esa
Blv
d.
Market Street
47th
Stre
et
Eucl
id A
venu
e
Market Street
Orange Avenue
Eucl
idAv
enue
52nd
St.
Collw
ood B
lvd
Orange Line Trolley
El Cajon Blvd.
Del CerroBoulevard
HillgroveDrive
Rose
cran
s St.
Chatsworth Blvd.
Cata
lina
Blvd
.
Nimitz Blvd.
Talbot St.
Hill St.
Point Loma Ave.
N. Harbor Dr.
SAN DIEGOBAY
CURRENTCONSTRUCTION
Area
CURRENTCONSTRUCTIONArea
CURRENTCONSTRUCTIONArea
CURRENTCONSTRUCTIONArea
Canon Street
Rosecrans St.
CURRENTCONSTRUCTIONArea
94
94
52
54
94
5
5
5
5
5 8 8
8
15
15
Taylo
r Stre
et
Rosc
rans
St.
Juan Street
Pacific Highway
Pacific Hwy. Hotel Circle North
Mor
ena
Blv
d.
Sunset Boulevard Ft. Stockton Drive
Goldfinch Street
Washington StreetUniversity Avenue
ProjectArea
CURRENTCONSTRUCTIONArea
ProjectArea
ProjectArea
ProjectArea
Lake
Mur
ray Boulevard
70th
Stre
et
LAKE MURRAY
805
25th
Str
eet
28th
Str
eet
27th
Str
eet
30th
Str
eet
Broadway
F Street
Ocean View Blvd.
Ocean View Blvd.
National Avenue
National Avenue5
Market Street
Imperial AvenueCommercial Street
G Street
CURRENTCONSTRUCTIONArea
Genesee Ave.
Clai
rem
ont D
rive
52
5
ProjectArea
CURRENTCONSTRUCTIONAreaS
Island Avenue
20th
Str
eet
17th
Str
eet
24th
Str
eet
ProjectArea
Clair e mon
t
Mesa Bo ulev
ard
Morena Boulevard
Luna Avenue
Mor
aga B
oule
vard
Jutla
nd Driv e
Cla
irem
ont M
esa
Blv
d.
Rege
nts R
oad
94
5
CURRENTCONSTRUCTIONArea K Street
L Street
32nd
Str
eet
J Street
VICINITY MAP: SHERMAN HEIGHTS
Legend
Sidewalk repairs, cabling, cut-over and overhead line removal activi-ties throughout project block
2PAGEContact
Information
Information Line: (619) 533-3841Email: [email protected]: www.sandiego.gov/undergrounding
CORRECTION NOTICESCurrently, there are 46 residences in Job 1 and 21 resi-dences in Job 2 that need to make corrections to their ser-vices or properties. Most of these corrections are minor and are the responsibility of the property owner. Corrections need to be completed before we can cut customers over to the new under-ground system. Customers who are not cut-over to the new underground system risk loss of service when the overhead system is removed.
If you need to make a correction to your property in order to pass final inspection, you will receive a door hanger or letter from a City of San Diego inspector. The door hanger and letter have a descrip-tion of the correction needed. Most of these corrections are minor. Please do not delay in contacting the inspector whose name and phone number appear on these notices, so that the problem can be resolved.
SAFETYIf you see anyone on your property that is not visibly wearing an identification badge, or if they are in a vehicle that is not marked with a contractor or utility company name, please call the Informa-tion Line at (619) 533-3841 or the San Diego Police Department. The construction crew must travel in marked vehicles and have proper identification at all times on the jobsite.
CONTACT USIn the event that you are not satisfied or pleased with the work that was done on your property or your street, please let us know. Please do not attempt to make corrections, adjustments or improvements yourself. We promise to work with you on reach-ing a solution or creating an outcome that meets your needs and ours in this process. We will not be able to switch your services to the new underground system if any modifications were done to our work. If you are unsure about the status of the work that has taken place on your property or your street, contact us at:
• Information Line: (619) 533-3841 • Email: [email protected] UTILITIES UNDERGROUNDING PROGRAM VIDEOA video about the Utilities Undergrounding Program can be seen by visiting our web site at www.sandiego.gov/undergrounding and clicking on video. By watching it, you can see all the processes as-sociated with our work and gain a better understanding of what is involved in completing those processes.
We thank you in advance for your patience and support while we complete the Utilities Undergrounding Program project in the Sher-man Heights community.
PANEL AND TRENCHING ACTIVITIESPanel work by Southern Contracting began in December 2010. Panel work is when electricians prepare the electrical panel at your home to receive underground service. Approximately two weeks prior to any work being performed on your property, you should receive a door hanger with the electrical contractor’s name and phone number on it. If you have any questions or concerns about the work, please do not hesitate to contact the electrical contractor. To date, approximately 98% of the paneling work has been completed.
Trench work is 100% complete in Project Block 8G.
CABLING, CUT-OVER AND OVERHEAD LINE REMOVAL After all trenching operations were completed, the cabling portion of the work began. Cabling involves technicians placing new utility lines in the new conduits, so that the new lines can be “energized” and brought into service. Once the new system has been energized, the process to “cut-over” customers from overhead to underground services will begin. Once customers have been cut-over, the over-head lines will be removed. We anticipate this process will move very swiftly and it’s not nearly as disruptive or distracting as the trenching work, which is why you may not even see us working. A door hanger will be left prior to the contractor visiting your property. SDG&E is 100% complete with their cabling activities.
SDG&E is 30% complete with their cut-over activities in Job 1 and 65% complete in Job 2.
A crew member works on the installation of the underground utility cables.