PEBBLE BEACH COMMUNITY SERVICES DISTRICT REQUEST FOR PROPOSALS: Undergrounding Overhead Utilities Feasibility Study RFP Available: February 23, 2010 Submission Deadline: March 23, 2010 Issued By: Pebble Beach Community Services District 3101 Forest Lake Road Pebble Beach, CA 93950 (831) 373‐1274 main (831) 373‐2357 fax www.pbcsd.org Contact: Christina Baca Assistant Engineer (831) 647‐5605 direct [email protected]
7

Undergrounding OH Utilities Study 10.02 RFP - PBCSDpbcsd.org/Important_Notices/2010/pbcsd_uoh_utilities_10_02_rfp.pdf · PBCSD 2010 3 RFP: Undergrounding Overhead Utilities Feasibility

Jul 01, 2018

Download

Documents

nguyentu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Undergrounding OH Utilities Study 10.02 RFP - PBCSDpbcsd.org/Important_Notices/2010/pbcsd_uoh_utilities_10_02_rfp.pdf · PBCSD 2010 3 RFP: Undergrounding Overhead Utilities Feasibility

 

PEBBLE BEACH COMMUNITY SERVICES DISTRICT 

        

REQUEST FOR PROPOSALS: Undergrounding Overhead Utilities Feasibility Study  

RFP Available: February 23, 2010  Submission Deadline: March 23, 2010  Issued By: Pebble Beach Community Services District 3101 Forest Lake Road Pebble Beach, CA  93950 (831) 373‐1274 main (831) 373‐2357 fax www.pbcsd.org  Contact: Christina Baca Assistant Engineer (831) 647‐5605 direct [email protected]  

Page 2: Undergrounding OH Utilities Study 10.02 RFP - PBCSDpbcsd.org/Important_Notices/2010/pbcsd_uoh_utilities_10_02_rfp.pdf · PBCSD 2010 3 RFP: Undergrounding Overhead Utilities Feasibility

PBCSD  2010  

2  RFP: Undergrounding Overhead Utilities Feasibility Study  

1 INTRODUCTION

Pebble Beach Community Services District (PBCSD) Board of Directors and residents have expressed interest in investigating the feasibility of undergrounding overhead utilities throughout Pebble Beach, which consist of PG&E, AT&T, and Comcast utilities.   Being a forest, Pebble Beach experiences many outages during rain and wind storms due to  fallen trees.   The outages are exacerbated since Pebble Beach is essentially “at the end of the line” and often experiences outages for a longer duration than surrounding areas, such as Monterey, Pacific Grove or Carmel‐by‐the‐Sea. 

At  this  time,  PBCSD  does  not  have  sufficient  information  to  determine  whether  undergrounding overhead utilities  in Pebble Beach provides a benefit  to  the community  that out‐weighs  the costs of undergrounding, specifically to  increase reliability.   Currently, PBCSD does not have the authority to fund undergrounding overhead utilities construction projects; however, PBCSD can conduct a study to aid the Staff and Board of Directors in determining whether or not to pursue the authority from the Local Agency Formation Commission (LAFCO) of Monterey County to fund such projects.   

Pebble  Beach  Community  Services  District  issues  this  Request  for  Proposals  (RFP)  to  qualified professional  engineering  consultants  to  provide  Undergrounding  Overhead  Utilities  Feasibility Study services. 

1.1 PBCSD History 

PBCSD  is  the  local government of Pebble Beach, which provides:   Fire Protection and Emergency Medical Services; Supplemental Law Enforcement; Wastewater Collection and Treatment; Recycled Water Distribution; Garbage Collection, Disposal, and Recycling.  

PBCSD,  a  multi‐purpose  special  district,  was  formed  on  July  1,  1982  by  local  voters.    Under  its enabling  act,  PBCSD  can  provide  many  other  municipal‐type  services  when  requested  by  the residents, authorized by  its Board of Directors and approved by LAFCO.   PBCSD is governed by a five‐member board, which is accountable to the electorate in the same manner as city councils and county boards of supervisors.   Directors must be residents within PBCSD service boundaries, and they stand for election every four years. 

1.2 Service Area 

Pebble Beach is a private, unincorporated community of Monterey County, California.  Pebble Beach is bounded by Pacific Grove on the north, Monterey on the east, Carmel on the south, and the Pacific Ocean  on  the  west.    Pebble  Beach  has  an  approximate  population  of  4,500  people  and  3,124 developed  properties.    PBCSD’s  service  area  coincides  with  the  Pebble  Beach  border.    Refer  to Attachment A for a figure of PBCSD service area.   

Page 3: Undergrounding OH Utilities Study 10.02 RFP - PBCSDpbcsd.org/Important_Notices/2010/pbcsd_uoh_utilities_10_02_rfp.pdf · PBCSD 2010 3 RFP: Undergrounding Overhead Utilities Feasibility

PBCSD  2010  

3  RFP: Undergrounding Overhead Utilities Feasibility Study  

2 IMPORTANT DATES AND SUBMISSION PROCESS 

2.1 Important Dates 

Release of RFP  9:00 am, February 23, 2010

Deadline for Questions and Requests for Information 4:00 pm, March 12, 2010

Submission Deadline for Proposals  4:00 pm, March 23, 2010

Consultant Interviews  Week of April 12, 2010 

Award of Agreement  April 30, 2010 

 

2.2 Interested Parties 

All consultants who  intend  to respond to  this RFP are asked  to notify PBCSD of  their  interest via email to the RFP contact.  Interested parties will receive any addenda to this RFP and responses to questions submitted by prospective proposers via email. 

2.3 Questions and Request for Information 

Proposers  are  asked  to  direct  all  questions  regarding  this  RFP  to  the  RFP  contact.    PBCSD  will respond to written questions and requests for information in writing no less than one week prior to the submittal date.   

2.4 Submission Deadline for Proposals 

Proposal and all required submission elements must be received at the PBCSD office no later than 4:00 PM, TUESDAY, MARCH, 23 2010.   Delivered proposals shall be submitted in a marked, sealed envelope to: 

PROPOSAL: Undergrounding Overhead Utilities Feasibility Study Attention: Christina Baca 

Pebble Beach Community Services District 3101 Forest Lake Road Pebble Beach, CA  93950 

2.5 Proposal Review 

All proposals received by the specified deadline will be reviewed by PBCSD.  The following criteria will be used to evaluate the Proposal: 

1. Consultant’s specialized experience in similar projects 

2. Consultant’s understanding of the RFP requirements and goals 

3. Fee proposal 

4. Demonstrated ability to manage projects to achieve on‐time completion 

5. Qualifications of consultant’s project manager and staff, and recommendations from references 

6. Any other factors that PBCSD deems relevant 

Page 4: Undergrounding OH Utilities Study 10.02 RFP - PBCSDpbcsd.org/Important_Notices/2010/pbcsd_uoh_utilities_10_02_rfp.pdf · PBCSD 2010 3 RFP: Undergrounding Overhead Utilities Feasibility

PBCSD  2010  

4  RFP: Undergrounding Overhead Utilities Feasibility Study  

2.6 Consultant Interviews 

After  evaluating  the  proposals,  should  PBCSD  establish  a  “short  list”  of  qualified  finalists, consultants on the short list will be asked to formally present their proposal at the PBCSD office and respond  to  interviewer questions.   Presentations and  the  interview will not exceed one hour per proposer. 

2.7 Award of Agreement 

PBCSD  anticipates  executing  an  Agreement  at  the  April  2010  PBCSD  Board  Meeting  to  provide services beginning in May 2010.  PBCSD expects to present the final work products for this project to the Board of Directors within 6 months after PBCSD issues a Notice to Proceed to the consultant.    

3 SCOPE OF SERVICES 

3.1 Project Objectives 

Through  the  performance  of  the  scope  of  services  described  below,  PBCSD  hopes  to  provide sufficient information and cost estimates on converting overhead utilities to underground facilities in  Pebble  Beach  to  the  PBCSD  Board  of  Directors  to  determine whether  or  not  undergrounding overhead utilities in Pebble Beach is a community‐wide benefit and to pursue latent powers from LAFCO to execute such construction projects. 

3.2 Scope of Work 

Consultants  should  provide  a  proposed  work  plan  and  budget,  the  information  and  resources required to complete the tasks, and clearly described deliverables.   This Scope of Services is to be used as a general guide and shall include, but will not be limited to: 

1. Review existing system, existing reports and information 

2. Identify any system deficiencies, problem areas, or future plans for improvements 

3. Identify and prioritize proposed system improvements 

4. Develop construction cost estimates within the right of way and construction costs on private property to reconnect the utility services 

5. Develop proposed phased construction projects 

6. Prepare Undergrounding Overhead Utilities Feasibility Report 

4 PROPOSAL FORMAT AND CONTENTS 

4.1 Proposal Format 

Provide  five  (5)  hard  copies  of  proposals.    Proposals  shall  be  no more  than  thirty  (30)  pages  in length.   Proposals shall be printed double‐sided on 8‐1/2” x 11” paper, with the pages numbered sequentially.  Figures may be on 11” x 17” paper.  Provide an electronic copy of the proposal. 

   

Page 5: Undergrounding OH Utilities Study 10.02 RFP - PBCSDpbcsd.org/Important_Notices/2010/pbcsd_uoh_utilities_10_02_rfp.pdf · PBCSD 2010 3 RFP: Undergrounding Overhead Utilities Feasibility

PBCSD  2010  

5  RFP: Undergrounding Overhead Utilities Feasibility Study  

4.2 Proposal Contents 

The proposal shall include the following: 

4.2.1 Introduction and Executive Summary 

Submit a letter of introduction and executive summary of the proposal.  The letter must be signed by a person authorized by your firm to obligate your firm to perform the commitments contained in the proposal.  Submission of the letter will constitute a representation by your firm that your firm is willing and able to perform the commitments contained in the proposal.  Identify a contact person with  telephone  number,  email,  and  mailing  address  for  future  communication  regarding  the Proposal. 

4.2.2 Project Approach 

Describe the services and activities that your firm proposes to provide to PBCSD.  Include an overall scope of work tasks and specific deliverables associated with those tasks.  Feel free to include any suggested  project  enhancements,  opportunities  for  improvement,  and  key  process  milestones.  Provide a proposed schedule for the project including milestones for each deliverable work product and meeting.    Any  assumptions  regarding  turnaround  or  lead  time  for  PBCSD  staff  or  for  Board review should be clearly noted. 

4.2.3 Firm Qualifications 

Provide  information on your  firm’s background and qualifications which  include: a description of your  firm,  and  its  expertise  as  it  relates  to  the  scope  of  services;  a  description  of  not more  than three projects similar in size and scope recently completed by your firm, including client reference and telephone numbers, staff members who worked on each project, budget, schedule and project summary; and, if joint consultants or subconsultants are proposed, provide the above information for each.  

4.2.4 Project Team Qualifications 

Identify all personnel, including joint consultants or subconsultants, who will be assigned to work on  this  project  and  describe  the  organization  of  the  consultant’s  proposed  team.    Identify  the project  manager.    Include  brief  summaries  of  their  background  and  experience,  as  well  as  the assigned responsibilities for this project.  Provide a list of subconsultants, if any, and describe their role on the project team.  Include brief summaries of their background and experience. 

4.2.5 References 

Provide  references  for  the  lead  consulting  firm,  lead  project  manager,  and  all  subconsultants, including  the  name,  address  and  telephone  number  of  three  or  more  recent  clients  (preferably other public agencies). 

4.2.6 Fee Proposal 

Provide a detailed  fee proposal  indicating the consultant’s proposed project staffing, billing rates, and estimate of hours required to perform each task; subconsultant  fees; reimbursable expenses; and any other work or materials needed to complete the scope of work.   

   

Page 6: Undergrounding OH Utilities Study 10.02 RFP - PBCSDpbcsd.org/Important_Notices/2010/pbcsd_uoh_utilities_10_02_rfp.pdf · PBCSD 2010 3 RFP: Undergrounding Overhead Utilities Feasibility

PBCSD  2010  

6  RFP: Undergrounding Overhead Utilities Feasibility Study  

Appendix A Figure:  PBCSD Service Area 

Page 7: Undergrounding OH Utilities Study 10.02 RFP - PBCSDpbcsd.org/Important_Notices/2010/pbcsd_uoh_utilities_10_02_rfp.pdf · PBCSD 2010 3 RFP: Undergrounding Overhead Utilities Feasibility

Pacific Grove

Carmel

Cypress FPD

Monterey

Pacific Ocean

Arrowhead Point

StillwaterCove

Pescadero Point

MidwayPoint

Lone CypressTree

SunsetPoint

CypressPoint

FanshellBeach

Birdrock

Sealrock

Chinarock

Point Joe South MossBeach

North MossBeachSpanish Bay

Pacific GroveGate

Country ClubGate

Morse Gate

HWY 1Gate

CarmelGate

Mission Linen(PBCSD)

Pebble BeachF.S.

Pebble Beach

Carmel HillF.S.

SFB Morse

HWY 68

Sloa

t

Ronda

Haul

Riata

Portola

Padre

Viscaino

Bird

Roc

k

Lopez

Congr

ess

Stev

enso

n

Forest Lake

Drake

Crest

Lisbon

Seventeen Mile

Del Ciervo

Sunridge

Spruance

Palmero

Colton

Maj

ella

Cor

tez

Sonado

El Bosque

Ondulado

Hiking Trail

Arroyo

Ocean

Forest Lodge

Alva

Sombria

Fores

t

Mora

Suns

et

Valdez

Oleada

Cypress

Los Altos

Rodeo

Bonifacio Deer

Crespi

Mission

Coral

Lark

in

Hacien

da

Herm

itage

San Carlos

Spanish Bay

Spyglass Hill

Mid

woo

d

Wranglers

Cantera

Porque

Mestres

Costado

ClubBroncho

Sawmill Gulch

Patio

The Dunes

Cormora

nt

Gal

leon

The Old

Marcheta

Coyo

te

Look

out

Carmel

Ataj

o

Pioneer Crescent

Oak

Kno

ll

Whit

man

Chaparral

Bristol

Griffin

Bristol Curve

Indian Village

Signal Hill

Trappers

Racco

onLaurel

Quarry

Scen

ic

Oxen

Presidio

Flavin

Venadero

Hopi

Lariat

Wildcat Canyon

Paradise Park

The Benbow

Wha

lers

Parkway

Elk Run

Faculty

Ortega

Lake

Treasure

Lupi

n

Stillwate

r

Corte

Sher

man

Mad

re

Peisano

Susan

Matador

Oasis

Starboard

Laur

eles

Circle

Adobe

Ballantrae

Hawkins

Alva

rado

AlvisoWat

erta

nk

Costado

Lopez

Congress

Stev

enso

n

Lopez

Cypre

ss

Seventeen Mile

Stevenson

Oleada

Hiking Trail

Seventeen Mile

Hiking

Trail

Seventeen Mile

Sunset

Seventeen Mile

Seventeen Mile

Hik

ing

Trai

l

Hiking Trail

Stevenson

Sunridge

Sunridge

Alva

Hiking Trail

Hiking Trail

PEBBLE BEACHCommunity Services District

CAL FIRE/PBCSDJanuary 25, 2010

0 0.50.25MilesToll Gate

Fire Station