12 th Annual Concrete Pavement Workshop January 23, 2013 Cory Pope, P.E. UDOT Program Development
Nov 22, 2014
12th Annual Concrete Pavement Workshop January 23, 2013
Cory Pope, P.E. UDOT Program Development
• MAP 21 and the Federal Program
• Transportation Investment Fund (TIF)
• Projected Future
• Consolidated Programs – Flexibility
• Maintained Existing Funding Levels
• 2 Years – FY13/FY14
• Significant General Fund transfers and Leveraged Future Revenues
IM
NHS
On
Sys.
Brid
ge ST
P
Equi
ty B
onus
Off
Sys.
Brid
ge
Safe
ty
Rail
X-in
g
Rec
Trai
ls
SR2S
Enha
ncem
ents
CMAQ
MPO
Pla
n
Plan Fund Type $0M
$20M
$40M
$60M
$80M
$100M
$120M
$140M
$160M
$180M
$200M 2012 Funding Distribution
IM
NHS
On
Sys.
Brid
ge ST
P
Equi
ty B
onus
Off
Sys.
Brid
ge
Safe
ty
Rail
X-in
g
Rec
Trai
ls
SR2S
Enha
ncem
ents
CMAQ
MPO
Pla
n
Plan Fund Type $0M
$20M
$40M
$60M
$80M
$100M
$120M
$140M
$160M
$180M
$200M 2013 Funding Distribution
STP 85.3M (-4.2M)
HSIP 20.4M (+7.9M)
Trans. Alt. 6.4M (-4.2M)
(+401K) (-626K)
NHPP 185.5M
(+736K)
Transportation Investment Fund (TIF)
• 8.3% of Sales Tax (2005) • ½ of auto related sales tax
• SB 229 (2011) • Added 30% of sales tax growth
• Other Misc.
TIF - Revenues
• FY 2012 ~ $420 Million
• Projected: FY 2014 ~ $ 530 Million FY 2016 ~ $ 612 Million FY 2018 ~ $ 700 Million