Urgent Maintenance Dredging Project Sites National Importance A 1 A 2 A 3 A 4 B 1 B 3 B 4 C 1 C 2 C 3 C 4 D 1 D 2 D 3 D 4 D 5 PROPOSED DISPOSAL SITES PROPOSED DISPOSAL SITE C 5 B 2
Feb 11, 2016
Urgent Maintenance DredgingProject Sites
National Importance
A1
A2
A3
A4
B1
B3
B4
C1
C2
C3
C4D
1
D2
D3
D4
D5
PROPOSED DISPOSAL SITES PROPOSED DISPOSAL SITE
C5
B2
DG Cipta Karya Sites
Kamal: Proposed widening. Extensive impact. In-depth PAP socio-economic six month study initiated by DGCK Housing to begin in May 2008. Design described in DKI 3-9
Tanjungan: Proposed widening. Industrial and residential extensive impact. Final design not yet prepared
Lower Angke: Dredging only. Prior sheet piling prevents encroachment. No PAPs. Temporary removal of ferry structures
Cideng-Thamrin: No encroachment evident. Temporary impact may result if embankments are repaired. Final design not yet presented
KAMAL
DG Cipta Karya Sites
Kamal: Proposed widening. Extensive impact. In-depth PAP socio-economic six month study initiated by DGCK Housing to begin in May 2008. Design described in DKI 3-9
TANJUNGAN
DG Cipta Karya Sites
Tanjungan: Proposed widening. Industrial and residential extensive impact. Final design not yet prepared
LOWER ANGKE
DG Cipta Karya Sites
Lower Angke: Dredging only. Prior sheet piling prevents encroachment. No PAPs. Temporary removal of ferry structures
CIDENG THAMRIN
DG Cipta Karya Sites
Cideng-Thamrin: No encroachment evident. Temporary impact may result if embankments are repaired. Final design not yet presented
DG Water Resources Sites
Cengkareng: Wide canal. No resettlement impacts
West Banjir Canal:Wide canal. No resettlement impacts
Sunter: No resettlement impacts. Housing encroaches on the banks around the Taruna Bridge/Pasar Pulo Gadung. Will not be affected by dredging. Plans for embankment work is not known
Cakung: 2 separate communities (Madura inland, Bugis fishing community at the Cakung mouth). Extensive resettlement impact depending on engineering design and dredging requirements. Separate LARAPs will be required for the 2 communities
CENGKARENG
DG Water Resources Sites
Cengkareng: Wide canal. No resettlement impacts
DG Water Resources Sites
West Banjir Canal:Wide canal. No resettlement impacts
SUNTER
DG Water Resources Sites
Sunter: No resettlement impacts. Housing encroaches on the banks around the Taruna Bridge/Pasar Pulo Gadung. Will not be affected by dredging. Plans for embankment work is not known
CAKUNG DRAIN
CAKUNG FISHING COMMUNITY
DG Water Resources Sites
Cakung: 2 separate communities (Madura inland, Bugis fishing community at the Cakung mouth). Extensive resettlement impact depending on engineering design and dredging requirements. Separate LARAPs will be required for the 2 communities
DKI Sites
Pakin-Kali Besar:Channel walls are generally hard surface (concrete, bricks). No encroachment
Ciliwung-Gunung Sahari:No encroachment evident in site visits
Krukut: Channel walls are generally hard surface (concrete, bricks). No encroachment
Sentiong-Sunter: No encroachment issues if the site visit covered the Project area
Diversion Grogol-Secretaris-Angke:The section between the Lower Angke and the Secretaris is nasty (mud embankments, garbage, small housing section). Possible resettlement impact (±30 hh) depending on engineering design
DIVERSION GROGOL-SEKRETARIS-ANGKE
DKI Sites
Diversion Grogol-Secretaris-Angke:The section between the Lower Angke and the Secretaris is nasty (mud embankments, garbage, small housing section). Possible resettlement impact (±30 hh) depending on engineering design
DKI Sites
Pakin-Kali Besar:Channel walls are generally hard surface (concrete, bricks). No encroachment
DKI Sites
Ciliwung-Gunung Sahari:No encroachment evident in site visits
DKI Sites
Krukut: Channel walls are generally hard surface (concrete, bricks). No encroachment
SENTIONG-SUNTER
DKI Sites
Sentiong-Sunter: No encroachment issues if the site visit covered the Project area
DKI Sites (Waduks)Waduk Pluit: The Pluit reservoir (80ha)was built about 20 years ago. DKI estimates there are now 10,000hh living on the reservoir embankment. The JUFMP planned dredging should not impact this population. No relocation will be required
Waduk South Sunter:No encroachment which will affect planned dredging. No relocation will be required
Waduk North Sunter: No encroachment which will affect planned dredging. No relocation will be required
Waduk East Sunter III: No encroachment which will affect planned dredging. No relocation will be required
Waduk Melati: No encroachment which will affect planned dredging. No relocation will be required
Pluit
Melati
East Sunter
South Sunter
North Sunter
WADUK PLUIT
DKI Sites (Waduks)Waduk Pluit: The Pluit reservoir (80ha)was built about 20 years ago. DKI estimates there are now 10,000hh living on the reservoir embankment. The JUFMP planned dredging should not impact this population. No relocation will be required
Pluit
WADUK MELATI
DKI Sites (Waduks)
Waduk Melati: No encroachment which will affect planned dredging. No relocation will be required
Melati
DKI Sites (Waduks)
Waduk South Sunter:No encroachment which will affect planned dredging. No relocation will be required
Waduk North Sunter: No encroachment which will affect planned dredging. No relocation will be required
Waduk East Sunter III: No encroachment which will affect planned dredging. No relocation will be required
East Sunter
South Sunter
North Sunter
DKI Sites (Disposal Areas)
Taman BMW: This site (32ha)of flat land surrounding an old railway bed is sandwiched between the highway and a small lake
Pluit:The site is in the tidal zone. Mangroves and fishponds/fishpond sheds (± 6) are found on the site which is walled off from the inland areas by a cement block wall. Outside the walls can be seen a large power plant complex, as well as residential areas
Muara Kali Adem: The proposed disposal site is sea based, located along the coast and out into the sea between a fishing harbour breakwater and a small river – the Kali Adem
Pluit Karang: The site is located under the tollroad, and is covered with banana trees. Approx 30 structures, small gardens and extensive fishponds are found on the site
Kapuk Muara:The site is located in a gated community, surrounded on the outskirts by upper middle income housing and middle income new rukos. The assumption is that fill has been requested by the private sector owners of the land
Kamal Muara: The site is located in an industrial area where a large section of land is currently being filled with loads of earth, concrete, etc. The site is reported previously to have been swampy. There are 2 good size fishponds in the foreground but these are said to be outside of the Project site
Rorotan:There are 2 sites at Rorotan. Rorotan 1 is private sector land requesting fill to deal with flooding problems. Rorotan 2 is a large solid waste dumpsite currently in use
Rorotan: This site is a large currently utilized solid waste dump located directly on a main road
DISPOSAL SITE KAMAL MUARA
DKI Sites (Disposal Areas)Kamal Muara: The site is located in an industrial area where a large section of land is currently being filled with loads of earth, concrete, etc. The site is reported previously to have been swampy. There are 2 good size fishponds in the foreground but these are said to be outside of the Project site
DISPOSAL SITE KAPUK MUARA
DKI Sites (Disposal Areas)
Kapuk Muara:The site is located in a gated community, surrounded on the outskirts by upper middle income housing and middle income new rukos. The assumption is that fill has been requested by the private sector owners of the land
DISPOSAL SITE PLUIT KARANG
DKI Sites (Disposal Areas)
Pluit Karang: The site is located under the tollroad, and is covered with banana trees. Approx 30 structures, small gardens and extensive fishponds are found on the site
DISPOSAL SITE MUARA KALI ADEM
DKI Sites (Disposal Areas)
Muara Kali Adem: The proposed disposal site is sea based, located along the coast and out into the sea between a fishing harbour breakwater and a small river – the Kali Adem
DISPOSAL SITE PLUIT
DKI Sites (Disposal Areas)
Pluit:The site is in the tidal zone. Mangroves and fishponds/fishpond sheds (± 6) are found on the site which is walled off from the inland areas by a cement block wall. Outside the walls can be seen a large power plant complex, as well as residential areas
DISPOSAL SITE BMW
DKI Sites (Disposal Areas)
Taman BMW: This site (32ha)of flat land surrounding an old railway bed is sandwiched between the highway and a small lake
DISPOSAL SITE ROROTAN
DKI Sites (Disposal Areas)Rorotan:There are 2 sites at Rorotan. Rorotan 1 is private sector land requesting fill to deal with flooding problems. Rorotan 2 is a large solid waste dumpsite currently in use
DISPOSAL SITE CAKUNG
DKI Sites (Disposal Areas)
Rorotan: This site is a large currently utilized solid waste dump located directly on a main road