S-12D Spillway Structure Maintenance Dredging

S-12D Spillway Structure Maintenance Dredging

February 27, 2007February 27, 2007

Page 2: S-12D Spillway Structure Maintenance Dredging

Everglades National Park

S-12D

L-67

S-333

Page 3: S-12D Spillway Structure Maintenance Dredging

S-12D Spillway Structure Maintenance Dredging

S-12D Spillway Structure Maintenance Dredging

NTP – Issued December 11, 2006Substantial Completion – May 17, 2007Final Completion – June 18, 2007Interim IOP approved by COE

NTP – Issued December 11, 2006Substantial Completion – May 17, 2007Final Completion – June 18, 2007Interim IOP approved by COE

Page 4: S-12D Spillway Structure Maintenance Dredging

CONSTRUCTION PROGRESS/STATUS CONSTRUCTION PROGRESS/STATUS Dredging operations north and at the in-take Dredging operations north and at the in-take structure is 100% complete Post Survey/soundings of the dredged area (in-take structure) completed. Vegetation removal along the banks of the in-take structure completed. Canal banks along and at the in-take structure currently being re-graded. Based upon the above and work completed to-date, the project is approximately 40% complete and on-schedule.

structure is 100% complete Post Survey/soundings of the dredged area (in-take structure) completed. Vegetation removal along the banks of the in-take structure completed. Canal banks along and at the in-take structure currently being re-graded. Based upon the above and work completed to-date, the project is approximately 40% complete and on-schedule.

Page 5: S-12D Spillway Structure Maintenance Dredging
Page 6: S-12D Spillway Structure Maintenance Dredging
Page 7: S-12D Spillway Structure Maintenance Dredging
Page 8: S-12D Spillway Structure Maintenance Dredging
Page 9: S-12D Spillway Structure Maintenance Dredging
Page 10: S-12D Spillway Structure Maintenance Dredging
Page 11: S-12D Spillway Structure Maintenance Dredging
Page 12: S-12D Spillway Structure Maintenance Dredging
Page 13: S-12D Spillway Structure Maintenance Dredging

CONSTRUCTION PROGRESS/STATUS CONSTRUCTION PROGRESS/STATUS

Any Questions?Any Questions?