Top Banner

of 45

Urea EPC Schedule

Apr 09, 2018

Download

Documents

vishal_madhukar
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/8/2019 Urea EPC Schedule

    1/45

  • 8/8/2019 Urea EPC Schedule

    2/45

  • 8/8/2019 Urea EPC Schedule

    3/45

  • 8/8/2019 Urea EPC Schedule

    4/45

  • 8/8/2019 Urea EPC Schedule

    5/45

  • 8/8/2019 Urea EPC Schedule

    6/45

  • 8/8/2019 Urea EPC Schedule

    7/45

  • 8/8/2019 Urea EPC Schedule

    8/45

  • 8/8/2019 Urea EPC Schedule

    9/45

  • 8/8/2019 Urea EPC Schedule

    10/45

  • 8/8/2019 Urea EPC Schedule

    11/45

  • 8/8/2019 Urea EPC Schedule

    12/45

  • 8/8/2019 Urea EPC Schedule

    13/45

  • 8/8/2019 Urea EPC Schedule

    14/45

  • 8/8/2019 Urea EPC Schedule

    15/45

  • 8/8/2019 Urea EPC Schedule

    16/45

  • 8/8/2019 Urea EPC Schedule

    17/45

  • 8/8/2019 Urea EPC Schedule

    18/45

  • 8/8/2019 Urea EPC Schedule

    19/45

  • 8/8/2019 Urea EPC Schedule

    20/45

  • 8/8/2019 Urea EPC Schedule

    21/45

  • 8/8/2019 Urea EPC Schedule

    22/45

  • 8/8/2019 Urea EPC Schedule

    23/45

  • 8/8/2019 Urea EPC Schedule

    24/45

  • 8/8/2019 Urea EPC Schedule

    25/45

  • 8/8/2019 Urea EPC Schedule

    26/45

  • 8/8/2019 Urea EPC Schedule

    27/45

  • 8/8/2019 Urea EPC Schedule

    28/45

  • 8/8/2019 Urea EPC Schedule

    29/45

  • 8/8/2019 Urea EPC Schedule

    30/45

  • 8/8/2019 Urea EPC Schedule

    31/45

    MATIX FERTILIZER & CHEMICAL LIMITED

  • 8/8/2019 Urea EPC Schedule

    32/45

    Activity ID Activity Name riginal

    uration

    Start Finish

    PRMCS24585 DATA SHEET 0 27-Aug-10

    PRMCS25740 ISSUE MR 21 01-Oct-10 22-Oct-10

    PRMCS25750 ISSUE ENQUIRY 3 22-Oct-10 25-Oct-10

    PRMCS25760 RECIEVE BIDS 30 25-Oct-10 24-Nov-10

    PRMCS25770 ISSUE TBA 21 24-Nov-10 15-Dec-10PRMCS25780 PLACE LOI 14 15-Dec-10 29-Dec-10

    PRMCS25790 ISSUE PR 14 29-Dec-10 12-Jan-11

    PRMCS25800 ISSUE PO 14 29-Dec-10 12-Jan-11

    PR MCS25810 VENDOR DRAWING PREPAR ATION 119 12-Jan-11 11-May-11

    PRMCS25820 VENDOR DRAWING CHECKING/ REVIEW 63 09 -Mar -11 11-May-11

    PRMCS25840 MANFG-RECEIPT AT SITE 308 29-Dec-10 02-Nov-11

    PIPINGPIPING 411 04-Dec-10 19-Jan-12

    1ST MTO1ST MTO 322 04-Dec-10 22-Oct-11

    FITTINGSFITTINGS 297 04-Dec-10 27-Sep-11

    PRPIP2852 ISSUE MR 21 04-Dec-10 25-Dec-10

    PRPIP2855 ISSUE ENQUIRY 3 25-Dec-10 28-Dec-10

    PRPIP2860 RECIEVE BIDS 21 28-Dec-10 18-Jan-11PRPIP2870 ISSUE TBA 14 18-Jan-11 01-Feb-11

    PRPIP2880 PLACE LOI 14 01-Feb-11 15-Feb-11

    PRPIP2960 ISSUE PR 14 15-Feb-11 01-Mar-11

    PRPIP2970 ISSUE PO 14 15-Feb-11 01-Mar-11

    PRPIP2980 MANUFACTURING 181 01-Mar-11 29-Aug-11

    PRPIP2990 DESPATCH 91 30-May-11 29-Aug-11

    PRPIP3000 RECIEPT AT SITE 91 28-Jun-11 27-Sep-11

    GASKETSGASKETS 213 01-Jan-11 02-Aug-11

    PRPIP9000 ISSUE MR 14 01-Jan-11 15-Jan-11

    PRPIP9010 ISSUE ENQUIRY 3 15-Jan-11 18-Jan-11

    PRPIP9020 RECIEVE BIDS 21 18-Jan-11 08-Feb-11

    PRPIP9030 ISSUE TBA 14 08-Feb-11 22-Feb-11

    PRPIP9040 PLACE LOI 14 22-Feb-11 08-Mar-11

    PRPIP9050 ISSUE PR 14 08-Mar-11 22-Mar-11

    PRPIP9060 ISSUE PO 14 08-Mar-11 22-Mar-11

    PRPIP9070 MANUFACTURING 119 22-Mar-11 19-Jul-11

    PRPIP9080 DESPATCH 63 17-May-11 19-Jul-11

    PRPIP9090 RECIEPT AT SITE 63 31-May-11 02-Aug-11

    STUD / BOLSTUD / BOLTS 213 01-Jan-11 02-Aug-11

    PRPIP3702 ISSUE MR 14 01-Jan-11 15-Jan-11

    PRPIP3707 ISSUE ENQUIRY 3 15-Jan-11 18-Jan-11

    PRPIP3710 RECIEVE BIDS 21 18-Jan-11 08-Feb-11

    PRPIP3720 ISSUE TBA 14 08-Feb-11 22-Feb-11

    PRPIP3730 PLACE LOI 14 22-Feb-11 08-Mar-11

    PRPIP3740 ISSUE PR 14 08-Mar-11 22-Mar-11

    PRPIP3750 ISSUE PO 14 08-Mar-11 22-Mar-11

    PRPIP3760 MANUFACTURING 119 22-Mar-11 19-Jul-11

    PRPIP3770 DESPATCH 63 17-May-11 19-Jul-11

    PRPIP3780 RECIEPT AT SITE 63 31-May-11 02-Aug-11

    PIPESPIPES 297 12-Dec-10 05-Oct-11

    PRPIP2690 ISSUE MR 21 12-Dec-10 02-Jan-11

    PRPIP2700 ISSUE ENQUIRY 3 02-Jan-11 05-Jan-11

    PRPIP2660 RECIEVE BIDS 21 05-Jan-11 26-Jan-11

    PRPIP2670 ISSUE TBA 14 26-Jan-11 09-Feb-11

    PRPIP2680 PLACE LOI 14 09-Feb-11 23-Feb-11

    -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

    Month

    MATIX FERTILIZER & CHEMICAL LIMITED

    Schedule bar

    Critical

    Milestone

    Summary EPC ScheduleDate- 31-Dec-10 Time - 16:10 Page 32 of 45

    MATIX FERTILIZER & CHEMICAL LIMITED

  • 8/8/2019 Urea EPC Schedule

    33/45

    Activity ID Activity Name riginal

    uration

    Start Finish

    PRPIP2760 ISSUE PR 14 23-Feb-11 09-Mar-11

    PRPIP2770 ISSUE PO 14 23-Feb-11 09-Mar-11

    PRPIP2780 MANUFACTURING 181 09-Mar-11 06-Sep-11

    PRPIP2790 DESPATCH 91 07-Jun-11 06-Sep-11

    PRPIP2800 RECIEPT AT SITE 91 06-Jul-11 05-Oct-11

    VALVESVALVES 315 11-Dec-10 22-Oct-11

    PRPIP3260 ISSUE MR 14 11-Dec-10 25-Dec-10

    PRPIP3270 ISSUE ENQUIRY 3 25-Dec-10 28-Dec-10

    PRPIP3280 RECIEVE BIDS 21 28-Dec-10 18-Jan-11

    PRPIP3290 ISSUE TBA 21 18-Jan-11 08-Feb-11

    PRPIP3300 PLACE LOI 14 08-Feb-11 22-Feb-11

    PRPIP3305 ISSUE PR 14 22-Feb-11 08-Mar-11

    PRPIP3307 ISSUE PO 14 22-Feb-11 08-Mar-11

    PRPIP3370 DESPATCH 51 05-Aug-11 25-Sep-11

    PRPIP3360 MANUFACTURING 210 08-Mar-11 04-Oct-11

    PRPIP3380 RECIEPT AT SITE 50 02-Sep-11 22-Oct-11

    FLANGESFLANGES297 04-Dec-10 27-Sep-11

    PRPIP3005 ISSUE MR 21 04-Dec-10 25-Dec-10

    PRPIP3010 ISSUE ENQUIRY 3 25-Dec-10 28-Dec-10

    PRPIP3015 RECIEVE BIDS 21 28-Dec-10 18-Jan-11

    PRPIP3020 ISSUE TBA 14 18-Jan-11 01-Feb-11

    PRPIP3030 PLACE LOI 14 01-Feb-11 15-Feb-11

    PRPIP3040 ISSUE PR 14 15-Feb-11 01-Mar-11

    PRPIP3050 ISSUE PO 14 15-Feb-11 01-Mar-11

    PRPIP3120 DESPATCH 91 30-May-11 29-Aug-11

    PRPIP3110 MANUFACTURING 181 01-Mar-11 29-Aug-11

    PRPIP3130 RECIEPT AT SITE 91 28-Jun-11 27-Sep-11

    2ND MTO2ND MTO 260 16-Mar-11 01-Dec-11

    PIPESPIPES 234 16-Mar-11 05-Nov-11

    PRPIP5720 ISSUE MR 14 16-Mar-11 30-Mar-11

    PRPIP5730 ISSUE ENQUIRY 3 30-Mar-11 02-Apr-11

    PRPIP5740 RECIEVE BIDS 21 02-Apr-11 23-Apr-11

    PRPIP5750 ISSUE TBA 14 23-Apr-11 07-May-11

    PRPIP5760 PLACE LOI 14 07-May-11 21-May-11

    PRPIP5770 ISSUE PR 14 21-May-11 04-Jun-11

    PRPIP5772 ISSUE PO 14 21-May-11 04-Jun-11

    PRPIP5776 DESPATCH 35 17-Sep-11 22-Oct-11

    PRPIP5774 MANUFACTURING 140 04-Jun-11 22-Oct-11

    PRPIP5778 RECIEPT AT SITE 35 01-Oct-11 05-Nov-11

    FITTINGSFITTINGS 234 16-Mar-11 05-Nov-11

    PRPIP3920 ISSUE MR 14 16-Mar-11 30-Mar-11

    PRPIP3930 ISSUE ENQUIRY 3 30-Mar-11 02-Apr-11

    PRPIP3940 RECIEVE BIDS 21 02-Apr-11 23-Apr-11

    PRPIP3950 ISSUE TBA 14 23-Apr-11 07-May-11

    PRPIP3960 PLACE LOI 14 07-May-11 21-May-11

    PRPIP3970 ISSUE PR 14 21-May-11 04-Jun-11

    PRPIP3980 ISSUE PO 14 21-May-11 04-Jun-11

    PRPIP3990 MANUFACTURING 140 04-Jun-11 22-Oct-11

    PRPIP4000 DESPATCH 35 17-Sep-11 22-Oct-11

    PRPIP4002 RECIEPT AT SITE 35 01-Oct-11 05-Nov-11

    FLANGESFLANGES 234 16-Mar-11 05-Nov-11

    PRPIP5960 ISSUE MR 14 16-Mar-11 30-Mar-11

    -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

    Month

    MATIX FERTILIZER & CHEMICAL LIMITED

    Schedule bar

    Critical

    Milestone

    Summary EPC ScheduleDate- 31-Dec-10 Time - 16:10 Page 33 of 45

    MATIX FERTILIZER & CHEMICAL LIMITED

  • 8/8/2019 Urea EPC Schedule

    34/45

    Activity ID Activity Name riginal

    uration

    Start Finish

    PRPIP5970 ISSUE ENQUIRY 3 30-Mar-11 02-Apr-11

    PRPIP5980 RECIEVE BIDS 21 02-Apr-11 23-Apr-11

    PRPIP5990 ISSUE TBA 14 23-Apr-11 07-May-11

    PRPIP5992 PLACE LOI 14 07-May-11 21-May-11

    PRPIP5994 ISSUE PR 14 21-May-11 04-Jun-11PRPIP5996 ISSUE PO 14 21-May-11 04-Jun-11

    PRPIP5998 MANUFACTURING 140 04-Jun-11 22-Oct-11

    PRPIP6002 DESPATCH 35 17-Sep-11 22-Oct-11

    PRPIP6004 RECIEPT AT SITE 35 01-Oct-11 05-Nov-11

    VALVESVALVES 248 28-Mar-11 01-Dec-11

    PRPIP5464 ISSUE MR 14 28-Mar-11 11-Apr-11

    PRPIP5466 ISSUE ENQUIRY 3 11-Apr-11 14-Apr-11

    PRPIP5468 RECIEVE BIDS 21 14-Apr-11 05-May-11

    PRPIP5470 ISSUE TBA 14 05-May-11 19-May-11

    PRPIP5480 PLACE LOI 14 19-May-11 02-Jun-11

    PRPIP5490 ISSUE PR 14 02-Jun-11 16-Jun-11

    PRPIP5500 ISSUE PO 14 02-Jun-11 16-Jun-11

    PRPIP5510 MANUFACTURING 140 16-Jun-11 03-Nov-11

    PRPIP5520 DESPATCH 35 29-Sep-11 03-Nov-11

    PRPIP5530 RECIEPT AT SITE 35 27-Oct-11 01-Dec-11

    GASKETSGASKETS 234 23-Mar-11 12-Nov-11

    PRPIP4510 ISSUE MR 14 23-Mar-11 06-Apr-11

    PRPIP4520 ISSUE ENQUIRY 3 06-Apr-11 09-Apr-11

    PRPIP4530 RECIEVE BIDS 21 09-Apr-11 30-Apr-11

    PRPIP4540 ISSUE TBA 14 30-Apr-11 14-May-11

    PRPIP4550 PLACE LOI 14 14-May-11 28-May-11

    PRPIP4560 ISSUE PR 14 28-May-11 11-Jun-11

    PRPIP4570 ISSUE PO 14 28-May-11 11-Jun-11

    PRPIP4580 MANUFACTURING 140 11-Jun-11 29-Oct-11

    PRPIP4590 DESPATCH 35 24-Sep-11 29-Oct-11

    PRPIP4600 RECIEPT AT SITE 35 08-Oct-11 12-Nov-11

    STUD / BOLSTUD / BOLTS 234 23-Mar-11 12-Nov-11

    PRPIP4340 ISSUE MR 14 23-Mar-11 06-Apr-11

    PRPIP4350 ISSUE ENQUIRY 3 06-Apr-11 09-Apr-11

    PRPIP4360 RECIEVE BIDS 21 09-Apr-11 30-Apr-11

    PRPIP4370 ISSUE TBA 14 30-Apr-11 14-May-11

    PRPIP4380 PLACE LOI 14 14-May-11 28-May-11

    PRPIP4390 ISSUE PR 14 28-May-11 11-Jun-11

    PRPIP4400 ISSUE PO 14 28-May-11 11-Jun-11

    PRPIP4402 MANUFACTURING 140 11-Jun-11 29-Oct-11

    PRPIP4404 DESPATCH 35 24-Sep-11 29-Oct-11

    PRPIP4406 RECIEPT AT SITE 35 08-Oct-11 12-Nov-11

    SPRING SUSPRING SUPPORTS 234 23-Mar-11 12-Nov-11

    PRPIP4792 ISSUE MR 14 23-Mar-11 06-Apr-11

    PRPIP4794 ISSUE ENQUIRY 3 06-Apr-11 09-Apr-11

    PRPIP4796 RECIEVE BIDS 21 09-Apr-11 30-Apr-11

    PRPIP4798 ISSUE TBA 14 30-Apr-11 14-May-11

    PRPIP4800 PLACE LOI 14 14-May-11 28-May-11

    PRPIP4860 ISSUE PR 14 28-May-11 11-Jun-11

    PRPIP4870 ISSUE PO 14 28-May-11 11-Jun-11

    PRPIP5160 MANUFACTURING 140 11-Jun-11 29-Oct-11

    PRPIP5170 DESPATCH 35 24-Sep-11 29-Oct-11

    -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

    Month

    MATIX FERTILIZER & CHEMICAL LIMITED

    Schedule bar

    Critical

    Milestone

    Summary

    EPC Schedule

    Date- 31-Dec-10 Time - 16:10 Page 34 of 45

    MATIX FERTILIZER & CHEMICAL LIMITED

  • 8/8/2019 Urea EPC Schedule

    35/45

    Activity ID Activity Name riginal

    uration

    Start Finish

    PRPIP5180 RECIEPT AT SITE 35 08-Oct-11 12-Nov-11

    STRAINERSSTRAINERS 234 23-Mar-11 12-Nov-11

    PRPIP9100 ISSUE MR 14 23-Mar-11 06-Apr-11

    PRPIP9110 ISSUE ENQUIRY 3 06-Apr-11 09-Apr-11

    PRPIP9120 RECIEVE BIDS 21 09-Apr-11 30-Apr-11PRPIP9130 ISSUE TBA 14 30-Apr-11 14-May-11

    PRPIP9140 PLACE LOI 14 14-May-11 28-May-11

    PRPIP9150 ISSUE PR 14 28-May-11 11-Jun-11

    PRPIP9160 ISSUE PO 14 28-May-11 11-Jun-11

    PRPIP9170 MANUFACTURING 140 11-Jun-11 29-Oct-11

    PRPIP9180 DESPATCH 35 24-Sep-11 29-Oct-11

    PRPIP9190 RECIEPT AT SITE 35 08-Oct-11 12-Nov-11

    STEAM TRASTEAM TRAPS 234 23-Mar-11 12-Nov-11

    PRPIP5300 ISSUE MR 14 23-Mar-11 06-Apr-11

    PRPIP5310 ISSUE ENQUIRY 3 06-Apr-11 09-Apr-11

    PRPIP5320 RECIEVE BIDS 21 09-Apr-11 30-Apr-11

    PRPIP5330 ISSUE TBA 14 30-Apr-11 14-May-11

    PRPIP5340 PLACE LOI 14 14-May-11 28-May-11

    PRPIP5350 ISSUE PR 14 28-May-11 11-Jun-11

    PRPIP5360 ISSUE PO 14 28-May-11 11-Jun-11

    PRPIP5372 DESPATCH 35 24-Sep-11 29-Oct-11

    PRPIP5370 MANUFACTURING 140 11-Jun-11 29-Oct-11

    PRPIP5375 RECIEPT AT SITE 35 08-Oct-11 12-Nov-11

    SILENCERSILENCER 234 23-Mar-11 12-Nov-11

    PRPIP4594 ISSUE MR 14 23-Mar-11 06-Apr-11

    PRPIP4596 ISSUE ENQUIRY 3 06-Apr-11 09-Apr-11

    PRPIP4598 RECIEVE BIDS 21 09-Apr-11 30-Apr-11

    PRPIP4603 ISSUE TBA 14 30-Apr-11 14-May-11

    PRPIP4605 PLACE LOI 14 14-May-11 28-May-11

    PRPIP4615 ISSUE PR 14 28-May-11 11-Jun-11

    PRPIP4625 ISSUE PO 14 28-May-11 11-Jun-11

    PRPIP4635 MANUFACTURING 140 11-Jun-11 29-Oct-11

    PRPIP4645 DESPATCH 35 24-Sep-11 29-Oct-11

    PRPIP4655 RECIEPT AT SITE 35 08-Oct-11 12-Nov-11

    FINAL MTOFINAL MTO 180 23-Jul-11 19-Jan-12

    PIPESPIPES 162 23-Jul-11 01-Jan-12

    PRPIP6020 ISSUE PR 21 23-Jul-11 13-Aug-11

    PRPIP6030 ISSUE PO 21 13-Aug-11 03-Sep-11

    PRPIP6040 MANUFACTURING 105 03-Sep-11 17-Dec-11

    PRPIP6042 DESPATCH 35 13-Nov-11 18-Dec-11

    PRPIP6045 RECIEPT AT SITE 35 27-Nov-11 01-Jan-12

    FITTINGSFITTINGS 162 23-Jul-11 01-Jan-12

    PRPIP4765 ISSUE PR 21 23-Jul-11 13-Aug-11

    PRPIP5780 ISSUE PO 21 13-Aug-11 03-Sep-11

    PRPIP5790 MANUFACTURING 105 03-Sep-11 17-Dec-11

    PRPIP5800 DESPATCH 35 13-Nov-11 18-Dec-11

    PRPIP5810 RECIEPT AT SITE 35 27-Nov-11 01-Jan-12

    FLANGESFLANGES 162 23-Jul-11 01-Jan-12

    PRPIP5230 ISSUE PR 21 23-Jul-11 13-Aug-11

    PRPIP5240 ISSUE PO 21 13-Aug-11 03-Sep-11

    PRPIP5250 MANUFACTURING 105 03-Sep-11 17-Dec-11

    PRPIP5260 DESPATCH 35 13-Nov-11 18-Dec-11

    -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

    Month

    MATIX FERTILIZER & CHEMICAL LIMITED

    Schedule bar

    Critical

    Milestone

    Summary

    EPC Schedule

    Date- 31-Dec-10 Time - 16:10 Page 35 of 45

    MATIX FERTILIZER & CHEMICAL LIMITED

  • 8/8/2019 Urea EPC Schedule

    36/45

    Activity ID Activity Name riginal

    uration

    Start Finish

    PRPIP5270 RECIEPT AT SITE 35 27-Nov-11 01-Jan-12

    VALVESVALVES 162 27-Jul-11 05-Jan-12

    PRPIP5430 ISSUE PR 21 27-Jul-11 17-Aug-11

    PRPIP5440 ISSUE PO 21 17-Aug-11 07-Sep-11

    PRPIP5450 MANUFACTURING 105 07-Sep-11 21-Dec-11PRPIP5460 DESPATCH 35 17-Nov-11 22-Dec-11

    PRPIP5465 RECIEPT AT SITE 35 01-Dec-11 05-Jan-12

    GASKETSGASKETS 162 27-Jul-11 05-Jan-12

    PRPIP5630 ISSUE PR 21 27-Jul-11 17-Aug-11

    PRPIP5640 ISSUE PO 21 17-Aug-11 07-Sep-11

    PRPIP5650 MANUFACTURING 105 07-Sep-11 21-Dec-11

    PRPIP5660 DESPATCH 35 17-Nov-11 22-Dec-11

    PRPIP5665 RECIEPT AT SITE 35 01-Dec-11 05-Jan-12

    STUD / BOLSTUD / BOLTS 162 27-Jul-11 05-Jan-12

    PRPIP5890 ISSUE PR 21 27-Jul-11 17-Aug-11

    PRPIP5900 ISSUE PO 21 17-Aug-11 07-Sep-11

    PRPIP5910 MANUFACTURING 105 07-Sep-11 21-Dec-11PRPIP5915 DESPATCH 35 17-Nov-11 22-Dec-11

    PRPIP5917 RECIEPT AT SITE 35 01-Dec-11 05-Jan-12

    STRAINERSSTRAINERS 162 10-Aug-11 19-Jan-12

    PRPIP5570 ISSUE PR 21 10-Aug-11 31-Aug-11

    PRPIP5580 ISSUE PO 21 31-Aug-11 21-Sep-11

    PRPIP5590 MANUFACTURING 105 21-Sep-11 04-Jan-12

    PRPIP5600 DESPATCH 35 01-Dec-11 05-Jan-12

    PRPIP5610 RECIEPT AT SITE 35 15-Dec-11 19-Jan-12

    STEAM TRASTEAM TRAPS 162 10-Aug-11 19-Jan-12

    PRPIP5820 ISSUE PR 21 10-Aug-11 31-Aug-11

    PRPIP5830 ISSUE PO 21 31-Aug-11 21-Sep-11

    PRPIP5840 MANUFACTURING 105 21-Sep-11 04-Jan-12

    PRPIP5850 DESPATCH 35 01-Dec-11 05-Jan-12

    PRPIP5860 RECIEPT AT SITE 35 15-Dec-11 19-Jan-12

    SILENCERSILENCER 162 10-Aug-11 19-Jan-12

    PRPIP5666 ISSUE PR 21 10-Aug-11 31-Aug-11

    PRPIP5670 ISSUE PO 21 31-Aug-11 21-Sep-11

    PRPIP5680 MANUFACTURING 105 21-Sep-11 04-Jan-12

    PRPIP5690 DESPATCH 35 01-Dec-11 05-Jan-12

    PRPIP5700 RECIEPT AT SITE 35 15-Dec-11 19-Jan-12

    ELECTRICALELECTRICAL 403 26-Nov-10 03-Jan-12

    SWITCHGEARSWITCHGEAR 350 26-Nov-10 11-Nov-11

    PRELE16830 ISSUE MR 21 26-Nov-10 17-Dec-10

    PRELE16840 ISSUE ENQUIRY 3 17-Dec-10 20-Dec-10

    PRELE16850 RECIEVE BIDS 30 20-Dec-10 19-Jan-11

    PRELE16860 ISSUE TBA 21 19-Jan-11 09-Feb-11

    PRELE16870 PLACE LOI 14 09-Feb-11 23-Feb-11

    PRELE16880 ISSUE PR 14 23-Feb-11 09-Mar-11

    PRELE16890 ISSUE PO 14 23-Feb-11 09-Mar-11

    PR ELE16900 VENDOR DRAWING PREPAR ATION 119 10-Mar-11 07-Jul-11

    PRELE16895 VENDOR DRAWING CHECKING/ REVIEW 63 06 -May -11 08 -Ju l-11

    PRELE16905 MANUFACTURING ( DUR = 7 M) 210 11-Mar-11 07-Oct-11

    PRELE16907 FINAL INSPECTION/ DESPATCH 7 07-Oct-11 14-Oct-11

    PRELE16915 RECIEPT AT SITE 28 14-Oct-11 11-Nov-11

    -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

    Month

    Schedule bar

    Critical

    Milestone

    Summary

    EPC Schedule

    Date- 31-Dec-10 Time - 16:10 Page 36 of 45

  • 8/8/2019 Urea EPC Schedule

    37/45

  • 8/8/2019 Urea EPC Schedule

    38/45

  • 8/8/2019 Urea EPC Schedule

    39/45

  • 8/8/2019 Urea EPC Schedule

    40/45

  • 8/8/2019 Urea EPC Schedule

    41/45

  • 8/8/2019 Urea EPC Schedule

    42/45

  • 8/8/2019 Urea EPC Schedule

    43/45

  • 8/8/2019 Urea EPC Schedule

    44/45

    Activity ID Activity Name riginal Start Finish

    Month

    MATIX FERTILIZER & CHEMICAL LIMITED

  • 8/8/2019 Urea EPC Schedule

    45/45

    urationCM1640 COMMISSIONING 30 03-Mar-12 01-Apr-12*

    COMPRESSCOMPRESSOR SECTION 75 19-Mar-12 01-Jun-12

    CM1650 COMMISSIONING 75 19-Mar-12 01-Jun-12*

    HP PUMPSHP PUMPS 45 18-Apr-12 01-Jun-12

    CM1660 COMMISSIONING 45 18-Apr-12 01-Jun-12*DRAINAGEDRAINAGE SYSTEM 30 04-Mar-12 02-Apr-12

    CM1670 COMMISSIONING 30 04-Mar-12 02-Apr-12*

    FIRE FIGHTIFIRE FIGHTING SYSTEM 15 27-Feb-12 12-Mar-12

    CM1630 COMMISSIONING 15 27-Feb-12 12-Mar-12*

    OSBLOSBL 773 16-Dec-09 31-Jan-12

    -4 -3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

    Schedule bar

    Critical

    Milestone

    Summary

    EPC Schedule

    Date- 31-Dec-10 Time - 16:10 Page 45 of 45