    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 1

    CHAPTER TWO

    UNDERSTANDING URBAN STORMWATER AND

    WASTEWATER LOADING CHARACTERISTICS

    This chapter describes the basic concepts and techniques used in the quantification of thestormwater and wastewater loads in an urban area. It is expected that, at the end of the

    lectures, you will be able to estimate the current or likely future value of the most

    critical quantity of stormwater and wastewater that will flow at different locations

    on an existing or proposed drainage system in an urban area.

    Thus, in this chapter, the three main aspects presented are:

    Definition of Points of Interest for Quantification of Flow and

    Conceptualization of Drainage Basins and Sub-Basins

    Definition of Critical Storm Characteristics at Each Point of Interest (for

    stormwater drainage) Techniques for Estimation of Peak Discharge at Each Point of Interest

    2.1 Points of Interest for Quantification of Flow, Drainage

    Basins and Sub-Basins

    Analysis and re-design of a drainage system in an urban area requires, first and foremost,

    the identification and preparation of the plan/layout of the existing network. Theplan/layout of the network should indicate among other things, the locations of the inlets,

    pipes, channels, structures, outlets appurtenances etc. as well as the dimensions

    /characteristics of each of the components such as:pipe sizes and lengths, manholeelevations and locations, and pump sizes.

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    2/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 2

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    3/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 3

    Figure 2.1- Examples of existing or proposed drainage systems

    Figure 2.1B Drainage Basin and Layout for StormwaterDepending on the purpose of a study, basins can vary in size; this is a small,approximately 10 acre hypothetical urban drainage basin

    Another important requirement is the identification of nodes and segments on the

    network. In an existing network, nodes are the inlets or open ditches. In a proposed

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    4/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 4

    network, node points can be assigned to the principal road intersections where cross flow

    cannot be allowed, to sag points, to points where the direction of flow changes

    significantly and locations where flow will enter from major sub-divisions or from

    commercial/ industrial estates. The nodes are linked by flow paths using existing or

    planned conduits (pipes or open channels), down-slope roadways, swales, and overlandflow paths. All of these flow paths are collectively termed 'links'. Thus the network

    structure consists ofnodes and links. A segment or run consists of a node and a link

    that may be a pipe length, a roadside or median ditch or an engineered waterway.Following the identification of the flow paths and the drainage network nodes and links

    and runs, the drainage basin(s) and each basin should be discretised into sub-basins.

    There are two main types of drainage basins: stormwater and wastewater drainagebasins.

    A stormwater drainage basin is an area draining to a discharge point. It is an area of land

    from which all water drains, running downhill, to a shared destination - a river, pond,stream, lake, or estuary. An urban drainage basin can range in size from under a square

    kilometer to hundreds of square kilometers. Any rain that falls within the area willeventually drain to the discharge point.

    A drainage basin is the area drained by a stream and all of its tributaries. Any rainthat falls within the watershed will pass through the main stream channel.

    A divide separates each basin

    from the surrounding drainagebasins. Divides follow ridgesand hill tops. If a raindrop fallson one side of a divide, it willflow down one side of the hill,and into one drainage basin. Ifthe raindrop falls on the otherside of a divide, it will flow intoa different drainage.

    Watersheds are composed of many smallerdrainage basins. In the diagram, a sub-basinhas been drawn for every tributary.

    Figure 2.2

    Stormwater drainage basin boundaries can be identified from contour maps assuming

    that water will flow at right angles to the contours. In addition, location of discharge

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    5/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 5

    points (outfalls), can be located along with their capacity and downstream constraints

    can be identified together with the natural drainage paths through the area. The

    influences of ditches and roads must be taken into account as well as other features that

    could divert runoff from the natural runoff channels shown by the contours. The

    drainage basin area is usually expressed in units of hectares (ha) or square kilometers(km2). Since water flows downhill, delineating a drainage area is a matter of identifyingan outfall and locating the drainage area boundary such that any rain that falls within the

    boundary will be directed toward that point of discharge. By using a planimeter and/or

    other methods, the area and slope etc. can be measured. An example is shown in Figure

    2.3.

    .

    Runoff Travel Path and Features of a Natural Drainage Area

    Figure 2.3

    Similarly, a sewage drainage area is the territory being considered within which it is

    possible to find a continuously downhill surface route from any point to the establishedoutlet/treatment plant. Sewage drainage areas should also include areas that are tributary

    by gravity that will be served by future sewer construction and areas that are not

    tributary by gravity that could be served by pumping or adverse grade construction. It

    should be noted that natural drainage boundaries do not necessarily coincide withpolitical boundaries.

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    6/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 6

    After identifying drainage basin boundaries, drainage sub-basins can be defined. Adrainage sub-basin is a defined area within which all the stormwater or wastewater flows

    to the node. An example for stormwater is illustrated in Figure 2.4. It is usually desirable

    for sub-catchments to be chosen so that they have homogeneous physical characteristics

    and/or land-use characteristics.

    Figure 2.4 Example Link and Sub-Area (Node) Numbering System for Hydrologic Model

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    7/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 7

    Figure 2.4

    After preparing a base plan of the existing or proposed drain system, each node or

    structure can be given a number in the form U.V where U, the integral part of the

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    8/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 8

    number, denotes the branch to which the length belongs and V, the fractional part of

    the number, denotes the position of the structure within the branch. The integral part of

    the number is called the branch number.

    The main line is identified alphabetically, for example as line A and the structurefurthest downstream is assigned structure A1. It is useful for ease of reference if the

    designation of the main line has a physical significance, such as the abbreviation of a

    suburb, administrative area, watercourse name, or road name. Thus the main channel in

    administrative area XY could be numbered XY-A, and so on.

    Working upstream, number the remaining structures on the main line A2, A3, A4, etc.Branch lines are identified as B, C etc. and their nodes are numbered as line B (B1, B2,

    B3, . . . ), line C (C1, C2, C3, . ..) etc. This system allows for future upstreamextensions or additions. If new structures are inserted, for example between nodes B.9

    and B.10, they are numbered B.9A, B.9B etc. See Figure 2.5.

    Figure 2.5 Example Detailed Numbering System for Open Drains and Pipes

    In addition to defining the sub-basins, information such as (a) the land-use characteristics (in terms of gross area, population, household size, zoning designation, the total per cent that

    is impervious (TIA), per cent directly connected impervious area (DCIA), etc. (b) soil

    characteristics and (d) shape and orientation characteristics are needed for each sub-area.

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    9/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 9

    2.2 Design Storm

    2.2.1 Background

    A rainfall or storm event is defined in terms of the following

    -depth (mm) or volume (mm3) of rainfall in a specified time

    -duration of the storm (min or hr.)- intensity (rate of rainfall) (mm/hr) [i.e. depth divided by the duration of the storm over a

    time interval] and

    -frequency of the storm event. Frequency is expressed in terms of the return period, T, orthe recurrence interval (years) of the event. The recurrence interval is the average length of

    time expected to elapse between the occurrences of events of equal or greater magnitude. It

    is also related to the storm events exceedance probability, P, which is the probability thatthe storm will be equaled or exceeded in any given year. That is:

    T=1/P(2.1)

    Furthermore, every rainfall event is unique. Temporal and spatial distribution of rainfall

    varies seasonally as well as within a storm event due to the prevailing climatic

    conditions at the time of the storm. Just as every rainfall event is unique, the resultingrunoff from a storm event is also unique. Surface conditions such as the amount of

    vegetation, land use, type of soil, soil condition, topography, and other factors affect

    runoff volume and distribution. Finally, the condition of conveyance elements such asblockage by sediment or obstruction by trees and vegetation also has an effect on runoff

    spatial and temporal distribution. While the effects of the temporal and spatial

    distribution of runoff are in general relatively small, however, these effects must be

    considered in designing large components such as detention basins or delineatingfloodplains. Furthermore, the variables relating to time and space, rainfall variation,

    abstractions, surface conditions, and numerous others that affect runoff are considered

    continuous-that is, quantitatively they can assume any real value. Because the

    combinations of values of all such variables are infinite, an exact repeat occurrence of an

    event, although not impossible, is very unlikely.

    The infinite number of possible rainfall and runoff events presents an improbable task of

    ever obtaining all of the unique data potentially available in the hope of predicting

    hydrologic events precisely and accurately. Thus, rainfall events are predicted by statingthe "Annual Exceedance Probability"AEP or the ARI, Average recurrence interval

    also referred to as the return period. The AEP is the probability that an event ofspecified magnitude, or volume and duration, will be exceeded in a time period. It is theaverage length of time between events that have the same magnitude, or volume and

    duration. Specifically, the ARI is given by:

    PARI

    100= ..(2.2 )

    wherePis the AEP in percent. Hence, a 1% AEP has an ARI of 100 years.The concept of AEP and ARI is frequently misinterpreted in two ways. First, the ARI of

    100 years does not imply that 50 m3/s will occur only once in 100 years. Thinking that if

    a particular event occurs today then it will not occur for the next Tryears is not the

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    10/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 10

    proper interpretation of the ARI. This misconception is a deterministic perspective, and

    if hydrology were so predictable, many of the world's water resource problems could be

    easily solved. The ARI represents the statistical average number of years between

    similar events given a very long period of record. The second common misuse is the

    failure to recognise the AEP concept. This 50 m3/s discharge has a 1 in 100 chance ofbeing exceeded in any given year. Not that the exact value of 50 m

    3/s has a 1%

    probability of occurrence. Technically, the probability of exactly 50 m3/s occurring is

    zero.Occasionally it is necessary to determine the probability of a specific event being

    exceeded within a specific time. The probabilityPof an event having a given ARI, x

    occurring at least once inNsuccessive years is given as;

    N

    xP }

    11{1 = (2.3)

    A distinction exists between the probability of an event occurring at least once and

    exactly once in a given time period. Another form of the risk equation determines the

    probability of an event occurring a precise number of times in a given period. In this

    equation;

    )!(

    }1

    1{}1

    {! 1

    INI

    xxN

    P

    NN

    =

    (2.4)

    Here,Iis the exact number of times the event with the ARI of x occurs inNsuccessive

    years. These concepts are also used in the definition ofmajor and minor design storms,the frequency of which is expressed in terms of ARI.

    2.2.2 Design Storm Event Characteristics at Each Point of Interest

    Design storm is the rainfall pattern that is considered the most critical for the drainage

    system in the area. Specification of the design storm involves definition of the designreturn period, total depth, duration of the storm and the temporal distribution or storm

    hyetograph at the location. A hyetograph shows how the total depth (or intensity) of

    rainfall in a storm is distributed among time increments within the storm while thetemporal distribution of rainfall over the duration of the storm is also described in terms

    of a mass rainfall (or cumulative distribution) curve.

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    11/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 11

    Rainfall for various storm frequencies vs. rainfall duration.

    Similar to this is a hydrograph- a graphical plot of flow versus time for a specific

    location. Two types of design storm are recognised: synthetic and actual (historic)

    storms. Synthesis and generalisation of a large number of actual storms is used to derivethe former. The latter are events which have occurred in the past, and which may have

    well documented impacts on the drainage system. However, it is the usual practice in

    urban stormwater drainage to use synthetic design storms. A synthetic rainfall

    distribution is obtained by distributing a selected/known total rainfall depth/volume overa selected duration of the storm based on a defined mathematical distribution.

    The most popular way to obtain the design storm characteristics is to obtain and use

    what is known as the Intensity-Duration-Frequency (IDF) curves or equations. A typicalIDF relationship is illustrated in Figure 2.6 below.

    Figure 2.6

    Alternatively, IDF relationships are given as:

    n

    m

    p

    Db

    RaI

    )(

    )(

    += ..2.5

    where I = intensity of rainfall (mm/hr)

    Rp = frequency or return period of the rainfall (year)

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    12/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 12

    D = duration of the rainfall (min or hr)

    a, b, m and n are coefficients.

    Examples are:

    796.0

    185.0

    )189.0(

    )45.0(6.40

    +

    =D

    RI p ..(2.6)

    Where

    D = duration in hr

    and

    4.36t

    T5693i

    178.0

    += .(2.7)

    where i = rainfall intensity (mm/hr)

    T = return period (year)

    t = rainfall duration (min)

    Equations 2.6 and 2.7 imply that the estimation of the design value of intensity at alocation requires the knowledge of design frequency or return period and the designstorm duration. Very often, a design storm event frequency is specified in terms of its

    "Annual Exceedance Probability" (AEP), e.g. the 5% storm event i.e. there is a 5%

    chance of such a storm occurring in any year or on average five such storms would be

    expected to occur in a period of 100 years, i.e. the average recurrence interval of a storm

    of this severity is 20 years.. Typical recommendations are shown in Table 2.1 below.

    Table 2.1 a -Design Average Recurrence Intervals

    Effect of surcharge (Overflow) and overland flow ARI (years)

    Small impact, in low density area 1

    Normal impacts 2

    Ponding in flat topography; or flooding of parkinglots to depths greater than 150 mm

    10

    Impeded access to commercial and industrial building 10

    Ponding against adjoining buildings; or impededaccess to institutional or important buildings (e,g,

    hospitals, city halls, school entrances)

    20

    Table 2.1b- Design Storm Return Periods

    Land Use or Zoning Design Storm Return Period

    Initial Storm Major Storm

    Residential 2-year 100-year

    Business 5-year 100-year

    Public Building Areas 5-year 100-year

    Parks, Greenbelts, etc. 2-year 100-year

    Open Channels andDrainageways

    - 100-year

    Detention Facilities - 100-year

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    13/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 13

    In general, the design average recurrence interval (ARI) can be obtained by using the

    following equation:

    )]1ln([ AEP

    DLARI

    = .(2.8)

    Where DL = expected or selected design life of the system (yr)

    AEP = acceptable probability of exceedance (fraction)

    2.2.2A Design Storm Duration

    Design storm duration is an important parameter that defines the rainfall depth or

    intensity for a given frequency, and therefore affects the resulting runoff peak andvolume. It is assumed that peak stormwater flow at a given location will usually result

    when the entire drainage area is contributing flow from rainfall on the area. The current

    practice is to select the design storm duration as equal to the time of concentration forthe catchment [or some minimum value (usually 5 min) when the time of concentration

    is short].

    The time of concentration is the flow travel time from the most hydraulically remote

    point in the contributing area to the point of interest.

    Depending on the particular location, the calculation of Tc will include one or a numberof components as shown in Table 2.2.

    Table 2.2 Flow Time Components

    Flow Type Components

    Overland or 'sheet'

    flow

    natural surfaces

    landscaped surfaces

    impervious surfaces

    Roof to main pipe

    system

    residential roofs

    commercial/industrial

    roofs

    Open channel open drains

    kerbs and gutters

    roadside table drains

    engineered waterways

    natural channels

    Underground pipe downpipe to street gutter

    pipe flow within lots

    including roof drainage,

    car parks, etc

    street drainage pipe flow

    Thus, pchgodirect

    c ttttiT +++=)( (2.9)

    Where

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    14/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 14

    Tcdirect= flow travel time from the hydraulically most remote point on a sub-catchment to

    point of interest i on the same sub-catchment.

    to, tg, and tch , tp are the tc components attributed to overland flow, kerb gutter flow, open

    channel flow and pipe flow respectively.

    Overland Flow Time

    Overland flow can occur on either grassed or paved surfaces. The major factorsaffecting time of concentration for overland flow are the maximum flow distance,

    surface slope, surface roughness, rainfall intensity, and infiltration rate. Overland flow

    over unpaved surfaces initially occurs as sheet flow for a short time and distance afterwhich it begins to form a runnel or rill and travels thereafter in a natural channel form. In

    urban areas, the length of overland flow will typically be less than 50 metres after which

    the flow will become concentrated against fences, paths or structures or intercepted by

    open drains. The formula shown below, known as Friends formula, should be used to

    estimate overland sheet flow times. The formula was derived from previous work in theform of a nomograph (Figure 1.7) for shallow sheet flow over a plane surface.

    ..(2.10)

    where,

    to = overland sheet flow travel time (minutes)

    L = overland sheet flow path length (m)

    n = Horton's roughness value for the surface

    S = slope of surface (%)

    Note : Values for Horton's 'n ' are similar to those for Manning's 'n ' for similar surfaces.

    Values are given in Table 2.3. Some texts recommend an alternative equation, theKinematic Wave Equation. However this theoretical equation is only valid for uniform

    planar homogeneous flow. It is not recommended for practical application.

    Table 2.3 Values of Mannings 'n' for Overland Flow

    Surface Type Mannings

    n

    Range

    Concrete/Asphalt** 0.011 0.01-0.013

    Bare Sand** 0.01 0.01-0.06

    Bare Clay-Loam(eroded)**

    0.02 0.012-0.033

    Gravelled Surface** 0.02 0.012-0.03

    Packed Clay** 0.03

    Short Grass** 0.15 0.10-0.20

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    15/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 15

    Light Turf* 0.20

    Lawns* 0.25 0.20-0.30

    Dense Turf* 0.35

    Pasture* 0.35 0.30-0.40

    Dense Shrubbery and

    Forest Litter*

    0.40

    Figure 2.7. Nomograph for Estimating Overland Sheet Flow Times

    Where the characteristics of segments of a sub-catchment are different in terms of landcover or surface slope, the sub-catchment should be divided into these segments, and the

    calculated travel times for each combined. However, it is incorrect to simply add thevalues oft0for each segment as Equation 2.10 is based on the assumption that segments

    are independent of each other, i.e. flow does not enter a segment from upstream.

    The following method for estimating the total overland flow travel time for segments in

    series is recommended. For two segments, termed a and b (Figure 2.8):

    aba LbLLbLaatotaltttT ,)(,, += + (2.11)

    where,La = length of flow for Segment a

    Lb = length of flow for Segment b

    ta,(La) = time of flow calculated for Segment a over length L atb ,(...) =time for Segment b over the lengths indicated

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    16/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 16

    Figure 2.8. Overland Flow over Multiple Segments

    For each additional segment, the following value should be added:

    )(,, atotaltotal LLaLatt

    ..(2.12)

    where,

    a = segment name

    L total = total length of flow, including the current segment a

    La = length of flow for current segment a

    ta(...) = time for the current segment aover the lengths indicated

    Kerb Gutter Flow Time

    The velocity of water flowing in kerb gutters is affected by:

    the roughness of the kerb gutter and road surface

    the cross-fall of the road pavement

    the longitudinal grade of the kerb gutter

    the flow carried in the kerb gutterThe flow normally varies along the length of a kerb gutter due to lateral surface inflows.

    Therefore, the flow velocity will also vary along the length of a kerb gutter. As the

    amount of kerb gutter flow is not known for the initial analysis of a sub-catchment, theflow velocity and hence the kerb gutter flow time cannot be calculated directly. An

    initial assessment of the kerb gutter flow time must be made.

    An approximate kerb gutter flow time can be estimated from Figure 2.9 or by the

    following empirical equation:

    (2.13)

    where,tg = kerb gutter flow time (minutes)

    L = length of kerb gutter flow (m)

    S =longitudinal grade of the kerb gutter (%)

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    17/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 17

    Kerb gutter flow time is generally only a small portion of the time of concentration for a

    catchment. The errors introduced by these approximate methods of calculation of the

    kerb gutter flow time result in only small errors in the time of concentration for a

    catchment, and hence only small errors in the calculated peak flow.

    Figure 2.9 Kerb Gutter Flow Time

    Channel Flow Time

    The time stormwater takes to flow along an open channel may be determined by dividingthe length of the channel by the average velocity of the flow. The average velocity of

    the flow is calculated using the hydraulic characteristics of the open channel.

    The Manning's Equation is suitable for this purpose:

    ( 2.14)

    From which,

    ( 2 .15)

    Where,V = average velocity (m/s)n = Manning's roughness coefficient

    R =hydraulic radius (m)

    S = friction slope (m/m)L =length of reach (m)

    t = travel time (minutes)

    Where an open channel has varying roughness or depth across its width it may be

    necessary to sectorise the flow and determine the average velocity of the flow, to

    determine the flow time.

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    18/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 18

    Pipe Flow Time

    The velocity Vin a pipe running just full can be estimated from pipe flow charts derivedfrom Mannings equation where the flow, pipe diameter and pipe slope are known. The

    time of flow, tp , is then given by:

    .(2.16)where,

    L = pipe length (m)

    Where the pipe diameter is not known, the diameter can be first estimated given the flowat the upstream end of the pipe reach and the average grade of the land surface between

    its ends.

    As is the case with kerb gutter flow time, pipe flow time is generally only a small portionof the time of concentration for a sub-catchment. The error in the estimated pipe flow

    time introduced by the adoption of the wrong diameter or slope, or by the assumption

    that the pipe is flowing full when in fact it is only flowing part full, will not introduce

    major errors into the calculated peak flow.

    Although travel time from individual elements of a system may be very short, the totalnominal flow travel time to be adopted for all individual elements within any catchment

    to its point of entry into the stormwater drainage network shall not be less than 5

    minutes. For small catchments up to 0.4 hectare in area, it is acceptable to use the

    standard minimum times of concentration given in Table 2.4 instead of detailed

    calculation.

    Table 2.4 Standard Minimum Times of Concentration

    Location Standard Tc (minutes)

    Roof and property

    drainage

    5

    Road inlet pits 5

    Small areas < 0.4 hectare 10

    Furthermore, the time of concentration to a point of interest due to flow from many sub-catchments can be estimated by first defining the hydraulic flow path from each sub-

    catchment to the point of interest.

    After defining the hydraulic flow path, the next task is to estimate the time of concentrationto the point of interest i as:

    ))](),..(),((),([)(,2,1,

    iTiTiTiTMAXiTchmentlastsubcatindirect

    c

    ntsubcatchmeindirect

    c

    ntsubcatchmeindirect

    c

    direct

    c

    net

    c =

    (2.17)Where:

    Tcnet

    (i) = governing time of concentration at location i on the network (min or hr)

    Tcdirect

    (i) = time of concentration along the direct flow path (i.e. along the sub-catchment of

    the point of interest i) to i (min or hr)

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    19/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 19

    Tcindirect,subcatchment(i) = time of concentration from another sub-catchment (i.e. along the

    hydraulic flow path) to location i (min or hr)

    Furthermore:

    ),1()1()(,,

    iiTiTiTntsubcatchme

    conduit

    ntsubcatchmenet

    c

    ntsubcatchmeindirect

    c

    += (2.18)

    whereTconduit

    subcatchment(i-1,i)= travel time on the conduit (pipe or open channel) that links i-1 and i.

    in a sub-catchment (min)

    ),1(

    ),1(*60),1(

    iivelocity

    iiLiiT

    conduit

    conduitntsubcatchme

    conduit

    = (2.19)

    Lconduit(i-1,i)= length of conduit between i-1 and i (meters)

    velocityconduit(i-1,i)= velocity of flow in the conduit between i-1 and i (m/sec)The velocity can be estimated by using the chart below or by using the relationship given

    as:

    n

    SR

    velocityconduitconduit

    conduit

    5.0667.0

    = ..(2.20)

    Rconduit= hydraulic radius of the conduit

    Sconduit= slope of the conduit.

    Exercise:

    On the following page you are given a topographic map of the post-developed conditionfor a proposed development.

    1) Sketch the principle flow path for basin 4 and determine the map scale.

    2) Estimate the time of concentration for basin 4

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    20/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 20

    Note that you may use a mixed method to find the time of concentration. For example,

    you may use the kinematic wave for sheet flow and combine with the Manning equationto handle any concentrated flow.

    High Point

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    21/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 21

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    22/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 22

    2.2.2.BRainfall Intensity

    For a given duration Tc and recurrence interval ARI, the intensity i at a point of interest

    is determined from the appropriate rainfall intensity-duration-frequency (IDF) curve for

    the area concerned.

    2.3 Peak Flow/Discharge

    2.3.1 Stormwater Runoff

    Peak Runoff flow or discharge is the maximum rate of runoff passing a particular

    location during a storm event. Peak runoff discharge has units of volume/time (e.g.m

    3/sec). The peak flow/discharge is a primary design variable for the design of

    stormwater runoff facilities such as pipe systems, storm inlets and culverts, and smallopen channels. It is also used for some hydrologic planning such as small detentionfacilities in urban areas. Peak discharge can be estimated with or without calculating a

    hydrograph. In general, a hydrograph is used to establish the peak discharge when an

    analysis of the effect of water storage [ponds, reservoirs etc] on the drainage area underconsideration needs to be considered.

    There have been many different approaches for determining the peak runoff from an

    area. As a result many different models (equations) for peak discharge estimation have

    been developed. There are two general classes of peak discharge hydrologic models.They are CalibratedModelsand UncalibratedModels.

    2.3.1.A Calibrated Models

    Calibrated models are generally multi-parameter regression models that were

    derived from a frequency analysis from long-term gaged data from watersheds inthe region.

    Some examples of calibrated models include:

    USGS Urban Peak Discharge FormulasIndex-Flood Estimation

    Moment Estimation

    Calibrated models are based on the analysis of stream gage data. For small watersheds,

    especially those undergoing urban/suburban development, regional equations that are

    appropriate for assessing the impact of development of peak discharges are not available,with the possible exception of the USGS regression equations. However, these are not

    widely used because they do not include variables that are typically used to reflect

    changes in watershed conditions. Thus, there is a demand for methods that provide peakdischarge estimates that use readily available input data such as watershed and design-

    storm rainfall characteristics.

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    23/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 23

    2.3.1.B Uncalibrated Models

    Rational Method

    The most widely used uncalibrated equation is the Rational Method. The rational methoduses a formula that expresses a supposedly rational relation between rainfall intensity

    and catchment area as independent variables and the peak flood discharge resulting from

    the rainfall as the dependent variable. It has been in use for about 150 years and iswidely used in the design of stormwater drainage systems, farm dam spillways, and

    small culverts in road and railway embankments. The rational method is based on the

    following major assumptions.

    Rainfall intensity and duration is uniform over the area of study

    Storm duration must be equal to or greater than the time of concentration of thewatershed.

    Mathematically, the rational method relates the peak discharge (Q, m3/sec) to the

    drainage area (A, ha), the rainfall intensity (i, mm/hr), and the runoff coefficient (C).

    The formula is:

    360

    . totalyty

    AICQ c= ..( 2.21 ) or

    DCIAytAIQ c= ..(2.22)

    where,

    Qy =y year ARI peak flow (m3/s)

    C = dimensionless runoff coefficient

    Iyt =y year ARI average rainfall intensity over time of concentration, tc , (mm/hr)Atotal = total drainage area (ha)

    ADCIA = directly connected impervious area

    To estimate peak flow using the rational formula, the A, I and C must be determined.

    The runoff coefficient can be estimated as by using one of the available charts or tables

    which is illustrated in Figure 2.10

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    24/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 24

    Figure 2.10 Runoff Coefficients for Urban Catchments

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    25/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 25

    For a heterogeneous sub-basin (i.e. in areas where the runoff coefficient is not constant

    over the entire area), a weighted runoff coefficient should be determined. The runoff

    coefficient for each sub-area is determined and a single weighted runoff coefficient is

    obtained as:

    (2.23)

    Alternatively, for a heterogeneous watershed that can be subdivided into homogeneoussub areas Aj with associated curve number Cj, Q becomes:

    j

    J

    j

    j ACiQ .0028.01

    =

    = ..(2.24)

    Limitations

    A principal limitation of the Rational Method is that only a peak discharge is produced.Therefore, the simple form of the Rational Method cannot be used to calculate thevolume or shape of the runoff hydrograph, which is required for the design of facilities

    that use storage such as detention and retention basins.

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    26/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 26

    Figure 2.11 General Procedure for Estimating Peak Flow for a Single Sub-catchment Using the Rational

    Method

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    27/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 27

    Worked Examples

    Example 2-1

    A culvert on a road is to be designed to pass a flood of ARI = 10 years; the catchment areais 5 km

    2. The statistical runoff coefficient C10 is found to be 0.3. A fragment of the rainfall

    intensity-duration relation for ARI = 10 years at the site is given below. Calculate the

    design discharge by the rational method.

    100

    80

    60

    40

    20

    1 2

    Duration, hours

    Intensity,mm/h

    1012631.4

    -1

    Intensity-duration relation for

    Average Recurrence Interval = 10 years

    Solution

    Using equation 2.21 .

    Q = 0.28 CIA

    C = 0.3

    A = 5 km2

    To determine I, first calculate tc = 1.4 hours

    For a storm duration of 1.4 h, from the above intensity-duration diagram,I = 65 mmh

    -1

    Q = 0.28 x 0.3 x 65 x 5= 27.3 m

    3s

    -1

    The design discharge is 27 m3s

    -1

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    28/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 28

    Example 2-2

    50

    50

    100

    50

    Drain

    Outflow

    Dimensions in m.

    A paved parking area is defined in the above diagram. Runoff occurs as sheet flow and is

    collected in a drain as shown. Time of concentration to the drain is 12 minutes, time of flow

    in the drain can be assumed negligible. What is the peak discharge at the outflow?

    Q = 0.28 CIA

    CI = mean rate of rainfall-excess in mm/h= (4 + 8 + 3 + 1) x 60/12

    = 80 mm/h

    A = catchment area in km2

    = (100 x 100 - 50 x 50) x 10

    -6

    = 0.0075 km2

    Q = 0.28 x 80 x 0.0075 m3s

    -1

    = 0.28 x 80 x 7.5 Ls-1

    = 168 Ls-1

    Repeat the above Worked Example for a parallelogram shaped area 100 m x 100 m, i.e. like

    the one used in the Worked Example but without the 50 m x 50 m corner cut out.

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    29/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 29

    The following information is given about your development area:

    o The information given below defines the IDF curve for this area.

    5min 10min 15min 30min 1hr 2hr 3hr 6hr 12hr 24hr

    1 year 0.13 0.18 0.23 0.31 0.39 0.45 0.50 0.64 0.77 0.90

    2 year 0.15 0.22 0.28 0.38 0.47 0.55 0.63 0.82 1.00 1.18

    5 year 0.19 0.24 0.30 0.43 0.55 0.67 0.78 1.06 1.31 1.56

    10 year 0.13 0.23 0.31 0.46 0.59 0.73 0.86 1.19 1.49 1.80

    25 year 0.15 0.27 0.36 0.53 0.69 0.86 1.03 1.44 1.81 2.19

    50 year 0.16 0.30 0.40 0.59 0.77 .96 1.16 1.63 2.05 2.48

    100 year 0.12 0.27 0.39 0.60 0.80 1.02 1.24 1.76 2.23 2.71

    o The area is considered to be pasture/range land before development

    o All analysis/design should be for a 50-year return period.o Model units are in meters.

    o Assume a longitudinal roadway slope of .01 and a transverse slope of .03.

    o Use 450 mm wide P-1-7/8 grates that are 1 m long for all storm draininlets.

    o The highpoint of the development is the north east corner and the low

    point is the southwest corner. In other words flow will travel from east towest and north to south (the crown in the road can be assumed sufficient

    to contain flows for basin delineation purposes).o The minimum storm drain pipe size that can be used is 450 mm.

    1. Using the data provided compute the 50-year peak runoff for the development

    site with the rational method.2. Determine the peak flow for each sub-basin after development. Sub-basin

    boundaries should be determined from the storm drain inlets (shown in red).

    Since you do not have elevation data you will need to delineate the basins- makeapproximations.

    3. Determine the amount flow captured at each storm drain and the amount that

    bypasses. Is a 450 mm storm drain pipe adequate (you can use Manning's

    equation with the assumption that the pipe is flowing full to determine thecapacity of the 450 mm storm drain pipe)?

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    30/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 30

    SCS Triangular Hydrograph Method

    In this method, peak runoff is determined using the curve number approach. The

    assumption of uniform rainfall still applies. The hydrograph takes on a triangular shape

    with equal peak and flow volume as in the rational method. This can be seen below.

    Peak runoff rate is calculated by

    q = 0.0021QA/Tp .(2.25)

    where Q = runoff volume in mm depth (from the curve number)q = runoff rate in m3/s

    A = watershed area in ha.

    Tp = time of peak in hours

    In this method, the time to peak does not equal the time of concentration as in the

    rational method, in this method time to peak Tp equals

    Tp = D/2 + TL = D/2 + 0.6Tc..(2.26)Where Tp = time to peak (hours)

    D = duration of excess rainfall

    TL = time of lag

    Tc = time of concentrationIt is assumed that the total time of flow is 2.67 Tp and the recession time of the

    hydrograph is 1.67 Tp.

    Time of concentration is calculated using the SCS Lag formula discussed earlierTc = 0.002 L

    0.8(1000/CN 9)0.7 S-0.5..(2.27)

    where L = watershed length (m)

    S = watershed slope (m/m)

    CN = curve number

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    31/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 31

    Table 2.5-Runoff Curve Numbers*

    Hydrologic Soil Group

    Land Use, Crop, and Management A B C D

    CULTIVATED, with crop rotations

    Row Crops, poor management 72 81 88 91

    Row Crops, conservation mgmt 65 75 82 86

    Small Grains, poor management 65 76 84 88

    Small Grains, conservation mgmt 61 73 81 84

    Meadow 55 69 78 83

    PASTURE, permanent w/moderate grazing 39 61 74 80

    WOODS, permanent, mature, no grazing 25 55 70 77ROADS, hard surfaces and roof areas 74 84 90 92

    Hydrologic Soil Group Descriptions:

    A -- Well-drained sand and gravel; high permeability.

    B -- Moderate to well-drained; moderately fine to moderately coarse texture; moderate

    permeability.

    C -- Poor to moderately well-drained; moderately fine to fine texture; slow permeability.

    D -- Poorly drained, clay soils with high swelling potential, permanent high water table,

    claypan, or shallow soils over nearly impervious layer(s).

    *Foraverage antecedent mositure conditions in a watershed.

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    32/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 32

    Graphical Peak Discharge Method

    The graphical peak discharge method of calculating runoff was developed by the

    USDA-Soil Conservation Service and is contained in SCS Technical Release No. 55

    entitled Urban Hydrology for Small Watersheds. This method of runoff calculationyields a total runoff volume as well as a peak discharge. It takes into consideration

    infiltration rates of soils, as well as land cover and other losses to obtain the net runoff.

    As with the rational formula, it is an empirical model and its accuracy is dependent uponthe judgment of the user. Following is the procedure to use the peak discharge method of

    runoff determination:

    Task 1 - Measure the drainage area. Use surveyed topography, aerial photographs,soils maps, etc.

    Task 2 - Calculate a curve number (CN) for the drainage area.

    The curve number (CN) is similar to the runoff coefficient of the rational formula. It is

    an empirical value which establishes a relationship between rainfall and runoff based

    upon characteristics of the drainage area. The soil type also influences the curvenumber. Each soil belongs to a different hydrologic soil group. If the soil name is

    unknown, a judgment must be made based upon knowledge of the soils and the soil

    group description. Soil names can be obtained from county soil surveys, the local Soil

    Conservation Service office, or analysis of actual soil borings.

    Table 2.6-Hydrologic Soil Groups

    Soil Group

    ARepresents soils having a low runoff potential due to high infiltrationrates. These soils consist primarily of deep, well-drained sands and

    gravel.

    Soil Group B

    Represents soils having a moderately low runoff potential due to moderate

    infiltration rates. These soils consist primarily of moderately deep to deep,

    moderately well-drained to well-drained soils with moderately fine to

    moderately coarse textures.

    Soil Group C

    Represents soils having a moderately high runoff potential due to slow

    infiltration rates. These soils consist primarily of soils in which a layer

    exists near the surface that impedes the downward movement of water, or

    soils with moderately fine to fine texture.

    Soil Group D

    Represents soils having a high runoff potential due to very slow infiltrationrates. These soils consist primarily of clays with high water tables, soils

    with a claypan or clay layer at or near the surface, and shallow soils over

    nearly impervious parent material.

    If the watershed has uniform land use and soils, the curve number value can be easilydetermined directly. Curve numbers for nonhomogenous watersheds may be determined

    by dividing the watershed into homogeneous sub-areas and performing a weighted

    average.

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    33/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 33

    =

    i

    i

    i

    ii

    A

    xACN

    CN ..(2.28)

    Table 2.7-Runoff Curve Numbersfor Graphical Peak Discharge Method

    Cover DescriptionHydrologic Soil

    Group

    A B C D

    Fully Developed Urban Areas

    (Vegetation Established)

    Open Space (lawns,parks,etc.)

    Poor Condition; GrassFair Condition; Grass 50 - 75% cover

    Good Condition; Grass > 75% cover

    684939

    7969

    61

    8679

    74

    8984

    80

    Impervious Areas Paved parking lots, roofs, driveways 98 98 98 98

    Streets and RoadsPaved; curbs and storm sewersPaved; open ditches (w/ right-of-way)

    Gravel (with right-of-way)

    Dirt (with right-of-way)

    98

    83

    76

    72

    98

    89

    85

    82

    98

    92

    89

    87

    98

    93

    91

    89

    Urban Districts

    Average % Impervious

    Commercial and Business 85

    Industrial 7289

    81

    92

    8894

    91

    95

    93

    Residential Districts

    (by average lot size)

    Average % Impervious

    1/8 acre (town house) 65

    1/4 acre 38

    1/3 acre 30

    1/2 acre 25

    1 acre 202 acres 12

    77

    61

    5754

    51

    46

    85

    75

    7270

    68

    65

    90

    83

    8180

    79

    77

    92

    87

    8685

    84

    82

    Urban Areas - Development UnderwayNo Vegetation Established

    Newly graded area 81 89 93 95

    Pavement and Roofs, Commercial & Business Areas 98 98 98 98

    Row Houses, Town Houses and Residential w/ lot sizes:

    1/8 acre or less1/4 acre

    1/2 acre

    1 acre

    2 acres

    9388858281

    9693919089

    9795949392

    9897969594

    Cultivated Agricultural Lands

    Fallow:Bare SoilCrop Residue (CR) poor

    Crop Residue (CR) good

    777674

    868583

    919088

    949390

    Row Crops:Straight row (SR) poor

    Strai ht row SR ood

    7267

    8178

    8885

    9189

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    34/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 34

    Contoured (C) poor

    Contoured (C) goodContoured and Terraced (C&T) poor

    Contoured and Terraced (C&T) good

    70656662

    79757471

    84828078

    88868281

    Other Agricultural Lands

    Pasture, grassland or range

    poor

    fair

    good

    684939

    796961

    867974

    89

    8480

    Meadow 30 58 71 78

    Brush - brush, weed, grass mixpoor

    fair

    good

    483530

    675648

    777065

    837773

    Woods - grass combinationpoor

    fair

    good

    574332

    736558

    827672

    868279

    Woodspoorfair

    good

    453630

    666055

    777370

    837977

    Porous Pavement**

    Gravel SubbaseThickness

    (inches)

    Porous Pavement (Properly Maintained)

    10

    1824

    36

    57535247

    66615852

    69646155

    75696658

    Porous Pavement (Not Properly Maintained) 10 - 36 98 98 98 98

    **This information is not intended for design purposes.

    Task 3 - Determine runoff depth and volume for the design storm.

    The rainfall depth (in inches) can be determined from theRainfall Depths forSelectedDesign Storms. (For the examples in this lesson, the design storms are based upon the

    SCS Type II 24-hour rainfall distribution.

    The runoff depth (in inches) can be determined from the graph contained on theRainfall

    Depths for Selected Design Storms. Enter the graph with the rainfall depth (inches) at

    the bottom, move vertically to intersect the appropriate curve, then move horizontally

    and read inches of runoff. The volume of runoff from the site can be calculated by

    simply multiplying the drainage area of the site by the runoff depth.

    Task 4 - Determine time of concentration.

    Task 5 - Determine initial abstraction (Ia).

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    35/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 35

    Initial abstraction (Ia) refers to all losses that occur before runoff begins. It

    includes water retained in surface depressions, water intercepted by vegetation,

    and evaporation and infiltration. Ia is highly variable but generally is correlated

    with soil and cover parameters. The relationship of Ia to curve number is

    presented below.

    Table 2.8- Ia Values for Runoff Curve Numbers

    CurveNumber

    Ia(inches)

    CurveNumber

    Ia(inches)

    CurveNumber

    Ia(inches)

    40 3.000 60 1.333 80 0.500

    41 2.878 61 1.279 81 0.469

    42 2.762 62 1.226 82 0.439

    43 2.651 63 1.175 83 0.410

    44 2.545 64 1.125 84 0.381

    45 2.444 65 1.077 85 0.353

    46 2.348 66 1.030 86 0.326

    47 2.255 67 0.985 87 0.299

    48 2.167 68 0.941 88 0.273

    49 2.082 69 0.899 89 0.247

    50 2.000 70 0.857 90 0.222

    51 1.922 71 0.817 91 0.198

    52 1.846 72 0.778 92 0.174

    53 1.774 73 0.740 93 0.151

    54 1.704 74 0.703 94 0.12855 1.636 75 0.667 95 0.105

    56 1.571 76 0.632 96 0.083

    57 1.509 77 0.597 97 0.062

    58 1.448 78 0.564 98 0.041

    59 1.390 79 0.532

    Task 6 - Determine the unit peak discharge.

    Divide the initial abstraction by the rainfall to obtain the Ia/P ratio. Enter Figure 2. with

    the calculated Tc in hours, move up the Ia/P ratio (this can be a linear interpolation) andread the unit peak discharge (qu) on the left in cubic-feet per second per square mile of

    drainage area per inch of runoff (csm/in). Convert to cubic meter per sec per square km

    of drainage area per mm of runoff (m3/s/km

    2/mm)

    Unit Peak Discharge (qu) for SCS Type II Rainfall Distribution

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    36/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 36

    Figure 2.12

    To determine the peak discharge (q), multiply the value of (qu) by the drainage area in

    square km and by the runoff in mm.

    q = Qu Am Q ..(2.29)where: q = peak discharge in cubic meter per sec

    Qu = unit peak discharge in (m3/s/km

    2/mm)

    Am = drainage area in square km

    Q = runoff in mm

    Task 7 - Determine whether ponding and swampy conditions in the watershed area will

    affect the peak discharge. This adjustment is not always needed. Ponds or swamps on

    the main stream or that are in the path used for calculating time of concentration (Tc) arenot considered here. Only ponds and swamps scattered throughout the watershed that

    are not in the Tc path are considered.

    Table below contains the adjustment factors for ponds and swamps spread throughout

    the watershed. Measure or estimate the area covered by ponds and/or swamps, convert

    to percentage of the watershed drainage area, enter the Table and read (or interpolate)

    the multiplying factor (Fp).

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    37/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 37

    Table 2.9-Adjustment Factor (Fp) for Pond and Swamp Areas

    Spread Throughout the Watershed

    Percentage of pond and swamp

    areas

    Fp

    0 1.00

    0.2 0.97

    1.0 0.87

    3.0 0.75

    5.0 0.72

    If the Fp adjustment is needed, then the discharge from step 5 is multiplied by the Table

    value to obtain the final peak discharge (qp).

    qp = (q) (Fp) .(2.30)

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    38/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 38

    TR55/SCS MethodPeak discharge, runoff depth, initial abstraction, unit peak discharge, and pond/swamp

    factor are computed as follows:

    )4.25)(101000

    (

    2.0

    )( 2

    =

    =

    +

    =

    =

    CS

    SI

    SIP

    IPQ

    AQFQQ

    a

    a

    a

    pUP

    (2.31)

    where: A = total watershed area (km2). CN = overall curve number for the watershed.

    Fp = pond and swamp adjustment factor. Ia = initial abstraction (mm); losses before

    runoff begins (surface depressions, interception by leaves, evaporation, infiltration) -SCS determined the above equation for Ia after numerous studies. P = precipitation(mm) for 24-hr duration storm of return period for which you are interested. Q = depth

    of runoff over entire watershed (mm). Qp = peak discharge (m3/sec ). Qu = unit peak

    discharge (m3/sec /km

    2-mm); outside the USA, use the rainfall distribution type that best

    represents your typical storm.

    SCS 24-hour rainfall distributions (SCS, 1986):(y-axis reads "Fraction of 24-hour rainfall" and x-axis reads "Time, hours")

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    39/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 39

    h o u r s

    Figure 2.13

    S = potential maximum watershed water retention after runoff begins (mm). Tc = time

    of concentration for the watershed (hr); time for runoff to travel from the furthest

    distance (by time) in the watershed to the location where you wish to determine Qp.

    A user can divide a watershed into a maximum of five sub-regions represented by

    different curve numbers. Then, the overall curve number and total area are computed.

    Alternatively, if there are more than five sub-regions, you may compute the overallcurve number by hand and enter that value into our calculation. Overall curve number

    is computed from:

    .(2.32)

    Example 2-3

    A 1.2-ha development site is comprised of 0.4 ha of impervious surface and 0.8 ha of

    lawn and woods with a NRCS Curve Number (CN) of 65. The entire impervious surfaceis directly connected to the sites drainage system. Compute the sites total runoff

    volume for the 31.75-mm design Storm using the Weighted Average CN technique.

    Compare the results with the Weighted Average Volume technique.Stormwater Quality Design Storm = P = 31.75 mm

    Total drainage area = 1.2 ha

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    40/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 40

    Impervious area = 0.4 ha (1/3 of total area)

    Pervious area = 0.8 ha (2/3 of total area)

    Pervious cover = mixture of lawn and woods Pervious CN = 65

    Impervious cover = asphalt Impervious CN = 98

    Note: All impervious cover is connected to the drainage system

    1. Using Weighted Average Curve Number Technique

    Weighted CN = (65)(2/3) + (98)(1/3) = 76Average S = [(1000/76)-10]x25.4 = 80 mm

    Average initial abstraction = Ia = 0.2S = (0.2)(80) = 16 mm

    0.8S = (0.8)(16) = 12.8 mm

    Runoff volume = Q = SIP

    SP

    a +

    2)2.0(

    = (31.75 - 16)2/(31.75+0.8*80) = 2.54 mm

    Runoff volume = (2.54 mm/1000 mm per m)(1.2 ha)(10000 sq m per ha)Total site runoff volume = 30.4 cubic meters

    2. Using Weighted Average Volume Technique

    Impervious Area

    Impervious area S = [(1000/98)-10] x 25.4 = 50 mm

    Impervious area initial abstraction = 0.2S = (0.2)(50) = 10 mm

    0.8S = (0.8)(10) = 8 mm

    Impervious area runoff volume = Q = =SIP

    SP

    a +

    2)2.0(

    = (31.75 -10)2/(31.75+0.8*50) =

    25.4 mm

    Runoff volume = (25.4mm/1000 mm per m)(0.4 ha)(10000 sm per ha)

    Impervious area runoff volume = 102 cubic meter

    Pervious Area

    Pervious area S = [(1000/65) 10](25.4) = 136.6 mm

    Pervious area initial abstraction = 0.2S = (0.2)(136.6) = 27.3 mm

    0.8S = (0.8)(136.6) = 109.2 mm

    Pervious area runoff volume = Q = =SIP

    SP

    a +

    2)2.0(

    = 0.13 mm

    Runoff volume = (0.13 mm/1000 mm per m)(0.8 ha)(10000 sm per ha)

    Pervious area runoff volume = 0.97 cubic meters

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    41/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 41

    Total site runoff volume = 102 + 0.97 = 103 cubic meters(vs. 30.4 cubic meters using weighted average CN)As can be seen in this Example, the weighted average CN technique produced an

    estimated Stormwater Quality Design Storm runoff volume that was less than 30 percent

    of the volume produced by the weighted average volume technique. Perhaps moresignificantly, the example also demonstrates how virtually the entire site runoff for the

    Stormwater Quality Design Storm comes from the impervious portion and that very little

    comes from the pervious portion (i.e., 102 cubic meters vs. 0.97 cubic meters). Thesignificant but erroneous initial loss that the NRCS cautions about in TR-55 can also be

    seen in the 16 mm initial abstraction for the entire site (including one acre of impervious

    surface) produced by the weighted average CN technique. It is important to note that, incomputing a weighted average runoff volume from the development site, the example

    does not address the resultant peak discharge or hydrograph from the site. If both the

    pervious and directly connected impervious site areas will have the same Time ofConcentration, the weighted runoff volume can then be used directly to compute the

    peak site discharge or hydrograph. However, if these areas will respond to rainfall withdifferent TCs, separate hydrographs should be computed for each and then combined to

    produce the peak site discharge or hydrograph.

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    42/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 42

    Example 2-4

    Design Flow Estimate

    In some instances, more than one design flow calculation method should

    be used. The designer should evaluate all the results and finally estimatea design flow based on the reliability of input data, past events, historic

    high flow records and experience.

    Background

    Thames Creek is

    located onthe east side of

    Vancouver

    Island nearDenman Island.

    Problem

    Since thehighway crosses

    Thames Creek, abridge or

    culvert will be

    required.

    Estimate the 200year (Q200)

    flow.

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    43/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 43

    Solution

    Step 1 - Determine Basin Size and Creek Length.

    From the 1:50,000 scale mapping, the following dimensions weremeasured:

    A = 6.6 km2 = 660 ha

    L = 8.2 km

    Step 2 - Determine Basin Slope

    A profile of the main channel was plotted. Since the upper portion of

    basin is steep, the basin slope was estimated using the Equivalent Slope

    Method.

    S = 0.051 m/m = 5.1%

    Step 3 - Determine Land Characteristics

    Design flows are estimated assuming worst case conditions.

    Considerations include basin slope, type of vegetation, recurrence

    intervals, snowmelt, antecedent moisture condition (AMC), etc. Since

    the Thames Creek basin is relatively low with light forest cover, thefollowing land characteristic values were selected:

    r = 0.60, deciduous timber land

    CN = 85, forest land with good cover, Hydrologic Soil Group C,AMC III

    C = 0.40, flat, forested.

    Step 4 - Determine Time of Concentration

    There are numerous ways of estimating the time of concentration (tc). A

    few different methods will be used and an average value will be

    selected.Method 1 - BC Rational Formula Method

    A = 6.6 km2 = 2.6 km

    tc = 3.6hr (interpolated)

    tc = (rL)0.467 = ((0.60)(8.2km))0.467 = 2.6hr

    1.65s0.234 1.65(0.051m/m)0.234

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    44/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 44

    Design Flow Estimate continued

    Method 2 - SCS Curve Number Method

    SCN = 254 (100 - 1) = 254 (100 - 1) = 44.8

    CN 85

    TL = L0.8 (0.039CN + 1)0.7 = (8200m)0.8 (0.039(44.8) +1)0.7 = 1.7hr

    735s0.5 735(5.1%)0.5

    tc = 1.7TL = 1.7(1.7hr) = 2.8hr

    Method 3 - Bransby Williams Formula

    tc = 0.605L = 0.605(8.2km) = 3.0hrs0.2 A0.1 (5.1%)0.2 (6.6km2)0.1

    Taking an average, it is assumed that tc = 3 hours.

    Step 5 - Determine Rainfall Intensity

    The nearest rainfall gauging station is located at Comox Airport

    (El.24m). Since the basin elevation varies from El.20 m to El.760 m, aprecipitation gradient is expected. The 10-year rainfall intensity

    corresponding to the time of concentration will be used due to the

    increased reliability of rainfall data over more frequent return periods

    (e.g. 2-year). A previous hydrological study estimated the averageintensity over the basin will increase at a rate of 5% per 100 m rise in

    elevation.

    i = (9mm/hr)((740m)(0.5)(0.05)+1) = 10.7 mm/hr100m

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    45/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 45

    Step 6- Determine Design Flow

    There are numerous ways of estimating the design flow. A few different

    methods will be used.

    Method 1 - Rational Formula

    Since the basin is small and there is limited data, the Rational Formula

    will be used to determine the 10-year flow. The 10-year flow will thenbe converted to a 200-year flow. Studies have shown that the Q200/Q100

    ratio is approximately 1.7 for this region.

    Q10 = CiA = (0.40)(10.7mm/hr)(660ha) = 7.9 m3/s

    360 360

    Q200 = 1.7Q10 = 1.7(7.9m3/s) = 13.4m3/s

    Design Flow Estimate continued

    Method 2 - SCS Method

    For this creek, a 24-hour, Type 1A rainfall distribution is used in the

    analysis. The 10-year 24-hour total rainfall volume is obtained from theComox Airport IDF curve. The estimated 10-year flow will be converted

    to a 200-year flow.Total Rainfall = (3.2mm/hr)(24hr) = 76.8mm.

    Q10 = 7.4m3/s

    Q200 = 1.7Q10 = 1.7(7.4m3/s) = 12.6m3/s

    Method 3 - Regional Frequency Analysis

    Hydrological studies have resulted in regional frequency curves for the

    area.Q200 = (A)(unit runoff)(peaking factor)

    = (6.6km2)(1.8m3/skm2)(1.5)= 17.8m3/s

    Since the results do not vary significantly, an average will be taken.

    The 200 year flow is estimated to be 15 m3/s.

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    46/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 46

    2.3.2 Peak Wastewater Flow

    2.3.2.A Characteristics

    There are two main categories of sanitary sewer loads. The major oneconsists of sanitary loads or dry weather loads that result from human activity

    and are not weather dependent. The main sources of these loads are the

    activities from many land-use types- residential, commercial, industrial etc.

    The second category consists of wet weather loads that are to rainfall activitysuch as groundwater infiltration- water leaking into a pipe through cracks,

    joints, and defects) and structure inflow (surface water entering a structure

    through openings around the cover, or due to a missing cover). In addition,they sometimes include flow of stormwater through illegal connection of

    roof, yard and foundation drains to sanitary sewers as well as to poorly

    constructed manholes and or connections and improperly laid house laterals,high water table etc. It is known that leakage through manhole covers may

    be up to 180 liters per km with a depth of 5.54 mm. of water over the cover.

    Sanitary sewer loads vary with time. The variation depends on the land use

    characteristics. Thus, the loads are presented as hydrographs (flow vs time

    data) or as pattern loads that is as a combination of base load and anassociated loading pattern which is a series of multipliers relating loading to

    time.

    Sewer analysis and design generally consider a variety of loading conditions

    such as minimum, average and peak conditions. Base or average loads are

    transformed into peak loads using a variable peaking factor. Total load in a sewer segment is a combination of load that is generated

    within the segment (node and link) and accumulated load from upstream

    segments(see Figure below).

    When calculating flows for a sewer, you have to start from the upstream end

    of an individual line and works downstream to accumulate flows to the givenpipe. The total flow to a pipe is computed by adding accumulated flows to the

    flow contributed by the gravity line. The flow contributed by an individual

    pipe is calculated by adding up the flow from different land uses (residential,commercial and miscellaneous) and the infiltration flows. The flow in a

    forcemain (pressurized sewer pipe) is found by selecting the appropriate

    system operating point computed for the corresponding pump station.

    2.3.2.B Estimation

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    47/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 47

    Based on the characteristics of the loads described earlier, peak sewage load generated

    within a segment can be estimated as:

    86400

    ][ iuiuik

    i

    i

    i

    gen

    FNQQQQ

    +== .(2.33)

    where:

    Qi= peak load generated by each land use type i in liters per sec

    Qk= fixed load for the land use type in the segment in lpd. [Qinf+ Qin ]

    Qinf= infiltration flow on the link. (liters/day)

    1000inf

    line

    u

    LfQ = (2.34)

    where Qinf= infiltration on a line of length Lline in km.fu = unit infiltration in liters/day/kmQui=flow rate per unit of land-use type i in lpd.

    Nui= Number of units of land-use type i in lpd.

    Fi=Peak(ing) factor.

    Also, uiui aWQ = .(2.35)

    where

    Wui = unit water consumption in lpd and a is the return factor i.e. wastewater flow/water

    consumption. Typical values are: W=500 lpd and 4000 lpd per household for developing

    and developed countries respectively and a=0.85

    Peak(ing) factor is defined in several ways-depending on the locality. One commonexpression is:

    5.0

    5.0

    DPC

    BPAFi

    +

    += ..(2.36)

    where Fi=Peak(ing) factor for a land-use type i

    A,B,C,D are user defined constants { typical values are A=18, B=1,C=4 and D=1)P= population equivalent/1000.

    In general, peak factors range between 1.3 and 2. A value of 1.8 has been used in some

    developing countries.

    Total flow at the end of a segment l:

    gencuminputl QQQtot += , ..(2.37)

    where:

    Qtotl =total load at the end of a segment or line l in liters per sec

    Qinput,cum = cumulative load (summation of average input flows for all lines upstream of

    line l whose flows pass through line l) (lps)

    Qgen = loads generated within the line.

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    48/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 48

    Typical values of land-use map and peak factors in developed countries are as follows.

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    49/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 49

    .

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    50/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 50

    1. The coefficients of discharge used in the example are as follows:

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    51/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    STORMWATER AND WASTEWATER DEMAND FLOW 51

    (cfs per acre)

    Low Density LD .0031

    Medium Density MD .0116

    High Density HD .0217

    Commercial Comm .006

    2. Peak(ing) Factors (PF) are shown in the Peak Factor Table

    3. Qav flows are accumulated as they become tributary to the line. See Sample Land Use

    Map and Sample of Flow Estimating Calculations . Dr. Area 1 average flow is totaledand converted to Qpk in Manhole (MH) A, Dr. Area 2 is added at MH B, Dr. Area 3 is

    added at MH C, Dr. Area 4 is added at MH D. Dr. Area 5 is served by a number of house

    connection sewers directly tributary to the study sewer all along the Drainage Area. To

    simplify calculations the flow from this area has been lumped together and added at onepoint. The point arbitrary selected was MH D so Dr. Areas 4 and 5 are both added at that

    point. As each Qav is added to the sum of upstream Qav's the subtotal is converted to

    Qpk with the Pf. The Qpk or Qd downstream from MH D in this example is 4.5 cfs.

    4. If a larger sewer was being studied, this entire area could be considered one DrainageArea with the same procedures followed to accumulate Qav and then convert to Qpk

    using the Peak Factors.

    5. If a relief sewer was proposed that would intercept a portion of this Study Area the

    average flow from Drainage Areas or parts of Drainage Areas tributary to the new line

    would be added to the relief line and subtracted from the existing line. The average flowswould be totaled and converted to Peak using Peak Factors.

    6. The estimated Qav and Qpk's are shown on the Sample Land Use Map. The Qav's areshown because they can be easily added and subtracted and are useful when studying

    alternate routes, etc. The Qpk's are the quantities to be used to determine the adequacy of

    an existing sewer or to design a new one. These Qpk's can also be called Qd.

    Example: 2-5 Peak Sanitary Load

    A shopping center and a residential area consisting of average and luxury homes load a

    gravity sanitary sewer. The shopping center has 100 parking spaces. 80 people live ineach average home, whereas 30 people live in each luxury home. What is the averagebase load contributing to the sanitary sewer at this point? What would be an approximate

    peak flow applied to this system? The local ordinance dictates that for all population

    based sanitary loads, the peaking factor should be estimated as:

    5.0)1000

    (0.4

    0.140.1

    PPF

    +

    += .

    In addition, a constant peaking factor of 2 should be applied to all non-population-based

    loads.

  • 7/28/2019 Urban Drainage Notes-CHAPTER 2

    52/52

    URBAN DRAINAGE AND SEWERAGE E.O. AKINYEMI

    Solution

    First, to get the average base load, find the amount of load per unit for the three loading

    categories. In this problem, assume the following [ based on the location of the housing]:

    Land-use Type Unit Load

    Shopping center 4 l/d-spaceAverage housing 280 l/d-resident

    Luxury housing 380 l/d-resident

    We then multiply this unit flow by the number of units as follows:

    Shopping Center 100x4 = 400 l/dAverage housing 80x280 = 22400 l/d

    Luxury housing 30x380 = 11400 l/d

    Total = 34200 l/d

    PF = 1.0+14/{4+[(80+30)/1000]0.5 }=4.23

    By applying this peaking factor to the base loads from the population and then a peaking

    factor of 2 to the load from the shopping center, the total peak load can be computed as:

    4.23(22400+11400)+2x400 = 144000 l/d