Top Banner
UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School Improvement Program Presented to the Board of Education January 16, 2007
29

UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

Mar 27, 2015

Download

Documents

Carter Holloway
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

UPDATEDCOMPREHENSIVE SCHOOL

IMPROVEMENT PLAN (CSIP)

Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School Improvement Program

Presented to the Board of EducationJanuary 16, 2007

Page 2: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

School District Planning Process

No Child Left Behind

(Federal mandate)

Missouri School Improvement

Program (MSIP) (State mandate)

Desegregation Settlement Agreement

….

Comprehensive School

Improvement Plan (CSIP)

(Local district mandate)

School Improvement Plan

(SIP)

School Improvement Plan

(SIP)

School Improvement Plan

(SIP)

School Improvement Plan

(SIP)

School Improvement Plan

(SIP)

Page 3: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

The Missouri Department of Elementary and Secondary Education (DESE) requires that

every school district have a Comprehensive School Improvement Plan (CSIP). St. Louis

has not had a true CSIP in several years.

The CSIP identifies important long-range improvement issues related to student performance and describes a specific set of actions. The CSIP is a fluid document. It correlates to No Child Left Behind, the Desegregation Settlement Agreement and, most importantly, to the Missouri School Improvement Program (MSIP) Standards on which

the District will be judged in 2009.

The Importance of the CSIP

Page 4: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

The CSIP has three main goals which reflect the District’s long range plan and the

MSIP Standards:

- Performance

- Process & Performance

- Resource

Three Main Goals of MSIP

Page 5: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

Performance Goals

SLPS will establish and implement a framework based on continuous improvement to provide its students with high quality, research-based

curriculum and instructional materials taught by certified, trained and highly qualified teachers who know and practice principles of education

most likely to benefit the learning of urban students, especially identified student

subgroups struggling to reach proficiency.

Page 6: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

Process & Performance Goals

SLPS will plan, implement and regularly monitor the effectiveness and efficiency of

its key leadership functions including administration, management and

communication in a transparent fashion based on actual data that directly impacts student

performance.

Page 7: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

Resource Goals

SLPS will strive to meet individual key standards at the desirable level of compliance

as contained in the MSIP Standards & Indicators Manual while continuing to maintain

at least minimum standards at all levels.

Page 8: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

For example, by 2010 –

– 68% of students will score at the proficient or advanced level in Communication Arts on the MAP test

– 64% of students will score at the proficient or advanced level in Mathematics on the MAP

Improving Academic Achievement For All Students

Page 9: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

Strategies to Improve Academic Achievement

The CSIP provides numerous strategies, including:

- School Performance Teams

- School Improvement Plans

- Curriculum aligned with state standards and assessments

- Attendance targets

- Professional Development

Page 10: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

• All school facilities will meet a score of 85% or higher during regular building inspections

• The number of serious incidents from behavior infractions will be reduced by 10% each year

Providing a Safe and Secure Learning Environment

Page 11: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

Strategies to Increase Safety and Security

• Increased use of technology

• Staff training at all levels on the revised comprehensive emergency operations plan

• Character Education

• Monthly reviews of all facilities for cleanliness and maintenance issues

Page 12: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

Improving Our Fiscal Stability• Expenditures will not exceed revenues in

any proposed District budget

• The overall deficit will continue to be reduced

• Utilization of existing facilities will be fully reviewed for efficiency

Page 13: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

Additional Objectives

• Improving community outreach and education

• Increasing use of technology to streamline services and improve academics

• Increasing the number of certified teachers in classrooms

Page 14: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

The CSIP will be the guide to move the district to full accreditation. As items come to the Board of Education for approval they will reflect the CSIP and MSIP goals being

addressed.

Page 15: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

Annual Performance Report Projections for Accreditation

2007-2009

January 16, 2007

Page 16: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

2007 – 2009 MAP Projections for Grades 3 – 5 Mathematics

Standard

9.1*12006 2007

Target2008 Target

2009 Target

2009

Status

MPIMissouri Performance Index

703.7 715.1 * 727.1 * 738.1 ** 721.0

LNDLevel Not Determined

0.8 1.0 * 1.0 * 1.0 * 1.0

Notes: The 2006 baseline data was obtained from DESE Website posted on December 1, 2006.http://dese.mo.gov/planning/profile/MAP115115.html*The 2007 – 2009 Targets and LND are projections only and are set to meet APR Requirements in 2009 per MSIP 4th Cycle Understanding Your APR 2006-2007.http://dese.mo.gov/divimprove/sia/UnderstandingYourAPR2006-2007-4thCycle2006.pdf** 2009 Target meets APR requirement using the Below Avg + Annual Measures in the Grade Span and Below Avg + Annual Measures in the Grade Level.Targets are subject to change based on actual data and revisions to the APR rubric when It becomes available from the state.

Page 17: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

2007 – 2009 MAP Projections for Grades 3 – 5 Communication Arts

Standard

9.1*22006 2007

Target2008 Target

2009 Target

2009 Status

MPI 707.3 715.3 * 732.3 * 742.1 ** 726.0

LND 1.7 1.0 * 1.0 * 1.0 * 1.2

Notes: The 2006 baseline data was obtained from DESE Website posted on December 1, 2006.http://dese.mo.gov/planning/profile/MAP115115.html*The 2007 – 2009 Targets and LND are projections only and are set to meet APR Requirements in 2009 per MSIP 4th Cycle Understanding Your APR 2006-2007.http://dese.mo.gov/divimprove/sia/UnderstandingYourAPR2006-2007-4thCycle2006.pdf** 2009 Target meets APR requirement using the Below Avg + Annual Measures in the Grade Span and Below Avg + Annual Measures in the Grade Level.Targets are subject to change based on actual data and revisions to the APR rubric when It becomes available from the state.

Page 18: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

2007 – 2009 MAP Projections for Grades 6 – 8 Mathematics

Standard

9.1*32006 2007

Target2008 Target

2009 Target

2009 Status

MPI 666.8 707.1 * 751.1 * 795.1 ** 730.0

LND 0.8 1.0 * 1.0 * 1.0 * 1.0

Notes: The 2006 baseline data was obtained from DESE Website posted on December 1, 2006.http://dese.mo.gov/planning/profile/MAP115115.html*The 2007 – 2009 Targets and LND are projections only and are set to meet APR Requirements in 2009 per MSIP 4th Cycle Understanding Your APR 2006-2007.http://dese.mo.gov/divimprove/sia/UnderstandingYourAPR2006-2007-4thCycle2006.pdf** 2009 Target meets APR requirement using the Annual Measure in the Grade Span and Avg + Annual Measures in the Grade Level.Targets are subject to change based on actual data and revisions to the APR rubric when It becomes available from the state.

Page 19: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

2007 – 2009 MAP Projections for Grades 6 – 8 Communication Arts

Standard

9.1*42006 2007

Target2008 Target

2009 Target

2009 Status

MPI 685.9 721.4 * 771.4 * 821.4 ** 750.0

LND 1.7 1.0 * 1.0 * 1.0 * 1.2

Notes: The 2006 baseline data was obtained from DESE Website posted on December 1, 2006.http://dese.mo.gov/planning/profile/MAP115115.html*The 2007 – 2009 Targets and LND are projections only and are set to meet APR Requirements in 2009 per MSIP 4th Cycle Understanding Your APR 2006-2007.http://dese.mo.gov/divimprove/sia/UnderstandingYourAPR2006-2007-4thCycle2006.pdf** 2009 Target meets APR requirement using the High 2 + Annual Measures in the Grade Level. Targets are subject to change based on actual data and revisions to the APR rubric when It becomes available from the state.

Page 20: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

2007 – 2009 MAP Projections for Grades 9 – 11 Mathematics

Standard

9.1*52006 2007

Target2008 Target

2009 Target

2009 Status

MPI 654.0 704.0 * 763.0 * 823.0 ** 736.0

LND 0.8 1.0 * 1.0 * 1.0 * 1.0

Notes: The 2006 baseline data was obtained from DESE Website posted on December 1, 2006.http://dese.mo.gov/planning/profile/MAP115115.html*The 2007 – 2009 Targets and LND are projections only and are set to meet APR Requirements in 2009 per MSIP 4th Cycle Understanding Your APR 2006-2007.http://dese.mo.gov/divimprove/sia/UnderstandingYourAPR2006-2007-4thCycle2006.pdf** 2009 Target meets APR requirement using the High 2 + Annual Measures in the Grade Level. Targets are subject to change based on actual data and revisions to the APR rubric when It becomes available from the state.

Page 21: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

2007 – 2009 MAP Projections for Grades 9 - 11 Communication Arts

Standard

9.1*62006 2007

Target2008 Target

2009 Target

2009 Status

MPI 692.8 717.4 * 742.4 * 767.4 ** 730.0

LND 1.7 1.0 * 1.0 * 1.0 * 1.2

Notes: The 2006 baseline data was obtained from DESE Website posted on December 1, 2006.http://dese.mo.gov/planning/profile/MAP115115.html*The 2007 – 2009 Targets and LND are projections only and are set to meet APR Requirements in 2009 per MSIP 4th Cycle Understanding Your APR 2006-2007.http://dese.mo.gov/divimprove/sia/UnderstandingYourAPR2006-2007-4thCycle2006.pdf** 2009 Target meets APR requirement using the Annual Measure in the Grade Span and Avg + Annual Measures in the Grade Level.Targets are subject to change based on actual data and revisions to the APR rubric when It becomes available from the state.

Page 22: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

2007 – 2009 APR Projections: ACT

2005 2006 2007 Target

2008 Target

2009 Target

5 Year Avg.

8.7% 12.6% 13.6% * 14.6% * 15.6% ** 13.0%% of GradsAt or AboveNat Average

Notes: The 2005 & 2006 baseline data was obtained from the DESE Website posted on December 1, 2006http://dese.mo.gov/planning/profile/apr/2006d115115.html*The 2007 – 2009 data and targets are projections only and are set to meet APR requirements per 4th cycle MSIP Understanding Your APR 2006 – 2007.http://dese.mo.gov/divimprove/sia/UnderstandingYourAPR2006-2007-4thCycle2006.pdf** The 2009 Target meet the APR requirements using the Annual method in the Progress Measure. Targets are subject to change based on actual data and revisions to the APR rubric when it becomes available from the state.

StandardStandard9.39.3

Page 23: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

2007 – 2009 APR Projections Advanced Courses

2005 2006 2007 Target

2008 Target

2009 Target

5 Year Avg.

49.6% 57.8% 57.8% * 57.8% * 57.8% * 56.2%% CreditsEarned in Advanced Courses

Notes: The 2005 & 2006 baseline data was obtained from the DESE Website posted on December 1, 2006http://dese.mo.gov/planning/profile/apr/2006d115115.html*The 2007 – 2009 data and targets are projections only and are set to meet APR requirements per 4th cycle MSIP Understanding Your APR 2006 – 2007.http://dese.mo.gov/divimprove/sia/UnderstandingYourAPR2006-2007-4thCycle2006.pdfTargets are subject to change based on actual data and revisions to the APR rubric when it becomes available from the state.

StandardStandard9.4*19.4*1

Page 24: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

2007 – 2009 APR Projections Career Education Courses

2005 2006 2007 Target

2008 Target

2009 Target

5 Year Avg.

12.5% 14.7% 15.0% * 16.0% * 16.5% * 14.9%% Credits Earned in CE Courses

Notes: The 2005 & 2006 baseline data was obtained from the DESE Website posted on December 1, 2006http://dese.mo.gov/planning/profile/apr/2006d115115.html*The 2007 – 2009 data and targets are projections only and are set to meet APR requirements Per 4th cycle MSIP Understanding Your APR 2006 – 2007.http://dese.mo.gov/divimprove/sia/UnderstandingYourAPR2006-2007-4thCycle2006.pdfTargets are subject to change based on actual data and revisions to the APR rubric when it becomes available from the state.

StandardStandard9.4*29.4*2

Page 25: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

2006 – 2008 APR Projections College Placement

2004 2005 2006 Target

2007 Target

2008 Target

5 Year Avg.

58.3% 55.9% 56.9% * 57.9% * 58.9% * 57.6%

Notes: The 2004 and 2005 baseline data was obtained from the DESE Website posted on December 1, 2006.http://dese.mo.gov/planning/profile/apr/2006d115115.html*The 2006 – 2008 data and targets are projections only and is set to meet APR requirements using Below Avg. method in the Status Measure + Annual method in the Progress Measure per 4th cycle MSIP Understanding Your APR 2006 – 2007.http://dese.mo.gov/divimprove/sia/UnderstandingYourAPR2006-2007-4thCycle2006.pdfTargets are subject to change based on actual data and revisions to the APR rubric when it becomes available from the state.

% of Grads Entering College

StandardStandard9.4*39.4*3

Page 26: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

2006 – 2008 APR Projections Career Education Placement

2004 2005 2006 Target

2007 Target

2008 Target

5 Year Avg.

80.2% 74.5% 75.5% * 76.5% * 77.5% * 76.8%

Notes: The 2004 & 2005 baseline data was obtained from the DESE Website posted on December 1, 2006http://dese.mo.gov/planning/profile/apr/2006d115115.html*The 2006 – 2008 data and targets are projections only and are set to meet APR requirements using the Average method in the Status Measure + Annual method in the Progress Measure per 4th Cycle MSIP Understanding Your APR 2006 – 2007.http://dese.mo.gov/divimprove/sia/UnderstandingYourAPR2006-2007-4thCycle2006.pdfTargets are subject to change based on actual data and revisions to the APR rubric when it becomes available from the state.

% CourseCompletersPlaced

StandardStandard9.4*49.4*4

Page 27: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

2007 – 2009 APR Projections Graduation Rate

2005 2006 2007 Target

2008 Target

2009 Target

5 Year Avg.

60.2%

District

55.6%

Targets

93.0% *

70%

98.0% *

77%

100.0%**

85%

81.5%

70%

Notes: The 2005 & 2006 baseline data was obtained from the DESE Website posted on December 1, 2006http://dese.mo.gov/planning/profile/apr/2006d115115.html*The 2007 – 2009 data and targets are projections only and are set to meet APR requirements in 2009 per 4th cycle MSIP Understanding Your APR 2006 – 2007.http://dese.mo.gov/divimprove/sia/UnderstandingYourAPR2006-2007-4thCycle2006.pdf** The 2009 Target meet the APR requirement using the Below Avg. method in the Status Measure + Annual/Rolling Avg. method(s) in the Progress Measure.Targets are subject to change based on actual data and revisions to the APR rubric when it becomes available from the state.

% Gradua-tion Rate

StandardStandard9.59.5

Page 28: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

2007 – 2009 APR Projections Attendance Rate

2005 2006 2007 Target

2008 Target

2009 Target

5 Year Avg.

81.5%

District

83.1%

Targets

100.0% *

90%

100.0% *

91%

100.0%**

92%

92.9%

88%

Notes: The 2005 & 2006 baseline data was obtained from the DESE Website posted on December 1, 2006http://dese.mo.gov/planning/profile/apr/2006d115115.html*The 2007 – 2009 data and targets are projections only and are set to meet APR requirements in 2009 per 4th cycle MSIP Understanding Your APR 2006 – 2007.http://dese.mo.gov/divimprove/sia/UnderstandingYourAPR2006-2007-4thCycle2006.pdf** The 2009 Target meet the APR requirement using the Below Avg. method in the Status Measure + Annual/Rolling Avg/3 over 2 method(s) in the Progress Measure.Targets are subject to change based on actual data and revisions to the APR rubric when it becomes available from the state.

GradesK - 12

StandardStandard9.69.6

Page 29: UPDATED COMPREHENSIVE SCHOOL IMPROVEMENT PLAN (CSIP) Implementing the Missouri Standards for Performance, Process and Resource used in the Missouri School.

2007 – 2009 APR Projections Subgroup Achievement

2006 2007 Target

2008 Target

2009 Target

Average

30.0%District Targets

85.0% *

40%

90.0% *

50%

95.0% **

60%

75.0%

45.0%

% of SubgroupsMET

Notes: The 2005 & 2006 baseline data was obtained from the DESE Website posted on December 1, 2006http://dese.mo.gov/planning/profile/apr/2006d115115.html*The 2007 – 2009 data and targets are projections only and are set to meet APR requirements in 2009 per 4th cycle MSIP Understanding Your APR 2006 – 2007.http://dese.mo.gov/divimprove/sia/UnderstandingYourAPR2006-2007-4thCycle2006.pdf** The 2009 Target meet the APR requirement using the High 2 method in the Status Measure. Targets are subject to change based on actual data and revisions to the APR rubric when it becomes available from the state.

StandardStandard9.79.7