Top Banner
Update on the SOUTHWEST COASTAL LA Project Governor’s Advisory Commission Meeting August 7, 2013 Abbeville, LA committed to our coast committed to our coast
10

Update on the SOUTHWEST COASTAL LA Project Governor’s Advisory Commission Meeting August 7, 2013 Abbeville, LA committed to our coast.

Jan 04, 2016

Download

Documents

Gerard Lucas
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Update on the SOUTHWEST COASTAL LA Project Governor’s Advisory Commission Meeting August 7, 2013 Abbeville, LA committed to our coast.

Update on the SOUTHWEST COASTAL LA Project

Governor’s Advisory Commission MeetingAugust 7, 2013

Abbeville, LA

committed to our coastcommitted to our coast

Page 2: Update on the SOUTHWEST COASTAL LA Project Governor’s Advisory Commission Meeting August 7, 2013 Abbeville, LA committed to our coast.

Coastal Protection and Restoration Authority of Louisiana

Page 3: Update on the SOUTHWEST COASTAL LA Project Governor’s Advisory Commission Meeting August 7, 2013 Abbeville, LA committed to our coast.

Coastal Protection and Restoration Authority of Louisiana

• The Feasibility Cost Share Agreement was signed between CPRA and the Corps in January 2009.

• The study is multi-purpose = coastal restoration and hurricane protection. Is cost shared 50-50 between the CPRA and the Corps.

• The Project Delivery Team has the active participation of many stakeholder groups and agencies.

• Study was transitioned to the Corps new 3X3X3 planning paradigm (SMART Planning).

• Funds have been made available to complete the study.

Southwest Coastal Overview

Page 4: Update on the SOUTHWEST COASTAL LA Project Governor’s Advisory Commission Meeting August 7, 2013 Abbeville, LA committed to our coast.

Coastal Protection and Restoration Authority of Louisiana

Status

• The Study has produced a Feasibility Scoping Report and a Value Engineering Report.

• Full structural inventory has been completed.

• Hydraulic models developed:• ADCIRC model (storm surge)• Regional Circulation (salinity)

• The current schedule indicates a Draft Feasibility Report in November 2013 and and a Chief’s Report Milestone in September 2014.

• The Alternatives Milestone (all work to date, plus the alternatives carried forward) was approved by the Corps vertical team in June 2013.

• Measure types under evaluation are in concert with the 2012

State Master Plan.

Page 5: Update on the SOUTHWEST COASTAL LA Project Governor’s Advisory Commission Meeting August 7, 2013 Abbeville, LA committed to our coast.

Coastal Protection and Restoration Authority of Louisiana

Page 6: Update on the SOUTHWEST COASTAL LA Project Governor’s Advisory Commission Meeting August 7, 2013 Abbeville, LA committed to our coast.

NER Focused Array of Alternatives

• No Action Plan (Future without-project condition)• Large Integrated Restoration Across Basins• Moderate Integrated Restoration (Hydrologic Emphasis)• Moderate Integrated Restoration, including Gum Cove• Entry Salinity Control (Emphasis)• Interior Perimeter Salinity Control (Emphasis)• Marsh and Shoreline (Minimal Hydraulic & Salinity

Control)

Page 7: Update on the SOUTHWEST COASTAL LA Project Governor’s Advisory Commission Meeting August 7, 2013 Abbeville, LA committed to our coast.

Coastal Protection and Restoration Authority of Louisiana

Page 8: Update on the SOUTHWEST COASTAL LA Project Governor’s Advisory Commission Meeting August 7, 2013 Abbeville, LA committed to our coast.

NED Focused Array of Alternatives

• No Action Plan (Future without-project condition)• Lake Charles Risk Reduction Structural Feature• Abbeville Risk Reduction Structural Feature• Lake Charles Structural and Abbeville Non-

Structural• Abbeville Structural and Lake Charles Non-

Structural• Non-structural plan

Page 9: Update on the SOUTHWEST COASTAL LA Project Governor’s Advisory Commission Meeting August 7, 2013 Abbeville, LA committed to our coast.

Upcoming Milestone Schedule

29 Oct 2013 Tentative Selected Plan

15 Nov 2013 Public Review/ ATR/ IEPR

30 Jun 2014 Final Report Milestone/ CWRB

25 Jul 2014 State and Agency Review Complete

30 Sep 2014 Chief’s Report Milestone

9

Page 10: Update on the SOUTHWEST COASTAL LA Project Governor’s Advisory Commission Meeting August 7, 2013 Abbeville, LA committed to our coast.

Coastal Protection and Restoration Authority of Louisiana

Discussion/Questions

Norwyn [email protected]

Darrel [email protected]

Southwest Coastal