UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall
Jan 05, 2016
UCN 2014-Shutdown Schedule
UCN Monthly Meeting(July 24, 2013)
L.Lee, C.Marshall
2014 UCN Installation Resource-Loaded Schedule 2
(Draft version forwarded to M.Keyzer, in preparation for SAS submission)
Total ~15 wksO
pen
up ~
3 w
kM
ain
wor
k ~
2 m
thC
lose
up
~4
wk
2014 UCN Installation Schedule (Rolled up) 3
2014 UCN Installation Schedule (Tasks) 4
Core “immovable” block (2014 or 2015?)
Ope
n up
& D
isco
nnec
t
2014 UCN Installation Schedule (Tasks) 5
Cor
e B
lock
& J
ack-
up/A
lign
1BV
B2
2014 UCN Installation Schedule (Tasks) 6
Install Septum & Dipole (1UB2) magnets, then BL1U Monitors/Blockers,then restore 1A monitors & SM’s
2014 UCN Installation Schedule (Tasks) 7
Ser
vice
s in
par
alle
l (C
ontr
acto
rs)
Shi
eld-
Plu
g &
Clo
se u
p
2014 UCN Installation Schedule & Resources (FTE-days) 8
Rolled-up Tasks in Yellow
2014 UCN Installation Schedule & Resources (FTE-days) 9
2014 UCN Installation Schedule & Resources (FTE-days) 10
2014 UCN Installation Schedule & Resources (FTE-days) 11
Summary of Resources (partial)
(“Vetted” w/ D.Preddy, C.Marshall, M.Keyzer)
“TRIUMF” Resources Some “Outside” Contractors
2 BL Alignment Techs for (part of) 9 wks
Open up
2014 UCN Installation (Resource Req.) 12
Close up
Dismantle M13 Infrastructureafter 2014 Shutdown
.T-BL
.T-Plant
2014 UCN Installation (Resource Req.) 13
Open upMain Install
Dismantle M13 Infrastructureafter 2014 Shutdown.T-Mech
.T-Vac
UCN Installation Details & Timeframes
(D2O Cryostat) 10-20 K D2O Ice “Cold” Moderator
Source for Cold Neutrons(“New” Cold Moderator for TRIUMF)
UCN Cryostats
(He-II Cryostat)4.0/0.8/0.9 K 4He,3He,He-II“Superthermal” Converter
Source for Ultra-Cold Neutrons(“Keep” UCN Source for an extra year)
15
UCN Installation Timeframes (Current Schedule)
N
2014 Shutdown
2015 Non-Shutdown& 2016 Shutdown
(Beam & UCN-Source Comm. later in 2016)
6 months
2015 Shutdown6 months
4 months
16
16
Alternate UCN Installation Scenario
N
2014 Shutdown
2015 Non-S/D & 2016
Shutdown(Beam Comm. in
2016)
2015 Shutdown17
2017 Shutdown(Install He-II
cryostat & rest of UCN Source)
17
Important to installnew Shielding Plug & Septum
in 2014 S/D to decouple future UCN installations from Cycl. Operations