UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall
17

UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.

Jan 05, 2016

Download

Documents

Merryl Hancock
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.

UCN 2014-Shutdown Schedule

UCN Monthly Meeting(July 24, 2013)

L.Lee, C.Marshall

Page 2: UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.

2014 UCN Installation Resource-Loaded Schedule 2

(Draft version forwarded to M.Keyzer, in preparation for SAS submission)

Page 3: UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.

Total ~15 wksO

pen

up ~

3 w

kM

ain

wor

k ~

2 m

thC

lose

up

~4

wk

2014 UCN Installation Schedule (Rolled up) 3

Page 4: UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.

2014 UCN Installation Schedule (Tasks) 4

Core “immovable” block (2014 or 2015?)

Ope

n up

& D

isco

nnec

t

Page 5: UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.

2014 UCN Installation Schedule (Tasks) 5

Cor

e B

lock

& J

ack-

up/A

lign

1BV

B2

Page 6: UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.

2014 UCN Installation Schedule (Tasks) 6

Install Septum & Dipole (1UB2) magnets, then BL1U Monitors/Blockers,then restore 1A monitors & SM’s

Page 7: UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.

2014 UCN Installation Schedule (Tasks) 7

Ser

vice

s in

par

alle

l (C

ontr

acto

rs)

Shi

eld-

Plu

g &

Clo

se u

p

Page 8: UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.

2014 UCN Installation Schedule & Resources (FTE-days) 8

Rolled-up Tasks in Yellow

Page 9: UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.

2014 UCN Installation Schedule & Resources (FTE-days) 9

Page 10: UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.

2014 UCN Installation Schedule & Resources (FTE-days) 10

Page 11: UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.

2014 UCN Installation Schedule & Resources (FTE-days) 11

Summary of Resources (partial)

(“Vetted” w/ D.Preddy, C.Marshall, M.Keyzer)

“TRIUMF” Resources Some “Outside” Contractors

Page 12: UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.

2 BL Alignment Techs for (part of) 9 wks

Open up

2014 UCN Installation (Resource Req.) 12

Close up

Dismantle M13 Infrastructureafter 2014 Shutdown

.T-BL

.T-Plant

Page 13: UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.

2014 UCN Installation (Resource Req.) 13

Open upMain Install

Dismantle M13 Infrastructureafter 2014 Shutdown.T-Mech

.T-Vac

Page 14: UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.

UCN Installation Details & Timeframes

Page 15: UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.

(D2O Cryostat) 10-20 K D2O Ice “Cold” Moderator

Source for Cold Neutrons(“New” Cold Moderator for TRIUMF)

UCN Cryostats

(He-II Cryostat)4.0/0.8/0.9 K 4He,3He,He-II“Superthermal” Converter

Source for Ultra-Cold Neutrons(“Keep” UCN Source for an extra year)

15

Page 16: UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.

UCN Installation Timeframes (Current Schedule)

N

2014 Shutdown

2015 Non-Shutdown& 2016 Shutdown

(Beam & UCN-Source Comm. later in 2016)

6 months

2015 Shutdown6 months

4 months

16

16

Page 17: UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.

Alternate UCN Installation Scenario

N

2014 Shutdown

2015 Non-S/D & 2016

Shutdown(Beam Comm. in

2016)

2015 Shutdown17

2017 Shutdown(Install He-II

cryostat & rest of UCN Source)

17

Important to installnew Shielding Plug & Septum

in 2014 S/D to decouple future UCN installations from Cycl. Operations