UC San Diego SEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014 PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M. BID PACKAGE: 2A ‐ DEMOLITION ESTIMATED CONSTRUCTION COST: $450,000 CONTRACTOR'S NAME LUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING CASPER COMPANY NO BID CEMENT CUTTING 483,950.00 $ N/A (84,000.00) $ N/A N/A 399,950.00 $ CLANCY CONTRACTING NO BID PALM ENGINEERING NO BID US DEMOLITION NO BID LVI SERVICES NO BID ‐ ‐ x ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ x x PREQUALIFIED x x x ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
26
Embed
UC San Diegormp-public.ucsd.edu/fdc/Bid Results/4768 Argo Hall Bid... · 2014. 4. 18. · bid package: 12a ‐ window coverings estimated construction cost: $30,000 contractor's name
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 2A ‐ DEMOLITION ESTIMATED CONSTRUCTION COST: $450,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 5A ‐ MISC. METALS AND RAILINGS ESTIMATED CONSTRUCTION COST: $800,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDINGANDERSON CHARNESKY STRUCTURAL STEEL, INC. $ 530,000.00 N/A N/A N/A N/A 530,000.00$
MCMAHON STEEL COMPANY
PREQUALIFIED
x
718,022.00$ x
$ 718,022.00 ‐$ ‐$ ‐$ ‐$
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 6A ‐ MILLWORK ESTIMATED CONSTRUCTION COST: $75,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 6B ‐ SOLID SURFACE / STONE COUNTERS ESTIMATED CONSTRUCTION COST: $140,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
AMERICAN MARBLE $ 162,240.00 ‐$ ‐$ 250.00$ ‐$ 162,490.00$
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 8A ‐ DOORS, FRAMES AND HARDWARE ESTIMATED CONSTRUCTION COST: $200,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
STANDARD DRYWALL 427,150.00$ N/A N/A 21,150.00$ N/A 448,300.00$
x
x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 9B ‐ CERAMIC AND STONE TILE ESTIMATED CONSTRUCTION COST: $345,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
AMERICAN MARBLE NO BID ‐ ‐ ‐ ‐ ‐
CHRISTIAN BROTHERS $ 210,653.00 N/A N/A N/A N/A 210,653.00$
CONTINENTAL MARBLE & TILE NO BID ‐ ‐ ‐ ‐ ‐
HOWARDS RUG 275,190.00$ ‐$ ‐$ ‐$ ‐$ 275,190.00$
PARAMOUNT TILE NO BID ‐ ‐ ‐ ‐ ‐
PRO SPECTRA CONTRACT FLOORING NO BID ‐ ‐ ‐ ‐ ‐
PROVIDENCE VENTURE (PVI) NO BID ‐ ‐ ‐ ‐ ‐x
x
x
x
x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 9C ‐ ACOUSTICAL CEILINGS ESTIMATED CONSTRUCTION COST: $12,500
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
BEST INTERIORS $ 16,475.00 N/A N/A N/A N/A 16,475.00$
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 9D ‐ RESILIENT FLOORING, CARPET, BASE ESTIMATED CONSTRUCTION COST: $300,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
CHRISTIAN BROTHERS $ 287,967.00 N/A (1,371.00)$ N/A N/A 286,596.00$
HOWARDS RUG $ 414,352.00 ‐$ ‐$ ‐$ ‐$ 414,352.00$
PRO SPECTRA CONTRACT FLOORING $ 313,374.00 ‐$ ‐$ ‐$ ‐$ 313,374.00$ x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 9E ‐ PAINTING AND WALLCOVERING ESTIMATED CONSTRUCTION COST: $515,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
GENERAL COATING $ 847,528.90 38,436.64$ ‐$ ‐$ ‐$ 885,965.54$
MC PAINTING $ 425,836.00 ‐$ ‐$ ‐$ ‐$ 425,836.00$
PECORARO INC. $ 513,000.00 6,000.00$ N/A N/A N/A 519,000.00$
VASQUEZ CONSTRUCTION 538,749.00$ 8,015.00$ ‐$ ‐$ ‐$ 546,764.00$
x
x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 10A ‐ SIGNAGE AND GRAPHICS ESTIMATED CONSTRUCTION COST: $100,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 10B ‐ SPECIALTIES AND ACCESSORIES ESTIMATED CONSTRUCTION COST: $135,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 12A ‐ WINDOW COVERINGS ESTIMATED CONSTRUCTION COST: $30,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
A1 QUALITY BLINDS $ 6,750.00 ‐ ‐ ‐ ‐ 6,750.00$
CONTRACT DÉCOR NO BID ‐ ‐ ‐ ‐ ‐
SHEWARDS & SONS NO BID ‐ ‐ ‐ ‐ ‐x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 12B ‐ FFE MOVING AND STORAGE ESTIMATED CONSTRUCTION COST: $135,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
UNIVERSITY MECHANICAL 533,692.00$ ‐$ ‐$ ‐$ ‐$ 533,692.00$ x
x
x
x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 23A ‐ HVAC ESTIMATED CONSTRUCTION COST: $225,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
ACCO ENGINEERED SYSTEMS $ 184,000.00 N/A N/A N/A N/A 184,000.00$
JACKSON & BLANC $ 208,075.00 N/A N/A N/A N/A 208,075.00$
UNIVERSITY MECHANICAL $ 122,061.00 ‐$ ‐$ ‐$ ‐$ 122,061.00$ x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 26A ‐ ELECTRICAL AND FIRE ALARM ESTIMATED CONSTRUCTION COST: $1,250,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
BAKER ELECTRIC $ 1,161,200.00 ‐$ ‐$ ‐$ ‐$ 1,161,200.00$
FULLER ELECTRIC $ 762,345.00 N/A N/A N/A N/A 762,345.00$
NEAL ELECTRIC 543,026.00$ N/A N/A 5,000.00$ N/A 548,026.00$
x
x
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 32A ‐ LANDSCAPING AND GRADING ESTIMATED CONSTRUCTION COST: $35,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
VALLEY CREST $ 114,222.00 N/A N/A N/A N/A 114,222.00$
PALM ENGINEERING Non‐Responsive ‐ ‐ ‐ ‐ ‐
PREQUALIFIED
x
x
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 33A ‐ UNDERGROUND UTILITIES ESTIMATED CONSTRUCTION COST: $25,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 49A ‐ FINAL CLEAN ESTIMATED CONSTRUCTION COST: $25,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING
UC San DiegoSEALED BID NO.: 4768/A4L‐372/966270 DATE: 4/15/2014PROJECT: ARGO HALL FIRE & LIFE SAFETY UPGRADES TIME: 2:00 P.M.BID PACKAGE: 49C ‐ MAN HOIST AND OPERATION ESTIMATED CONSTRUCTION COST: $150,000
CONTRACTOR'S NAMELUMP SUM ALTERNATE #1 ALTERNATE #2 ALTERNATE #3 ALTERNATE #4 UNIT PRICE TOTAL
TIME BID RECEIVED YES NO BASE BID SOFFIT COVERS REDUCE SCOPE LAVATORY WALL SCAFFOLDING OPERATOR