Top Banner
FACILITIES DESIGN & CONSTRUCTION SEALED BID NO.: DATE: 11/5/15 PROJECT: 4917/A4L-400/962470 TIME: 2:00 P.M. PROJECT DELIVERY METHOD: BID BUILD ESTIMATED CONSTRUCTION COST: $1,300,000 CONTRACTOR'S NAME LUMP SUM CITY - TIME REC'D BID YES NO BASE BID TOTAL ALIGN BUILDERS, INC. La Jolla- 1:53pm BARNHART-REESE CONSTRUCTION, INC. San Diego- 1:55pm W.E. O'NEIL San Diego- 1:56pm PRAVA CONSTRUCTION SERVICES, INC. Escondido- 1:57pm ROBINSON BUILDING COMPLEX SCHOOL OF GLOBAL POLICY & STRATEGY (GPS) RENOVATION PREQUALIFIED DAILY RATE OF COMPENSATION X 10 MULTIPLIER $1,264,755 $1 X 10 $10 X 10 $0 $0 $1,264,765 $1,286,283 $1 X 10 $10 $1,286,293 10 $100 $1,323,554 10 $0 $0 $0 10 $0 X X X X X $1,323,454 $10 X 10 $10 $1,153,362 X $1,153,352 $1 X
7

FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid Summary... · 2015. 11. 9. · date: 11/5/15 project: 4917/a4l-400/962470 time: 2:00 p.m. project delivery

Jul 20, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid Summary... · 2015. 11. 9. · date: 11/5/15 project: 4917/a4l-400/962470 time: 2:00 p.m. project delivery

FACILITIES DESIGN & CONSTRUCTION

SEALED BID NO.: DATE: 11/5/15

PROJECT: 4917/A4L-400/962470 TIME: 2:00 P.M.

PROJECT DELIVERY METHOD: BID BUILD ESTIMATED CONSTRUCTION COST: $1,300,000

CONTRACTOR'S NAME LUMP SUMCITY - TIME REC'D BID YES NO BASE BID TOTAL

ALIGN BUILDERS, INC.

La Jolla- 1:53pmBARNHART-REESE CONSTRUCTION, INC.

San Diego- 1:55pmW.E. O'NEIL

San Diego- 1:56pmPRAVA CONSTRUCTION SERVICES, INC.

Escondido- 1:57pm

ROBINSON BUILDING COMPLEX SCHOOL OF GLOBAL POLICY & STRATEGY (GPS) RENOVATION

PREQUALIFIED DAILY RATE OF COMPENSATIONX 10 MULTIPLIER

$1,264,755 $1 X 10 $10X

10 $0 $0

$1,264,765

$1,286,283 $1 X 10 $10 $1,286,293

10 $100 $1,323,554

10 $0 $0

$010 $0

X

X

X

X

X $1,323,454 $10 X

10 $10 $1,153,362X $1,153,352 $1 X

Page 2: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid Summary... · 2015. 11. 9. · date: 11/5/15 project: 4917/a4l-400/962470 time: 2:00 p.m. project delivery
Page 3: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid Summary... · 2015. 11. 9. · date: 11/5/15 project: 4917/a4l-400/962470 time: 2:00 p.m. project delivery
Page 4: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid Summary... · 2015. 11. 9. · date: 11/5/15 project: 4917/a4l-400/962470 time: 2:00 p.m. project delivery

ROBINSON BUILDING COMPLEX Project No.: 4917/ML-400/962470 SCHOOL OF GLOBAL POLICY & STRATEGY (GPS) RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO

9.0 LIST OF SUBCONTRACTORS

BIDDING COMPANY'S NAME:_A_l_ig_n_B_u_i_ld_e_rs_,_ln_c_. ___ _

Bidder will use Subcontractors for the Worlc

Yes_!_ No

If "yes," provide in the spaces below (a) the name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid.

Portion of the Work Activity

(e.g. electrical, mechanical, concrete)

April29,2015 LF/BF/MP-BF

****REF

Subcontractor Name of Business Location of Business License No.

(City)

-RENCE ATTACHED~ :UBCONTRACTOR LI. 1T***

(Note: Add additional pages if required.)

Bid Form 4

Page 5: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid Summary... · 2015. 11. 9. · date: 11/5/15 project: 4917/a4l-400/962470 time: 2:00 p.m. project delivery

h /~LIG BUIL.DERS I NC

SUBCONTRACTOR LIST

UCSD Robinson Bui lding GPS Re ovation

-- -----1 DEMOLITION Anton Lakeside 861069 - - - --- ----- - - - ·----·--·------- ----- - - - . -------- --- - -· --2 DFH Arnie La Mesa 766712

------ --·---- ----·-- ----------- - - -· ··---- . ---·-··- ------ -- . --- ·-- -·- ··- -- ---12 GLAZING GP Acoustics Carlsbad 605515

- ------ -- ------·------------- . ---- . - - -- --- ----- - ------ ---- -- - . ~ --- -----13 ER~fy1J~_Q[g_~~A._L~-------- _ EL H_obbs _______ __ _-------~Ca!~~----- _______ ] 77073 ---

_1 ~- __ __ FLOORJ_N_G _ _ ·--- _ _ __ ·--- _W~!_k_p_I~~ ______ !'_lpi_~~ _ _ _ ___ _?~~?_6-~---_ 16 ________ _PAl~l_ __ . _ Ce~~~_ry_ _ -- ~~ _q_i~!!~. _____ 89?~7 __ _

17 ACOUSTICAL GP Acoustics Carlsbad 605515 -- - --· -- -· -·- ·--- -- - -- - - - -- --- - ----- - -- - -- 2Q _ _ _ -~§~~GE _ ____ ___ Ey~ C~tch~r ··- - - _ __ Escondido ---- ---·· _ 774217 __ _

21 FIRE PROTECTION Bradshaw Santee 383330 . ------- - - - ·-·----- -- - -----··- --- - - --- . - ·-·-·--·---------·-- - - - -- - -

23 HVAC Alpha Sa_n ~~!!o___ ___ __ _ 847~~--=-~~ -_ ·-··-_ --~1~~TRICAL-- - "!f~ --q~ -~grrg .. ; -~4i_a~~g~~~-- _ Flewev-~_l?[p. _ ~~813 6~~1~

25 FIR~_ALJ\R~ ______ ___ ___ _l).!_mplex ______ §a~~i~o __ 9~0~7 ---·

11 /5/201 5 Page of l BUILD TOGETHER I www.alignbuilders.com

Page 6: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid Summary... · 2015. 11. 9. · date: 11/5/15 project: 4917/a4l-400/962470 time: 2:00 p.m. project delivery

ROBINSON BUILDING COMPLEX Project No.: 4917/ML-400/962470 SCHOOL OF GLOBAL POLICY & STRATEGY (GPS) RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO

9.0 LIST OF SUBCONTRACTORS

BIDDING COMPANY'S NAME: PRAVA Construction Services, Inc.

Bidder will use Subcontractors for the Work:

Yes~ No

If "yes," provide in the spaces below (a) the name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid.

Portion of the Work Activity

(e.g. electrical, mechanical, concrete)

Demolition

Doors/Frames/Hardware

Metal Stud Framing

Flooring

- .. _,~-- .. Qll

"- ·- .. II,.... I

·----··-

Acoustic Ceilinqs

{i\ ~. _ .. , .... ;:,

HVAC

Fire Sprinkler

Electrical

Data

Fire Alarm

Access Controls/Surveillance

~ (o"-$. ~ c.. \)..,U

April 29, 2015 LF/BF/MP-BF

Subcontractor Name of Business Location of Business License No.

(City)

SoCal Building & Restoration Spring Valley 1003205

JSI Door, Inc, El Cajon 842268

KT Construction Lemon Grove 892715

'.".: .. • ,..,,.., SP-rvir-C!s ... .. -'irin -----/ "'4..,, lll"ll_"

r-·· -· ,... -~ _.iLy, II IL., ·- ~.:)LOvu

(, n-<.c;'\- Cit1.1 ~t°"'iT.t Sun \"::>\'e c:.b ~Q~~,...,

'-' -- - ... - - ---··· ·~"'· II IL.

f;:, I L.;;;J;;;J

F\ \ 0 h ""- ""~'"' (4. \ 5"'n ~\ e.'\ ~ g \.\-, 4 ~ '-'\ ' -

" <?-! -~'.l °'ti l \ 1.\~(\ ~l(t ~{~\i M \h S-\-"'" -·- - ,,. -{r.., \l <t\, A-t"1 c.. ~\ Ca. ~1'n 71c \ ~"&

I -C<.t.L'-1 fl~r'1c.. (\ c~\Of\ 1 ~c \'51?

1 -f \of r o- (ni\M. ~ ~h>l'll 1 C..,r\.; ~.._~ b '~ \ s 3 -;, t.~C.I'\ s tt'\~\L(~U S""'" "D\e,l> 'ISi~q<c,

-\"..l 1'\~~-\ CJu l+r'""'Mc ' (~.I\ ~1..P e.D

~~d.~ \\ .....

(Note: Add additional pages if required .)

Bid Form 4

Page 7: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid Summary... · 2015. 11. 9. · date: 11/5/15 project: 4917/a4l-400/962470 time: 2:00 p.m. project delivery

ROBINSON BUILDING COMPLEX Project No.: 4917/ML-400/962470 SCHOOL OF GLOBAL POLICY & STRATEGY (GPS) RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO

9.0 LIST OF SUBCONTRACTORS

BIDDING COMPANY'S NAME: PRAVA Construction Services, Inc.

Bidder will use Subcontractors for the Work:

Yes~ No

If "yes," provide in the spaces below (a) the name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid.

Portion of the Work Activity

(e.g. electrical, mechanical, concrete)

tli. \ II\.\', r'\t:..

April 29, 2015 LF/BF/MP-BF

J

Subcontractor Name of Business Location of Business License No.

(City)

!\\\ c;.,,, l'(. l lnmlM • • ~'• .Y"\ !)\ <a\:) 9~3"3"1 ....

(Note: Add additional pages if required.)

Bid Form 4