TUGAS AKHIR ANALISIS WAKTU DAN BIAYA METODE PEKERJAAN PIER HEAD CAST IN SITU DAN PIER HEAD PRECAST PADA PROYEK INFRASTRUCTURE FLY OVER Diajukan sebagai syarat untuk meraih gelar Sarjana Teknik Strata 1 (S-1) Disusun Oleh : Nama : MUHAMMAD ZAENAL ARIFIN NIM : 41111120046 PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS MERCU BUANA TERAKREDITASI A BERDASARKAN BADAN AKREDITASI NASIONAL PERGURUAN TINGGI NOMOR : 242/SK/BAN-PT/AK-XVI/S1/XII/2013 2016 http://digilib.mercubuana.ac.id/
15
Embed
TUGAS AKHIR ANALISIS WAKTU DAN BIAYA METODE PEKERJAAN PIER HEAD CAST IN SITU DAN … · 2016-09-23 · TUGAS AKHIR. ANALISI. S. WAKTU DAN BIAYA . METODE PEKERJAAN . PIER HEAD CAST
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
TUGAS AKHIR
ANALISIS WAKTU DAN BIAYA
METODE PEKERJAAN PIER HEAD CAST IN SITU DAN PIER HEAD PRECAST
PADA PROYEK INFRASTRUCTURE FLY OVER
Diajukan sebagai syarat untuk meraih gelar Sarjana Teknik Strata 1 (S-1)
Disusun Oleh :
Nama : MUHAMMAD ZAENAL ARIFIN
NIM : 41111120046
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MERCU BUANA
TERAKREDITASI A BERDASARKAN BADAN AKREDITASI NASIONAL
PERGURUAN TINGGI NOMOR : 242/SK/BAN-PT/AK-XVI/S1/XII/2013
2016
http://digilib.mercubuana.ac.id/
ii
http://digilib.mercubuana.ac.id/
iii
http://digilib.mercubuana.ac.id/
iv
http://digilib.mercubuana.ac.id/
v
KATA PENGANTAR
Segala puji dan syukur penulis panjatkan kehadirat Allah SWT, karena hanya
dengan izin serta rahmat-Nya yang telah memberikan kemampuan kepada penulis sehingga
dapat menyelesaikan Tugas Akhir ini dalam upaya melengkapi persyaratan menjadi sarjana
pada program studi Teknik Sipil Universitas Mercu Buana.
Tugas Akhir ini disusun sebagai salah satu syarat kelulusan mahasiswa semester
akhir Teknik Sipil – Universitas Mercu Buana dan sebagai tambahan pengetahuan dan
pengalaman bagi penulis sendiri.
Penulisan Tugas Akhir ini dapat diselesaikan tidak lepas dari bimbingan, arahan,
dan dukungan dari berbagai pihak. Oleh karena itu, penulis mengucapkan terima kasih
kepada semua pihak yang terkait dalam penulisan Tugas Akhir, yaitu kepada :
1. Allah SWT yang telah memberikan kesehatan dan kesempatan kepada penulis
sehingga penulis dapat menyelesaikan Tugas Akhir ini.
2. Bapak Ir. Mawardi Amin, MT. selaku Ketua Program Studi Teknik Sipil bagi
penulis yang telah memberikan arahan, bimbingan serta waktunya dalam
penyelesaian Tugas Akhir ini.
3. Ibu Mirnayani, ST, MT. selaku Pembimbing bagi penulis yang telah memberikan
arahan, bimbingan serta waktunya dalam penyelesaian Tugas Akhir ini.
4. Bapak Zaedun dan Ibu Sunah sebagai orang tua tercinta yang senantiasa
memberikan dorongan baik secara materil maupun moril yang selalu
membangkitkan semangat penulis.
5. Pihak kontraktor PT Waskita Karya yang memberikan dukungan berupa data dan
bimbingan dalam proses penulisan tugas akhir ini.
6. Seluruh Dosen dan Staf Program Studi Teknik Sipil Universitas Mercubuana.
http://digilib.mercubuana.ac.id/
vi
7. Teman-teman Mahasiswa Teknik Sipil Angkatan XX Universitas Mercubuana
yang selalu memberikan warna dalam proses perkuliahan.
8. Pihak-pihak lain yang telah banyak membantu, yang tidak dapat disebutkan
Tabel 3.1 Uraian Ringkas Proyek Jalan Tol Becakayu Seksi I ................................. III-1
Tabel 4.1 Waktu Pelaksanaan Pier Head Cast In Situ ............................................. IV-7
Tabel 4.2 Volume Pekerjaan Pier Head Cast In Situ ............................................... IV-8
Tabel 4.3 Harga Satuan Bahan Bangunan ............................................................... IV-9
Tabel 4.4 Harga Satuan Upah Pekerjaan Pengecoran............................................... IV-9
Tabel 4.5 Harga Satuan Upah Pekerjaan Pembesian ................................................ IV-9
Tabel 4.6 Harga Satuan Upah Pekerjaan Beton K-350 ............................................ IV-10
Tabel 4.7 Harga Satuan Upah Pekerjaan Bekisting .................................................. IV-11
Tabel 4.8 Harga Satuan Upah Pekerjaan Besi Beton ............................................... IV-11
Tabel 4.9 Harga Satuan Upah Pekerjaan Stressing Dan Grouting ............................ IV-12
Tabel 4.10 Harga Satuan Upah Pekerjaan Shooring ................................................ IV-12
Tabel 4.11 Biaya Pelaksanaan Pekerjaan Pier Head Cast In Situ ............................. IV-12
Tabel 4.12 Waktu Pelaksanaan Pekerjaan Pier Head Presast .................................. IV-22
Tabel 4.13 Harga Satuan Pekerjaan Beton K-500 .................................................... IV-23
http://digilib.mercubuana.ac.id/
xiii
Tabel 4.12 Harga Satuan Pekerjaan Erection/Instal ................................................. IV-23
Tabel 4.12 Biaya Pelaksanaan Pekerjaan Pier Head Precast ................................... IV-24
http://digilib.mercubuana.ac.id/
xiv
DAFTAR PUSTAKA
Akbar, Amirul dkk (2013) “Perencanaan Metode Kerja, Waktu Pelaksanaan, Dan Anggaran Biaya Box Girder Dengan Metode Launching Gantry Dan Traveller Pada Proyek Pembangunan Jalan Layang Non-Tol Antasari-Blok M, Jakarta”. Bandung: Politeknik Negeri Bandung.
Budiarso, Tri (2007) “Tinjauan Optimalisasi Biaya Dan Waktu Menggunakan Metode Least Cost Scheduling (Studi Kasus: Proyek Fly Over Arif Rahman Hakim, Depok)”. Depok: Universitas Indonesia.
Diansyah, Asmar (2014) “Analisis Biaya Perbandingan Metode Kerja Sistem Shoring Dengan Sistem Bracket Pada Konstruksi Pier-Head Jembatan”. Jakarta: Universitas Muhamadiyah.
Hedy, Krisna Permana dkk (2013) “Analisa Perbandingan Biaya Dan Waktu Pelaksanaan Bekisting Metode Semi Sistem Berdasarkan Strategi Rotasi Pada Proyek Gedung Bertingkat Tinggi (Studi Kasus: Proyek FMIPA ITS Surabaya)”. Surabaya: Universitas Teknologi Sepuluh November.
Hardivanta, I Dewa Made Yudi (2015) “Optimalisasi Waktu Dan Biaya Pelaksanaan Pekerjaan Dengan Metode Least Cost Analysis (Studi Kasus: Proyek Pembangunan dan Perluasan Kantor Bupati Klungkung)”. Denpasar: Universitas Udayana.
Iramutyn, Ermis Vera (2010) “Optimalisasi Waktu Dan Biaya Dengan Metode Crash (Studi Kasus : Proyek Pemeliharaan Gedung Dan Bangunan Rumah Sakit Orthopedi Prof. Dr. R. Soeharso Surakarta)”. Surakarta: Universitas Sebelas Maret.
Messah, Yunita Afliana dkk (2013) “Pengendalian Waktu Dan Biaya Pekerjaan Konstruksi Sebagai Dampak Dari Perubahan Desain (Studi Kasus Embung Irigasi Oenaem, Kecamatan Biboki Selatan, Kabupaten Timor Tengah Utara)”. Kupang: Universitas Nusa Cendana.
Rosadi, Tiara Marlita (2013) “Analisa Efisiensi antara Waktu dan Biaya Percepatan Pelaksanaan pada Kegiatan Pembangunan Jalan H.M. Ardan di Kota Samarinda”. Samarinda: Universitas 17 Agustus 1945.
Tarore, Michael Kareth H. Dkk (2012) “Analisis Optimalisasi Waktu Dan Biaya Dengan Program Primavera 6.0 (Studi Kasus: Proyek Perumahan Puri Kelapa Gading)”. Samarinda: Universitas Sam Ratulangi.