Lampiran Hal - 1 RENCANA ANGGARAN BIAYA DAFTAR HARGA SATUAN PROGRAM : PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM DAN AIR LIMBAH KEGIATAN : PENYEDIAAN PRASARANA DAN SARANA AIR BERSIH/AIR MINUM (PENUNJANG) PEKERJAAN : PERENCANAAN PRASARANA DAN SARANA AIR BERSIH LOKASI : KECAMATAN DUSUN TIMUR - KABUPATEN BARITO TIMUR NO ANALISA SATUAN VOLUME HARGA SATUAN JUMLAH HARGA 1 3 4 5 6 7 I PEKERJAAN PERSIAPAN / SITEWORK 1 Pek. Papan Nama Proyek LS Unit 1.00 250,000.00 250,000.00 2 Pek. Pengukuran LS Lokasi 1.00 3,380,000.00 3,380,000.00 3,630,000.00 II A. 2.3.1.1. M3 283.20 87,167.70 24,685,892.64 A. 2.3.1.1. M3 976.05 87,167.70 85,080,033.59 LS M1 706.00 150,000.00 105,900,000.00 A.8.4.1.21 M1 1180.00 546,962.47 645,415,715.78 A.8.4.1.20.b M1 5205.60 354,466.18 1,845,209,141.40 A. 2.3.1.9. M3 94.40 64,832.40 6,120,178.56 A. 2.3.1.9. M3 325.35 64,832.40 21,093,221.34 A.8.4.5.5 M1 1180.00 1,840.94 2,172,307.31 A.8.4.5.4.b M1 5205.60 1,769.18 9,209,635.08 2,744,886,125.70 III A.8.4.3.16.c Bh 2.00 1,326,623.62 2,653,247.25 A.8.4.3.15.d Bh 1.00 1,132,282.57 1,132,282.57 A.8.4.3.16 Bh 1.00 2,706,623.62 2,706,623.62 A.8.4.3.15.b Bh 1.00 1,534,782.57 1,534,782.57 LS Bh 1.00 1,092,500.00 1,092,500.00 A.8.4.3.1.b Bh 2.00 3,793,854.19 7,587,708.37 LS Bh 4.00 2,000,000.00 8,000,000.00 LS Bh 8.00 15,000.00 120,000.00 24,827,144.39 IV LS Unit 1.00 51,750,000.00 51,750,000.00 LS Unit 3.00 34,500,000.00 103,500,000.00 LS Unit 4.00 2,500,000.00 10,000,000.00 165,250,000.00 V A. 4.1.1.3. M3 52.95 1,183,509.52 62,666,829.16 62,666,829.16 3,001,260,099.24 RENCANA ANGGARAN DAN BIAYA (RAB) JENIS PEKERJAAN 2 JUMLAH I PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA DISTRIBUSI Galian Tanah Biasa Pipa Ø 8" Galian Tanah Biasa Pipa Ø 6" Pembongkaran Aspal Galian Pipa Ø 6" Pemasangan Pipa HDPE Ø 200 mm (8") Pemasangan Pipa HDPE Ø 160 mm (6") Urugan Tanah Kembali Pipa Ø 8" Urugan Tanah Kembali Pipa Ø 6" Pengetesan Pipa HDPE Ø 200 mm (8") Pengetesan Pipa HDPE Ø 160 mm (6") JUMLAH II PEKERJAAN PENGADAAN DAN PEMASANGAN AKSESORIS PIPA JUMLAH I+II+III+IV+V JUMLAH III PENGADAAN DAN PEMASANGAN POMPA Pengadaan Pompa Distribusi Centrifugal 15 KW Pengadaan Dozing PEKERJAAN LAINNYA Cor Jalur Pipa Rabat Beton K-150 Tebal 25 cm JUMLAH V Pemasangan Pompa JUMLAH IV Karet Packing Ø 160 mm (6") Mur dan Baut Bend 90˚ HDPE Ø 200 mm (8") Bend 90˚ HDPE Ø 160 mm (6") Tee All Socket HDPE Ø 200 x 160 mm Tee All Socket HDPE Ø 160 x 160 mm Reducer HDPE Ø 160 x 110 mm Air Valve Ø 160 mm (6")
18

RENCANA ANGGARAN DAN BIAYA (RAB)repository.untag-sby.ac.id/6788/6/3. Lampiran foto dan... · 2020. 12. 16. · RENCANA ANGGARAN DAN BIAYA (RAB) JENIS PEKERJAAN 2 JUMLAH I PEKERJAAN

Aug 22, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: RENCANA ANGGARAN DAN BIAYA (RAB)repository.untag-sby.ac.id/6788/6/3. Lampiran foto dan... · 2020. 12. 16. · RENCANA ANGGARAN DAN BIAYA (RAB) JENIS PEKERJAAN 2 JUMLAH I PEKERJAAN

Lampiran Hal - 1

RENCANA ANGGARAN BIAYA

DAFTAR HARGA SATUAN

PROGRAM : PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM DAN AIR LIMBAH

KEGIATAN : PENYEDIAAN PRASARANA DAN SARANA AIR BERSIH/AIR MINUM (PENUNJANG)

PEKERJAAN : PERENCANAAN PRASARANA DAN SARANA AIR BERSIH

LOKASI : KECAMATAN DUSUN TIMUR - KABUPATEN BARITO TIMUR

NO ANALISA SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

1 3 4 5 6 7

I PEKERJAAN PERSIAPAN / SITEWORK

1 Pek. Papan Nama Proyek LS Unit 1.00 250,000.00 250,000.00

2 Pek. Pengukuran LS Lokasi 1.00 3,380,000.00 3,380,000.00

3,630,000.00

II

A. 2.3.1.1. M3 283.20 87,167.70 24,685,892.64

A. 2.3.1.1. M3 976.05 87,167.70 85,080,033.59

LS M1 706.00 150,000.00 105,900,000.00

A.8.4.1.21 M1 1180.00 546,962.47 645,415,715.78

A.8.4.1.20.b M1 5205.60 354,466.18 1,845,209,141.40

A. 2.3.1.9. M3 94.40 64,832.40 6,120,178.56

A. 2.3.1.9. M3 325.35 64,832.40 21,093,221.34

A.8.4.5.5 M1 1180.00 1,840.94 2,172,307.31

A.8.4.5.4.b M1 5205.60 1,769.18 9,209,635.08

2,744,886,125.70

III

A.8.4.3.16.c Bh 2.00 1,326,623.62 2,653,247.25

A.8.4.3.15.d Bh 1.00 1,132,282.57 1,132,282.57

A.8.4.3.16 Bh 1.00 2,706,623.62 2,706,623.62

A.8.4.3.15.b Bh 1.00 1,534,782.57 1,534,782.57

LS Bh 1.00 1,092,500.00 1,092,500.00

A.8.4.3.1.b Bh 2.00 3,793,854.19 7,587,708.37

LS Bh 4.00 2,000,000.00 8,000,000.00

LS Bh 8.00 15,000.00 120,000.00

24,827,144.39

IV

LS Unit 1.00 51,750,000.00 51,750,000.00

LS Unit 3.00 34,500,000.00 103,500,000.00

LS Unit 4.00 2,500,000.00 10,000,000.00

165,250,000.00

V

A. 4.1.1.3. M3 52.95 1,183,509.52 62,666,829.16

62,666,829.16

3,001,260,099.24

RENCANA ANGGARAN DAN BIAYA (RAB)

JENIS PEKERJAAN

2

JUMLAH I

PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA DISTRIBUSI

Galian Tanah Biasa Pipa Ø 8"

Galian Tanah Biasa Pipa Ø 6"

Pembongkaran Aspal Galian Pipa Ø 6"

Pemasangan Pipa HDPE Ø 200 mm (8")

Pemasangan Pipa HDPE Ø 160 mm (6")

Urugan Tanah Kembali Pipa Ø 8"

Urugan Tanah Kembali Pipa Ø 6"

Pengetesan Pipa HDPE Ø 200 mm (8")

Pengetesan Pipa HDPE Ø 160 mm (6")

JUMLAH II

PEKERJAAN PENGADAAN DAN PEMASANGAN AKSESORIS PIPA

JUMLAH I+II+III+IV+V

JUMLAH III

PENGADAAN DAN PEMASANGAN POMPA

Pengadaan Pompa Distribusi Centrifugal 15 KW

Pengadaan Dozing

PEKERJAAN LAINNYA

Cor Jalur Pipa Rabat Beton K-150 Tebal 25 cm

JUMLAH V

Pemasangan Pompa

JUMLAH IV

Karet Packing Ø 160 mm (6")

Mur dan Baut

Bend 90˚ HDPE Ø 200 mm (8")

Bend 90˚ HDPE Ø 160 mm (6")

Tee All Socket HDPE Ø 200 x 160 mm

Tee All Socket HDPE Ø 160 x 160 mm

Reducer HDPE Ø 160 x 110 mm

Air Valve Ø 160 mm (6")

Page 2: RENCANA ANGGARAN DAN BIAYA (RAB)repository.untag-sby.ac.id/6788/6/3. Lampiran foto dan... · 2020. 12. 16. · RENCANA ANGGARAN DAN BIAYA (RAB) JENIS PEKERJAAN 2 JUMLAH I PEKERJAAN

Lampiran Hal - 2

DAFTAR HARGA SATUAN

No. Bahan / Upah Sat H.Satuan

Bahan

KAYU

Kayu Klas III M3 5,200,000.00

Kayu Dolken Btg 15,500.00

BAJA

Besi Beton U-24 Kg 18,342.50

Kawat Beton Kg 21,800.00

Rangka Atap Baja Ringan M2 155,129.00

Tiang Pipa Besi Galvanis Ø 1.5" Tinggi 260 cm M1 200,000.00

Klem / U -Clip Bh 20,000.00

Panel Pagar BRC Ukuran 240 x 240 cm Lbr 825,000.00

Pintu Swing Ganda 250 x 240 Unit 1,750,000.00

BATU, TANAH, PASIR DAN MATERIAL BETON

Batu koral/split 1/2 M3 616,100.00

Pasir beton M3 231,800.00

Pasir pasang M3 231,800.00

Pasir urug M3 66,700.00

Semen PC Kg 1,730.00

Semen warna Kg 2,870.00

Air Bersih Ltr 4.80

PAKU DAN MUR

Paku 5-10 Kg 20,300.00

Pasir beton M3 231,800.00

Paku Sekrup Bh 550.00

PENUTUP ATAP

Genteng Metal Lbr 160,000.00

Nok Metal Lbr 35,000.00

PLAFOND

Gypsum 9 mm Lbr 89,800.00

List Profil Gypsum 5 mm M1 20,000.00

Rangka Metal Hollow 40.40.2 mm M1 27,500.00

BAHAN FINISHING

Minyak Bekesting Ltr 5,500.00

Plamur Kg 12,800.00

Cat Dasar Kg 37,500.00

Cat Penutup Kg 37,500.00

DAFTAR HARGA SATUAN BAHAN DAN UPAH

BARITO TIMUR

SEMESTER I TAHUN 2016 (JANUARI - JUNI)

Page 3: RENCANA ANGGARAN DAN BIAYA (RAB)repository.untag-sby.ac.id/6788/6/3. Lampiran foto dan... · 2020. 12. 16. · RENCANA ANGGARAN DAN BIAYA (RAB) JENIS PEKERJAAN 2 JUMLAH I PEKERJAAN

Lampiran Hal - 3

DAFTAR HARGA SATUAN

MATERIAL PERPIPAAN

Pipa HDPE Ø 250 mm (10") Bh 695,200.00

Pipa HDPE Ø 200 mm (8") Bh 447,200.00

Pipa HDPE Ø 160 mm (6") Bh 286,500.00

Dop HDPE Ø 250 mm (10") Bh 400,000.00

Dop HDPE Ø 200 mm (8") Bh 300,000.00

Dop HDPE Ø 160 mm (6") Bh 215,000.00

Bend 90˚ HDPE Ø 250 mm (10") Bh 1,800,000.00

Bend 90˚ HDPE Ø 200 mm (8") Bh 1,100,000.00

Bend 90˚ HDPE Ø 160 mm (6") Bh 950,000.00

Tee All Socket HDPE Ø 250 mm (10") Bh 4,200,000.00

Tee All Socket HDPE Ø 200 mm (8") Bh 2,300,000.00

Tee All Socket HDPE Ø 160 mm (6") Bh 1,300,000.00

Reducer HDPE Ø 160 - 110 mm Bh 950,000.00

Air Valve Ø 250 mm (10") Bh 5,000,000.00

Air Valve Ø 200 mm (8") Bh 4,000,000.00

Air Valve Ø 1600 mm (6") Bh 3,000,000.00

Karet Packing Ø 200 mm (8") Bh 1,200,000.00

Karet Packing Ø 160 mm (6") Bh 1,000,000.00

Mur dan Baut Bh 15,000.00

POMPA AIR

Pengadaan Pompa Distribusi Centrifugal 15 KW Unit 45,000,000.00

Pompa Dosing Unit 30,000,000.00

MATERIAL MEKANIKAL DAN ELEKTRIKAL

Kabel PLN NYY 4x16 M1 80,000.00

Tiang Listrik Besi Galvanis PLN Bh 2,000,000.00

Bensin Ltr 8,000.00

Oli Ltr 35,000.00

Upah Tenaga Kerja

Pekerja OH 95,220.00

Tukang Kayu OH 124,200.00

Tukang Batu OH 124,200.00

Tukang Besi OH 108,900.00

Tukang Cat OH 124,200.00

Tukang Gali OH 95,220.00

Kepala Tukang Kayu OH 130,680.00

Kepala Tukang Batu OH 154,980.00

Kepala Tukang Besi OH 154,980.00

Kepala Tukang Cat OH 154,980.00

Mandor OH 175,320.00

Page 4: RENCANA ANGGARAN DAN BIAYA (RAB)repository.untag-sby.ac.id/6788/6/3. Lampiran foto dan... · 2020. 12. 16. · RENCANA ANGGARAN DAN BIAYA (RAB) JENIS PEKERJAAN 2 JUMLAH I PEKERJAAN

Lampiran Hal - 4

ANALISA HARGA SATUAN

A. 2.3.1.1. Penggalian 1 m3 tanah Biasa sedalam 1 m

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.750 95,220.00 71,415.00

Mandor L.04 OH 0.025 175,320.00 4,383.00

75,798.00

B BAHAN

C PERALATAN

D 75,798.00

E 11,369.70

F 87,167.70

A. 2.3.1.9. Pengurugan kembali 1 m3 galian tanah

Pengurugan kembali 1 3 galian dihitung dari1/3 kali dari koefisien pekerjaan galian

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.5 95,220.00 47,610.000

Mandor L.04 OH 0.1 175,320.00 8,766.000

56,376.00

B BAHAN

C PERALATAN

D 56,376.00

E 8,456.40

F 64,832.40

A. 2.3.1.11. Pengurugan 1 m3 dengan pasir urug

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.300 95,220.00 28,566

Mandor L.04 OH 0.010 175,320.00 1,753

30,319

B BAHAN

Pasir Urug M3 1.20 66,700 80,040.00

C PERALATAN

D 110,359.20

E 16,553.88

F 126,913.08 Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah(A+B+C)

Overhead & Profit 15% x D

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

ANALISA HARGA SATUAN PEKERJAAN

PERMEN PU NOMOR : 11 / PRT / M / 2013

Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah(A+B+C)

Overhead & Profit 15% x D

Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah(A+B+C)

Overhead & Profit 15% x D

Page 5: RENCANA ANGGARAN DAN BIAYA (RAB)repository.untag-sby.ac.id/6788/6/3. Lampiran foto dan... · 2020. 12. 16. · RENCANA ANGGARAN DAN BIAYA (RAB) JENIS PEKERJAAN 2 JUMLAH I PEKERJAAN

Lampiran Hal - 5

ANALISA HARGA SATUAN

A. 4.1.1.1. Membuat 1 m3 Mutu K-100

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 1.650 95,220.00 157,113.00

Tukang Batu 0.275 124,200.00 34,155.00

Kepala Tukang 0.028 154,980.00 4,339.44

Mandor L.04 OH 0.083 175,320.00 14,551.56

210,159.00

B BAHAN

Semen Portland Kg 230.000 1,730.00 397,900

Pasir Pasang Kg 893.000 165.57 147,855

Batu Pecah 1-2 Kg 1,027.000 165.57 170,042

Air Liter 200.000 4.80 960

716,757

C PERALATAN

D 926,916.14

E 139,037.42

F 1,065,953.56

A. 4.1.1.3. Membuat 1 m3 Mutu K-150

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 1.65 95,220.00 157,113.00

Tukang Batu 0.28 124,200.00 34,155.00

Kepala Tukang 0.03 154,980.00 4,339.44

Mandor L.04 OH 0.08 175,320.00 14,551.56

210,159.00

B BAHAN

Semen Portland Kg 299.00 1,730.00 517,270

Pasir Pasang Kg 799.00 165.57 132,292

Batu Pecah 1-2 Kg 1,017.00 165.57 168,386

Air Liter 215.00 4.80 1,032

818,980

C PERALATAN

D 1,029,138.71

E 154,370.81

F 1,183,509.52

A. 4.1.1.28. Membuat 1 m3 Pondasi beton bertulang (200 kg besi + bekisting)

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 5.300 95,220.00 504,666.00

Tukang Batu L.02 OH 0.275 124,200.00 34,155.00

Tukang Kayu L.02 OH 1.300 124,200.00 161,460.00

Tukang Besi L.02 OH 1.050 108,900.00 114,345.00

Kepala Tukang Batu L.03 OH 0.262 154,980.00 40,604.76

Mandor L.04 OH 0.265 175,320.00 46,459.80

901,690.56

B BAHAN

Kayu Kelas III m3 0.200 5,200,000.00 1,040,000.00

Paku 5 Cm - 12 Cm kg 1.500 20,300.00 30,450.00

Minyak bekisting Liter 0.400 5,500.00 2,200.00

Besi Beton polos kg 157.500 18,342.50 2,888,943.75

Kawat Beton kg 2.250 21,800.00 49,050.00

Semen Portland 40 Kg kg 336.000 1,730.00 581,280.00

Pasir Pasang m3 0.540 165.57 89.41

Batu Pecah 1-2 m3 0.810 165.57 134.11

4,592,147.27

C PERALATAN

D 5,493,837.83

E 824,075.67

F 6,317,913.51 Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah(A+B+C)

Overhead & Profit 15% x D

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

A.4.1.1 HARGA SATUAN PEKERJAAN BETON

Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah(A+B+C)

Overhead & Profit 15% x D

Jumlah(A+B+C)

Overhead & Profit 15% x D

Harga Satuan Pekerjaan (D+E)

Page 6: RENCANA ANGGARAN DAN BIAYA (RAB)repository.untag-sby.ac.id/6788/6/3. Lampiran foto dan... · 2020. 12. 16. · RENCANA ANGGARAN DAN BIAYA (RAB) JENIS PEKERJAAN 2 JUMLAH I PEKERJAAN

Lampiran Hal - 6

ANALISA HARGA SATUAN

A. 4.1.1.29. Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 5.650 95,220.00 537,993.00

Tukang Batu L.02 OH 0.275 124,200.00 34,155.00

Tukang Kayu L.02 OH 1.560 124,200.00 193,752.00

Tukang Besi L.02 OH 1.400 108,900.00 152,460.00

Kepala Tukang L.03 OH 0.323 154,980.00 50,058.54

Mandor L.04 OH 0.283 175,320.00 49,615.56

1,018,034.10

B BAHAN

Kayu Kelas III m3 0.270 5,200,000.00 1,404,000.00

Paku 5 Cm - 12 Cm kg 2.000 20,300.00 40,600.00

Minyak bekisting Liter 0.600 5,500.00 3,300.00

Besi Beton polos kg 210.000 18,342.50 3,851,925.00

Kawat Beton kg 3.000 21,800.00 65,400.00

Semen Portland 40 Kg kg 336.000 1,730.00 581,280.00

Pasir Pasang m3 0.540 165.57 89.41

Batu Pecah 1-2 m3 0.810 165.57 134.11

5,946,728.52

C PERALATAN

D 6,964,762.62

E 1,044,714.39

F 8,009,477.01

A. 4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 cm, plafon

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.350 95,220.00 33,327.00

Tukang Kayu L.02 OH 0.350 124,200.00 43,470.00

Kepala Tukang Kayu L.03 OH 0.035 154,980.00 5,424.30

Mandor L.04 OH 0.018 175,320.00 3,155.76

85,377.06

B BAHAN

Rangka Metal Hollow 40.40.2 mm m' 4.000 27,500.00 110,000.00

Asesoris ls 100%xrangka 27,500.00 27,500.00

137,500.00

C PERALATAN

D 222,877.06

E 33,431.56

F 256,308.62

A. 4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.1 95,220.00 9,522.00

Tukang Kayu L.02 OH 0.05 124,200.00 6,210.00

Kepala Tukang L.03 OH 0.005 154,980.00 774.90

Mandor L.04 OH 0.005 175,320.00 876.60

17,383.50

B BAHAN

GypsuM Board Lembar 0.364 165,000.00 60,060.00

Paku Sekrup Kg 0.11 27,500.00 3,025.00

63,085.00

C PERALATAN

D 80,468.50

E 12,070.28

F 92,538.78 Harga Satuan Pekerjaan (D+E)

Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah(A+B+C)

Overhead & Profit 15% x D

Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah(A+B+C)

Overhead & Profit 15% x D

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah(A+B+C)

Overhead & Profit 15% x D

Page 7: RENCANA ANGGARAN DAN BIAYA (RAB)repository.untag-sby.ac.id/6788/6/3. Lampiran foto dan... · 2020. 12. 16. · RENCANA ANGGARAN DAN BIAYA (RAB) JENIS PEKERJAAN 2 JUMLAH I PEKERJAAN

Lampiran Hal - 7

ANALISA HARGA SATUAN

A. 4.5.2.32.b. Pemasangan 1 m2 Atap Zincalume

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.2 95,220.00 19,044.00

Tukang Kayu L.02 OH 0.1 124,200.00 12,420.00

Kepala Tukang L.03 OH 0.01 154,980.00 1,549.80

Mandor L.04 OH 0.001 175,320.00 175.32

33,189.12

B BAHAN

Atap Zincalume Bh 1.02 160,000.00 163,200.00

Paku Metal Kg 0.2 27,500.00 5,500.00

168,700.00

C PERALATAN

D 201,889.12

E 30,283.37

F 232,172.49

A. 4.5.2.36. Pemasangan 1 m' nok Atap Zincalume

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.25 95,220.00 23,805.00

Tukang Kayu L.02 OH 0.15 124,200.00 18,630.00

Kepala Tukang L.03 OH 0.015 154,980.00 2,324.70

Mandor L.04 OH 0.013 175,320.00 2,279.16

47,038.86

B BAHAN

Nok Atap Zincalume Bh 1.1 35,000.00 38,500.00

Paku Metal Kg 0.05 27,500.00 1,375.00

39,875.00

C PERALATAN

D 86,913.86

E 13,037.08

F 99,950.94

A. 4.7.1.10. Pengecetan 1 m2 tembok baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.200 95,220.00 19,044.00

Tukang Cat L.02 OH 0.063 124,200.00 7,824.60

Kepala Tukang L.03 OH 0.006 154,980.00 976.37

Mandor L.04 OH 0.003 175,320.00 525.96

28,370.93

B BAHAN

Palmur Kg 0.10 12,800.00 1,280.00

Cat Dasar Kg 0.100 37,500.00 3,750.00

Cat Penutup Kg 0.260 37,500.00 9,750.00

14,780.00

C PERALATAN

D 43,150.93

E 6,472.64

F 49,623.57

Overhead & Profit 15% x D

Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah(A+B+C)

Overhead & Profit 15% x D

15% x D

Harga Satuan Pekerjaan (D+E)

Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah(A+B+C)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah(A+B+C)

Overhead & Profit

Page 8: RENCANA ANGGARAN DAN BIAYA (RAB)repository.untag-sby.ac.id/6788/6/3. Lampiran foto dan... · 2020. 12. 16. · RENCANA ANGGARAN DAN BIAYA (RAB) JENIS PEKERJAAN 2 JUMLAH I PEKERJAAN

Lampiran Hal - 8

ANALISA HARGA SATUAN

A.8.4.1.20.b Pemasangan 1 m pipa HDPE Ø 160 mm

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.062 95,220.00 5,903.64

Tukang pipa L.02 OH 0.031 108,900.00 3,375.90

Mandor L.04 OH 0.006 175,320.00 1,051.92

10,331.46

B BAHAN

Pipa HDPE Ø 160 mm m 1.000 286,500.00 286,500.00

286,500.00

C PERALATAN

Sewa Tripot/Tackel & handle crane 2 T hari 0.019 600,000.00 11,400.00

11,400.00

D 308,231.46

E 46,234.72

F 354,466.18

A.8.4.1.21 Pemasangan 1 m pipa HDPE Ø 200 mm

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.102 95,220.00 9,712.44

Tukang pipa L.02 OH 0.051 108,900.00 5,553.90

Mandor L.04 OH 0.010 175,320.00 1,753.20

17,019.54

B BAHAN

Pipa HDPE Ø 200 mm m 1.000 447,200.00 447,200.00

447,200.00

C PERALATAN

Sewa Tripot/Tackel & handle crane 2 T hari 0.019 600,000.00 11,400.00

11,400.00

D 475,619.54

E 71,342.93

F 546,962.47

A.8.4.1.22 Pemasangan 1 m pipa HDPE Ø 250 mm

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.133 95,220.00 12,664.26

Tukang pipa L.02 OH 0.067 108,900.00 7,296.30

Mandor L.04 OH 0.013 175,320.00 2,279.16

B BAHAN

Pipa HDPE Ø 250 mm m 1.000 695,200.00 695,200.00

695,200.00

C PERALATAN

Sewa Tripot/Tackel & handle crane 2 T hari 0.042 600,000.00 25,200.00

25,200.00

D 720,400.00

E 108,060.00

F 828,460.00

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah (A+B+C)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Overhead & Profit (Contoh 15 %) 15% x D

Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

15% x D

Harga Satuan Pekerjaan (D+E)

15% x D

Harga Satuan Pekerjaan (D+E)

JUMLAH HARGA ALAT

Jumlah (A+B+C)

Overhead & Profit (Contoh 15 %)

Overhead & Profit (Contoh 15 %)

JUMLAH HARGA ALAT

Jumlah (A+B+C)

Page 9: RENCANA ANGGARAN DAN BIAYA (RAB)repository.untag-sby.ac.id/6788/6/3. Lampiran foto dan... · 2020. 12. 16. · RENCANA ANGGARAN DAN BIAYA (RAB) JENIS PEKERJAAN 2 JUMLAH I PEKERJAAN

Lampiran Hal - 9

ANALISA HARGA SATUAN

A.8.4.5.4.b Pengetesan 1 m pipa Ø 160 mm

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.008 95,220.00 761.76

Mandor L.04 OH 0.0008 175,320.00 140.26

902.02

B BAHAN

Air test (air bersih) m3

0.018 4,800.00 86.40

Bahan bakar liter 0.060 8,000.00 480.00

Oli liter 0.002 35,000.00 70.00

636.40

C PERALATAN

D 1,538.42

E 230.76

F 1,769.18

A.8.4.5.5 Pengetesan 1 m pipa Ø 200 mm

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.008 95,220.00 761.76

Mandor L.04 OH 0.0008 175,320.00 140.26

902.02

B BAHAN

Air test (air bersih) m3

0.031 4,800.00 148.80

Bahan bakar liter 0.060 8,000.00 480.00

Oli liter 0.002 35,000.00 70.00

698.80

C PERALATAN

D 1,600.82

E 240.12

F 1,840.94

A.8.4.5.6 Pengetesan 1 m pipa Ø 250 mm

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.008 95,220.00 761.76

Mandor L.04 OH 0.0008 175,320.00 140.26

902.02

B BAHAN

Air test (air bersih) m3

0.049 4,800.00 235.20

Bahan bakar liter 0.060 8,000.00 480.00

Oli liter 0.002 35,000.00 70.00

785.20

C PERALATAN

D 1,687.22

E 253.08

F 1,940.30 Harga Satuan Pekerjaan (D+E)

Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah (A+B+C)

Overhead & Profit (Contoh 15 %) 15% x D

JUMLAH HARGA ALAT

Jumlah (A+B+C)

Overhead & Profit (Contoh 15 %) 15% x D

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah (A+B+C)

Overhead & Profit (Contoh 15 %) 15% x D

Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Page 10: RENCANA ANGGARAN DAN BIAYA (RAB)repository.untag-sby.ac.id/6788/6/3. Lampiran foto dan... · 2020. 12. 16. · RENCANA ANGGARAN DAN BIAYA (RAB) JENIS PEKERJAAN 2 JUMLAH I PEKERJAAN

Lampiran Hal - 10

ANALISA HARGA SATUAN

A.8.4.3.1.b Pemasangan 1 buah Valve Ø 160 mm

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 1.429 95,220.00 136,069.38

Tukang pipa L.02 OH 0.715 108,900.00 77,863.50

Mandor L.04 OH 0.143 175,320.00 25,070.76

239,003.64

B BAHAN

Valve Ø 160 mm bh 1.000 3,000,000.00 3,000,000.00

3,000,000.00

C PERALATAN

Sewa Tripot/Tackel & handle crane 2 T hari 0.100 600,000.00 60,000.00

60,000.00

D 3,299,003.64

E 494,850.55

F 3,793,854.19

A.8.4.3.2 Pemasangan 1 buah Valve Ø 200 mm

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 1.714 95,220.00 163,207.08

Tukang pipa L.02 OH 0.857 108,900.00 93,327.30

Mandor L.04 OH 0.171 175,320.00 29,979.72

286,514.10

B BAHAN

Valve Ø 200 mm bh 1.000 4,000,000.00 4,000,000.00

4,000,000.00

C PERALATAN

Sewa Tripot/Tackel & handle crane 2 T hari 0.300 600,000.00 180,000.00

180,000.00

D 4,466,514.10

E 669,977.12

F 5,136,491.22

A.8.4.3.3 Pemasangan 1 buah Valve Ø 250 mm

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 1.714 95,220.00 163,207.08

Tukang pipa L.02 OH 0.857 108,900.00 93,327.30

Mandor L.04 OH 0.171 175,320.00 29,979.72

286,514.10

B BAHAN

Valve Ø 250 mm bh 1.000 5,000,000.00 5,000,000.00

5,000,000.00

C PERALATAN

Sewa Tripot/Tackel & handle crane 2 T hari 0.400 600,000.00 240,000.00

240,000.00

D 5,286,514.10

E 792,977.12

F 6,079,491.22 Harga Satuan Pekerjaan (D+E)

Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah (A+B+C)

Overhead & Profit (Contoh 15 %) 15% x D

Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah (A+B+C)

Overhead & Profit (Contoh 15 %) 15% x D

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah (A+B+C)

Overhead & Profit (Contoh 15 %) 15% x D

Page 11: RENCANA ANGGARAN DAN BIAYA (RAB)repository.untag-sby.ac.id/6788/6/3. Lampiran foto dan... · 2020. 12. 16. · RENCANA ANGGARAN DAN BIAYA (RAB) JENIS PEKERJAAN 2 JUMLAH I PEKERJAAN

Lampiran Hal - 11

ANALISA HARGA SATUAN

A.8.4.3.15.b Pemasangan 1 buah Tee Ø 160 mm

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.106 95,220.00 10,093.32

Tukang pipa L.02 OH 0.053 108,900.00 5,771.70

Mandor L.04 OH 0.011 175,320.00 1,928.52

17,793.54

B BAHAN

Tee Ø 160 mm bh 1.000 1,300,000.00 1,300,000.00

1,300,000.00

C PERALATAN

Sewa Tripot/Tackel & handle crane 2 T hari 0.028 600,000.00 16,800.00

16,800.00

D 1,334,593.54

E 200,189.03

F 1,534,782.57

A.8.4.3.15.c Pemasangan 1 buah Dop Ø 160 mm

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.106 95,220.00 10,093.32

Tukang pipa L.02 OH 0.053 108,900.00 5,771.70

Mandor L.04 OH 0.011 175,320.00 1,928.52

17,793.54

B BAHAN

Dop Ø 160 mm bh 1.000 215,000.00 215,000.00

215,000.00

C PERALATAN

Sewa Tripot/Tackel & handle crane 2 T hari 0.028 600,000.00 16,800.00

16,800.00

D 249,593.54

E 37,439.03

F 287,032.57

A.8.4.3.15.d Pemasangan 1 buah Bend Ø 160 mm

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.106 95,220.00 10,093.32

Tukang pipa L.02 OH 0.053 108,900.00 5,771.70

Mandor L.04 OH 0.011 175,320.00 1,928.52

17,793.54

B BAHAN

Bend Ø 160 mm bh 1.000 950,000.00 950,000.00

950,000.00

C PERALATAN

Sewa Tripot/Tackel & handle crane 2 T hari 0.028 600,000.00 16,800.00

16,800.00

D 984,593.54

E 147,689.03

F 1,132,282.57

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah (A+B+C)

Overhead & Profit (Contoh 15 %) 15% x D

Harga Satuan Pekerjaan (D+E)

JUMLAH HARGA ALAT

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah (A+B+C)

JUMLAH TENAGA KERJA

Harga Satuan Pekerjaan (D+E)

Overhead & Profit (Contoh 15 %) 15% x D

Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah (A+B+C)

Overhead & Profit (Contoh 15 %) 15% x D

Page 12: RENCANA ANGGARAN DAN BIAYA (RAB)repository.untag-sby.ac.id/6788/6/3. Lampiran foto dan... · 2020. 12. 16. · RENCANA ANGGARAN DAN BIAYA (RAB) JENIS PEKERJAAN 2 JUMLAH I PEKERJAAN

Lampiran Hal - 12

ANALISA HARGA SATUAN

A.8.4.3.16 Pemasangan 1 buah Tee Ø 200 mm

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.216 95,220.00 20,567.52

Tukang pipa L.02 OH 0.108 108,900.00 11,761.20

Mandor L.04 OH 0.022 175,320.00 3,857.04

36,185.76

B BAHAN

Tee Ø 200 mm bh 1.000 2,300,000.00 2,300,000.00

2,300,000.00

C PERALATAN

Sewa Tripot/Tackel & handle crane 2 T hari 0.029 600,000.00 17,400.00

17,400.00

D 2,353,585.76

E 353,037.86

F 2,706,623.62

A.8.4.3.16.b Pemasangan 1 buah Dop Ø 200 mm

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.216 95,220.00 20,567.52

Tukang pipa L.02 OH 0.108 108,900.00 11,761.20

Mandor L.04 OH 0.022 175,320.00 3,857.04

36,185.76

B BAHAN

Dop Ø 200 mm bh 1.000 300,000.00 300,000.00

300,000.00

C PERALATAN

Sewa Tripot/Tackel & handle crane 2 T hari 0.029 600,000.00 17,400.00

17,400.00

D 353,585.76

E 53,037.86

F 406,623.62

A.8.4.3.16.c Pemasangan 1 buah Bend Ø 200 mm

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.216 95,220.00 20,567.52

Tukang pipa L.02 OH 0.108 108,900.00 11,761.20

Mandor L.04 OH 0.022 175,320.00 3,857.04

36,185.76

B BAHAN

Bend Ø 200 mm bh 1.000 1,100,000.00 1,100,000.00

1,100,000.00

C PERALATAN

Sewa Tripot/Tackel & handle crane 2 T hari 0.029 600,000.00 17,400.00

17,400.00

D 1,153,585.76

E 173,037.86

F 1,326,623.62

JUMLAH HARGA ALAT

Jumlah (A+B+C)

Overhead & Profit (Contoh 15 %) 15% x D

Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah (A+B+C)

Overhead & Profit (Contoh 15 %) 15% x D

Harga Satuan Pekerjaan (D+E)

Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah (A+B+C)

Overhead & Profit (Contoh 15 %) 15% x D

Page 13: RENCANA ANGGARAN DAN BIAYA (RAB)repository.untag-sby.ac.id/6788/6/3. Lampiran foto dan... · 2020. 12. 16. · RENCANA ANGGARAN DAN BIAYA (RAB) JENIS PEKERJAAN 2 JUMLAH I PEKERJAAN

Lampiran Hal - 13

ANALISA HARGA SATUAN

A.8.4.3.17 Pemasangan 1 buah Tee Ø 250 mm

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.326 95,220.00 31,041.72

Tukang pipa L.02 OH 0.163 108,900.00 17,750.70

Mandor L.04 OH 0.033 175,320.00 5,785.56

54,577.98

B BAHAN

Tee Ø 250 mm bh 1.000 4,200,000.00 4,200,000.00

4,200,000.00

C PERALATAN

Sewa Tripot/Tackel & handle crane 2 T hari 0.039 600,000.00 23,400.00

23,400.00

D 4,277,977.98

E 641,696.70

F 4,919,674.68

A.8.4.3.17.b Pemasangan 1 buah Dop Ø 250 mm

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.326 95,220.00 31,041.72

Tukang pipa L.02 OH 0.163 108,900.00 17,750.70

Mandor L.04 OH 0.033 175,320.00 5,785.56

54,577.98

B BAHAN

Dop Ø 250 mm bh 1.000 400,000.00 400,000.00

400,000.00

C PERALATAN

Sewa Tripot/Tackel & handle crane 2 T hari 0.039 600,000.00 23,400.00

23,400.00

D 477,977.98

E 71,696.70

F 549,674.68

A.8.4.3.17.c Pemasangan 1 buah Bend Ø 250 mm

No Uraian Kode Satuan KoefisienHarga Satuan

(Rp.)

Jumlah Harga

(Rp.)

A TENAGA

Pekerja L.01 OH 0.326 95,220.00 31,041.72

Tukang pipa L.02 OH 0.163 108,900.00 17,750.70

Mandor L.04 OH 0.033 175,320.00 5,785.56

54,577.98

B BAHAN

Bend Ø 250 mm bh 1.000 1,800,000.00 1,800,000.00

1,800,000.00

C PERALATAN

Sewa Tripot/Tackel & handle crane 2 T hari 0.039 600,000.00 23,400.00

23,400.00

D 1,877,977.98

E 281,696.70

F 2,159,674.68 Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah (A+B+C)

Overhead & Profit (Contoh 15 %) 15% x D

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah (A+B+C)

Overhead & Profit (Contoh 15 %) 15% x D

Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

Overhead & Profit (Contoh 15 %) 15% x D

Harga Satuan Pekerjaan (D+E)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah (A+B+C)

Page 14: RENCANA ANGGARAN DAN BIAYA (RAB)repository.untag-sby.ac.id/6788/6/3. Lampiran foto dan... · 2020. 12. 16. · RENCANA ANGGARAN DAN BIAYA (RAB) JENIS PEKERJAAN 2 JUMLAH I PEKERJAAN

Lampiran Hal - 14

DETAIL ENGINEERING DESIGN

Page 15: RENCANA ANGGARAN DAN BIAYA (RAB)repository.untag-sby.ac.id/6788/6/3. Lampiran foto dan... · 2020. 12. 16. · RENCANA ANGGARAN DAN BIAYA (RAB) JENIS PEKERJAAN 2 JUMLAH I PEKERJAAN

Lampiran Hal - 15

DETAIL ENGINEERING DESIGN

Page 16: RENCANA ANGGARAN DAN BIAYA (RAB)repository.untag-sby.ac.id/6788/6/3. Lampiran foto dan... · 2020. 12. 16. · RENCANA ANGGARAN DAN BIAYA (RAB) JENIS PEKERJAAN 2 JUMLAH I PEKERJAAN

Lampiran Hal - 16

FOTO – FOTO KONSTRUKSI

Page 17: RENCANA ANGGARAN DAN BIAYA (RAB)repository.untag-sby.ac.id/6788/6/3. Lampiran foto dan... · 2020. 12. 16. · RENCANA ANGGARAN DAN BIAYA (RAB) JENIS PEKERJAAN 2 JUMLAH I PEKERJAAN

Lampiran Hal - 17

FOTO – FOTO KONSTRUKSI

Page 18: RENCANA ANGGARAN DAN BIAYA (RAB)repository.untag-sby.ac.id/6788/6/3. Lampiran foto dan... · 2020. 12. 16. · RENCANA ANGGARAN DAN BIAYA (RAB) JENIS PEKERJAAN 2 JUMLAH I PEKERJAAN

Lampiran Hal - 18

FOTO – FOTO KONSTRUKSI