Top Banner
217 217 217 200 200 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56 48 130 120 111 237 237 237 80 119 27 252 174 .59 The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation. Angie Sowers USACE-Baltimore, representing the Maryland Interagency Oyster Restoration Workgroup 10 July 2017 TRED AVON RIVER OYSTER SANCTUARY RESTORATION 1 File Name
6

TRED AVON RIVER OYSTER SANCTUARY RESTORATION … · TRED AVON RIVER OYSTER SANCTUARY RESTORATION 1 File Name. RESTORATION PLAN BY ACREAGE File Name 2 Treatment Total Planned Acreage*

Aug 21, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TRED AVON RIVER OYSTER SANCTUARY RESTORATION … · TRED AVON RIVER OYSTER SANCTUARY RESTORATION 1 File Name. RESTORATION PLAN BY ACREAGE File Name 2 Treatment Total Planned Acreage*

217217217

200200200

255255255

000

163163163

131132122

2396553

110135120

1129256

62102130

1025648

130120111

237237237

8011927

252174.59

“The views, opinions and findings contained in this report are

those of the authors(s) and should not be construed as an

official Department of the Army position, policy or decision,

unless so designated by other official documentation.”

Angie Sowers

USACE-Baltimore, representing the Maryland Interagency Oyster Restoration Workgroup

10 July 2017

TRED AVON RIVER OYSTER

SANCTUARY RESTORATION

1

File Name

Page 2: TRED AVON RIVER OYSTER SANCTUARY RESTORATION … · TRED AVON RIVER OYSTER SANCTUARY RESTORATION 1 File Name. RESTORATION PLAN BY ACREAGE File Name 2 Treatment Total Planned Acreage*

RESTORATION PLAN BY ACREAGE

File Name

2

Treatment Total Planned Acreage* Total Acreage Completed

Seed Only 71 50.2

Substrate and Seed

(9 – 20 ft MLLW)

26 24

Substrate and Seed

(6.5 – 9 ft MLLW)

57 5.9

TOTAL 154 80.1

Restoration Target = 146 acres

This is the full restoration plan as outlined in the Tributary Plan.

*potential, based on initial planning data

Page 3: TRED AVON RIVER OYSTER SANCTUARY RESTORATION … · TRED AVON RIVER OYSTER SANCTUARY RESTORATION 1 File Name. RESTORATION PLAN BY ACREAGE File Name 2 Treatment Total Planned Acreage*

FULL RESTORATION

PLAN

File Name

3

Page 4: TRED AVON RIVER OYSTER SANCTUARY RESTORATION … · TRED AVON RIVER OYSTER SANCTUARY RESTORATION 1 File Name. RESTORATION PLAN BY ACREAGE File Name 2 Treatment Total Planned Acreage*

COMPLETED WORK

File Name

4

38 39

43

41 ,40

46

13

56

59, 60

20, 27

09, 18

03

24

19

23

04A, B

53, 05

27

61

22

44

Page 5: TRED AVON RIVER OYSTER SANCTUARY RESTORATION … · TRED AVON RIVER OYSTER SANCTUARY RESTORATION 1 File Name. RESTORATION PLAN BY ACREAGE File Name 2 Treatment Total Planned Acreage*

File Name

5

Seed Only Sites

Substrate ReefsTributary Plan

Location (Site

ID # on map)

Size

(ac)

Substrate

Type

Substrate

Planting

Height (ft)

Year

Planted

Water

Depth

SS_38 3.31 rock 1 2015 >9 ft

SS_39 2.67 mixed shell 1 2015 >9 ft

SS_41 3.44 rock 1 2015 >9 ft

SS_44 1.75 mixed shell 1 2015 >9 ft

SS_46 3.29 rock 1 2015 >9 ft

SS_56 0.8 mixed shell 1 2015 >9 ft

SS_59 0.74 mixed shell 1 2015 >9 ft

SS_40 1.37 mixed shell 1 2016 >9 ft

SS_43 0.81 mixed shell 1 2016 >9 ft

SS_53 2.63 mixed shell 1 2016 >9 ft

SS_60 1.32 mixed shell 1 2016 >9 ft

SS_61 1.9 mixed shell 1 2017 >9 ft

SS_05 4.11 mixed shell 1 2017 6.5-9 ft

SS_220.43 of

1.43mixed shell 1 2017 6.5-9 ft

SS_27 1.34 mixed shell 1 2017 6.5-9 ft

Total Acreage 29.9

Tributary Plan

Location (Site

ID # on map)

Size (ac) Year Planted

SO_04A 12.98 2016

SO_13 5.94 2016

SO_03 1.95 2017

SO_04B 10.17 2017

SO_09 9.4 2017

SO_18 0.89 2017

SO_19 1.12 2017

SO_20 2.12 2017

SO_23 0.94 2017

SO_24 3.07 2017

SO_27 1.63 2017

Total Acreage 50.2

Page 6: TRED AVON RIVER OYSTER SANCTUARY RESTORATION … · TRED AVON RIVER OYSTER SANCTUARY RESTORATION 1 File Name. RESTORATION PLAN BY ACREAGE File Name 2 Treatment Total Planned Acreage*

LITTLE CHOPTANK RIVER OYSTER RESTORATION

UPDATE

Treatment

Seed Only acres completed 2014-2016 54.4

Substrate and Seed acres completed 2014-2016 123.4

Seed Only acres completed 2017 (to date) 42.7

Acres remaining to be seeded (Seed only) 56.4

File Name

6

• Restoration target is 440 acres.

• Initially 40 acres met the Oyster Metrics Success Criteria.