Transportation Project Solicitations: Transportation Economic Development (TED) & Safety And Mobility (SAM) Interchange Programs Informational Meetings October 2010
Apr 01, 2015
Transportation Project Solicitations:
Transportation Economic Development (TED) & Safety And Mobility (SAM)
Interchange ProgramsInformational Meetings
October 2010
TED Overview
• New collaboration between MnDOT and DEED for highway improvement projects that support economic development
• Seeking projects that will assist development of new business or expanding existing businesses – Target industries: manufacturing, technology, warehousing and
distribution, research and development, agricultural processing, bioscience, tourism/recreation, or does it support industrial park development or mixed use-high density multimodal development
• Looking for projects that will improve the statewide transportation network
TED Funding
• $39 million available– $30 million state trunk highway bonds legislatively
designated for interchanges– $5 million general trunk highway bonds which can be
spent on any projects– $3 million through the Greater Minnesota Business
Development Public Infrastructure (BDPI) Program– $1 million through the Innovative BDPI Program
TED Funding
• $10 Million maximum award (BDPI limit is lower)
• Up to 70% of total infrastructure project costs– Max grant could be less based on state law and policies
• Remaining funds from private and other sources
• Funding split between Metro and Greater MN– Greater MN proposals reviewed separately from Metro
TED Funding
• Trunk highway bonds used for eligible costs in trunk highway
• BDPI funds required to be spent outside trunk highway
• BDPI funds require 50% match• Innovative BDPI funds can be used for
public buildings and equipment
TED Funding Timeline
• October 11 – Solicitation announced, application available
• October 25-28 – Informational sessions held• December 10 – Phase 1 applications due• December 23 – Phase 1 applications selected• January – June 2011 – Phase 2 application and
confirm project readiness
TED Eligible Applicants
• Must be a government entity as defined by state law– Trunk Highway funds eligible applicants include any
government entity– Greater Minnesota BDPI eligible applicants include
statutory home rule charter cities and counties located outside the metropolitan area. (Chisago County is eligible)
– Innovative BDPI eligible applicants include counties, cities, special districts, public higher education institutions, or other public political subdivisions or public corporations throughout the state (including the metropolitan area)
TED Application Process
• Phase 1 (due December 10)– Determine eligibility– Rank projects– Determine grant funding awards
• Phase 2 (January–June 2011)– Approved Phase 1 applicants– Complete additional predevelopment activities– Final proposal to meet compliance requirements
TED Phase 1 Application Scoring
• Eligibility Criteria– Must answer yes to all to be eligible
• Prioritizing Criteria– 35 Points – Transportation System– 35 Points – Economic Development– 20 Points – Financial Plan– 10 Points - Readiness
TED Application
• General Information– Basic applicant and project information– Brief project narrative– Project Costs (just transportation and infrastructure
costs)– Project funding sources and status of commitment
TED Application
• Transportation System (35 Points)– Enhances safety of statewide transportation system– Reduces future crashes– Improves mobility access– Supports modal integration
TED Application
• Economic Development (35 points)– Leads to private investment and job creation/retention in
manufacturing, technology, or other identified business types
– Names of impacted businesses– North American Industry Classification System (NAICS)
Codes– Jobs created in 2 & 5 years– Wages of created jobs– Building and equipment investments within 2 years– Effect on tax base
TED Application
Company NAICS CODE
# of Jobs (2 Years)
# of Jobs (5 Years)
Avg. Wages
Building Cost
Building Type
Building Completion Timing
Equipment Cost
Equipment Type
Equipment Purchase Timing
Minnesota Manufacturing Inc.
123467 30 100 $45,000 per year
$5,000,000 Industrial 12/31/14 $1,000,000 Communications Equipment
3/1/15
Economic Analysis Data Table
TED Application
• Financial Plan (20 points)– Identify all funding sources– If not committed, explain steps to get commitment
• Project Readiness (10 points)– Can project be let by 1/1/14– Project schedule (earlier the better)– Current status for planned development (including
environ.)– Community support from private and public partners –
(ATP and MPO letters of support in Phase 1; Formal approval in Phase 2)
TED Application Tips
• Retail is not an eligible business• Businesses should not be overly speculative• Higher private and/or non-TED leverage will score
better• More secure leverage will score better• Mature projects with developed planning will
score better• Not just interchanges• Must be state trunk highway, if not maybe BDPI• For NAICS see
www.census.gov/eos/www/naics/index.html
TED Application Submission
• Application Deadline: 4:30 p.m. on 12/10/10• Submit one signed copy of the General Project
Information Form and Phase 1 Application• Mail or email to Matt Shands at MnDOT
TED Contact Information
Matt Shands(651) [email protected]
Jeremy LaCroix(651) [email protected]
TED Website: http://tinyurl.com/positivelyminnesotaTED
TRLF Website: http://www.dot.state.mn.us/planning/program/trlf.html
SaM Interchange Program Purpose
Provide funding for “…construction of interchanges involving a trunk highway…” that “…relieve growing traffic congestion, and promote traffic safety…” as appropriated in Minnesota Laws 2010 Chapter 388, Section 2.
SaM Program Particulars
• Applications accepted from Mn/DOT Districts only• For construction of interchanges• $40 million Trunk Highway bonds available• $20 million maximum award to any single project• Up to 100% of the Trunk Highway eligible
construction cost
SaM Program Application Scoring
• 50% KA (Fatal & A-Injury) Crash Cost 2000-2009• 30% Intersection Approach Volume• 20% Non-SaM fund contribution
SaM Program Timeline
• October 11 – Solicitation announced, application available
• October 25-28 – Informational sessions held• December 10 – SaM applications due• December 23 – SaM projects selected• January 1, 2014 – Construction contract award deadline
SaM Contact Information
SaM Website: http://www.dot.state.mn.us/sam
Ed Idzorek(651) [email protected]