Top Banner
US 301(SR 200) / I-10 INTERCHANGE The Florida Department of Transportation invites you to attend a public meeting to discuss proposed transportation improvements to the US 301 (SR 200) / I-10 Interchange in Duval County, Florida. The proposed interchange improvements will include: The construction of a new US 301 northbound to I-10 eastbound on-ramp in the southeast quadrant of the interchange. The reconstruction of the loop ramp in the southwest quadrant of the interchange. The construction of a new two-lane I-10 westbound to US 301 off-ramp in the northeast quadrant of the interchange. Public participation is solicited without regard to race, color, religion, sex, age, national origin, disability or family status. Persons who require special accommodations under the Americans with Disabilities Act or persons who require translation services (free of charge) should contact Jim Knight at the number below at least 7 days before the meeting. Financial Project ID: 428865-1 NOVEMBER 26, 2012 Baldwin Senior Center 850 N. Center Street Baldwin, Florida 32234 4:30-6:00PMOPEN HOUSE Drop by at your convenience 6:00PMCOMMENT PERIOD Make an oral statement during this time See Map on Back for Details CONTACT INFO Jim Knight, P.E. \ Florida DOT, MS 2007 \ 1109 S. Marion Ave. \ Lake City, FL 32025 (800) 749-2967 x 7707 \ (386) 961-7707 \ [email protected]
2

US 301(SR 200) / I-10 INTERCHANGE Interchange...US 301(SR 200) / I-10 INTERCHANGE The Florida Department of Transportation invites you to attend a public meeting to discuss proposed

Mar 18, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: US 301(SR 200) / I-10 INTERCHANGE Interchange...US 301(SR 200) / I-10 INTERCHANGE The Florida Department of Transportation invites you to attend a public meeting to discuss proposed

US 301(SR 200) / I-10 INTERCHANGE

The Florida Department of Transportation invites you to attend a public meeting to discuss proposed transportation improvements to the US 301 (SR 200) / I-10 Interchange in Duval County, Florida. The proposed interchange improvements will include:

The construction of a new US 301 northbound to I-10 eastbound on-ramp in the southeast quadrant of the interchange.

The reconstruction of the loop ramp in the southwest quadrant of the interchange.

The construction of a new two-lane I-10 westbound to US 301 off-ramp in the northeast quadrant of the interchange.

Public participation is solicited without regard to race, color, religion, sex, age, national origin, disability or family status. Persons who require special accommodations under the Americans with Disabilities Act or persons who require translation services (free of charge) should contact Jim Knight at the number below at least 7 days before the meeting.

Financial Project ID: 428865-1

NOVEMBER 26, 2012

Baldwin Senior Center 850 N. Center Street

Baldwin, Florida 32234

4:30-6:00PM—OPEN HOUSE Drop by at your convenience

6:00PM—COMMENT PERIOD Make an oral statement during this time

See Map on Back for Details

CONTACT INFO

Jim Knight, P.E. \ Florida DOT, MS 2007 \ 1109 S. Marion Ave. \ Lake City, FL 32025

(800) 749-2967 x 7707 \ (386) 961-7707 \ [email protected]

Page 2: US 301(SR 200) / I-10 INTERCHANGE Interchange...US 301(SR 200) / I-10 INTERCHANGE The Florida Department of Transportation invites you to attend a public meeting to discuss proposed

N