Continue Continue TOWNLUCKNOW S/SBKT (As on Date- 14/08/2010) S/S FDR Itaunja Feeder Katpoora Feeder Makrandpur FDR Vishwabank Feeder From 132/33 kV N.K.N. S/s 33/11 KV BKT S/S (2x5) MVA
12

TOWN LUCKNOW S/S BKT · S/S‐BKT S.No Description Symbol 1 220 KV S/s 2 132 KV S/s 3 33 KV S/s 4 33 KV Line 5 11 KV Line 6 Underground 11 KV 7 Existing DT 8 33 KV S/s Proposed 9

Aug 21, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TOWN LUCKNOW S/S BKT · S/S‐BKT S.No Description Symbol 1 220 KV S/s 2 132 KV S/s 3 33 KV S/s 4 33 KV Line 5 11 KV Line 6 Underground 11 KV 7 Existing DT 8 33 KV S/s Proposed 9

 Continue Continue  

TOWN‐LUCKNOW           S/S‐ BKT                              (As on Date- 14/08/2010) 

S/S FDR  

Itaunja Feeder 

Katpoora Feeder 

Makrandpur FDR  

Vishwabank Feeder 

From 132/33 kV N.K.N. S/s  

33/11 KV BKT S/S (2x5) MVA 

Page 2: TOWN LUCKNOW S/S BKT · S/S‐BKT S.No Description Symbol 1 220 KV S/s 2 132 KV S/s 3 33 KV S/s 4 33 KV Line 5 11 KV Line 6 Underground 11 KV 7 Existing DT 8 33 KV S/s Proposed 9

 

Continue  Continue  

BKT FDR  

Page 3: TOWN LUCKNOW S/S BKT · S/S‐BKT S.No Description Symbol 1 220 KV S/s 2 132 KV S/s 3 33 KV S/s 4 33 KV Line 5 11 KV Line 6 Underground 11 KV 7 Existing DT 8 33 KV S/s Proposed 9

 

Continue  

Continue  

Continue  

TOWN‐LUCKNOW           S/S‐ BKT

S.No Description Symbol 1 220 KV S/s 2 132 KV S/s 3 33 KV S/s 4 33 KV Line 5 11 KV Line 6 Underground 11 KV 7 Existing DT 8 33 KV S/s Proposed 9 33 KV Line Proposed 10 11 KV Feeder 11 Cut Point 12 Proposed DT (100 13 Proposed DT (63KVA) 14 Proposed DT (250 15 Interlinking Point

S.No. Name of Feeders Length

of feeders (In Km)

No. of DTs

TOWN Capacity

(KVA)

BEFORE IMPLEMENTATION OF SCHEME

A 33/11 KV S/s BKT (2x5)MVA 1 BKT 38.415 90 3049 2 MAKRANDPUR 38.083 75 4899 3 KATPOORA 53.382 132 3885 4 ITAUNJA 45.053 78 2493 5 VISHWABANK 18.51 35 2029 6 S/S 3.92 12 939

TOTAL 197.363 422 17294

Page 4: TOWN LUCKNOW S/S BKT · S/S‐BKT S.No Description Symbol 1 220 KV S/s 2 132 KV S/s 3 33 KV S/s 4 33 KV Line 5 11 KV Line 6 Underground 11 KV 7 Existing DT 8 33 KV S/s Proposed 9

 

TOWN‐LUCKNOW           S/S‐ BKT

Page 5: TOWN LUCKNOW S/S BKT · S/S‐BKT S.No Description Symbol 1 220 KV S/s 2 132 KV S/s 3 33 KV S/s 4 33 KV Line 5 11 KV Line 6 Underground 11 KV 7 Existing DT 8 33 KV S/s Proposed 9

 

BKT FEEDER

Page 6: TOWN LUCKNOW S/S BKT · S/S‐BKT S.No Description Symbol 1 220 KV S/s 2 132 KV S/s 3 33 KV S/s 4 33 KV Line 5 11 KV Line 6 Underground 11 KV 7 Existing DT 8 33 KV S/s Proposed 9

 

ITAUNJA FEEDER

Page 7: TOWN LUCKNOW S/S BKT · S/S‐BKT S.No Description Symbol 1 220 KV S/s 2 132 KV S/s 3 33 KV S/s 4 33 KV Line 5 11 KV Line 6 Underground 11 KV 7 Existing DT 8 33 KV S/s Proposed 9

 

KATPOORA FEEDER

Continue

Page 8: TOWN LUCKNOW S/S BKT · S/S‐BKT S.No Description Symbol 1 220 KV S/s 2 132 KV S/s 3 33 KV S/s 4 33 KV Line 5 11 KV Line 6 Underground 11 KV 7 Existing DT 8 33 KV S/s Proposed 9

 

Continue

Page 9: TOWN LUCKNOW S/S BKT · S/S‐BKT S.No Description Symbol 1 220 KV S/s 2 132 KV S/s 3 33 KV S/s 4 33 KV Line 5 11 KV Line 6 Underground 11 KV 7 Existing DT 8 33 KV S/s Proposed 9

 

MAKRANDPUR FEEDER

Continue

Page 10: TOWN LUCKNOW S/S BKT · S/S‐BKT S.No Description Symbol 1 220 KV S/s 2 132 KV S/s 3 33 KV S/s 4 33 KV Line 5 11 KV Line 6 Underground 11 KV 7 Existing DT 8 33 KV S/s Proposed 9

 

Continue

Page 11: TOWN LUCKNOW S/S BKT · S/S‐BKT S.No Description Symbol 1 220 KV S/s 2 132 KV S/s 3 33 KV S/s 4 33 KV Line 5 11 KV Line 6 Underground 11 KV 7 Existing DT 8 33 KV S/s Proposed 9

 

S/S FEEDER

Page 12: TOWN LUCKNOW S/S BKT · S/S‐BKT S.No Description Symbol 1 220 KV S/s 2 132 KV S/s 3 33 KV S/s 4 33 KV Line 5 11 KV Line 6 Underground 11 KV 7 Existing DT 8 33 KV S/s Proposed 9

 

VISHWABANK FEEDER