Top Banner
Total Quality Management Total Quality Management Week # 13 Week # 13 JIT, Poka Yoka, & ISO JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic Faculty of Commerce – the Islamic University of Gaza University of Gaza This material was collected from different sources This material was collected from different sources
30

Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

Dec 25, 2015

Download

Documents

Johnathan Quinn
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

Total Quality ManagementTotal Quality Management

Week # 13Week # 13

JIT, Poka Yoka, & ISOJIT, Poka Yoka, & ISO

Prepared by: Khalid DahleezPrepared by: Khalid Dahleez

Faculty of Commerce – the Islamic Faculty of Commerce – the Islamic University of GazaUniversity of Gaza

This material was collected from different sourcesThis material was collected from different sources

Page 2: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

• JIT comes from Japan, was known at the end of 1950s.• JIT is a programme directed towards ensuring that the right

quantities purchased or produced, at the right time, and that there is no waste.

• JIT will not work without the umbrella of TQM.• A series of operating concepts that allows systematic

identification of operational problems,• A series of technology-based tools for correcting problems

following their identification.• A main requirement of JIT is that the suppliers are in the near

of the purchaser’s place. • JIT it means also a reduction in inventory and transportation

costs.

Just in Time (JIT)

Page 3: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

Just in Time (JIT)

Basically JIT is a program directed towards ensuring that the right quantities are purchased or produced at the right time, and there is no waste.

JIT fits well under the TQM umbrella, for many of the ideas and techniques are very similar and, moreover, JIT will not work without TQM in operation.

Writing down a definition of JIT for all types of organization is extremely difficult, because the range of products, services and organization structures leads to different impressions of the nature and scope of JIT.

Page 4: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

By Toyota Motor Company

The concept of producing or conveying

only those units needed,

at all stages of production.

just when they are needed,in just the amount needed,

Just-In-Time (JIT) system

Page 5: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

Push & Pull Systems

Push System

Pull System

CustomerMaterialsupplier

Manufacturer Dealer

Materialsupplier

Manufacturer Dealer Customer

Page 6: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

Planning for just-in-time (JIT) Planning for just-in-time (JIT) managementmanagement

The Kanban system The word Kan means "visual" in Japanese and the word "ban"

means "card". So Kanban refers to "visual cards" , but in the West it is generally taken to mean a card that signals the need to deliver or produce more parts or components.

The main feature of the Kanban system is that it pulls parts and components through the production processes when they are needed.

Each material, component, or part has its own special container designed to hold a precise, preferably small, quantity.

A Kanban system provides parts when they are needed but without guesswork, and therefore without the excess inventory that results from bad guesses.

A JIT program can succeed without a Kanban-based operation, but Kanbans will not function effectively independently of JIT.

Page 7: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

Planning for just-in-time (JIT) Planning for just-in-time (JIT) managementmanagement

Just-in-Time Purchasing The development of long-term relationships with a

few suppliers, rather than short-term ones with many, leads to the concept of co-producers in networks of trust providing dependable quality and delivery of goods and services.

Each organization in the chain of supply is encouraged to extend JIT methods to its suppliers.

The requirements of JIT mean that suppliers are usually located near the purchaser’s premises, delivering small quantities, often several times per day, to match the usage rate.

Page 8: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

Planning for just-in-time (JIT) Planning for just-in-time (JIT) managementmanagement

The requirement for suppliers to be located near the buying organization, which places those at some distance at a competitive disadvantage, causes lead times to be shorter and deliveries to be more reliable.

It can be argued that JIT purchasing and delivery are suitable mainly for assembly line operations, and less so far certain process and service industries.

Nevertheless, there must be a recognition of the need to develop closer relationships and to begin the dialogue that leads to the product or service of the right quality, being delivered in the right quantity, at the right time.

Page 9: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

• Make mistakes for counting, measuring, work sequence, setting, etc.

• “I forgot things to do.” “I missed the monitoring.”

• “I did something which I should not do.”

Note: “Poka” ----- Carelessness; Absent-mind

“Yoke”----- EliminationThis refers to the thoughtful use of devices which eliminates operator’s careless mistakes.

Fool-proof (Poka-yoke)

Page 10: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

The worker stirs the liquid in a tank and add some additives.

“Did I already add additives?”

(Poka-yoke) - Example

Page 11: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

Poka-yoke Solution

Before stirring the liquid, put additives in cups.

Page 12: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

Documentation and Documented System, Why?

The Keystone of Quality Management is met/done, when the Customer and Supplier are working together to reach their common advantage.

Example:

5 persons ordered the same menu in a restaurant and each one get the same at the same time (the same taste, the same size, same shape, asf), “CONSISTENCY”. The Chef Cock had used the same “Equipment, Material, procedures”. The Process was under Control. The Chef Cock wants to open FIVE new restaurants and he wants to be sure that the same menu in each one has the same taste, asf (System Audit, System Review).

Page 13: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

Documentation and Documented System, Why?

A fully documented quality management system has always to ensure that the two following requirements are met:

1. The Customer’s Requirements

2. The Organisation's Requirements (internally, externally, and at optimum cost with optimum usage of the available resources)

A Quality System is an assembly of components, such as the organisational structure, responsibilities, procedures, processes for implementing TQM.

The components are interacting with each other and within the system. Such interaction between materials and processes are very important as the components themselves.

Page 14: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.
Page 15: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

Quality System Design

• A quality should interact with all activities of the organisation,

• It begins with the identification with the requirements,

• It ends with the satisfaction AT EVERY TRANSACTION INTERFACE.

The Activities could be classified as “Processing, Communicating, and Controlling and more specifically as:

Marketing, Market Research, Design, Specifying, Development,

Procurement, Process Planning, Process Development and Assessment,

Process Operation and Control, Product or Service Testing, Packaging,

Storage, Sales, Distribution, Technical Services, Maintenance, “RECYCLING”

Page 16: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

Product

Continual improvement of the quality management system

Continual improvement of the quality management system

Customers(and otherinterested parties)

Requirements

Managementresponsibility

Resourcemanagement

Measurement, analysis and improvement

Productrealization

Output

Satisfaction

Input

Source: BS EN ISO 9001:2000

Key: Value adding activity information flow

Customers(and otherinterested parties)

Page 17: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

Quality System Design

It is very important that the system as it had been designed meets the requirements of an international standards.

One Person alone can not document a quality system.

A Quality Manual is a task of every one, who is involved in any working process to produce some thing or to deliver a service.

No Process without data collection,

No data collection without analysis,

No analysis without decisions

No decisions without actions.

Page 18: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

Quality System Requirements

A good Quality System will improve process control, reduce wastage, lower costs, increase market share, (or funding), facilitate training, increase staff participation, and raise morale.

Environmental Management System must be a part of each good company (or organization).

The activities needed in design and implementation of a good quality system start and end with the customer, in two spheres – a customer sphere and a supplier sphere

Senior management in all types of industry must take responsibility for the adoption and documentation of the appropriate quality system in their organization.

Page 19: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

9-19

Quality Certification

ISO 9000 Set of international standards on quality management and quality assurance, critical to international business

ISO 9000 is a family of standards for quality management systems

ISO 9000:2000 QMS –Fundamentals and Vocabulary

ISO 9001:2000 QMS – Requirements ISO 9004:2000 QMS-Guidelines for

performance improvements

Page 20: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

02 February 2007 MATS324/iso9000-qfd.ppt

ISO9000:2000 series

moved towardsprocess performance metrics

reduced the need fordocumented procedureswhere clear evidence existsthat the process is working well. 

Page 21: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

ISO9000:2000 series

standards provide criteria for companies to "certify" their quality management

recertification is required every three years

achieve "registration" by third-party auditor.  the system

verifies practice and processes provides objective 3rd party validation enables benchmarking. 

Page 22: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

ISO9000:2000eight quality management principles

1. Customer focus 2. Leadership 3. Involvement of people 4. Process approach 5. System approach to management 6. Continual improvement 7. Factual approach to decision making 8. Mutually beneficial supplier relationships

Page 23: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

ISO9000:2000 structure

Four major sections Management Responsibility Resource Management Product Realisation Measurement, Analysis and

Improvement

Divided into 21 elements

Page 24: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

ISO9000 structure I

Management Responsibility 1. management commitment 2. customer focus 3. quality policy 4. planning 5. administration 6. management review

Page 25: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

ISO9000 structure II

Resource Management 7. provision of resources 8. human resources 9. facilities 10.work environment

Page 26: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

ISO9000 structure III

Product Realisation 11.planning of realisation processes 12.customer-related processes 13.design and/or development 14.purchasing 15.production and service operations 16.control of measuring and monitoring

devices

Page 27: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

ISO9000 structure IV

Measurement, Analysis and Improvement 17.planning 18.measurement and monitoring 19.control of nonconformity 20.analysis of data 21.improvement

Page 28: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

Quality policy is a formal statement from management, closely linked to business and to customers needs

Quality policy is understood at all levels and by all employees

Documentation and audits are conducted periodically

Records should show how and where raw materials and products are processed to allow products and problems to be traced to the source

Page 29: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.

Map all processes, monitor & control themMonitoring, measurement and analysis tools

must be properly maintained and calibratedDetermine customer requirements and

create systems for communicating with customer

Perform periodic internal audits and meetings

Page 30: Total Quality Management Week # 13 JIT, Poka Yoka, & ISO Prepared by: Khalid Dahleez Faculty of Commerce – the Islamic University of Gaza This material.