Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects [email protected]
37

Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects [email protected].

Dec 25, 2015

Download

Documents

Madison Shelton
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

Tomáš Sabol Faculty of EconomicsTechnical University of Košice

Experience with European R&D Projects

[email protected]

Page 2: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

2

Content

• EU R&D projects – some advices, health check

• FP7 instruments• Some aspects of R&D projects – partners,

project team, role of PhD students, dissemination, budget,

• Is there any “Success story” and how to measure it?

• Our R&D projects – what were they about?

• EU tenders

Page 3: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

3

Why Experience & Advice?

• Experience is simply the name we give to our mistakes.

Oscar Wilde

• Those who are already old enough to serve as bad examples are giving good advices.

Anonymous

Page 4: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

4

European R&D projects - Basics

• Long-term preparation needed (do not expect results in 3 months), it is a strategic decision/investment

• Support of top management needed• It has to be a part of organisational culture• It is a team activity, put emphasis on team

building• Build the credit of your team

Keep all promises Deliver quality (reports, SW etc.) and on time

Bad reputation travels 7 times faster than good reputation (multiple by factor of 10 on the Internet)

• Develop and cultivate contacts with partners abroad and at home on personal and institutional level (Networking!)

• It is an entrepreneurial activity – you have to invest up front (your time, effort, money) and the result is uncertain (success rate in FP7 IST - 11%)

Page 5: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

5

FP7 project proposal – Health check

• Is your project scientifically and technically excellent? Relevant to the topics addressed by the Call, „User/problem driven approach“ (clearly define the

problem/users needs) Progress beyond the state-of-the-art clearly defined, etc.?

• Well-worked out project management plan?• Will your project have a significant impact (through

development, dissemination, use of project results)?• Is your consortium competent and complete

(balanced - universities, companies, user partners, …)?

• Is the budget adequate (corresponding to project activities). Do you have all the resources you need?

Page 6: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

6

Applied research

Good to have on the country level:• Defined national strategies, e.g. of:

• Knowledge economy (National Lisbon strategy)• Information Society development, …

• Defined priorities of R&D • Innovation Strategy • Working links between Fundamental

research & Applied research• Efficient Technology transfer mechanisms• Efficient University-Industry cooperation• Advisory services, NCPs, …

Page 7: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

7

Choose the right instrument for your idea

• Integrated Project (IP)

• Specific Targeted Research Project (STREP)

• Network of Excellence

• Coordination Action• Specific Support Action

FP7 instruments

Page 8: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

8

Purpose: Ambitious objective-driven research with a ‘programme’ approach

Target audience: Industry (incl. SMEs), Research institutions, Universities, and in some cases potential end-users

Typical duration: 36-60 months

Optimum consortium: 10-20 participants

Total EU contribution: €4-25m (average €10m)

Flexibility in implementation: Yearly update of Workplan

Integrated project (IP)

Page 9: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

9

Scale of ambition is limited, reflected in limited

activities, duration, size of consortium more typical of a STREP

Goals are ambitious. The proposers include key

industry players. A full range of activities covering a substantial part of the development chain is envisaged. Broad industry sector impact is foreseen. SME participation has been sought/achieved. Effective project management plans are in place

Integrated project

Page 10: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

10

Purpose: Objective-driven research more limited in scope than an IP

Target audience: Industry, including SMEs, research institutes, universities

Typical duration: 18-36 monthsOptimum consortium: 6-15 participantsTotal EU contribution: €0.8-3m (average

€1.9m)Fixed Workplan and fixed partnership for the

duration

Specific targeted research project (STREP)

Page 11: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

11

The work is unoriginal, not scientifically

and technically excellent

A well-focused and well-planned

research project by capable partners which will extend the state-of-the-art

Specific targeted research project

Page 12: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

12

Roles in EU R&D projects

• Project coordinator• Project partners – development vs. user

partners (representatives of end users)• Project officer (PO) – representative of the

European Commission• Reviewers of the project• Other project teams (project clusters)• Target groups regarding dissemination &

exploitation of the project results• Management of your organisation

Page 13: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

13

Partners in EU R&D projects

• How to find them? You know them from previous projects (e.g. educational –

we used it, but did not work very well) Personal references Conferences, EU events, reviews, etc.

Pareto’s rule applies also here: 20% of organisations has 80% of EU projects

Different categories of institutions:• Universities:

Usually open for cooperation, but – track record is important the quality “speaks” (applies to the both parties)

• Knowledge Media Institute, Open University, UK• University of Regensburg, DE• University of Aarhus, DK• National Technical University of Athens, ICCS, GR • University of Reading, UK

Page 14: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

14

Partners in EU R&D projects

• Large companies May be suspicious towards “unknown institutions”, their

legal departments have an important say Sometimes frequent changes - people are leaving and

joining, more anonymous– British Aerospace, UK– Siemens, DE– Telefonica, Spain– SYGNITY S.A., PL

• SMEs One-two persons sometimes doing everything, more

personal– InJet, DK– CNET, Sweden

• Applied research institutes, think tanks Usually of top quality– Fraunhoffer institutes, DE– Danish Technological Institute (DTI), DK– RAND Europe, NL

Page 15: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

15

Partners in EU R&D projects

• NGOsUsually good in their area of expertise,

committed people (but also here exist exceptions)

– eISOTIS, GR• User partners (e.g. public administration)

Usually not very experienced in EU projects, research

– PA institutions in UK, PL, HU, SK• Commitment and personal motivation is

important, but not sufficient, • Important: Previous experience in

international projects, project management as a part of the organisational culture

Page 16: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

16

Your project team

• Optimal size: 6-8 (depends on the size of project)

• Combination of: professional + project management + interpersonal skills (team players)

Roles:• Project manager• Vision owner – answers the question “What?”• Chief architect - answers the question “How?”• Generator of ideas – producing ideas, …• Critical thinker – constructive criticism• Doers (in IT = coders)• Good communicator (“social glue”) One person can play several roles Categories: Specialist / Generalist / Versatilist

Page 17: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

17

PhD students in R&D projects

• Benefits (Pros):Working on real problems, applicationsProfessional growth, improving language skills,

learning principles of project managementPossibility to travelAvailability of resources In frequent contacts with international research

community, …• Cons:

Too busy working on the project(s), do not have time to write PhD thesis ;-)

May be offered jobs by partners from abroad• Some finished here (Jan Hreno, Robert Kende, Karol

Furdik) + Some left for abroad Is it good or bad?

Page 18: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

18

Dissemination

• Dissemination towards specified target groups– Specified targets for dissemination

• Target groups: Research community

Conferences, workshops Journals, monographs – in our case much less (BUT depends

on the research area – in IT different than in economy) Business community

Fairs (CeBIT, …), presentations, workshops, End users (e.g. public administration)

Presentations, workshops

• + Press releases, Newsletters,…• Exploitation Plan

– Business plan (definition of the products/services, added value, definition of customer, business model, price policy, licence policy, …)

Page 19: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

19

Budget

• Main budget items: Personnel costs – major item

• Month-rates depending on the track-record Travel & subsistence

• More travels in IPs (demanding coordination, integration) than in STREPs

Equipment – limited (in our projects) Consumables (SW, books, …) + Indirect costs (Overheads)

• Travelling– Within EU– Outside EU only with prior approval of the EC (PO)– Project management meetings (twice a year), WP

meetings, project reviews– Conferences, workshops – only where we have

presentations (no “private travel agency”)

Page 20: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

20

Project Review

• On average every 12 months (if not request for an additional review)

• Participants:– Project officer (PO) – 3-5 independent experts (from all over the EU) invited by the EC

(company senior managers, developers for private sector, university professors, …)

– All partners represented• One full day exercise (e.g. 9.00-16.00) in Brussels or at one of the

partner’s (e.g. user partner’s) site• Presentations:

– Technical presentations on individual WPs– Live demonstration (preferably online)– Pilot projects– Dissemination & Exploitation (business models, …)– Project Management

• Potential results of the review: Red flag – Pay the money back (for the undelivered work) Yellow flag – You can continue, but have to rework deliverables Dx.x,

Dy.y, … (and reviewers can ask for an additional review) Green flag – Go ahead! See you at the next review• Each project deliverable is accepted or rejected (with impact on

financing – rejected deliverables are not financed)• Tough (to produce good quality code is not enough, if you do not

have a clear idea who and how the project products will be used) - but professional, objective and fair!

Page 21: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

21

What do we mean by „Success Story“?

www.google.com: • define: Success story

• … „An example of a successful practice“If we accept the definition:• “… this term is used to distinguish those

that have succeeded with a practice from those that are experimenting …”

• … Then we are experimenting with international R&D projects for 14+ years

Page 22: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

22

How to measure success? (1/2)

Management adage: What cannot be measured, cannot be managed.

• What is an indicator of success in applied research projects?

• Approved project? It takes about one year - from starting to work on a

project proposal till starting the project (Writing project proposal, Submitting it, Evaluation of proposals, Negotiation, Signing a contract)

• Amount of funding (grant) / Project total budget?– Different tools in FP7 (STREP, IP, NoE, SA, NoE, …)– STREP: 1.5 – 3 million EUR, IP: 8 – 12 million EUR, NoE: 3

– 6 million EUR• Successfully closed project?

Successful final review, satisfied project officer (PO) About 3-4 years of effort

Page 23: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

23

How to measure success? (2/2)

• Project results accepted by the “client” (end users), applied in private/public sector? Somebody is interested in the project results, will use it.

And even willing to pay for it? Additional 1-2 years of effort

• Recognition by international partners? – Awards, prices, invitations, …? About 5+ years of effort

• Satisfaction of members of your project team– Are they willing to work with you on another project?

• Some spin-off?– Business? Another project, … ?

Success factor: Sustainability, repeatibility. Not just a one-off activity

Page 24: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

24

So how will we measure it? (1/2)

• Number of projects you participated in?• Amount of money?

Total amount of grants for your institution?Total amount of grants of projects you wrote?Person-month rates for you?

• Economic impact of practical applications of the realised projectsFP7 is applied research – there should be

measurable socio-economic impact• Satisfaction of the project team members

Do you have a stable core team? Is it growing?

Page 25: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

25

So how will we measure it? (2/2)

• Recognition by the European Commission Invitation to workshops/conferences organised

by the EC (invited speaker) Invitation by the EC for project proposals

evaluation, to act as project reviewerNomination for the “Project of the Month”…

• Recognition by project partners abroad?How many times were you asked by them to

join projects they initiated?Offers of other types (tenders, individual

expert, …)

Page 26: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

26

R&D projects (1/3)

Participation in FP4, FP5, eTEN, FP6, FP7:• Contract No. 217098 „Secure Process-oriented

Integrative Service Infrastructure for Networked Enterprises (SPIKE)”, FP7, STREP, 2008-2010

• FP6-2004-027020 Access to e-Government Services Employing Semantic Technologies (Access-eGov), FP6, STREP, 2006-2008

• FP6-2004-27128 Semantic-enabled Agile Knowledge–based e-Government (SAKE), FP6, STREP, 2006-2008

• IST-2005-034891 Networked Embedded System Middleware for Heterogeneous Physical Devices in a Distributed Architecture (HYDRA), FP6, IP, 2006-2010

• FP6-2004-027219 Democracy Network (DEMO_net), FP6, NoE, 2006-2009

Page 27: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

27

R&D projects (2/3)

• 517476 Interoperability Initiative for a European eHealth Area (I2Health), eTEN, SA, 2005-2007

• IST-1999-20364 “Web Technologies Supporting Direct Participation in Democratic Processes (Webocracy)“, FP5, STREP, 2000-2003

• IST-1999-29088 „Providing Innovative Service Models and Assessment (PRISMA)“, FP5, SSA, 2001-2003

• IST-2000-26224 “Best eEurope Practices (BEEP)”, FP5, SSA, 2002-2003

• IST-2000-26393 „European Knowledge Management Forum“, 5RP, Thematic Network, 2000-2003

Page 28: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

28

R&D projects (3/3)

• HPSE-CT-2001-00065 „EU Integration and the Prospects for Catch-Up Development in CEECs. The Determinants of the Productivity Gap (Productivity Gap)“, FP5, 2001-2004

• IST-2000-29518 „e-VOTE“, FP5, STREP, 2003-2004 • Esprit 29065 “Web in Support of Knowledge

Management in Company (KnowWeb)”, FP4, 1998-2001

• Esprit 29015 “Enriching Representations of Work to Support Organisational Learning (ENRICH)”, FP4, 1998-2000

• COPERNICUS CIPA-CT94-0149 „Environment for Configuration Design (ENCODE)“, FP3, 1994-1997

Page 29: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

29

Research areas (1/2)

• Constraint Satisfaction Problem (ENCODE)• Design problems (predefined components, constraints

between components which have to be satisfied → to choose components in such a manner that the resulted artefact will achieve requested functionality and satisfy all the given constraints

E.g. to design a portfolio of … satisfying pre-defined constraint

• Knowledge management (KnowWeb, ENRICH)• In knowledge economy knowledge is the most important

asset of the organisation Easy access to all knowledge within the organisation Support of organisational learning

• ICT and Knowledge economy (PRISMA) Scenario Planning, technology foresight To identify scenarios of potential future development

• Applications of ICT in service sector – eHealth, eTransport, eLearning, eGovernment (BEEP) Good practice processing, socio-economic assessment of

ICT applications

Page 30: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

30

Research areas (2/2)

• Analysis of FDIs in New Member States (ProductivityGap) Realisation of survey, statistical processing of the survey

results + application of artificial intelligence techniques (data mining)

• eGovernment and application of semantic technologies (Webocracy, SAKE, Access-eGov) Efficient government - condition of the country competitiveness Knowledge modelling, semantics (meaning) processing

• Ambient intelligence (HYDRA) Pilot applications: eHealth, Agriculture, Smart house Value modelling, business modelling

• Networked enterprises (SPIKE) Support of virtual enterprise creation (temporary alliances) in

knowledge economy + Business plan, Business models, Risk analysis,

Quality assurance plan (ALL projects)

Page 31: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

31

EU tenders

• Call for tenders published by the EC• Average size of EC tenders: 0.5 mil. – 5 mil. EUR• Duration: 6 – 18 months• Bids are evaluated by the EC • Result (survey etc.) of the tender is the property of the

EC• Studies, analyses, benchmarking exercises, best practice

identification, policy evaluation, … - usually in EU27• Process:

– Contacted by an experienced partner from abroad (empirica, DTI, RAND, ECOTEC, …) who knows you from previous project

– Submitting necessary legal documents, short description of organisation, list of previous projects, CV of key personnel

– Signing a subcontract with main contractor• Our subcontract – usually less than 10 000 EUR• Responsible for a given report (survey in SK, policy

analysis, … etc.)

Page 32: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

32

Participation in EU tenders (1/3)

• eHealth Benchmarking. Subcontract agreement under EC contract No. 30-CE-0160355/00-37, contractor: empirica GmBH, Germany, 2008.

• Ex Post Evaluation of Cohesion Policy Programmes 2000 – 2006 co-financed by the ERDF. WP6: Enterprise environment and innovation. Contractor: Danish Technological Institute, Denmark, 2008.

• Multi-channel delivery strategies and sustainable business models for public services addressing socially disadvantaged groups [Contract Number 30-CE-0161843/00-50]. Contractor: ECOTEC Research and Consulting Ltd, United Kingdom, 2008-2009.

• Benchmarkimg Sectoral Policy Initiatives in Support of eBusiness for SME´s. Contract NO.S12.449074, contractor: empirica GmBH, Germany, 2007.

Page 33: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

33

Participation in EU tenders (2/3)

• Benchmarking eSkills Policies on multi-stakeholder partnerships. Contract No. S12.444992, contractor: empirica GmBH, Germany, 2007.

• Measures to increase trust and confidence of consumers in the Information Society (CONSTRUST). Contract No. 30-CE-0033938/00-70, contractor: empirica GmBH, Germany, 2006 - 2007

• MeAc - Measuring Progress of eAccessibility in Europe (eAccessibility). Contract No. 30-CE0039801/00-96, contractor: Empirica GmBH, Germany, 2006 – 2007.

Page 34: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

34

Participation in EU tenders (3/3)

• eTEN Study, Contract No. C28955 “Study on trans-European deployment potential, sustainability and exploitation models for public services in the context of an enlarged European Union”. For the eTEN Unit of DG Information Society, European Commission, contractor: Danish Technological Institute, Denmark.

• Study: “eBusiness Market Watch”, for the European Commission, Contract No. FIF 20030224, contractor: empirica Gesellschaft für Kommunikations- und Technologieforschung mbH, Germany.

• ENISA study: “Member States’ Activities in Information and network Security – Inventory and Best Practices Guide”, contractor: Empirica Gesellschaft fur Kommunikations − und Technologieforschung Mbh, Germany

Page 35: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

35

Participation in EU tenders

Topics covered: eHealth Evaluation of Structural Funds tools (R&D,

innovation) Inclusive eGovernment eBusiness eSkills Trust and Confidence in Information Society eAccessability eGovernment Information and network security

• Cooperation with external experts if needed• Subcontract is paid after delivering the

work and approval of the EC (no advance payment)

Page 36: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

36

Conclusion (or Introduction?) - New concepts, buzz-words, technologies, trends, … appeared:

• Web 2.0 (Social web), Web 3.0 (Semantic web), Web 4.0 (connecting intelligence, people and things reason and communicate together)

• Ambient intelligence, Ubiquitous computing, …, Utility computing• Market-facing company, Enterprise 2.0 (social & networked changes to enterprise, social

SW), … Virtual enterprises, Networked enterprises, …• Knowledge economy Knowledge (the most important company asset) knowledge

management, knowledge technologies, knowledge asset management, …• Networked economy, Service oriented economy (services - intrinsically tradeable & valued

according to some notion of exchange value; technology strengthens labour inputs)

• Creative sector (media, the arts, …), creativity index, …• Business modelling value modelling

• Scenario building, technology foresight, technology assessment, …• Mega trend: Growing complexity/Networking (Complexity science), a-Life, Self-reflective

systems, ..

• So, are we ready for inter-/trans-disciplinary research (besides giving nice presentations/speeches on these topics)?

• Do we have methods/techniques for knowledge assets evaluation/assessment, new value/business models, …

Will there be “Economic Science 2.0”? ☺ • Economics = the social science that studies the production, distribution, and

consumption of goods and services (Wikipedia)• What will NOT change in this? (production, distribution, services, Wikipedia?)

• & … Is anybody out there? (To do this research)

The future is already here. It is just not evenly distributed. (W. Gibson)Zítřek je vždy tak trochu třaskavá směs (V. Nezval)

Page 37: Tomáš Sabol Faculty of Economics Technical University of Košice Experience with European R&D Projects Tomas.Sabol@tuke.sk.

37

Thank you for attention!

Questions (2.0)? Comments?