Page 1: Time management  dylan muhlstock

Report and AnalysisOf

Time Management

Submitted byDylan Muhlstock

October 20th 2013Bus 150 – Section 71873

Contemporary Business PracticeProfessor Nankin

Page 2: Time management  dylan muhlstock

Slide Number Title

1 What is Time Management?

2 Mission Statement

3 How do we measure Time Management?

4 Day 1

5 Day 2

6 Overall Results

7 Strengths

8 Weaknesses

9 Conclusion

Page 3: Time management  dylan muhlstock

• Time Management is the act of planning and controlling the amount of time spent on activities, and doing so in an effective and efficient manor.

• According to Stephen Covey, author of The 7 Habits of Highly Effective People, effective-self managers establish goals that are based on personal and ethical principles. Personally the most important and relatable statement to successful time management is “begin with the end in mind.”

• The following presentation is an analysis of a consecutive 48 hour time period and how well my time was managed.

Page 4: Time management  dylan muhlstock

To establish an efficient schedule in which I can properly accomplish what needs to be done daily, with a balanced lifestyle of work, education and leisure activities.

Page 5: Time management  dylan muhlstock

• The following quadrants, or the “time management matrix” displays urgent matters vs. important matters.

Quadrant 1Imporant/Urgent

Quadrant 2Important/Not Urgent

Quadrant 3Not Important/Urgent

Quadrant 4Not Important/Not Urgent

ImportantImportant

Not Important

Not Important

UrgentUrgent Not UrgentNot Urgent

Crises; Pressing problems; Deadline-driven projects.

Principle Centered Activities; Planning; Prevention; Relationship building; Opportunity Recognition; True Recreational Activities.

Imminent pressing matters; "Popular" Activities (i.e., activities that you think will make you popular with others); Personal Interruptions; Some calls and mail; Certain meetings and reports.

Time wasters; So called "Pleasant" activities that are not really pleasant (e.g., drinking to excess) that are actually escapes from responsibilities. Trivia, busy work. Some types of mail/phone calls.

Page 6: Time management  dylan muhlstock

The results above show that the majority of my day (50%) was spent in quadrant two. Therefore, only 50% of my day was completely productive in the “Not Urgent but Important quadrant.”

Page 7: Time management  dylan muhlstock

The results above, show that yet again 50% of my day was spent in quadrant two. Therefore, I remained in the “Not urgent, but important” quadrant.

Page 8: Time management  dylan muhlstock

Overall after two days, the results show that 50% of my time was spent in quadrant two, “Not urgent, but important.” The other majority of my time went towards quadrant three which is “Urgent, but not important.”

Page 9: Time management  dylan muhlstock

• Upon waking up, a schedule for the day is made with tasks that must be completed before going to sleep, which resulted in spending a large amount of time in quadrant two.

• Every task on my daily schedule is given a time frame to be completed. • Upon finding free time, I usually use that time allotted for homework, studying

and completing tasks that need to be done. • It is not a hard task for me to focus and prioritize what needs to get done.

Page 10: Time management  dylan muhlstock

• Friends can often be very distracting and make me more willing to want to go out frequently with the power of peer pressure.

• I don’t take many breaks, but once I do, it is difficult for me to get back in the routine of working and staying focused.

• I often over complicate situations and make the smallest tasks, larger than need be.

Page 11: Time management  dylan muhlstock

• Upon completing the recording of a consecutive 48-hour period and analyzing the results on graphs, only half of my days are spent to full efficiency levels.

Future changes to be made: Although 50% is a strong number in efficient time management, their can be additional time added to this result. This will be done with more focus on an end goal of success, and less focus on the social environment that doesn’t help accomplish long term goals.

• 29% of my time is spent on “urgent but not important.” Future changes to be made: Some time may be allotted for this, but in order to accomplish more goals

in quadrant two, there should be a decrease in this number.

12% of my overall time is spent on “Urgent and Important.” Future changes to be made: In order to reduce high levels of stress and chaos, this number should be

reduced to as low as possible. It is assumed that at times, there will be activities in this quadrant, but make it as low as possible.

9% of my time is spent on “Not Urgent and not Important.”Future changes to be made: Reduce all of these activities.