State of the Art Industrial Mines and Manufacturing Facilities in the Democratic

Republic of the Congo.

Somika SPRL was registered in December, 2001

2002 Investment Modern laboratory facility for procurement

Grading Equipment

Crushing, Drying and global standards packaging of cobalt and copper concentrates

Page 3: The somika group

State of the Art Industrial Mines and Manufacturing Facilities in the Democratic

Republic of the Congo.

Somika SPRL was registered in December, 2001

2003 Investment The Hydro-metallurgy based Cobalt Processing Plant

Initial capacity of 40 MT of ABS Cobalt per month - Scaled up to 100-120 MT.

In January 2009 Now 275 MT ABS Cobalt

275MT Copper Cathode per month with recent expansion

Page 4: The somika group

Page 5: The somika group

Page 6: The somika group

MMR – Mining and Processing of Tantalum, Tin, and Tungsten

Aurum SPRL – Development of 27 Copper Cobalt Permits

Sotrafer – Steel, Oxygen and Acytelene Production

Solutions 4 Africa – Potable Water through well drilling

Terra SPRL – Agricultural Produce & Agro Based Processing

TechnoConstruct – revolutionizing the way people construct in Africa.

Page 7: The somika group

Democratic Republic of Congo, in the

Heart of the African Continent, is

blessed with both Precious Minerals

and an Energetic, Friendly Population.

Page 8: The somika group

Currently we are producing over 3,600 MT

per year of absolute cobalt whereas world

demand for cobalt is 60,000 MT per year.

We plan to boost up our volume to 5,000

MT per year.

Somika is also building up facility for

production of copper blister with annual

capacity of 10,000MT. Production is

expected to commence in February, 2012.

Total investment is around $10million.

Page 9: The somika group

0 50 100 150 200 250

January

February

March

April

May

June

July

August

September

October

Series 1

YTD Mid-October 2011

1779.56 MT

Page 10: The somika group

We are presently producing over 12,500

MT per year of copper whereas world

demand is around 13 million MT. With our

current exploration work, we are sure to

find reserve of more than 1 million MT of

absolute copper which will allow us to put

up a copper plant for 100,000 MT per year

by 2014.

We also believe we will by then have found

reserve of approximately 2 million MT of

absolute copper with our exploration

permits.

Page 11: The somika group

0 200 400 600 800

January

February

March

April

May

June

July

August

September

October

Series 1

YTD Mid-October 2011

4869.74 MT

Page 12: The somika group

0 50 100 150 200

January

February

March

April

May

June

July

August

September

October

Series 1

YTD Mid-October 2011

863.61 MT

Page 13: The somika group

Tin concentrates is under MMR profile and

we produced 2,450MT of metal units in the

form of tin ore. (MTD October 2011)

Tin smelting plant is under construction with

likely investment of approximately $ 6million;

annual capacity being 4,000MT.

During the current year we have commenced

exploration work and some production

through up gradation methods. We plan to

achieve production of 15,000 MT by 2012.

Page 14: The somika group

Tantalum concentrates – we produced 134MT

of ore in current year till October 2011.

With our exploration permits, we are

progressing well on these products and will

meet production targets by next year.

Page 15: The somika group

Our Group has very interesting Gold

Permits and exploration work will

commence soon and we expect

to begin production in our mines from

year 2012.

Page 16: The somika group
Page 17: The somika group

For Gold – When production starts Provenance Records to be Compliant with

amendment 1502 to Dodd-Frank Financial Reform Package.

Tantalum Provenance Records in Full Compliance with Electronics Industry

Conservation Coalition (EICC) / Global e-Sustainability Initiative via iTSCi 3rd

party tagging at the mine sites.

Tin Provenance Records in Full Compliance with Electronics Industry

Conservation Coalition (EICC) / Global e-Sustainability Initiative via iTSCi 3rd

party tagging at the mine sites.

Page 18: The somika group

The Somika Group is an integral member of the community in which we reside

and as such believes in contributing to them and to support their continued

improvement. As part of our commitment to Society, we encourage and

participate actively for education, water, electricity solutions in the countries

where we have a presence.

We are proud of our environment initiatives-all our services strictly adhere to

stringent quality standards. The Somika Group uses valuable resources such as

energy, water, materials and land more efficiently. We have a responsibility to

be a viable member of society and a good corporate citizen. Our work helps in

creating an enriched society that benefits not only the local community but also

the world and our business as a whole.

Page 19: The somika group

Page 20: The somika group

Established/ Registered as Terra SPRL in 2006. Project is conceived from basic

unsatisfied demand for food of the domestic market.

Terra is a “socio-commercial project” as it deals in commerce along with its primary objective to satisfy the basic need of the

population.

The company has acquired 10,000 Hectares of land in the Lubanda and Katofio Region, 97km north-east of

Lubumbashi.

Our vision is to be the largest manufacturer of maize flour within D.R.

Congo while maintaining superior quality, affordable pricing, and to enhance the

quality of life for the Congolese People.

Page 21: The somika group

TechnoConstruct, established in 2011, is

revolutionizing the way people construct in

Africa.

Using Light Gauge Steel Technology,

TechnoConstruct is able to construct

structures that are precise, accurate and

faster than conventional structures thereby

lowering the cost of ownership and providing

a solution that is also eco-friendly.