The Atlanta BeltLine SE Study Groups: Eastside Trail Phase II Extension Updates July 20, 2017 @atlantabeltline @atlantabeltline @atlantabeltline View South of Kirkwood Ave
The Atlanta
BeltLine
SE Study Groups:
Eastside Trail Phase II
Extension Updates
July 20, 2017
@atlantabeltline
@atlantabeltline
@atlantabeltline
View South of Kirkwood Ave
Scope of Work – General
• Installation of trail from Kirkwood Ave to Memorial Dr
• Lighting
• Cameras
• Bioswales
• Trees
• Planting
• Sod Shoulder
Scope of Work – Kirkwood
• Trail crossing at Kirkwood
• Rapid Flashing Beacons and granite work
• Other design options being evaluated
Scope of Work – Mauldin
• Installation of new pedestrian-scale bridge
• Installation of new sidewalks along Mauldin/Fulton Terrace
• Installation of ramp and stairs to the trail from Mauldin/Fulton Terrace
Possible Impacts
• Closure of Mauldin/ Fulton Terrace during bridge work
• Short lane closure for work at Kirkwood for crossing
• Hiking trail closure from Memorial to Kirkwood
• Memorial Drive sidewalk closure during plaza construction